Loading...
HomeMy WebLinkAbout20200987 Ver 2_Modification Request_20220322Staff Review Does this application have all the attachments needed to accept it into the review process?* Yes No ID#* Version* 2 20200987 Is this project a public transportation project?* Yes • No Reviewer List: * Sue Homewood:eads\slhomewood Select Reviewing Office: * Winston-Salem Regional Office - (336) 776-9800 Does this project require a request for payment to be sent?* Yes No Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * For the Record Only (Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre -Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Project Contact Information Name: Robert Cork Who is submitting the information? Email Address: rcork@anchorgea.com Project Information Existing ID #: Existing Version: 20200987 1 20170001(no dashes) 1 Project Name: Lake Adger Maintenance Dredging Is this a public transportation project? Yes No Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown County (lies) Polk Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document Lake Adger Dredging - permit amendment.pdf 4.11 MB Only pdf or kmz files are accepted. Describe the attachments or comments: See cover email of attachments. Sign and Submit By checking the box and signing box below, I certify that: • I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form. Signature: Submittal Date: Is filled in automatically. 1 From:Robert Cork Sent:Friday, March 18, 2022 9:27 AM To:Homewood, Sue; Brown, David W CIV USARMY CESAW (USA) Cc:Ferguson, Jeff C; Joe Smith Subject:Lake Adger Maintenance Dredging - permit amendment Attachments:100% Lake Adger Dredging Plans (20210720)_revised.pdf; Lake Adger Dredging Extension (20220317)-s.pdf Sue and David  The Lake Adger dredging project (DWR # 20200987 and USACE Action ID. No. SAW‐2015‐+00788) has progressed well  and is nearing completion with demobilization from dredging activities scheduled for next week, and wetland planting to  occur following material consolidation in fall 2022.    Per my phone call with David on 3/15/2022, the North Carolina Wildlife Resources Commission has approved  approximately 1,000 cubic yards (CY) of additional dredging from Lake Adger to extend the navigation channel  approximately 530 feet beyond the approved limits of disturbance. This additional dredging will remove sediment that  accredited between the initial design survey in 2018 and the present.  The additional volume needs to be removed to  meet the project objective of elimination of hazards from the navigation channel.    To document this revised work, please find attached:  ‐ Revised 100% plans that includes revision‐bubbles of where the additional dredging is proposed  ‐ A stand‐alone figure that presents the new additional approximate limits of disturbance (dredging area) that is  approximately 550 feet long and 125 feet wide (approximately 1.6 acres).   This extension of the approved limits of disturbance will not impact the sediment placement area as there is adequate  capacity in the currently approved areas for the additional 1,000 CY of material.  We are also communicating with Land  Quality Section regarding a permit amendment.    Per verbal communication with David on 3/15/2022, USACE has provided approval to continue this dredging work  immediately with documentation of this amendment to be completed within a reasonable time frame.    Please confirm receipt of this permit amendment request and advise any other requirements we need to meet for this  amendment.   Rob  ‐‐‐  Robert Cork, PE, MEng  ANCHOR QEA OF NORTH CAROLINA, PLLC  Cell: 828.450.6435 | Direct: 828.771.0370  From: Homewood, Sue <sue.homewood@ncdenr.gov>   Sent: Monday, February 15, 2021 10:46 AM  To: Ferguson, Jeff C <jeff.ferguson@ncwildlife.org>; Robert Cork <rcork@anchorqea.com>  Cc: Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Brown, David W CIV USARMY CESAW (USA)  2 <David.W.Brown@usace.army.mil>; Yankura, Kaylie <kaylie.yankura@ncdenr.gov>  Subject: Lake Adger Maintenance Dredging 401 Approval  Please see attached.  Hard copies will not be sent unless requested.  Sue Homewood  Division of Water Resources, Winston Salem Regional Office  Department of Environmental Quality  336 776 9693    office  336 813 1863    mobile  Sue.Homewood@ncdenr.gov  450 W. Hanes Mill Rd, Suite 300  Winston Salem NC 27105  Approximate Extents of Sheet C2 from Plans approved with - Individual 401 Water Quality Certification on 2/15/2021 (DWR # 20200987); and - USACE Action ID. No. SAW-2015-+00788 on 5/10/2021Approximate Limits of Disturbance - Dredging Area; approved with - Individual 401 Water Quality Certification on 2/15/2021 (DWR # 20200987); and - USACE Action ID. No. SAW-2015-+00788 on 5/10/2021 New Additional Approximate Limits of Disturbance - Dredging Area; proposed 3/17/2022. Approx 550' x 125' E E 100% DESIGN SUBMITTAL LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING NORTH CAROLINA WILDLIFE RESOURCES COMMISSION o•m 1 mesa ce9*r� fi) 1) NORTH 0 4000 8000 SCALE IN FEET r„r PROJECT LOCATION T•a (claws 5_ SWIM, t ,4 NORTH CAROLINA shwI • Cherlotre Ra▪ leigh Project 0 NOT TO SCALE £ Wr ry 7 Mill Spray Daloo Rd f SOURCE: ©2019 Microsoft Corporation 02018 HERE VICINITY MAP DRAWING INDEX SHT # DWG # TITLE 1 G1 TITLE SHEET 2 G2 GENERAL NOTES, SPECIFICATIONS, LEGEND, AND ABBREVIATIONS (SHEET 1 OF 5) 3 G3 GENERAL NOTES, SPECIFICATIONS, LEGEND, AND ABBREVIATIONS (SHEET 2 OF 5) 4 G4 GENERAL NOTES, SPECIFICATIONS, LEGEND, AND ABBREVIATIONS (SHEET 3 OF 5) 5 G5 GENERAL NOTES, SPECIFICATIONS, LEGEND, AND ABBREVIATIONS (SHEET 4 OF 5) 6 G6 GENERAL NOTES, SPECIFICATIONS, LEGEND, AND ABBREVIATIONS (SHEET 5 OF 5) 7 El EXISTING CONDITIONS 8 Cl CONTRACTOR ACCESS ROUTE, STAGING AREA, AND LIMITS OF DISTURBANCE 9 C2 DREDGE PLAN 10 C3 LAKE ADGER NAVIGATION CHANNEL CENTERLINE PROFILE 11 C4 LAKE ADGER NAVIGATION CHANNEL SECTIONS 12 C5 DREDGED MATERIAL PLACEMENT LAYOUT 13 C6 TURBIDITY MONITORING LOCATIONS 14 C7 IMPACTED AREAS r- 15 C8 DETAILS 16 C9 VEGETATION PLANTING DETAILS 1 PROJECT INFORMATION: OWNER: JEFF FERGUSON, PE, NCWRC LEAD ENGINEER: ROBERT CORK, PE, ANCHOR QEA STATE CONSTRUCTION OFFICE ID #: 21-22971-01A 21-22971-01A STATE CONSTRUCTION OFFICE ID ANCHOR QEA ANCHOR QEA OF NORTH CAROLINA, PLLC 231 HAYWOOD STREET ASHEVILLE, NC 28801 LICENCE: P-1649 INowrllEe w. 6eio Call Ile REVISIONS REV DATE BY APP'D DESCRIPTION DESIGNED BY: SMITH 1. DRAWN BY: HOLMET, D. CHECKED BY: CORK R. APPROVED BY: DINICOIA, W. SCALE AS NOTED DATE JULY2021 NORTH CAROLINA WILDLIFE RESOURCES COMMISSION LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING TITLE SHEET G1 SHEET# 1 OF 16 0 z 2 2 a. DEFINITIONS: PROJECT TITLE: LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING PROJECT OWNER (OWNER): NORTH CAROLINA WILDLIFE RESOURCES COMMISSION (NCWRC) ENGINEER ANCHOR QEA OF NORTH CAROLINA, PLLC GENERAL NOTES: 1. THE SITE SURVEY USED FOR THIS DESIGN WAS COMPLETED BY HAYES, JAMES & ASSOCIATES, INC., IN SEPTEMBER 2018. THE SURVEY INCORPORATED THE TOPOGRAPHIC SURVEY COMPLETED BY SKYTECH, LLC, IN SEPTEMBER 2018. 2. CONTRACTOR SHALL FIELD VERIFY THE EXISTING CONDITIONS WITHIN THE LIMITS OF DISTURBANCE AND WILL BE RESPONSIBLE FOR DETERMINING APPROPRIATE QUANTITIES AND REQUIRED MATERIALS TO COMPLETE THE WORK. 3. INFORMATION CONCERNING UNDERGROUND UTILITIES WAS OBTAINED FROM AVAILABLE RECORDS. IT IS THE CONTRACTORS RESPONSIBILITY FOR DETERMINING EXACT LOCATIONS AND ELEVATIONS OF ALL UTILITIES. CALL "NORTH CAROLINA 811" AT 811 OR 1-800-632-4949 48 HOURS PRIOR TO BEGINNING EXCAVATION OR DREDGING TO DETERMINE THE EXACT LOCATION OF EXISTING UTILITIES. THE ONE -CALL TICKET SHALL REMAIN OPEN FOR THE DURATION OF CONSTRUCTION. 4. ADDITIONAL UNDERWATER UTILITIES MAY EXIST ELSEWHERE WITHIN THE PROJECT EXTENTS. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ANY IN -WATER UTILITIES, CROSSINGS, OR POTENTIAL IMPEDIMENTS TO THE WORK AND TAKE ADEQUATE PRECAUTIONS TO AVOID THEM. 5. REPAIR TO UTILITIES OR PROPERTY DAMAGE AS A RESULT OF THE CONTRACTORS NEGLIGENCE OR METHOD OF OPERATION MUST BE MADE, AT CONTRACTOR'S EXPENSE, BEFORE CONTINUING WITH CONSTRUCTION. 6. AS DETAILED IN 02 21 13 - SURVEYING, THE CONTRACTOR IS RESPONSIBLE FOR DOCUMENTING PRE -CONSTRUCTION SITE CONDITIONS (E.G., CONDITIONS OF PAVEMENT, BOAT RAMP, DOCK, AND ANY OTHER ACCESS AREAS OR WORK AREAS WITHIN THE LIMITS OF DISTURBANCE). ANY DAMAGES THAT MAY OCCUR TO PROPERTY OR EXISTING IMPROVEMENTS SHALL BE RESTORED BY THE CONTRACTOR TO AT LEAST THE SAME CONDITION THAT THE PROPERTY OR EXISTING IMPROVEMENTS WERE IN PRIOR TO THE DAMAGES, AT CONTRACTORS EXPENSE. THIS RESTORATION MAY BE NEGOTIATED WITH THE OWNER AND WILL BE SUBJECT TO THE OWNER'S APPROVAL. CONTRACTOR EQUIPMENT SHALL NOT ENTER OR IMPACT THE MARINA AREA AND SLIPS LOCATED OUTSIDE OF THE LIMITS OF DISTURBANCE. 7. CONTRACTOR SHALL PROTECT ALL UTILITIES, EXISTING INFRASTRUCTURE, AND WETLANDS OUTSIDE OF THE LIMITS OF ANCHOR QEA wL� ANCHOR QLA OF NORTH CAROLINA PLLC 231 HAYWOOD STREET ASHE'BLE, NC 28801 LICENCE: P-1649 DISTURBANCE DURING CONSTRUCTION OPERATIONS. 8. CONTRACTOR SHALL ENSURE THAT WETLAND BOUNDARIES ARE SURVEYED AND DELINEATED PRIOR TO BEGINNING WORK. 9. ALL SITE ACTIVITIES SHALL COMPLY WITH APPLICABLE PERMITS AND CONTRACT DOCUMENTS. 10. CONTRACTOR SHALL INSTALL A SURFACE WATER ELEVATION BOARD TO MONITOR LAKE WATER SURFACE ELEVATION. 