Loading...
HomeMy WebLinkAboutNC0001899_Comments_20220324Strickland, Bev From: Byrd, Julia <julia.byrd@ncdenr.gov> Sent: Thursday, April 1, 2021 10:31 AM To: Kaitlyn Rhonehouse Cc: Chernikov, Sergei Subject: RE: [External] NPDES NC0001899 - Former Performance Fibers CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. Good morning, I have reviewed the WWTP Closure Plan for Former Performance Fibers Closure Report. Overall the plan is well detailed and comprehensive, my only comments are the following: 1. Section 4. Sampling Protocols does not include steps for wastewater sampling and analyzing, only sludge and/or soil samples collected after dewatering each of the treatment system components. a. Per the 2012 Guidelines for the Closure of Permitted Wastewater Ponds and Lagoons, Item A, samples of wastewater should be collected and analyzed prior to dewatering ponds/lagoons. 2. Please revise the closure plan to include steps for sampling and analyzing wastewater from each of the ponds/lagoons in the wastewater treatment system in accordance with Item A. 1-5. Please feel free to contact me anytime if there are further questions. Thank you! Julia Byrd Environmental Engineer **Email preferred during this State of Emergency** NC DEQ / Division of Water Resources / Water Quality Permitting NPDES Industrial Permitting, Wastewater Branch 919 707 3707 office 919 707 9000 main office julia.byrd©ncdenr.gov Physical Address: 512 North Salisbury St.,Raleigh, NC, 27604 Mailing Address: 1617 Mail Service Center, Raleigh, NC, 27699-1617 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Chernikov, Sergei <sergei.chernikov@ncdenr.gov> Sent: Tuesday, March 30, 2021 4:42 PM To: Kaitlyn Rhonehouse <KRhonehouse@Geosyntec.com>; Byrd, Julia <julia.byrd@ncdenr.gov> Subject: Re: [External] NPDES NC0001899 - Former Performance Fibers Kaitlin, Julia Byrd will be reviewing this report, I did not have a chance to look at it. i Thank you! Sergei Get Outlook for iOS From: Kaitlyn Rhonehouse <KRhonehouse@Geosyntec.com> Sent: Tuesday, March 30, 2021 4:17:49 PM To: Chernikov, Sergei <sergei.chernikov@ncdenr.gov> Subject: RE: [External] NPDES NC0001899 - Former Performance Fibers CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Sergei —Just curious if you've had a chance to take a look at the work plan? The plant is still operating to treat stormwater going into drains on -site and the permit is likely to renewed to keep doing that until we can proceed the closure. I believe the permit expires on 31 July 2021. It would be great to understand if this plan is able to be implemented when the time arises to close the WWTP components. Thanks! Kaitlyn Kaitlyn S. Rhonehouse, P.E. (Nc, VA, FL) Principal Engineer Geosyntec Consultants of NC, PC 201 N. Front Street, Suite 501 Wilmington, NC 28401 Direct: 910.726.3652 Mobile: 561.866.0057 www.geosyntec.com From: Chernikov, Sergei <sergei.chernikov@ncdenr.gov> Sent: Friday, March 19, 2021 11:54 AM To: Kaitlyn Rhonehouse <KRhonehouse@Geosyntec.com> Subject: RE: [External] NPDES NC0001899 - Former Performance Fibers CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. We will review the plan and provide comments soon. Sergei Chernikov, Ph.D. Environmental Engineer III Industrial NPDES Permitting Unit NEW Tel. 919-707-3606 1617 Mail Service Center, Raleigh, NC 27699-1617 Express Mail: 512 N. Salisbury St., Raleigh, NC 27604 From: Kaitlyn Rhonehouse [mailto:KRhonehouse@Geosyntec.com] Sent: Friday, March 19, 2021 11:05 AM To: Chernikov, Sergei <sergei.chernikov@ncdenr.gov> Subject: Re: [External] NPDES NC0001899 - Former Performance Fibers 2 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Great! Assuming the new owner wants to move forward with this work this year - what would be the next steps? Appreciate the quick response! Get Outlook for iOS From: Chernikov, Sergei <sergei.chernikov@ncdenr.gov> Sent: Friday, March 19, 2021 10:45:31 AM To: Kaitlyn Rhonehouse <KRhonehouse@Geosyntec.com> Subject: RE: [External] NPDES NC0001899 - Former Performance Fibers CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. Kaitlyn, We are behind on some of our projects and we did not have any discussions with this facility about the closure. But they submitted the closure plan. Thank you! Sergei Sergei Chernikov, Ph.D. Environmental Engineer III Industrial NPDES Permitting Unit NEW Tel. 919-707-3606 1617 Mail Service Center, Raleigh, NC 27699-1617 Express Mail: 512 N. Salisbury St., Raleigh, NC 27604 From: Thornburg, Nathaniel Sent: Friday, March 19, 2021 10:39 AM To: Chernikov, Sergei <sergei.chernikov@ncdenr.gov> Cc: Kaitlyn Rhonehouse <KRhonehouse@Geosyntec.com> Subject: FW: [External] NPDES NC0001899 - Former Performance Fibers Sergei, Please see Ms. Rhonehouse's email below. She is inquiring about the closure plan status for Permit No. NC0001899. You were the last reviewer noted in BIMS. Thank you, Nathaniel D. Thornburg Branch Chief Non -Discharge Branch Department of Environmental Quality 3 919 707 3653 office nathaniel.thornburg@ncdenr.gov 512 N. Salisbury St. 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Kaitlyn Rhonehouse <KRhonehouse@Geosyntec.com> Sent: Friday, March 19, 2021 10:17 AM To: Thornburg, Nathaniel<nathaniel.thornburg@ncdenr.gov> Subject: [External] NPDES NC0001899 - Former Performance Fibers CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Nathaniel, Hope you are well. I am writing to inquire about the status of a WWTP Closure Plan review. I am digging through Laserfiche and saw a 12/4/2017 plan submitted to NCDEQ. I understand the plant has not been decommissioned/demolished but I am wondering if DEQ has reviewed the 2017 plan and if there has been any subsequent discussion or approval of the plan. Thanks so much for any information you may have. Best, Kaitlyn Kaitlyn S. Rhonehouse, P.E. (Nc, VA, FL) Principal Engineer Geosyntec Consultants of NC, PC 201 N. Front Street, Suite 501 Wilmington, NC 28401 Direct: 910.726.3652 Mobile: 561.866.0057 www.geosyntec.com 4