11. CONTRACTOR SHALL OBTAIN AND COMPLY WITH ALL PERMITS NECESSARY FOR CONSTRUCTION NOT SUPPLIED BY THE OWNER. THIS MAY INCLUDE, BUT IS NOT LIMITED TO, EROSION CONTROL OR LAND DISTURBANCE PERMITS, U.S. ARMY CORPS OF ENGINEERS (USACE) PERMITS, STORMWATER PERMITS, NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMITS, CITY OR COUNTY BUILDING PERMITS, OR ROADWAY PERMITS. CONTRACTOR SHALL OBTAIN PERMITS AT ITS OWN EXPENSE, AND SHALL NOT IMPACT THE PROJECT SCHEDULE. 12. CONTRACTOR MUST COMPLY WITH PERMIT TURBIDITY REQUIREMENTS. CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING MEASURES TO CONTROL TURBIDITY, AS REQUIRED OR AS DIRECTED BY THE ENGINEER. 13. ALL MECHANIZED EQUIPMENT OPERATED NEAR SURFACE WATERS SHOULD BE INSPECTED DAILY AND MAINTAINED AS NECESSARY TO PREVENT CONTAMINATION FROM FUELS, LUBRICANTS, HYDRAULIC FLUIDS, OR OTHER TOXIC MATERIALS. 14. CONTRACTOR SHOULD MAKE BEST EFFORT TO NOT IMPEDE PUBLIC ACCESS AT THE BOAT LAUNCH/DOCK AREA AND THE NAVIGATION CHANNEL IT IS EXPECTED THAT THERE WILL BE TIMES WHEN IT WILL BE NECESSARY AS WITH LAUNCHING AND RETRIEVING EQUIPMENT. CONTRACTOR SHALL NOTIFY THE OWNER AND THE ENGINEER AT LEAST 48 HOURS IN ADVANCE OF ANY BOAT RAMP/DOCK, PARKING AREA, OR NAVIGATION CHANNEL BLOCKAGES THAT WILL SPAN ANY CONTINUOUS PERIOD OF AT LEAST 4 HOURS OR MORE TO ALLOW THE OWNER TO POST PUBLIC CLOSURE NOTICES ON THE NCWRC WEBSITE. 15. NO MAJOR CONSTRUCTION ACTIVITIES SHALL TAKE PLACE DURING WET WEATHER OR PERIODS OF PREDICTED WET WEATHER PER 15A NCAC 04B 0106(a)(2). SEQUENCE OF CONSTRUCTION: SPECIFIC ACTIVITIES CONDUCTED BY THE CONTRACTOR TO COMPLETE THE WORK INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING: 1. PREPARE AND SUBMIT FINAL WORK PLANS AND ALL OTHER REQUIRED PRE -CONSTRUCTION SUBMITTALS. 2. ATTEND A PRE -CONSTRUCTION MEETING WITH THE OWNER, THE ENGINEER, REPRESENTATIVES OF REGULATORY AGENCIES (US ARMY CORPS OF ENGINEERS, NC DIVISION OF WATER RESOURCES), NC DOA STATE CONSTRUCTION OFFICE PROJECT MONITOR, AND NC LAND QUALITY DIVISION INSPECTOR) AND OTHER RELEVANT STAKEHOLDERS IDENTIFIED. 3. PERFORM AND SUBMIT ALL REQUIRED PRE -CONSTRUCTION SURVEYS. IDENTIFY AND FLAG ALL WETLANDS WITHIN 100 FEET OF THE LIMITS OF DISTURBANCE IDENTIFIED ON THE DRAWINGS. 4. ATTEND A CONSTRUCTION KICKOFF MEETING WITH THE ENGINEER AND OTHER RELEVANT STAKEHOLDERS IDENTIFIED. 5. PER EROSION AND SEDIMENT CONTROL (E&SC) PERMIT, NOTIFY ASHEVILLE REGIONAL OFFICE (ARO) LAND QUALITY SECTION (LQS) INSPECTOR WHEN PROJECT IS READY TO START 6. MOBILIZE CREWS, FACILITIES, EQUIPMENT, AND MATERIALS REQUIRED TO COMPLETE THE WORK. 7. INSTALL AND MAINTAIN ENVIRONMENTAL CONTROLS AND APPROVED PLACEMENT AREA CONTAINMENT FEATURES, INCLUDING SILT FENCING ALONG ALL WETLANDS ADJACENT TO THE PLACEMENT AREA. INSTALL AND MAINTAIN E&SC MEASURES. 8. PERFORM ALL REQUIRED DREDGING AND PLACEMENT WITHIN THE LIMITS SPECIFIED ON THE DRAWINGS. 9. PERFORM AND SUBMIT ALL REQUIRED POST -CONSTRUCTION SURVEYS. 10. PER E&SC PERMIT, NOTIFY ARO LQS INSPECTOR WHEN PROJECT IS READY TO CLOSE OUT. 11. PERFORM SITE RESTORATION AND DEMOBILIZATION IN ACCORDANCE WITH THE TECHNICAL SPECIFICATIONS. SPECIFICATIONS START HERE 01 14 00 - WORK RESTRICTIONS, ACCESS, AND SECURITY SUMMARY: 1. CONTRACTOR SHALL PERFORM THE WORK IN ACCORDANCE WITH THE RESTRICTIONS LISTED BELOW, AND ANY ADDITIONAL RESTRICTIONS DETERMINED BY THE ENGINEER DURING PERFORMANCE OF THE WORK. REFERENCES: 1. UNIFIED DEVELOPMENT ORDINANCE OF POLK COUNTY, NORTH CAROLINA. NOVEMBER 2012. 2. NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. JANUARY 2018. 3. NCDOT ROADWAY STANDARD Koorarearsbek.pii. C8116a1010d DRAWINGS. JANUARY 2018. EXECUTION: 1. CONTRACTOR SHALL MAINTAIN AND SECURE ALL WORK AREAS, CONSTRUCTION EQUIPMENT, AND BARRIERS, GATES, AND SECURITY SIGNAGE AS NECESSARY DURING WORKING AND NON -WORKING HOURS. BARRICADING AND TRAFFIC CONTROL DURING CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL CONFORM TO NCDOT STANDARD SPECIFICATIONS AND DRAWINGS. WITHIN THE CONTRACTOR ACCESS ROUTES AND THE LIMITS OF DISTURBANCE, PEDESTRIAN AND VEHICULAR TRAFFIC FLOW SHALL BE MAINTAINED DURING ALL PHASES OF CONSTRUCTION. CONTRACTOR SHALL PROVIDE TRAFFIC SAFETY MEASURES FOR WORK ON PROJECT. CONTRACTOR SHALL BEAR ALL COSTS ASSOCIATED WITH VANDALISM. 2. CONTRACTOR SHALL OBEY ALL COUNTY HEIGHT, WEIGHT, AND UNDER -CLEARANCE RESTRICTIONS. WORK MUST BE PERFORMED IN ACCORDANCE WITH POLK COUNTY REGULATIONS AND ORDINANCES. IF COMPLAINTS ARE RECEIVED BY THE ENGINEER REGARDING INTERFERENCES DUE TO WORK ACTIVITIES, THEN NO FURTHER WORK SHALL BE PERFORMED UNTIL MITIGATION MEASURES ARE IMPLEMENTED AND APPROVED BY THE ENGINEER. 3. WORK MAY BE PERFORMED DURING THE HOURS BETWEEN DUSK AND DAWN ON WEEKDAYS (MONDAYTHROUGH FRIDAY). WORK MAY BE PERMITTED BETWEEN CERTAIN HOURS (TO BE DETERMINED) ON WEEKENDS WITH OWNER'S APPROVAL. 4. CONTRACTOR SHALL COMPLY WITH ALL REQUIRED LOCAL STATE, AND FEDERAL PERMITS; PERMIT EQUIVALENCIES; AND SUBSEQUENT PERMITS AND ADDENDA PROVIDED BY THE OWNER. IN ADDITION, CONTRACTOR SHALL OBTAIN, PAY ALL FEES FOR AND COMPLY WITH ALL OTHER PERMITS REQUIRED TO COMPLETE THE WORK AS SHOWN ON THE DRAWINGS. ANY VIOLATION OF PERMIT REQUIREMENTS SHALL BE BORNE BY THE CONTRACTOR. 5. CONTRACTOR MUST SUSPEND OR LIMIT WORK WHEN DIFFICULT AND UNSAFE CONDITIONS ARE ANTICIPATED OR MANIFESTED (E.G., STORMS, VIOLENT WINDS, OR HIGH FLOWS). 6. ALL PROJECT ACTIVITIES MUST CEASE AND THE CHEROKEE NATION TRIBAL HISTORIC PRESERVATION OFFICE CONTACTED FOR FURTHER CONSULTATION IF ITEMS OF CULTURAL SIGNIFICANCE ARE DISCOVERED DURING THE COURSE OF THE PROJECT. 01 31 00 - PROJECT MANAGEMENT AND COORDINATION SUMMARY: 1. CONTRACTOR MUST COORDINATE ACTIVITIES AND MANAGE RESOURCES AS REVISIONS NEEDED TO CONSTRUCT THE PROJECT CONFORMING TO THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. CONTRACTOR SHALL SCHEDULE MEETINGS SUCH THAT ALL REQUIRED PARTIES ARE PRESENT AT EACH MEETING, IN ACCORDANCE WITH APPLICABLE PROJECT REQUIREMENTS AND PERMITS. EXECUTION: 1. CONTRACTOR MUST MANAGE AND COORDINATE ALL ACTIVITIES OF ITS OWN EMPLOYEES, SUBCONTRACTORS, SUPPLIERS, AND FABRICATORS. 2. CONTRACTOR MUST COORDINATE WITH THE OWNER/ENGINEER TO SCHEDULE MEETINGS, EVENTS, AND WORK ACTMTIES. 3. CONTRACTOR MUST COORDINATE ACTMTIES WITH THE OWNER/ENGINEER AND OTHER CONTRACTORS AND INSTALLERS INVOLVED IN PERFORMING THE WORK. 4. CONTRACTOR MUST ATTEND AND PARTICIPATE IN MEETINGS WITH THE OWNER ENGINEER AND OTHERS AS NECESSARY TO SUCCESSFULLY COMPLETE THE WORK. A. PRE -CONSTRUCTION MEETING: THE PRE -CONSTRUCTION MEETING SHALL BE SCHEDULED BY THE CONTRACTOR FOLLOWING EXECUTION OF THE CONTRACT AND HELD AT LEAST 7 CALENDAR DAYS PRIOR TO BEGINNING THE WORK. NOTICE OF THE SCHEDLUED PRE -CONSTRUCTION MEETING SHALL BE PROVIDED AT LEAST 30 CALENDAR DAYS PRIOR TO THE MEETING DATE. ATTENDEES SHALL INLCUDE, AT A MINIMUM, CONTRACTOR OWNER, THE ENGINEER DOA STATE CONSTRUCTION OFFICE (SCO) PROJECT MONITOR AND REPRESENTATIVES OF REGULATORY AGENCIES (US ARMY CORPS OF ENGINEERS, NC DIVISION OF WATER RESOURCES, NC LAND QUALITY DIVISION). AT A MINIMUM, DISCUSS THE SCHEDULE AND SEQUENCING OF THE WORK; CONTRACTORS USE OF THE SITE; COMMUNICATION PROCEDURES; REVIEW OF THE CONTRACT; HEALTH AND SAFETY REQUIREMENTS; AND PROCEDURES FOR SUBMITTALS, FIELD DECISIONS, PAYMENT, AND RECORD DOCUMENTS. B. CONSTRUCTION KICKOFF MEETING: HELD PRIOR TO COMMENCEMENT OF THE WORK AT THE SITE. ATTENDEES SHALL INCLUDE, AT A MINIMUM, CONTRACTOR AND THE ENGINEER. AT A MINIMUM, DISCUSS QUALITY CONTROL (QC) REQUIREMENTS AND HEALTH AND SAFETY REQUIREMENTS, REVIEW WORK PLANS AND DISCUSS ANY OUTSTANDING ISSUES, AND REVIEW DRAWINGS. C. DAILY CONSTRUCTION MEETING: CONTRACTOR MUST CONDUCT A DAILY CONSTRUCTION MEETING (FREQUENTLY REFERRED TO AS A REV DATE BY APP'D DESCRIPTION DESIGNED BY: SMITH 1. 'TAILGATE MEETING") AT THE BEGINNING OF EACH WORKDAY TO UPDATE ATTENDEES ON THE PREVIOUS DAY'S ACTIVITIES, IDENTIFY ANY HEALTH AND SAFETY CONCERNS FOR THE WORK, AND DISCUSS THE WORK PLAN FOR THE CURRENT DAY. THE ENGINEER MAY ELECT TO ATTEND THIS MEETING. D. CLOSEOUT MEETING: THE ENGINEER WILL SCHEDULE A PRE -FINAL WALKTROUGH/INSPECTION MEETING WITH THE OWNER AND THE CONTRACTOR PRIOR TO CONTRACTOR DEMOBILIZATION FROM THE SITE. CONTRACTOR AND ALL KEY SUBCONTRACTORS MUST ATTEND. THE MEETING AGENDA WILL BE PROVIDED BY THE ENGINEER AND WILL INCLUDE INSPECTION OF WORK AND DEVELOPING A PUNCH LIST OF ITEMS TO BE ADDRESSED. ONCE THE PUNCH LIST ITEMS HAVE BEEN COMPLETED, THE ENGINEER WILL SCHEDULE A FINAL INSPECTION TO INCLUDE THE OWNER PRIME CONTRACTOR AND THE DOA STATE CONSTRUCTION OFFICE (SCO) PROJECT MONITOR THE MEETING AGENDA WILL BE PROVIDED BY THE ENGINEER AND MAY INCLUDE, BUT WILL NOT BE LIMITED TO, CONTRACT CLOSEOUT AND EXECUTION INCLUDING ANY PUNCH LIST ITEMS TO BE ADDRESSED (SEE 01 70 00 - PROJECT CLOSEOUT REQUIREMENTS), FINAL PAYMENT FOR APPLICATION, FINAL SUBMITTALS, GUARANTEES AND WARRANTIES, AND FINAL ADJUSTMENTS TO THE ACCOUNT. 5. IN THE EVENT THE CONTRACTOR HAS QUESTIONS OR REQUIRES CLARIFICATIONS RELATED TO THE WORK OR CONTRACT DOCUMENTS, INCLUDING ANY POTENTIAL DISCREPANCIES OR CONFLICTS, OR SHOULD IT APPEAR THAT THE WORK TO BE DONE OR ANY MATTERS RELATIVE THERETO ARE INSUFFICIENTLY DETAILED OR EXPLAINED ON THE DRAWINGS, CONTRACTOR MUST SUBMIT A WRITTEN REQUEST FOR INFORMATION (RFI) TO THE ENGINEER IN A TIMELY FASHION THAT DOES NOT IMPACT THE PROJECT CONSTRUCTION SCHEDULE. ENGINEER WILL RESPOND TO RFIS WITHIN 5 WORKING DAYS OF RECEIPT. 01 32 00 - CONSTRUCTION PROGRESS DOCUMENTATION SUMMARY: 1. CONTRACTOR SHALL PROVIDE ALL SUBMITTALS IDENTIFIED ON THE DRAWINGS, INCLUDING, BUT NOT LIMITED TO, THOSE DEFINED IN THIS SECTION. PRE -CONSTRUCTION SUBMITTALS: CONTRACTOR SHALL PROVIDE THE FOLLOWING SUBMITTALS, TO BE APPROVED BY THE OWNER AND THE ENGINEER PRIOR TO SITE MOBILIZATION: 1. HEALTH AND SAFETY PLAN - SUBMITTED NO FEWER THAN 21 DAYS PRIOR TO MOBILIZATION. DRAWN BY: HOLMER. D. CHECKED BY: CORK R. APPROVED BY: DINICOLA W. SCALE: AS NOTED DATE JULY2021 A. THE HEALTH AND SAFETY PLAN SHALL BE PREPARED IN FULL CONFORMANCE WITH 29 CODE OF FEDERAL REGULATIONS (CFR) 1910.120 AND SHALL ESTABLISH, IN DETAIL THE PROTOCOLS NECESSARY FOR THE RECOGNITION, EVALUATION, AND CONTROL OF ALL HAZARDS ASSOCIATED WITH EACH TASK PERFORMED BY CONTRACTOR AND ALL ITS SUBCONTRACTORS, AS WELL AS PROTOCOLS FOR MANAGEMENT OF CHANGE (E.G., NEWLY IDENTIFIED HAZARDS AND CHANGING FIELD CONDITIONS) DURING THE WORK WITH REGARD TO HEALTH AND SAFETY. B. THE HEALTH AND SAFETY PLAN SHALL PROVIDE WORK SITE -SPECIFIC AND PROJECT -SPECIFIC SAFETY AND HEALTH REQUIREMENTS AND PROCEDURES BASED UPON WORK SITE -SPECIFIC AND PROJECT -SPECIFIC CONDITIONS. C. ALL TOPICS REQUIRED BY OSHA STANDARD 29 CFR 1910.120(6)(4) AND THOSE DISCUSSED IN SUBSEQUENT PARTS OF THIS SECTION SHALL BE ADDRESSED IN THE HEALTH AND SAFETY PLAN. WHEN THE USE OF A SPECIFIC TOPIC IS NOT APPLICABLE TO THE PROJECT, THE HEALTH AND SAFETY PLAN SHALL INCLUDE A STATEMENT TO JUSTIFY ITS OMISSION AND ESTABUSH THAT THE TOPIC WAS GIVEN ADEQUATE CONSIDERATION. D. AT A MINIMUM, THE HEALTH AND SAFETY PLAN SHALL INCLUDE A SITE DESCRIPTION AND CHARACTERISTICS; ACTIVITY HAZARD/RISK ANALYSIS FOR EACH ON -SITE TASK TO BE PERFORMED, INCLUDING DISCUSSION OF PHYSICAL, CHEMICAL AND BIOLOGICAL HAZARDS; DESCRIPTION OF HOW SAFETY WILL BE CONTROLLED WITH REGARD TO NON -CONTRACTOR PERSONNEL (E.G., CONSTRUCTION OBSERVERS AND VISITORS); STAFF SAFETY ORGANIZATION, QUALIFICATIONS, AND RESPONSIBILITIES, INCLUDING IDENTIFICATION OF A PROJECT HEALTH AND SAFETY OFFICER PERSONAL PROTECTIVE EQUIPMENT REQUIREMENTS; A DESCRIPTION OF STANDARD OPERATION SAFETY PROCEDURES, ENGINEERING CONTROLS, AND WORK PRACTICES TO BE IMPLEMENTED; A DESCRIPTION OF EMERGENCY AND FIRST AID EQUIPMENT TO BE USED; AND A DESCRIPTION OF RECORDKEEPING PROCEDURES, INCLUDING DOCUMENTATION OF APPROPRIATE EMPLOYEE TRAINING, NAME AND QUALIFICATIONS OF THE PERSON PREPARING THE HEALTH AND SAFETY PLAN, AND A SIGNATORY PAGE FOR WORK AREA PERSONNEL TO ACKNOWLEDGE RECEIPT, UNDERSTANDING, AND AGREEMENT TO COMPLY WITH THE HEALTH AND SAFETY PLAN. (CONTINUED NEXT SHEET) NORTH CAROLINA WILDLIFE RESOURCES COMMISSION LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING GENERAL NOTES, SPECIFICATIONS, LEGEND, AND ABBREVIATIONS (SHEET 1 OF 5) r. 01 1,4 41.1 0 9 0 2 re z 8 G2 SHEET* 2 OF 16 v 2. DREDGING AND DREDGED MATERIAL PLACEMENT WORK PLAN - SUBMITTED NO FEWER THAN 21 DAYS PRIOR TO MOBILIZATION. AT MINIMUM, INCLUDE THE FOLLOWING: A. CONTRACTOR'S BUSINESS NAME, ADDRESS, TELEPHONE NUMBER, DREDGING SITE REPRESENTATIVES, AND EMERGENCY CONTACT PHONE NUMBERS. B. A DESCRIPTION OF ANTICIPATED HYDRAULIC DREDGING EQUIPMENT TO BE USED, INCLUDING MAKE, AND MODEL NUMBER, TYPE, DIMENSIONS, HORSEPOWER, PUMP CURVES AND DETAILS, SUPPORT VESSELS, CONTAINERS, AND OTHER SUPPORT EQUIPMENT. INCLUDE A DESCRIPTION OF THE PRIMARY DREDGE AND SUPPORT CREW, INCLUDING THE RESUME OF THE LEVERMEN. C. DESCRIPTION, DIMENSIONS, CAPACITY, AND DRAWINGS/SKETCHES AND PHOTOGRAPHS OF THE HYDRAULIC EQUIPMENT (SHROUD AND CUTTERHEAD) OR EQUIVALENT EQUIPMENT TO BE USED FOR DREDGING. INCLUDE A DESCRIPTION OF THE DREDGE REAL-TIME KINEMATIC (RTK) DIFFERENTIAL GLOBAL POSITIONING SYSTEM (DGPS) AND DREDGE CUT VISUALIZATION SOFTWARE TO BE USED, INCLUDING MAKE, AND MODEL D. DESCRIPTION OF ANTICIPATED IN -WATER TURBIDITY CONTROLS, E&SC MEASURES, AND PLACEMENT AREA CONTAINMENT FEATURES, INCLUDING MANUFACTURER, NUMBER, TYPE, AND DIMENSIONS. CONTRACTOR SHALL ALSO INCLUDE THE PROPOSED APPROACH FOR DEPLOYING TURBIDITY CONTROLS, E86C MEASURES, AND PLACEMENT AREA CONTAINMENT FEATURES, INCLUDING PERSONNEL AND VESSEL REQUIREMENTS, PLANNED LENGTH AND SPACING OF STAKES, ANCHORS, CHAINS, AND OTHER APPURTENANCES, AS NECESSARY. E. PROPOSED APPROACH FOR DEPLOYMENT AND INSPECTION OF EQUIPMENT, INCLUDING MOBILIZATION OF DREDGES, PUMPS, PIPELINES, AND OTHER ANCILLARY EQUIPMENT TO THE SITE AND PROCEDURES TO VERIFY THAT ALL ARE FIT FOR CONSTRUCTION. IF THE CONTRACTOR DETERMINES SHRUBBERY OR TREES MUST BE REMOVED TO FACILITATE THE CONTRACTOR'S OPERATIONS, A DESCRIPTION OF TEMPORARY UPLAND EROSION AND SEDIMENT CONTROLS MUST BE INCLUDED IN THE DREDGING AND DREDGED MATERIAL PLACEMENT PLAN. F. PERSONNEL REQUIREMENTS FOR EACH VESSEL AND/OR OPERATION AND THE PROPOSED APPROACH FOR DEPLOYMENT OF PERSONNEL. G. DELINEATION AND DEMARCATION OF THE WORK AREAS TO BE USED BY THE CONTRACTOR. H. PROPOSED PLAN FOR COMPLYING WITH ALL CFR AND UNITED STATES COAST GUARD (USCG) REQUIREMENTS FOR IN -WATER CONSTRUCTION, INCLUDING PROVIDING A NOTICE TO MARINERS, MARKING IN -WATER WORK AREAS AND EQUIPMENT, AND FURNISHING AND USING LIGHTS DURING TIME PERIODS OF LOW VISIBILITY. I. PROPOSED METHODS FOR AVOIDING OR PROTECTING UTILITIES IDENTIFIED DURING UTILITY -LOCATING PROCEDURES. J. PROPOSED PLAN FOR THE IDENTIFICATION AND REMOVAL OF DEBRIS SO AS TO NOT INTERFERE WITH DREDGING AND NOT INCREASE THE OVERALL PROJECT CONSTRUCTION SCHEDULE. K. PROPOSED PROCEDURE FOR DREDGING WITHIN OVERDREDGE ALLOWANCES AS SPECIFIED HEREIN. INCLUDE METHODS TO PROVIDE QC DURING DREDGING, WITH A DESCRIPTION OF LOCATION CONTROL EQUIPMENT. PROPOSED PROCEDURE FOR DAILY QC CHECKS OF THE RTK-DGPS SYSTEM. L. PROPOSED PLAN FOR TRANSPORTING DREDGED MATERIAL VIA DREDGE SLURRY PIPELINE TO THE DESIGNATED DREDGED MATERIAL PLACEMENT AREAS. INCLUDE A DESCRIPTION OF THE DREDGE SLURRY PIPELINE, PIPELINE LAYOUT DRAWING, PHASED PLAN FOR ROUTING PIPELINE (AS NECESSARY), PIPE DIAMETER AND STANDARD DIMENSION RATIO, VALVES AND FITTINGS FOR PIPELINE AND PUMP STATIONS, NAVIGATION MARKINGS, NUMBER OF BOOSTER PUMPS AND LOCATIONS, PLAN FOR PUMP SEAL WATER, AND SUPPORT EQUIPMENT. DESCRIBE METHODS FOR WELDING OR SEALING PIPE SECTIONS TO PROVIDE A WATER -TIGHT PIPELINE AND METHODS TO BE EMPLOYED TO TEST FOR LEAKAGE AND MAINTAIN WATER TIGHTNESS DURING OPERATIONS AND MAINTENANCE ACTIVITIES. PROVIDE THE NAME AND QUALIFICATIONS OF PERSONNEL TRAINED THAT WILL BE PERFORMING THE PIPELINE FUSING. M. PROPOSED METHODS TO QC, TRACK, AND VERIFY INSTALLATION ELEVATION OF PLACED MATERIAL DURING THE WORK. QC METHODS MAY INCLUDE, BUT ARE NOT LIMITED TO, USE OF GRADE STAKES, CORES, CATCH PANS, OR OTHER METHODS OF DETERMINING INSTALLED MATERIAL PLACEMENT ELEVATION. N. IF THE MANNER IN WHICH THE CONTRACTOR STORES FUEL OR REFUELS EQUIPMENT TRIGGERS THE REQUIREMENTS FOR A SPILL PREVENTION, CONTROL AND COUNTERMEASURE (SPCC) PLAN CONSISTENT WITH 40 CFR 112, THE CONTRACTOR MUST PREPARE, SUBMIT FOR REVIEW, AND IMPLEMENT AN APPROPRIATE SPCC PLAN IN ACCORDANCE WITH 40 CFR 112 AND THE REQUIREMENTS ON THE DRAWINGS (SEE PART 6). IF REQUIREMENTS FOR A SPCC PLAN ARE NOT TRIGGERED CONSISTENT WITH 40 CFR 112, THE CONTRACTOR SHALL ADHERE TO ALL SPILL CONTAINMENT REQUIREMENTS ON THESE DRAWINGS (FOR EXAMPLE, SEE GENERAL COMMENT 13 AND EXECUTION PART 15 UNDER 35 20 23 - HYDRAULIC DREDGING AND DREDGED MATERIAL PLACEMENT). 3. SURVEY WORK PLAN - SUBMITTED NO FEWER THAN 21 DAYS PRIOR TO MOBILIZATION. AT MINIMUM, INCLUDE THE FOLLOWING: A. NAME, ADDRESS, SUMMARY OF QUALIFICATIONS, AND COPIES OF LICENSES AND CERTIFICATIONS OF THE SURVEYOR(S) SELECTED TO PERFORM THE SURVEY WORK. B. LIST OF ALL REQUIRED SURVEYING TASKS AND AREAS TO BE SURVEYED FOR HORIZONTAL LIMITS AND ELEVATIONS, AS NECESSARY, TO PERFORM AND DOCUMENT THE WORK DESCRIBED ON THE DRAWINGS. C. DESCRIPTION OF THE PROPOSED SURVEY METHODS, INCLUDING EQUIPMENT, PROCEDURES, CALIBRATION METHODS, CALIBRATION FREQUENCY, AND ESTIMATED PRECISION/ACCURACY OF MEASUREMENTS. D. CLEARLY DEFINED METHODS OF SURVEYING TO BE USED FOR EACH REQUIRED SURVEY AND IN EACH AREA, WITH CONSIDERATION OF REQUIRED SURVEY ACCURACY AND DENSITY, AS DESCRIBED ON THE DRAWINGS. THIS SHALL INCLUDE THE FOLLOWING: I. SINGLE -BEAM HYDROGRAPHIC SURVEY METHODS II. TOPOGRAPHIC SURVEY METHODS FOR AREAS WHERE A SINGLE -BEAM HYDROGRAPHIC SURVEY CANNOT BE CONDUCTED DUE TO SHALLOW WATER III. TOPOGRAPHIC SURVEY METHODS FOR UPLAND AREAS IV. DEBRIS SURVEYS IN DREDGE AREAS, IF THE CONTRACTOR ELECTS TO PERFORM A DEBRIS SURVEY E. LISTING OF THE CONTROL POINTS TO BE USED DURING ALL SURVEY OPERATIONS AND THE ANTICIPATED LOCATION OF A PROJECT BASE STATION FOR RTK-DGPS CORRECTIONS F. INSTRUMENT SPECIFICATIONS OR CUT SHEETS AND GPS CALIBRATION CERTIFICATES (6 MONTHS CURRENT) AND PROCEDURES FOR CALIBRATION DURING THE FULL PERIOD OF THE WORK G. DESCRIPTION OF RECORDKEEPING PROCEDURES DURING SURVEYING H. PROPOSED SURVEY DELIVERABLE FORMAT, INCLUDING EXAMPLE ELECTRONIC FILES OF SURVEY SURFACES FOR IN -WATER AND UPLAND WORK IN THE FORMAT SPECIFIED HEREIN. ENGINEER WILL EVALUATE WHETHER THE FILE FORMAT IS ACCEPTABLE FOR USE IN DETERMINING COMPLIANCE WITH THE DRAWINGS. 4. PROJECT CONSTRUCTION SCHEDULE - SUBMITTED NO FEWER THAN 5 DAYS PRIOR TO THE PRE -CONSTRUCTION MEETING. A. CONTRACTOR SHALL PROVIDE A PROJECT CONSTRUCTION SCHEDULE TO THE ENGINEER THAT SHOWS SPECIFIC TASKS, DATES, AND THE CRITICAL PATH NECESSARY FOR COMPLETION OF THE PROJECT. AT A MINIMUM, CONTRACTOR SHALL INCLUDE THE TASKS LISTED IN THE SEQUENCE OF CONSTRUCTION. 5. CONTRACTOR QC PLAN - SUBMITTED NO FEWER THAN 21 DAYS PRIOR TO MOBILIZATION. A. CONTRACTOR QC PLAN SHALL INCLUDE, AT A MINIMUM, ORGANIZATION CHART SHOWING THE VARIOUS QC TEAM MEMBERS, ALONG WITH THEIR DESIGNATED RESPONSIBILITIES AND LINES OF AUTHORITY; NAME, DUTIES, RESPONSIBILITIES, AND AUTHORITIES OF EACH PERSON ASSIGNED A PRIMARY QC FUNCTION; ACKNOWLEDGEMENT THAT THE QC STAFF SHALL CONDUCT INSPECTIONS FOR ALL ASPECTS OF THE WORK SPECIFIED AND SHALL REPORT TO THE QC SUPERVISOR OR SOMEONE OF HIGHER AUTHORITY IN THE CONTRACTOR'S ORGANIZATION; AND TESTING METHODS, SCHEDULES, AND PROCEDURES USED TO REPORT QC INFORMATION, INCLUDING SAMPLES OF THE VARIOUS REPORTING FORMS. CONTRACTOR IS ENCOURAGED TO ADD ANY ADDITIONAL ELEMENTS TO THE CONTRACTOR QC PLAN THAT ARE DEEMED NECESSARY TO ADEQUATELY CONTROL ALL PRODUCTION AND/OR CONSTRUCTION PROCESSES REQUIRED BY THE CONTRACT DOCUMENTS. 6. SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN - SUBMITTED NO FEWER THAN 21 DAYS PRIOR TO MOBILIZATION. A. SPCC PLAN MUST INCLUDE SPILL AND DISCHARGE CONTROL PROCEDURES, RESPONSES, AND CONTINGENCY PLANS. THIS MUST INCLUDE CONTAMINATION PREVENTION PROVISIONS TO BE TAKEN TO PREVENT ACCIDENTAL INTRODUCTION OF HAZARDOUS PRODUCTS INTO THE WATER, AIR, OR GROUND. THIS MUST ALSO INCLUDE A DESCRIPTION OF CONTRACTOR'S SECONDARY CONTAINMENT SYSTEMS AND METHODS OF CLEANUP THAT INCLUDES THE PROCEDURES, INSTRUCTIONS, AND REPORTS TO BE USED IN THE EVENT OF AN UNFORESEEN INCIDENT REQUIRING A CONTAMINANT RELEASE CLEANUP ACTION. THIS SECTION MUST INCLUDE THE FOLLOWING, AT A MINIMUM: I. NAME OF THE INDIVIDUAL ON EACH SHIFT WHO WILL BE RESPONSIBLE FOR REPORTING SPILLS, IMPLEMENTING AND SUPERVISING THE CONTAINMENT AND CLEANUP, AND FOLLOWING UP WITH COMPLETE DOCUMENTATION OF THE INCIDENT II. NAMES AND LOCATIONS OF SUPPLIERS OF CONTAINMENT MATERIALS AND NAMES AND LOCATIONS OF ADDITIONAL OIL RECOVERY, CLEANUP, RESTORATION, AND DISPOSAL EQUIPMENT AVAILABLE IN CASE OF AN UNFORESEEN SPILL EMERGENCY III. NAMES AND TELEPHONE NUMBERS OF ENGINEER, AGENCIES, AND INDIVIDUALS, INCLUDING 24-HOUR TELEPHONE CONTACT NUMBERS TO BE USED IN THE EVENT OF AN UNFORESEEN INCIDENT REQUIRING A CONTAMINANT RELEASE CLEANUP ACTION 7. ALL PRE -CONSTRUCTION SURVEYS DETAILED ON THE DRAWINGS. SUBMITTALS DURING CONSTRUCTION: CONTRACTOR SHALL PROVIDE THE FOLLOWING SUBMITTALS TO THE OWNER AND ENGINEER DURING CONSTRUCTION ACTIVITIES: 1. DAILY ACTIVITY REPORT (DAR) A. CONTRACTOR SHALL COMPLETE THE DAR EACH WORKDAY AND SUBMITTED TO THE ENGINEER NO LATER THAN NOON THE FOLLOWING WORKDAY. THE DAR WILL INCLUDE, BUT NOT BE LIMITED TO, THE FOLLOWING INFORMATION: I. DESCRIPTION OF GENERAL WORK ACTIVITIES, INCLUDING, BUT NOT LIMITED TO, INSPECTION AND MAINTENANCE OF TURBIDITY CONTROLS, E&SC MEASURES, AND PLACEMENT AREA CONTAINMENT FEATURES, AND LOCATION OF DREDGING AND PLACEMENT ACTIVITIES. II. RESULTS OF DAILY TURBIDITY MONITORING, AND A SUMMARY OF ANY DEFICIENCIES AND CORRECTIVE ACTIONS, IN ACCORDANCE WITH THE DREDGING AND DREDGED MATERIAL PLACEMENT TURBIDITY REQUIREMENTS. III. DAILY WATER SURFACE ELEVATION AS RECORDED USING THE WATER SURFACE ELEVATION BOARD INSTALLED BEFORE BEGINNING IN -WATER WORK. IV. EQUIPMENT PERFORMANCE, MAINTENANCE, HOURS OF DOWNTIME, AND CAUSE(S) OF DOWNTIME. V. EXPORT OF XYZ FILES FROM A HYPACK SYSTEM (OR EQUIVALENT) AND PROCESSED DRAWINGS IN AUTOCAD CIVIL 3D (2018 OR LATER) FORMAT OR COMPATIBLE DIGITAL TERRAIN MODEL OF THE SURVEY TO SHOW THE DREDGE PROGRESS FOR THE DAY. CONTRACTOR SHALL ESTIMATE TOTAL DREDGING QUANTITY EACH DAY AND REPORT ESTIMATED QUANTITY IN THE DAR. VI. HEALTH AND SAFETY INCIDENTS AND NEAR MISSES. 2. CONTRACTOR SHALL PROVIDE AN UPDATED CONSTRUCTION SCHEDULE SHOULD DELAYS BE ENCOUNTERED OR SHOULD THERE BE APPROVED CHANGES FROM THE WORK SHOWN ON THE DRAWINGS AND THE APPROVED CONSTRUCTION SCHEDULE. UPDATED CONSTRUCTION SCHEDULE SHALL BE SUBMITTED WEEKLY, AS NECESSARY. 3. CONTRACTOR SHALL SUBMIT ALL PROJECT CLOSEOUT SUBMITTALS IN ACCORDANCE WITH THE DRAWINGS. POST -CONSTRUCTION SUBMITTALS: WITHIN 30 CALENDAR DAYS FOLLOWING FINAL COMPLETION OF THE WORK, CONTRACTOR SHALL PROVIDE THE FOLLOWING SUBMITTALS TO THE OWNER AND THE ENGINEER TO DOCUMENT COMPLETION OF THE WORK: 1. RECORD DRAWINGS CONTRACTOR SHALL PROVIDE SURVEY RECORD DRAWINGS AND CONSTRUCTION RECORD DRAWINGS TO THE ENGINEER. A. SURVEY RECORD DRAWINGS: I. ALL SURVEY RECORD DRAWINGS MUST BE STAMPED AND SIGNED BY THE LICENSED PROFESSIONAL SURVEYOR RESPONSIBLE FOR SURVEY WORK. BOTH A HARD COPY AND AN ELECTRONIC COPY OF THE SURVEY RECORD DRAWINGS MUST BE SUBMITTED. ELECTRONIC VERSIONS OF SURVEY RECORD DRAWINGS MUST BE IN AUTOCAD CIVIL 3D (2018 OR LATER) FORMAT OR OTHER PROGRAM APPROVED BY THE ENGINEER. B. POST -CONSTRUCTION RECORD DRAWINGS: 1. ENGINEER WILL PROVIDE A SET OF THE DRAWINGS ELECTRONICALLY FOR CONTRACTOR USE IN PREPARING POST -CONSTRUCTION RECORD DRAWINGS. CONTRACTOR MUST RECORD ALL VARIATIONS TO THE DRAWINGS. BOTH A HARD COPY AND AN ELECTRONIC COPY OF THE SURVEY RECORD DRAWINGS MUST BE SUBMITTED. ELECTRONIC VERSIONS OF SURVEY RECORD DRAWINGS MUST BE IN AUTOCAD CIVIL 3D (2018 OR LATER) FORMAT OR OTHER PROGRAM APPROVED BY THE ENGINEER. 2. PROJECT RECORDS AND ADDENDA RECORD DOCUMENTS. CONTRACTOR MUST PROVIDE RECORD DOCUMENTS IN ACCORDANCE WITH THE DRAWINGS. AT A MINIMUM, RECORD DOCUMENTS MUST INCLUDE THE FOLLOWING: 1. HARD COPIES AND ELECTRONIC COPIES OF SPECIFICATIONS FOR EQUIPMENT USED FOR THE WORK. J. ALL RECORDS AND TESTING RESULTS GENERATED DURING DREDGING AND DREDGED MATERIAL PLACEMENT, TO THE ENGINEER AS PROOF OF COMPLIANCE WITH THE APPLICABLE PERMITS FOR THE SATISFACTORY COMPLETION OF THE WORK. RECORDS INCLUDE COPIES OF ANY PERMITS SECURED BY THE CONTRACTOR FOR THE PROJECT. K. IF APPLICABLE, RESTORATION DETAILS, SKETCHES, AND PLOTS DEPICTING FINAL RESTORATION PLANTING, INCLUDING PLANT SPECIES INFORMATION. LCONSTRUCTION PHOTOGRAPHS. M. RECORD DRAWINGS AND ADDENDA. CONTRACTOR MUST SUBMIT ONE COPY OF RECORD DRAWINGS, INCLUDING ADDENDA AND CONTRACT MODIFICATIONS AT THE TIME OF SUBSTANTIAL COMPLETION, AS DESCRIBED HEREIN. N. ANY ADDITIONAL DOCUMENTATION REQUESTED BY THE ENGINEER. 01 35 29.13 - HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES SUMMARY: 1. CONTRACTOR SHALL PERFORM WORK SAFELY, IN ACCORDANCE WITH REFERENCED STANDARDS AND REGULATIONS, ALL OTHER APPLICABLE LOCAL STATE, AND FEDERAL HEALTH AND SAFETY STANDARDS AND REGULATIONS, AND APPROVED HEALTH AND SAFETY WORK PLAN. REFERENCES: 1. USACE EM 385-1-1: (2014) SAFETY AND HEALTH REQUIREMENTS MANUAL 2. U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION 3. 29 CFR 1904: RECORDING AND REPORTING OCCUPATIONAL INJURIES AND ILLNESSES 4. 29 CFR 1910: OCCUPATIONAL SAFETY AND HEALTH STANDARDS 5. 29 CFR 1926: SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION (CONTINUED NEXT SHEET) STATE CONSTRUCTION OFFICE ID #: 21-22971-01A ANCHOR clEA ANCHOR QEA OF N CAROLINA. PLLC 231 HAYWOOD STREET ASHEVILLE, NC 28801 LICENCE-P-1649 Kidaribars Wan CaB Uelooyoudg. REVISIONS REV DATE BY APPD DESCRIPTION DESIGNED BY: SMITH J. DRAWN BY: HOLMER D. CHECKED BY: CORA 2 APPROVED BY: DINICOIA W. SCALE AS NOTED DATE JULY2021 NORTH CAROLINA WILDLIFE RESOURCES COMMISSION LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING GENERAL NOTES, SPECIFICATIONS, LEGEND, AND ABBREVIATIONS (SHEET 2 OF 5) G3 SHEET # 3 OF 16 QUALITY CONTROL 1. CONTRACTOR SHALL SUBMIT ANY AND ALL HEALTH AND SAFETY INCIDENTS RELATED TO COMPLETION OF THE WORK IN ACCORDANCE WITH 29 CFR 1904, RECORDING AND REPORTING OCCUPATIONAL INJURIES AND ILLNESSES. 2. CONTRACTOR SHALL RECORD ANY AND ALL INCIDENTS AND NEAR MISSES ON THE DAR FOR WORK COMPLETED ON THE DAY THE INCIDENT OR NEAR MISS OCCURRED. EXECUTION: 1. CONTRACTOR SHALL SUBMIT A HEALTH AND SAFETY PLAN, TO BE APPROVED BY OWNER AND THE ENGINEER PRIOR TO SITE MOBILIZATION. 2. EMERGENCY EQUIPMENT AND FIRST AID EQUIPMENT SHALL BE MAINTAINED BY THE CONTRACTOR ON SITE AND SHALL BE AVAILABLE FOR IMMEDIATE USE. 01 57 13 - TEMPORARY EROSION AND SEDIMENT CONTROL SUMMARY: 1. CONTRACTOR MUST COMPLY WITH ALL LOCAL STATE, AND FEDERAL REGULATORY REQUIREMENTS AND THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY EROSION AND SEDIMENT CONTROL PERMIT REGARDING PROTECTION OF THE ENVIRONMENT AND EROSION AND SEDIMENT CONTROL APPLICATIONS. REFERENCES: 1. NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL - REVISED MAY 2013. QUALITY CONTROL: 1. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED DAILY AND AFTER EACH SIGNIFICANT RAINFALL (0.5 INCH OR GREATER) AS MEASURED WITH AN ONSITE RAIN GAUGE. DEFICIENCIES SHALL BE CORRECTED IMMEDIATELY. CONTRACTOR SHALL MAINTAIN A DAILY RECORD. PROJECT SITE CONDITIONS MAY REQUIRE INSTALLATION OF ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES. EROSION CONTROL MEASURES AND MAINTENANCE SHALL BE IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL MANUAL. EXECUTION: 1. CONTRACTOR SHALL IMPLEMENT EROSION AND SEDIMENT CONTROL AND MAINTAIN EROSION AND SEDIMENT CONTROL MEASURES AS NECESSARY TO COMPLY WITH COUNTY, STATE, AND FEDERAL LAWS AND REGULATIONS AND THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY EROSION AND SEDIMENT CONTROL PERMIT. ANY SEDIMENT CONTROL MEASURES DISTURBED BY CONSTRUCTION SHALL BE REPAIRED THE SAME DAY. HAYBALES ARE NOT APPROVED E&SC MEASURES. 2. CONTRACTOR SHALL REMOVE ALL CONSTRUCTED SOIL AND EROSION CONTROL FOLLOWING COMPLETION OF THE WORK AND IN ACCORDANCE WITH PERMIT REQUIREMENTS. 01 70 00 - PROJECT CLOSEOUT REQUIREMENTS SUMMARY: 1. COMPLETE THE FOLLOWING ITEMS BEFORE REQUESTING PRE -FINAL INSPECTION: A. CONTRACTOR MUST CONDUCT INSPECTION TO ESTABLISH BASIS FOR REQUEST THAT WORK IS SUBSTANTIALLY COMPLETE. CREATE COMPREHENSIVE LIST (INITIAL PUNCH LIST) INDICATING ITEMS TO BE COMPLETED OR CORRECTED, VALUE OF INCOMPLETE OR NONCONFORMING WORK, REASON FOR BEING INCOMPLETE, AND DATE OF ANTICIPATED COMPLETION FOR EACH ITEM. INCLUDE COPY OF LIST WITH REQUEST FOR PRE -FINAL INSPECTION. BPERFORM FINAL CLEANING, INCLUDING, BUT NOT LIMITED TO, SWEEPING PAVED AREAS; RAKING CLEAN LANDSCAPED SURFACES; RESTORING SITE TO ITS PRE -CONSTRUCTION CONDITION, UNLESS INDICATED ON THE DRAWINGS; PRESERVING SIGNS, SURVEY CONTROL POINTS, BOLLARDS, AND FENCES IN THEIR EXISTING LOCATIONS AND CONDITIONS, UNLESS WRITTEN PERMISSION IS OBTAINED FROM ENGINEER; AND REPAIRING OR REPLACING DAMAGED ITEMS AS DIRECTED BY THE ENGINEER, AT CONTRACTOR'S EXPENSE. REMOVE WASTE AND SURPLUS MATERIALS, RUBBISH, AND CONSTRUCTION FACILITIES FROM SITE. 2. WHEN THE CONTRACTOR CONSIDERS WORK TO BE SUBSTANTIALLY COMPLETE, SUBMIT TO THE ENGINEER WRITTEN CERTIFICATE THAT WORK IS SUBSTANTIALLY COMPLETE AND A LIST OF ITEMS TO BE COMPLETED OR CORRECTED (INITIAL PUNCH LIST). 3. WITHIN 5 WORKING DAYS AFTER RECEIPT OF REQUEST FOR PRE -FINAL INSPECTION, THE ENGINEER WILL INSPECT THE WORK TO DETERMINE WHETHER IT OR SOME DESIGNATED PORTION THEREOF IS SUBSTANTIALLY COMPLETE. SHOULD THE ENGINEER DETERMINE THAT THE WORK IS NOT SUBSTANTIALLY COMPLETE, THE ENGINEER WILL PROMPTLY NOTIFY THE CONTRACTOR IN WRITING, STATING REASONS FOR ITS DETERMINATION. 4. CONTRACTOR MUST REMEDY DEFICIENCIES IN WORK AND SEND SECOND WRITTEN REQUEST FOR PRE -FINAL INSPECTION TO THE ENGINEER. THE ENGINEER WILL RE -INSPECT THE WORK. REDO AND INSPECTION OF DEFICIENT WORK WILL BE REPEATED UNTIL WORK PASSES THE ENGINEER INSPECTION. 5. WHEN THE ENGINEER HAS CERTIFIED THAT PROJECT IS COMPLETE, ENGINEER SHALL SCHEDULE A FINAL INSPECTION WITH THE SCO PROJECT MONITOR. PRIOR TO FINAL INSPECTION THE ENGINEER SHALL COMPLETE RELEVANT PORTIONS OF THE SCO FINAL INSPECTION FOR OWNER OCCUPANCY FORM, IF SCO PROJECT MONITOR FINDS THAT THE WORK IS COMPLETE AT THE TIME OF THE FINAL INSPECTION THEN DESIGNER AND SCO PROJECT MONITOR WILL SIGN FINAL INSPECTION FOR OWNER OCCUPANCY FORM CONFIRMING THE PROJECT AS COMPLETE. IF SCO PROJECT MONITOR FINDS THE PROJECT TO BE INCOMPLETE AT TIME OF FINAL INSPECTION A FINAL PUNCH LIST SHALL BE CREATED, AT THIS POINT THE CONTRACTOR MUST COMPLETE WORK LISTED FOR COMPLETION OR CORRECTION WITHIN TIME PERIOD STIPULATED. 6. WITHIN 5 WORKING DAYS OF REQUEST FOR FINAL COMPLETION, THE ENGINEER WILL INSPECT THE WORK TO DETERMINE WHETHER IT IS COMPLETE. SHOULD THE ENGINEER DETERMINE THAT THE WORK IS NOT SUBSTANTIALLY COMPLETE, THE METHODOLOGIES DESCRIBED FOR SUBSTANTIAL COMPLETION IN PARTS 4 AND 5 SHALL BE FOLLOWED UNTIL THE ENGINEER HAS DETERMINED THAT THE WORK IS COMPLETE. 7. CONTRACTOR MUST SUBMIT THE FINAL STATEMENT OF ACCOUNTING AND THE FINAL APPLICATION FOR PAYMENT AFTER RECEIVING WRITTEN ACCEPTANCE OF COMPLETION OF THE WORK BY THE ENGINEER. THE ENGINEER WILL ISSUE A CERTIFICATE OF COMPLETION TO THE CONTRACTOR AT COMPLETION OF THE PROJECT AFTER RECEIPT OF ALL REQUIRED MAINTENANCE INSTRUCTIONS, SCHEDULES, RECORD DRAWINGS, GUARANTEES, BONDS, INSURANCE CERTIFICATES, AND RELEASES OF LIENS. THE DATE OF THE CERTIFICATE OF COMPLETION WILL BE THE BEGINNING DATE OF ALL GUARANTEES. 02 21 13 - SURVEYING SUMMARY: 1. CONTRACTOR SHALL PERFORM TOPOGRAPHIC AND HYDROGRAPHIC SURVEYS VIA AN INDEPENDENT LICENSED SURVEYOR TO SET EQUIPMENT, ESTABLISH CONTROL POINTS, SET GRADE STAKES, PLACE FEATURES, DETERMINE REQUIRED LINES AND GRADES, AND DOCUMENT COMPLETION AND PAYMENT OF WORK. REFERENCES: 1. USACE, 2013. ENGINEERING AND DESIGN - HYDROGRAPHIC SURVEYING. EM 1110-2-1003 2. USACE, 2007. ENGINEERING AND DESIGN - CONTROL AND TOPOGRAPHIC SURVEYING EM 1110-1-1005 3. 14 CFR 107: SMALL UNMANNED AIRCRAFT SYSTEMS QUALITY CONTROL 1. LAND SURVEYOR QUALIFICATIONS: SURVEY WORK SHALL BE PERFORMED BY OR UNDER THE REVIEW OF A THIRD -PARTY NORTH CAROLINA-LICENSED PROFESSIONAL LAND SURVEYOR (PLS). LAND SURVEYOR SHALL HAVE A MINIMUM OF 5 YEARS' EXPERIENCE IN CONSTRUCTION SURVEYING AND LAYOUT AND MAINTENANCE OF RECORD DRAWINGS. 2. CONTRACTOR MUST RETAIN THE SERVICES OF A THIRD -PARTY HYDROGRAPHIC SURVEYOR TO PERFORM HYDROGRAPHIC SURVEYING, IN ACCORDANCE WITH USACE EM 1110-2-1003 GUIDANCE. THE HYDROGRAPHIC SURVEYOR SELECTED BY THE CONTRACTOR MUST BE A REGISTERED HYDROGRAPHIC SURVEYOR CERTIFIED BY THE NATIONAL SOCIETY OF PROFESSIONAL SURVEYORS OR THE HYDROGRAPHIC SOCIETY OF AMERICA, WITH QUALIFICATIONS ACCEPTABLE TO THE ENGINEER THE HYDROGRAPHIC SURVEYOR MUST WORK UNDER THE GUIDANCE AND OVERSIGHT OF THE LAND SURVEYOR. THE HYDROGRAPHIC SURVEYOR MUST HAVE ACTIVELY ENGAGED IN HYDROGRAPHIC SURVEY OPERATIONS DURING THE PAST 3 YEARS AND HAVE A MINIMUM OF 5 YEARS OF EXPERIENCE IN HYDROGRAPHIC SURVEYING WORKING IN SIMILAR MARINE CONDITIONS. 3. CONTRACTOR MUST DEMONSTRATE THE ABILITY TO ACHIEVE, MONITOR, AND REPORT THE ACCURACIES IDENTIFIED IN THE SURVEY WORK PLAN. CONTRACTOR MUST VERIFY ITS ERROR BUDGET (I.E., QC CHECK OF ALL SENSORS ONE TIME PER DAY) AND INCLUDE IT IN THE DAR EXECUTION: 1. ALL SURVEY WORK SHALL BE CONDUCTED USING EQUIPMENT, PERSONNEL, AND PROCEDURES THAT WILL ENSURE COMPLIANCE WITH THE ACCURACY STANDARDS DEFINED HEREIN. IT IS THE RESPONSIBILITY OF THE SUPERVISING LAND SURVEYOR TO ENSURE THAT ALL WORK UNDER THIS AGREEMENT COMPLIES WITH ALL STATE AND LOCAL REGULATIONS. ALL DOCUMENTS SUBMITTED BY THE LAND SURVEYOR SHALL BEAR THEIR SEAL. 2. TOPOGRAPHIC SURVEYS SHALL MEET THE FOLLOWING ADDITIONAL CRITERIA, AT A MINIMUM: A. MEASURE THE TARGET HORIZONTAL POSITION TO AN ACCURACY OF 0.1 FOOT AND THE TARGET ELEVATION TO AN ACCURACY OF 0.1 FOOT. B. LAND SURVEYOR SHALL PROVIDE COVERAGE OF THE WORK AREA BASED ON THE SIZE OF THE AREA TO ADEQUATELY CHARACTERIZE THE SURFACE AND TO SUBSEQUENTLY CALCULATE VOLUMES SUBJECT TO THE APPROVAL OF THE ENGINEER. TOPOGRAPHIC SURVEY SPACING SHALL NOT EXCEED 10 FEET. C. FOR TOPOGRAPHIC SURVEYS OF DREDGE AND DREDGED MATERIAL PLACEMENT AREAS, A MINIMUM OVERLAP OF 10 FEET IS REQUIRED WITH THE HYDROGRAPHIC SURVEY COVERAGE. 3. HYDROGRAPHIC SURVEYS SHALL MEET THE FOLLOWING ADDITIONAL, MINIMUM CRITERIA: A. SINGLE -BEAM DUAL FREQUENCY SURVEYS SHALL COMPLY WITH THE STANDARDS DEFINED IN USACE ENGINEERING AND DESIGN HYDROGRAPHIC SURVEYING MANUAL NO. 1110 2-1003, UNLESS OTHERWISE STATED HEREIN. B. SINGLE -BEAM SOUNDINGS SHALL BE TAKEN IN CONSECUTIVE CROSS -SECTIONS PARALLEL AND PERPENDICULAR TO THE STATIONING ESTABLISHED BY THE DRAWINGS. EACH CROSS-SECTION SHALL CONSIST OF INDIVIDUAL VERTICAL ELEVATIONS TAKEN IN LINES PARALLEL AND PERPENDICULAR TO THE BASELINE. C. TRANSECT SPACING FOR HYDROGRAPHIC DATA COLLECTED USING SINGLE -BEAM SURVEY EQUIPMENT SHALL NOT EXCEED 25 FEET. D. ALL HYDROGRAPHIC SURVEYS SHALL MEET THE FOLLOWING REPEATABLE ACCURACY: I. FOR ELEVATION, TO THE NEAREST 0.1 FOOT; REPEATABLE TO THE NEAREST 0.2 FOOT FOR THE EQUIPMENT USED. II. FOR HORIZONTAL DISTANCE, TO ±3.0 FEET; REPEATABLE TO THE NEAREST 1.0 FOOT FOR THE EQUIPMENT USED. III. HORIZONTAL POSITIONING SHALL BE BY RTK-DGPS OR EQUIVALENT TECHNOLOGY CAPABLE OF PROVIDING THE SAME LEVEL OF POSITIONING ACCURACY. 4. COMPUTE THE COORDINATES OF EACH SURVEYED POINT ON THE NORTH CAROLINA STATE PLANE, NORTH AMERICAN DATUM OF 1983, U.S. SURVEY FEET. THE VERTICAL DATUM SHALL BE BASED ON NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88). 5. THE FOLLOWING SURVEYS SHALL BE CONDUCTED AND PROVIDED TO THE ENGINEER IN BOTH A HARD COPY AND ELECTRONIC COPY, INCLUDING XYZ DATA FILES. ELECTRONIC VERSIONS MUST BE IN AUTOCAD CIVIL 3D (2018 OR LATER) FORMAT OR OTHER PROGRAM APPROVED BY THE ENGINEER. A. UTILITY SURVEY I. CONTRACTOR MUST SURVEY THE LOCATIONS OF ABOVEGROUND UTILITIES IN, OR IMMEDIATELY ADJACENT TO, THE WORK AREA PRIOR TO PERFORMING THE WORK TO CONFIRM CLEARANCES. II. CONTRACTOR MUST SURVEY LOCATIONS OF ANY UTILITIES REMOVED OR CAPPED DURING THE WORK AND PROVIDE SURVEY RESULTS TO THE ENGINEER WITHIN 10 WORKING DAYS OF COMPLETION OF SURVEY. III. CONTRACTOR MUST CONDUCT A POST -CONSTRUCTION UTILITIES SURVEY TO DOCUMENT THE LINE AND GRADE OF ANY INSTALLED UTILITIES. B. PRE -CONSTRUCTION AND POST -CONSTRUCTION CONDITIONS SURVEYS, INCLUDING PHOTOGRAPHS, TO ADEQUATELY DOCUMENT THE PRE -CONSTRUCTION AND POST -CONSTRUCTION SITE CONDITIONS I. CONTRACTOR MUST PERFORM A PRE -CONSTRUCTION CONDITIONS SURVEY BEFORE COMMENCEMENT OF THE WORK AND A POST -CONSTRUCTION CONDITIONS SURVEY AFTER COMPLETION OF THE WORK AS DESCRIBED HEREIN. II. PRE -CONSTRUCTION AND POST -CONSTRUCTION CONDITIONS SURVEYS MUST CONSIST OF DIGITAL PHOTOGRAPHS AND VIDEOS, INCLUDING AN INDEX. THE INDEX MUST USE A COUNTER OR OTHER INDEXING TECHNIQUE. VIDEOS MUST BE LABELED AND NARRATED. PHOTOGRAPHS MUST BE NUMBERED. A KEY PLAN MUST BE PROVIDED TO SHOW THE LOCATION AND GENERAL DIRECTION OF EACH PHOTOGRAPH AND VIDEO. III. DOCUMENTATION OF THE PRE -CONSTRUCTION CONDITIONS SURVEY MUST INCLUDE A WRITTEN DESCRIPTION OF THE CONDITION OF KEY FEATURES FOR EACH STRUCTURE IN AND ADJACENT TO THE WORK AREAS. THE DOCUMENTATION MUST NOTE ANY EVIDENT STRUCTURAL FAULTS AND DEFICIENCIES, OR RECENT REPAIRS. INSPECTION DOCUMENTATION MUST INCLUDE A SPACE FOR THE ENGINEER TO INITIAL CONFIRMING THE IDENTIFIED DEFECTS HAVE BEEN DISCUSSED. IV. AS PART OF THE PRE -CONSTRUCTION AND POST -CONSTRUCTION CONDITIONS SURVEYS, CONTRACTOR MUST CONDUCT TOPOGRAPHIC SURVEYS OF UPLAND AREAS THAT WILL BE DISTURBED DURING THE PERFORMANCE OF THE WORK TOPOGRAPHIC SURVEYS MUST DOCUMENT THE ELEVATIONS AND CONTOURS WITHIN THE WORK AREA THE SURVEY MUST ALSO DOCUMENT LOCATIONS, TYPES, AND SIZES OF VEGETATION (I.E., TREES AND SHRUBS), UTILITIES, AND STRUCTURES WITHIN AND IMMEDIATELY ADJACENT TO THE WORK AREA OR THAT MAY NEED TO BE ALTERED TO PERFORM THE WORK. C. CONTRACTOR MAY PERFORM A DEBRIS SURVEY PRIOR TO DREDGING. IF THE CONTRACTOR ELECTS TO PERFORM A DEBRIS SURVEY, THE METHODOLOGIES SHALL BE INCLUDED IN THE SURVEY WORK PLAN. D. PRE -DREDGE AND POST -DREDGE PAY SURVEYS TO CONFIRM THE WORK HAS BEEN COMPLETED AS SHOWN ON THE DRAWINGS. PRE -DREDGE SURVEYS MUST BE CONDUCTED FOR EACH DREDGE AREA NO MORE THAN 90 CALENDAR DAYS PRIOR TO THE START OF DREDGING IN THAT DREDGE AREA, UNLESS OTHERWISE APPROVED BY THE ENGINEER. E. PRE -DREDGED MATERIAL PLACEMENT AND POST -DREDGED MATERIAL PLACEMENT SURVEYS TO CONFIRM THE WORK HAS BEEN COMPLETED AS SHOWN ON THE DRAWINGS. PRE -DREDGED MATERIAL PLACEMENT SURVEYS MUST BE CONDUCTED FOR EACH DREDGED MATERIAL PLACEMENT AREA NO MORE THAN 90 CALENDAR DAYS PRIOR TO THE START OF DREDGED MATERIAL PLACEMENT IN THAT DREDGED MATERIAL PLACEMENT AREA, UNLESS OTHERWISE APPROVED BY THE ENGINEER. 6. DO NOT USE MARSH BUGGIES OR TRACKED AMPHIBIOUS VEHICLES WHEN CONDUCTING THE PRE- AND POST -DREDGED MATERIAL PLACEMENT SURVEYS. 7. IF CONTRACTOR ELECTS TO USE SINGLE -BEAM OR TOPOGRAPHIC SURVEY METHODS, THE SPACING OF THE MEASUREMENTS MUST CONSIDER LOCAL CONDITIONS ON A LOCATION -BY -LOCATION BASIS AND MUST BE DETAILED IN THE CONTRACTOR'S SURVEY WORK PLAN. SURVEY MEASUREMENT SPACING MUST NOT EXCEED 25 FEET; HOWEVER, SPACING MUST BE REDUCED AS APPROPRIATE TO COLLECT ADEQUATE DATA TO CHARACTERIZE THE CONDITIONS. FOR INSTANCE, IN A DREDGE AREA WITH NARROW WIDTH (E.G., 10 TO 15 FEET), AT LEAST TWO SURVEY MEASUREMENTS MUST BE COLLECTED ACROSS THE WIDTH OF THE UNIT. 8. THE SAME SURVEY METHOD AND SURVEY MEASUREMENT SPACING MUST BE USED FOR PRE- AND POST CONSTRUCTION SURVEYS FOR DREDGING AND DREDGED MATERIAL PLACEMENT WITHIN A GIVEN AREA. FOR INSTANCE, IF A PRE -DREDGED MATERIAL PLACEMENT SURVEY IS PERFORMED USING DRONE SURVEY METHODS FOR A GIVEN DREDGED MATERIAL PLACEMENT AREA, THEN THE POST -DREDGE SURVEY IN THAT DREDGE AREA MUST USE THE SAME DRONE SURVEY METHODS. 9. CONTRACTOR MUST PROVIDE AND MAINTAIN STAKES, LINES, BENCHMARKS, WATER SURFACE ELEVATION BOARDS, AND OTHER TEMPORARY WORKING POINTS, LINES, AND LEVELS. CONTRACTOR MUST CONSTRUCT THE TEMPORARY WORKING POINTS TO BE "PERMANENT" DURING CONSTRUCTION AND REMOVE WORKING POINTS AFTER OBTAINING THE ENGINEER'S APPROVAL WHEN THEY ARE NO LONGER NEEDED. (CONTINUED NEXT SHEET) STATE CONSTRUCTION OFFICE ID #: 21-22971-01A ANCHOR lEAANCHOR QEA CAROLINA. C 231 HAYWOOD STREET ASHEVILLE, NC 28801 LICENCE: P-1649 Kim Muffs WOW. Ca Woo you Mg REVISIONS REV DATE BY APP'D DESCRIPTION DESIGNED BY: SMITH J. DRAWN BY: HOLMER, D. CHECKED BY: CORK, R. APPROVED BY: DINICOLA, W. SCALE AS NOTED DATE JULY2021 NORTH CAROLINA WILDLIFE RESOURCES COMMISSION LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING GENERAL NOTES, SPECIFICATIONS, LEGEND, AND ABBREVIATIONS (SHEET 3 OF 5) G4 SHEET M 4 OF 16 G 0 u 0 E S K\ProiectA1713-NC Wildlif 10. SHOW FINAL CONTOURS OF THE DREDGING AND DREDGED MATERIAL PLACEMENT AREAS AT A MINIMUM OF 0.5-FOOT CONTOURS. 11. THE FINAL SURVEY/RECORD DRAWING SHALL BE CERTIFIED BY THE LAND SURVEYOR. 32 30 00 - SITE CLEARING AND RESTORATION EXECUTION: 1. CLEARING SHALL BE LIMITED TO THE LIMIT OF DISTURBANCE, AS SHOWN ON THE DRAWINGS. LIMIT TREE REMOVAL BY WORKING AROUND EXISTING TREES, AS POSSIBLE. CONTRACTOR MUST RECEIVE APPROVAL FROM THE ENGINEER PRIOR TO REMOVAL OF ANY TREES LARGER THAN 6 INCHES DIAMETER AT BREAST HEIGHT. 2. ANY TREES DAMAGED OR REMOVED DURING THE WORK SHALL BE REPLACED BY THE CONTRACTOR WITH THE SAME SPECIES, OR SIMILAR, AS APPROVED BY THE ENGINEER, AT CONTRACTOR'S EXPENSE. 3. AS DETAILED IN 02 21 13 - SURVEYING, THE CONTRACTOR IS RESPONSIBLE FOR DOCUMENTING PRE -CONSTRUCTION SITE CONDITIONS (E.G., CONDITIONS OF PAVEMENT, BOAT RAMP, DOCK, AND ANY OTHER ACCESS AREAS OR WORK AREAS WITHIN THE LIMITS OF DISTURBANCE). ANY DAMAGES THAT MAY OCCUR TO PROPERTY OR EXISTING IMPROVEMENTS SHALL BE RESTORED BY THE CONTRACTOR TO AT LEAST THE SAME CONDITION THAT THE PROPERTY OR EXISTING IMPROVEMENTS WERE IN PRIOR TO THE DAMAGES, AT CONTRACTOR'S EXPENSE. THIS RESTORATION MAY BE NEGOTIATED WITH THE OWNER AND WILL BE SUBJECT TO THE OWNER'S APPROVAL. CONTRACTOR EQUIPMENT SHALL NOT ENTER OR IMPACT THE MARINA AREA AND SLIPS LOCATED OUTSIDE OF THE LIMITS OF DISTURBANCE. 4. ADDITIONAL RESTORATION MAY BE REQUIRED IF THE ENGINEER DETERMINES THE POST -CONSTRUCTION SITE CONDITIONS ARE INADEQUATE AS A RESULT OF THE CONTRACTOR'S OPERATIONS TO COMPLETE THE WORK, AT CONTRACTOR'S EXPENSE. 32 90 00 - PLANTING SUMMARY: 1. CONTRACTOR SHALL PLANT WETLAND VEGETATION IN DREDGED MATERIAL PLACEMENT AREAS AS SHOWN IN THE DRAWINGS AND SHALL RESTORE ANY WETLAND AREAS DISTURBED AS A RESULT OF THE WORK. PLANT SPECIES FOR REPLACEMENT SHOULD BE SELECTED FOLLOWING THE PLANTING TABLES SHOWN IN THE DRAWINGS. QUALITY CONTROL: 1. THE CONTRACTOR SHALL SUBMIT A LIST OF NURSERIES SUPPLYING ALL PLANT SPECIES SHOWN IN THE DRAWINGS AND A MANUFACTURER'S PLANT SPECIFICATIONS AND CERTIFICATIONS. SUBMIT REPRESENTATIVE COLOR AND DATED tZANCHOR QEAG�f.r<I ANCHOR PEA Of NORTH CAROLINA PLLC 231 HAYWOOD STREET ASHEVILLE, NC 26801 LICENCE: P-1649 PHOTOGRAPHS OF EACH PLANT SPECIES. 2. SUBMIT THE FOLLOWING PRODUCT DATA WITH EACH PLANT MATERIAL DELIVERY: A. INVOICE INDICATING SIZES AND VARIETY OF PLANT MATERIAL BLABELS FOR EACH PLANT OR BUNDLES OF PLANTS INDICATING SPECIES AND SIZE. EXECUTION: 1. ALL PLANTS SHALL BE PROPERLY PROTECTED FROM DAMAGE, DRYING OUT, AND BROWSING BY ANIMALS. SUCH PROTECTION SHALL INCLUDE THE TIME WHEN THE PLANTS ARE IN TRANSIT, BEING HANDLED, OR IN TEMPORARY STORAGE. PLANTS SHALL BE CAREFULLY UNLOADED AT THE STAGING AREA AND PLACED IN A SHADED AREA. ALL PLANTS NOT PLANTED IMMEDIATELY SHALL BE WATERED AS SPECIFIED BY THE SUPPLIER. PLANTS SHALL BE PLANTED WITHIN 48 HOURS OF DELIVERY TO THE SITE. 2. PLANTS THAT ARE NOT FOUND TO MEET ALL REQUIRED CONDITIONS MUST BE REMOVED FROM THE SITE AND REPLACED IMMEDIATELY AT THE ENGINEER'S DISCRETION. 3. PLANTING UNITS SHALL BE INSTALLED AT THE LOCATIONS OF DISTURBED AREAS AS DETERMINED BY THE ENGINEER. PLANTINGS SHALL BE SPACED AS SHOWN ON THE DRAWINGS. 4. ALTERNATIVE SPACING ARRANGEMENTS AND LAYOUT MAY BE SUBMITTED IN WRITING TO THE ENGINEER FOR REVIEW AND APPROVAL AT A MINIMUM, ANY ALTERNATIVE METHODS MUST PROVIDE FOR UNIFORM COVERAGE OF THE RESTORATION AREA AND ADHERENCE TO PLANT EMBEDMENT REQUIREMENTS. 5. INSTALL HERBIVORY PROTECTION MEASURES APPROVED BY THE ENGINEER WITHIN 48 HOURS OF PLANTING. 6. THE CONTRACTOR SHALL WARRANTY ALL PLANT MATERIAL INSTALLED UNDER THIS CONTRACT FOR A PERIOD OF 1 YEAR FROM THE DATE OF FINAL ACCEPTANCE OF THE INSTALLED PLANTS. AT THE END OF THE WARRANTY PERIOD, THE PLANTING SHALL MEET THE COVERAGE REQUIREMENTS STATED BELOW. IF THE STATED COVERAGE IS NOT MET, THE PLANTS SHALL BE REPLACED IN ACCORDANCE WITH THESE DRAWINGS, NO LATER THAN THE FOLLOWING GROWING SEASON, AT THE CONTRACTOR'S EXPENSE. A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING NO MORE THAN THE ORIGINAL PLANTS AND ONE REPLACEMENT PLANT UNDER THE WARRANTY. B. THE CONTRACTOR CAN PLANT AT A HIGHER DENSITY, AT NO ADDITIONAL COST TO THE OWNER, THAN THAT IS PRESCRIBED IN IN THESE DRAWINGS TO ACHIEVE THE WARRANTY REQUIREMENTS OF THE PROJECT. 35 20 23 - HYDRAULIC DREDGING AND DREDGED MATERIAL PLACEMENT SUMMARY: 1. CONTRACTOR SHALL HYDRAULICALLY DREDGE MATERIAL FROM THE VERTICAL AND LATERAL DREDGING LIMITS IDENTIFIED ON THE DRAWINGS AND HYDRAULICALLY CONVEY THE DREDGED MATERIAL TO THE DREDGED MATERIAL PLACEMENT AREAS IDENTIFIED ON THE DRAWINGS. 2. ELECTRONIC DREDGE PRISM FILES THAT DEFINE THE REQUIRED LIMITS AND GRADES OF DREDGING AS SHOWN ON THE DRAWINGS INCLUDE THE FOLLOWING, WHICH ARE PROVIDED WITH THE BID DOCUMENTS: A. DESIGN DREDGE PRISM XYZ FILES, WHICH ARE ELECTRONIC DATA POINT FILES THAT SPECIFY THE HORIZONTAL (X AND Y) AND VERTICAL (Z) EXTENT OF MATERIAL TO BE REMOVED AS PART OF THE DREDGING ON A 1-FOOT-BY-1-FOOT BASIS WITHIN THE FOOTPRINT OF THE TARGETED DREDGING AREA PLUS ADJOINING SIDE SLOPE AREAS. THE DESIGN DREDGE PRISM XYZ FILES REPRESENT THE REQUIRED ELEVATIONS FOR THE DESIGN DREDGE CUT. I. OVERDREDGE PRISM XYZ FILES, WHICH ARE ELECTRONIC DATA POINT FILES THAT SPECIFY THE HORIZONTAL (X AND Y) AND VERTICAL (Z) EXTENT OF THE OVERDREDGE ALLOWANCE. THE ELECTRONIC DATA FILES CONTAIN X, Y, AND Z VALUES ON A 1-FOOT-BY-1-FOOT BASIS WITHIN THE FOOTPRINT OF THE TARGETED DREDGING, AREA PLUS ADJOINING SIDE SLOPE AREAS. II. DESIGN DREDGE PRISM BOUNDARY FILES, WHICH SHOW THE LATERAL EXTENT OF THE DESIGN DREDGE PRISM XYZ FILES WHERE THE DREDGE CUT INTERSECTS THE EXISTING PRE -DREDGE SURFACE. DESIGN DREDGE PRISM BOUNDARY FILES ARE AUTOCAD DXF DATA FILES. 111. OVERDREDGE PRISM BOUNDARY FILES, WHICH SHOW THE LATERAL EXTENT OF THE OVERDREDGE PRISM XYZ FILES WHERE THE ALLOWABLE OVERDREDGE CUT INTERSECTS THE EXISTING PRE -DREDGE SURFACE. B. DREDGE PRISM FILES MAY BE REVISED TO ACCOUNT FOR UPDATED PRE -CONSTRUCTION HYDROGRAPHIC SURVEY DATA, OR TO INCORPORATE SETBACKS APPROVED BY THE ENGINEER. REVISED DREDGE PRISM FILES, IF ANY, WILL BE ISSUED TO THE CONTRACTOR BY THE ENGINEER PRIOR TO THE START OF DREDGING WITHIN A DREDGE AREA. REFERENCES: 1. 33 CODE FEDERAL REGULATIONS Cal Were 11mLi4 (CFR) 2. USCG NAVIGATION RULES 3. NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL - REVISED MAY 2013. QUALITY CONTROL 1. CONTRACTOR SHALL SUBMIT MATERIAL SPECIFICATIONS FOR ALL TURBIDITY CONTROLS, E&SC MEASURES, AND PLACEMENT AREA CONTAINMENT FEATURES. 2. TURBIDITY CONTROL SYSTEM, E&SC MEASURES, AND PLACEMENT AREA CONTAINMENT FEATURES SHALL BE INSPECTED DAILY AND AFTER EACH SIGNIFICANT RAINFALL (0.5 INCH OR GREATER). DEFICIENCIES SHALL BE CORRECTED IMMEDIATELY. CONTRACTOR SHALL MAINTAIN A DAILY RECORD ON SITE. PROJECT SITE CONDITIONS MAY REQUIRE INSTALLATION OF ADDITIONAL TURBIDITY CONTROL MEASURES. EXECUTION - DREDGING: 1. CONTRACTOR MUST PROVIDE ALL SUPERVISION, LABOR, TOOLS, MATERIALS, EQUIPMENT, SERVICES, AND APPURTENANCES NECESSARY FOR, OR INCIDENTAL TO, DREDGING AND DEBRIS REMOVAL AND RELATED WORK SHOWN ON THE DRAWINGS. 2. CONTRACTOR MUST COMPLY WITH ALL APPLICABLE CFR AND USCG REGULATIONS FOR IN -WATER WORK, INCLUDING, BUT NOT LIMITED TO, PROVIDING LIGHTS FOR FLOATING EQUIPMENT, DREDGES, PIPELINES, AND BOOSTER PUMPS, DURING PERIODS OF RESTRICTED VISIBILITY AND MARKING WORK AREAS WITH BUOYS. 3. THE DREDGE MUST BE EQUIPPED WITH AN RTK-DGPS AND THE NECESSARY SENSORS TO ENABLE ACCURATE POSITIONING OF THE DREDGE AND FOR THE CONTRACTOR TO CONTINUOUSLY MONITOR AND TRACK THE LOCATION OF THE DREDGE. POSITIONING EQUIPMENT MUST BE CALIBRATED AT LEAST ONCE PER SHIFT AND DETAILS AND RESULTS PROVIDED IN THE DAR. 4. CONTRACTOR MUST OPERATE ALL IN -WATER EQUIPMENT SO AS TO MAINTAIN A DRAFT SUITABLE TO WORK WITHIN THE DREDGE AREAS. 5. CONTRACTOR MAY REQUEST THAT THE LAKE WATER LEVEL BE DRAWN DOWN AND HELD AT AN ELEVATION UP TO 5 FEET BELOW THE NORMAL FULL POND ELEVATION (911.61 FEET), SHOWN ON THE DRAWINGS. THE ENGINEER MUST APPROVE ANY WATER LEVEL DRAWDOWN REQUEST AND WILL FACILITATE APPROVAL AND SCHEDULING WITH THE DAM OPERATOR. ALL DRAWDOWN ACTIVITIES MUST FOLLOW ALL APPLICABLE PERMITS AND CONTRACT DOCUMENTS. 6. CONTRACTOR MUST REMOVE SEDIMENT FROM THE DREDGE PRISM TO THE LINES, GRADES, SLOPES, AND ELEVATIONS SHOWN ON THE DRAWINGS. REVISIONS DO NOT STOCKPILE SEDIMENT IN THE WATER OR WETLANDS. LEVELING OF THE COMPLETED DREDGING SURFACE BY DRAGGING A BEAM, OR SIMILAR IS NOT PERMITTED. 7. CONTRACTOR MUST EVALUATE AND SELECT METHODOLOGIES AND BEST MANAGEMENT PRACTICES TO LIMIT TURBIDITY GENERATED FROM DREDGING OPERATIONS. CONTRACTOR MUST COMPLY WITH THE FOLLOWING TURBIDITY REQUIREMENTS: A. CONTRACTOR SHALL MEASURE TURBIDITY USING HAND-HELD OR AUTOMATED TURBIDITY METERS TO RECORD NTU USING THE FOLLOWING SCHEDULE: I. DURING THE FIRST WEEK OF IN -LAKE ACTIVITIES: DAILY AT THE UPSTREAM LOCATION (SEE SHEET C6) AND TWICE DAILY AT THE DOWNSTREAM LOCATION (ONCE 2-3 HOURS AFTER OPERATIONS HAVE STARTED AND ONCE DURING THE LAST 1-2 HOURS OF WORK). II. IF TURBIDITY REQUIREMENTS DISCUSSED IN PARTS 7B THROUGH 7D ARE MET DURING THE FIRST WEEK MONITORING WILL BE REDUCED TO ONCE DAILY TAKEN DURING THE LAST 1-2 HOURS OF IN -LAKE ACTIVITIES FOR THE REMAINDER OF THE WORK. B. TURBIDITY READING AT THE DOWNSTREAM MONITORING LOCATION SHALL NOT EXCEED 25 NTU ABOVE TURBIDITY READING AT THE UPSTREAM MONITORING LOCATION FOR TWO CONSECUTIVE READINGS (SEE SCHEDULE OF READINGS IN PART 7A). MONITORING LOCATIONS ARE IDENTIFIED ON SHEET C6. C. IF TURBIDITY EXCEEDS 25 NTU ABOVE BACKGROUND, CONTRACTOR SHALL EVALUATE WORK OPERATIONS AND BEST MANAGEMENT PRACTICES TO DETERMINE THE SOURCE OF THE TURBIDITY. CONTRACTOR SHALL SUMMARIZE FINDINGS OF THE EVALUATION AND CORRECTIVE MEASURES IN THE DAR. D. IF ADJUSTMENTS DO NOT REDUCE DOWNSTREAM TURBIDITY LEVELS BELOW PROJECT TURBIDITY CRITERIA WITHIN 24 HOURS OF THE SECOND EXCEEDANCE READING, THEN WORK SHALL CEASE AND CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER. 8. CONTRACTOR SHALL REMOVE MATERIAL SUCH THAT 100% OF THE POST -DREDGE SURVEYED SURFACE IS AT OR BELOW THE DREDGE DESIGN SURFACE ELEVATIONS, BASED ON AN ISOPACH COMPARISON BETWEEN THE POST -DREDGE AND DESIGN SURFACES. 9. CONTRACTOR SHALL SEQUENCE DREDGING AS FOLLOWS: A. DREDGING SHALL BEGIN IN DREDGE UNIT (DU) 1, DU 2A, AND DU 2B. ALL DREDGING SHALL BE REV DATE BY APP'D DESCRIPTION DESIGNED BY: SMITH J. COMPLETED, AS DETERMINED BY CONTRACTOR ESTIMATE, WITH APPROVAL FROM THE ENGINEER, IN DU 1, DU 2A, AND DU 2B. B. CONTRACTOR SHALL THEN COMPLETE ALL DREDGING IN DU 3 AND DU 4. FOLLOWING APPROVAL FROM THE ENGINEER, THE CONTRACTOR SHALL PROCEED TO DU 5 AND DU 6, AND THEN, WITH APPROVAL FROM THE ENGINEER, WILL PROCEED TO DU 7 AND DU 8. 10. CONTRACTOR SHALL NOT DREDGE MORE THAN 3,000 CUBIC YARDS (CY) FROM DU 2A, DU 26, DU4, DU6, AND DU8 COMBINED. DREDGING WITHIN THESE DUS WILL BE CONSIDERED COMPLETE ONCE THE CONTRACTOR HAS REMOVED A TOTAL OF 3,000 CY FROM THEM. ANY ADDITIONAL DREDGING IDENTIFIED IN THESE DUS ON THE DRAWINGS WILL NOT BE COMPLETED. PAYMENT WILL NOT BE MADE FOR DREDGING WITHIN THESE DUS IN EXCESS OF A COMBINED 3,000 CY. 11. OVERDREDGE ALLOWANCE IS 6 INCHES BELOW THE REQUIRED DREDGE CUT SHOWN ON THE DRAWINGS. NO PAYMENT WILL BE MADE FOR THE REMOVAL MANAGEMENT, TRANSPORTATION, OR PLACEMENT OF MATERIAL BEYOND THE LATERAL LIMITS OF DREDGING OR BEYOND THE VERTICAL OVERDREDGE ALLOWANCE, UNLESS APPROVED OR DIRECTED BY THE ENGINEER. 12. CONTRACTOR DREDGING OR ASSOCIATED OPERATIONS MUST NOT DAMAGE EXISTING SHORELINE AND STRUCTURES ADJACENT TO THE WORK. CONTRACTOR MUST REPAIR DAMAGE RESULTING FROM DREDGING OPERATIONS OR OTHER CONTRACTOR CONSTRUCTION ACTIVITIES IN SUPPORT OF THE WORK TO THE ORIGINAL CONDITION PRIOR TO DAMAGE, AND REPAIR TO A CONDITION APPROVED BY THE ENGINEER, AT CONTRACTOR'S EXPENSE. 13. IF DEBRIS IS ENCOUNTERED WHILE DREDGING, CONTRACTOR SHALL TRANSPORT DEBRIS TO THE STAGING AREA, WHERE IT SHALL BE TRANSPORTED TO AN APPROVED OFF -SITE DISPOSAL LOCATION. CONTRACTOR MUST COMPLY WITH THE REQUIREMENT IN 01 57 13 - TEMPORARY EROSION AND SEDIMENT CONTROL DURING ALL DEBRIS HANDLING ACTIVITIES WITHIN THE STAGING AREA VEHICLES TRANSPORTING DEBRIS OFF SITE MUST FOLLOW POSTED SPEED LIMITS, TRAFFIC SIGNS AND SIGNALS, AND ALL COUNTY HEIGHT, WEIGHT, AND UNDER -CLEARANCE RESTRICTIONS. CONTRACTOR SHALL NOT TRACK OR DISCHARGE SEDIMENT OR DEBRIS ONTO ROADS. 14. CONTRACTOR MUST CONDUCT THE WORK WHILE MINIMIZING INTERFERENCE WITH NAVIGATION. 15. FOR ALL IN -LAKE OPERATIONS, THE CONTRACTOR MUST PROVIDE, DEPLOY, AND MAINTAIN SPILL CONTROL AND CONTAINMENT KITS AND OTHER OIL-SORBENT MATERIALS. EXECUTION - DREDGED MATERIAL DRAWN BY: HOLMEY. D. CHECKED BY: CORK_ R. APPROVED BY: DINICOLA W. SCALE AS NOTED DATE JULY2021 PLACEMENT: 1. CONTRACTOR SHALL CONSTRUCT PLACEMENT AREAS TO CONTAIN DREDGED MATERIAL IN THE FOOTPRINTS SHOWN ON THE DRAWINGS. IN ADDITION, CONTRACTOR SHALL INSTALL SILT FENCING ALONG ALL WETLANDS ADJACENT TO THE PLACEMENT AREA. CONCEPTUAL EXAMPLES OF MATERIAL THAT MAY BE USED ARE SHOWN ON THE DRAWINGS AND INCLUDE, BUT ARE NOT LIMITED TO, COIR LOGS AND HAYBALES. CONTRACTOR -SELECTED METHODOLOGIES FOR CONTAINING DREDGED MATERIAL SHALL BE DETAILED IN THE CONTRACTOR'S DREDGING AND DREDGED MATERIAL PLACEMENT WORK PLAN. 2. CONTRACTOR SHALL USE A PLACEMENT METHOD THAT RESULTS IN A GENERALLY UNIFORM DISTRIBUTION AND THICKNESS OF DREDGED MATERIAL WITHIN THE PLACEMENT AREA AND MINIMIZES TURBIDITY IN THE WATER DISCHARGED FROM THE PLACEMENT AREA. DREDGED MATERIAL SHALL BE HYDRAULICALLY CONVEYED AND SPRAYED WITHIN THE PLACEMENT AREA SUCH THAT ADDITIONAL IN -PLACE MANIPULATION OF THE MATERIAL IS NOT NECESSARY TO MEET ELEVATION REQUIREMENTS. 3. CONTRACTOR SHALL INSTALL ON AN APPROXIMATELY HALF -ACRE GRID, A MINIMUM OF FOUR BIODEGRADABLE BENCHMARKS, DRIVEN TO REFUSAL WITHIN PLACEMENT AREAS. LEGIBLE USGS STYLE -A STAFF GAUGES THAT ARE VISIBLE FROM A CENTRAL LOCATION (PREFERABLY THE STAGING AREA) SHALL BE ATTACHED TO EACH BENCHMARK, FOR NCWRC TO TRACK CONSOLIDATION OF PLACED DREDGED MATERIAL OVER TIME, FOLLOWING COMPLETION OF THE WORK. 4. CONTRACTOR SHALL MONITOR TURBIDITY DURING DREDGED MATERIAL PLACEMENT ACTIVITIES AND SHALL NOT EXCEED TURBIDITY LIMITS. THE MONITORING SCHEDULE AND TURBIDITY LIMITS ARE DEFINED IN THE DREDGING EXECUTION NOTES. 5. CONTRACTOR SHALL INSTALL E&SC MEASURES AND TURBIDITY CONTROLS AROUND THE DREDGED MATERIAL PLACEMENT AREAS, AS SHOWN ON THE DRAWINGS. CONCEPTUAL EXAMPLES OF E&SC MEASURES THAT MAY BE USED ARE SHOWN ON THE DRAWINGS AND INCLUDE, BUT ARE NOT LIMITED TO, COIR LOGS, PER G.S. 113A-57.3 HAYBALES ARE NOT AN APPROVED E&SC MEASURE. CONCEPTUAL EXAMPLES OF TURBIDITY CONTROLS THAT MAY BE USED ARE SHOWN ON THE DRAWINGS AND INCLUDE, BUT ARE NOT LIMITED TO, SILT CURTAINS AND SILT FENCES. CONTRACTOR -SELECTED METHODOLOGIES FOR ACHIEVING TURBIDITY REQUIREMENTS DEFINED IN THE DREDGING EXECUTION NOTES SHALL BE DETAILED IN THE CONTRACTOR'S DREDGING AND DREDGED MATERIAL PLACEMENT WORK PLAN. (CONTINUED NEXT SHEET) NORTH CAROLINA WILDLIFE RESOURCES COMMISSION LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING GENERAL NOTES, SPECIFICATIONS, LEGEND, AND ABBREVIATIONS (SHEET 4 OF 5) STATE CONSTRUCTION OFFICE ID #: 21-22971-01A G5 SHEET • 5 OF 16 DATUMS: ABBREVIATIONS: c o E E z Jul 20.2021 1:43pm dholmer 6. CONTRACTOR SHALL BEGIN BY PLACING DREDGED MATERIAL FROM DU 1, DU 2A, AND DU 2B IN THE SOUTHWESTERN (I.E., UPGRADIENT) PORTIONS OF DREDGED MATERIAL PLACEMENT AREAS Al AND A2. CONTRACTOR SHALL MOVE THE END OF THE DISCHARGE LINE, AS NEEDED, TO EVENLY DISTRIBUTE MATERIALS WITHIN THE DREDGED MATERIAL PLACEMENT AREA. AS NECESSARY, CONTRACTOR SHALL USE A SPREADER DEVICE AT THE END OF THE DISCHARGE LINE TO EVENLY DISPERSE MATERIAL AND LIMIT EROSIVE FORCES FROM THE DISCHARGE. 7. DREDGED MATERIAL MUST BE PLACED WITHIN PLACEMENT AREAS BELOW THE MAXIMUM ALLOWABLE PLACEMENT ELEVATION OF 913.9 FEET NAVD88 IN AT LEAST 95% OF THE PLACEMENT AREA. 8. CONTRACTOR SHALL USE QC ELEMENTS AS NECESSARY TO TRACK AND VERIFY INSTALLATION ELEVATION OF THE PLACED MATERIAL DURING THE WORK. QC METHODS MAY INCLUDE, BUT ARE NOT LIMITED TO, USE OF GRADE STAKES, CORES, CATCH PANS, OR OTHER METHODS OF DETERMINING INSTALLED COVER ELEVATION. 9. MATERIAL SHALL BE PLACED SUCH THAT A MUDWAVE IS NOT CREATED WITHIN THE PLACEMENT AREA. 10. CONTRACTOR SHALL FURNISH ALL DISCHARGE LINES, VALVING, SPREADERS, APPURTENANCES, AND ANY OTHER EQUIPMENT NEEDED TO MOVE DISCHARGE LINES AND PLACE DREDGED MATERIAL. 11. CONTRACTOR SHALL FURNISH ALL MATERIAL HOPPERS, CONVEYOR BELTS, MIXING TANKS, PUMPS, MAKE-UP WATER LINES, EARTH MOVING EQUIPMENT, AND OTHER APPURTENANCES NEEDED TO MIX AND HYDRAULICALLY TRANSPORT DREDGED MATERIAL TO THE DISCHARGE LOCATION. 12. ANY EQUIPMENT USED IN SHALLOW WATER (LESS THAN 2 FEET) WITHIN THE MATERIAL PLACEMENT AREA SHALL BE LOW GROUND PRESSURE, AMPHIBIOUS EQUIPMENT APPROVED BY THE ENGINEER PRIOR TO COMMENCING THE WORK. 13. CONTRACTOR SHALL SEQUENCE PLACEMENT ACTIVITIES APPROPRIATELY TO MINIMIZE TRAVEL OVER EXISTING SUBSTRATE WITHIN THE MATERIAL PLACEMENT AREA. 14. PRIOR TO BEGINNING THE WORK, CONTRACTOR SHALL IDENTIFY AND FLAG ALL WETLANDS WITHIN 100 FEET OF THE LIMITS OF DISTURBANCE IDENTIFIED ON THE DRAWINGS. NO EQUIPMENT SHALL DISTURB ANY WETLANDS. CONTRACTOR SHALL LIMIT ANY IMPACTS TO EXISTING WETLANDS WITHIN THE LIMITS OF DISTURBANCE. ANY WETLANDS IMPACTED DURING CONSTRUCTION SHALL BE RESTORED TO PRE -CONSTRUCTION CONDITIONS, AT CONTRACTOR'S EXPENSE. 15. CONTRACTOR SHALL NOT IMPACT WETLANDS OUTSIDE OF THE LIMITS OF DISTURBANCE IDENTIFIED ON THE DRAWINGS. IF IMPACTS OCCUR, CONTRACTOR SHALL IMMEDIATELY NOTIFY QANCHOR QEA ANCHOR QEA OF CAROLINA 231 HAYWOOD STREET ASHEVILLE. NC 28801 LICENCE: P-1 W9 THE ENGINEER, AND CONTRACTOR SHALL RESTORE TO PRE -CONSTRUCTION CONDITIONS, AT CONTRACTOR'S EXPENSE. 16. FOLLOWING COMPLETION OF DREDGED MATERIAL PLACEMENT WORK, CONTRACTOR SHALL REMOVE ALL SILT FENCING AND OTHER NON -BIODEGRADABLE MATERIALS. IN ADDITION, CONTRACTOR SHALL REMOVE ALL PLACEMENT AREA CONTAINMENT FEATURES ABOVE THE NEW GROUND SURFACE ELEVATION. Saw Mori a101r11. 1. HORIZONTAL DATUM: NORTH CAROLINA, NORTH AMERICAN DATUM (NAD83), U.S. SURVEY FEET 2. VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88), FEET SOURCE: AERIAL PHOTOGRAPH ©2019 MICROSOFT CORPORATION ©2019 DIGITALGLOBE ©CNESS (2019) DISTRIBUTION AIRBUS DS GENERAL LEGEND: PROPOSED: 14+00 —905 oaoo.c.s:c o• •S� SF EXISTING: PROJECT STATIONING DREDGE AREA (PRIMARY) DREDGE CONTOURS (1' INTERVAL) DREDGE AREA (CONTINGENCY) EXAMPLE COIR LOG OR HAYBALE LOCATION EXAMPLE EROSION AND SEDIMENT CONTROL MEASURES EXAMPLE SILT CURTAIN OR SILT FENCE LOCATION EXAMPLE SILT FENCE LOCATION LIMITS OF DISTURBANCE SITE ACCESS ROAD STAGING AREA TOPOGRAPHY (1' INTERVAL) CHANNEL MARKERS }—{ CULVERT ROAD 905 SHORELINE (NORMAL POOL ELEVATION 911.61') DETAIL AND SECTION REFERENCING: DETAIL REFERENCE NUMBER DRAWING ON WHICH DETAIL APPEARS "" INDICATES TYPICAL OR ON SAME DRAWING DETAIL REFERENCE NUMBER SECTION "A" IS SHOWN ON DRAWING "C-2" SECTION REFERENCE LETTER PLAN NUMBER WHICH SECTION WAS TAKEN 0 DETAIL SCALE: 1" = 10' REVISIONS INDICATES DIRECTION OF CUTTING PLAN SECTION SCALE: 1" = 10' REV DATE BY APPD DESCRIPTION 11 FEET, MINUTES INCHES, SECONDS o DEGREES O DIAMETER # NUMBER APPROX APPROXIMATE CONC CONCRETE CY CUBIC YARDS DIA DU DWG ELEV E&SC EX FG FL GALV HOR LF MAX MIN MLLW N NAD NAVD P.E. R, RAD REINF ROW S STA SY TESC TYP W W/ WSEL DESIGNED BY SMITH J. DIAMETER DREDGE UNIT DRAWING EAST, EASTING ELEVATION EROSION AND SEDIMENT CONTROL EXISTING FINISHED GRADE FLOW LINE GALVANIZED HORIZONTAL LENGTH LINEAR FEET MAXIMUM MINIMUM MEAN LOWER LOW WATER NORTH, NORTHING NORTH AMERICAN DATUM NORTH AMERICAN VERTICAL DATUM PROFESSIONAL ENGINEER RADIUS REINFORCED, REINFORCEMENT RIGHT-OF-WAY SLOPE, SOUTH STATION SQUARE YARD TEMPORARY EROSION AND SEDIMENT CONTROL TYPICAL WEST, WATER WITH WATER SURFACE ELEVATION DRAWN BY HOLMEP. D. CHECKED BY: CORK R. APPROVED BY: DINICOLk W. SCALE AS NOTED DATE JULY2021 NORTH CAROLINA WILDLIFE RESOURCES COMMISSION LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING GENERAL NOTES, SPECIFICATIONS, LEGEND, AND ABBREVIATIONS (SHEET 5 OF 5) STATE CONSTRUCTION OFFICE ID #: 21-22971-01A G6 SHEET # 6 OF 16 0 3 E N 0 gE EXISTING CULVERT LAKE ADGER PROPERTY OWNERS ACCOCIATION P41-15 OWNER UNKNOWN P54-279 FLOATING DOCK LAKE ADGER NO PARCEL NUMBER LAKE ADGER (FULL POOL ELEVATION 977.67) POLK COUNTY P55-566 • J O :saLa`ti.je • •►�` ` ' p • e. '• ! . r . Jf '1• • 7 • 6...V.14 . •o,. 4, _. _ � •ems -`�c - T f r • i .� ,.lJ�� A% %• .a ••f >iJ- y‘1per. p1 r,..-- 7 :� .... pt 4 1 ` r s • 0 a •' 4. e�' 1 Ak' 10r t • • • 0 .r 0 0 F .0 '" _ 2 r r - 0- .. . l f .1 1 dv:? nt ill \ ,5.-- 47 1 ` P4� r-� LAKE ADGER • LEGEND: —905— EXISTING TOPOGRAPHY (1' INTERVAL) — • • • - • • • — SHORELINE (NORMAL POOL ELEVATION 911.61') CHANNEL MARKERS - SUMMER 2019 POLK COUNTY PARCEL BOUNDARY AND NUMBER P54-279 0 NORTH 0 100�200 SCALE IN FEET SOURCES: 1. AERIAL PHOTOGRAPH ©2019 MICROSOFT CORPORATION ©2019 MAXAR ©CNESS (2019) DISTRIBUTION AIRBUS DS 2. TOPOGRAPHIC SURVEY BY HAYESIAMES DATED AUGUST 27, 2018. 3. PARCEL INFORMATION OBTAINED FROM NC ONE MAP (NCONEMAP.GOV/PAGES/PARCELS) STATE CONSTRUCTION OFFICE ID #: 21-22971-01A ANCHOR QEANCHOR aFA OF NORTH - 231 HAYWOOD STREET ASHEVILLE, NC 28101 LICENCE: P-1649 kiaw vIsers below C8�6daowo REVISIONS REV DATE BY APPD DESCRIPTION DESIGNED BY: SMITH J. DRAWN BY: HOLMFR, D. CHECKED BY: CORK R. APPROVED BY: DINICOLA W. SCALE AS NOTED DATE JULY2021 NORTH CAROLINA WILDLIFE RESOURCES COMMISSION LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING EXISTING CONDITIONS El SHEET # 7 OF 16 New Additional Approximate Limits of Disturbance - Dredging Area; proposed 3/17/2022. Approx 550' x 125' New Additional Approximate Limits of Disturbance - Dredging Area; proposed 3/17/2022. Approx 550' x 125' s. K\Pro•ects\1713-NC Wildlife Reso ELEVATION IN FEET (NAVD88) 920 910 900 890 92 89 LAKE ADGER CHANNEL CENTERLINE / !f ..._ - ~ .fr . .. �. �, .�: r , , i. .. . J' /Z ./%27frf_ �f JTl/4"//Jf////, 1L 3 ELEVATION 905.61' NAVD88 �• SLOPE FROM TO 904.61' NAVD88 W z J o - Q i ELEVATIONSREND 905.61' -u+ 1+ 1+50 + +5 LAKE ADGER CHANNEL CENTERLINE 3+00 3+50 4+00 4+50 5+00 HORIZONTAL DISTANCE IN FEET 5X VERTICAL EXAGGERATION I 904.61' MATCHLINE I• ELEVATION NAVD88 10+00 10+50 11+00 11+50 12+00 12+50 13+00 HORIZONTAL DISTANCE IN FEET 5X VERTICAL EXAGGERATION LEGEND: EXISTING MUDLINE NAVIGATION CHANNEL DESIGN DREDGE ELEVATION NAVIGATION CHANNEL 6" ALLOWABLE OVERDEPTH NAVIGATION CHANNEL DREDGED MATERIAL TO BE REMOVED LAKE ADGER FULL POOL ELEVATION 911.61' NOTE: ALL DESIGN SLOPES ARE 3H:1V UNLESS OTHERWISE NOTED. ANCHOR QEAi.r(.►L� ANCHOR QFA OF NORTH CAROLINA, PLLC 231 HAYWOOD STREET ASHEVILLE, NC 28801 LICENCE: P-1649 Kwew MLds below. Coll won you 13+50 14+00 14+50 920 910 900 890 15+00 5+50 REVISIONS 6+00 6+50 REV DATE BY APP'D DESCRIPTION 7+00 DESIGNED BY. SMITH J. 7+50 DRAWN BY: HOLMEP- D. CHECKED BY: CORK. R. APPROVED BY DINICOLA W. SCALE AS NOTED DATE JULY2021 8+00 8+50 9+00 9+50 920 910 900 890 10+00 NORTH CAROLINA WILDLIFE RESOURCES COMMISSION LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING LAKE ADGER NAVIGATION CHANNEL CENTERLINE PROFILE STATE CONSTRUCTION OFFICE ID #: 21-22971-01A C3 SHEET# 10 OF 16 m 0 z z W z z (5TA 0+201 »V 920 - 910 - 900 - B90 y3 - 92 - 911 -90 ,-891 .._..._..._..._..._ .._..._..._ .._..._..._ .._..._..._..._..._... Q... ..._..._..._..._..._..._.. DU _..._..._.. _..._..._..._..._.. 11— 930 0 920 zz Z 910 O 900 LU 890 93 89 K\Projects \1713-NC Wildlife Resourc gE -20 -10 0 10 20 30 40 50 60 OFFSET IN FEET (NO VERTICAL EXAGGERATION) 'STA 6+001 _..II.._.. DU 5 _..._..._..._..._..._.._..._..._.._..._..._.._. DU 6 iL4— /. Z.'fl ra .. . � - r�r Jy6 3 3 - i- -20 -10 0 10 20 30 40 OFFSET IN FEET (NO VERTICAL EXAGGERATION) 50 ISTA 12+001 60 0 zz 2 Z O 0 ISTA 2+001 VOU 920 910 - ( DU 5 DU 6 900 3 1 3 B90 - 70 80 90 100 -20 -10 0 10 20 30 OFFSET IN FEET (NO VERTICAL EXAGGERATION) 930 920 16 2 z 910 0 900 890 JSTA 8+001 7GU 920 DU 3 DU-4 910 900 B90 -20 -10 0 10 20 30 40 OFFSET IN FEET (NO VERTICAL EXAGGERATION) 50 , 1 y51 921 DU 2B - DU 1 DU 2A 911 901 891 I -70 -An An -411 -3n -7n -1n n in 7n an An an an 7n on On 11111 OFFSET IN FEET (NO VERTICAL EXAGGERATION) LEGEND: %////////%A EXISTING MUDLINE DESIGN DREDGE ELEVATION 6" ALLOWABLE OVERDEPTH DREDGED MATERIAL TO BE REMOVED LAKE ADGER FULL POOL ELEVATION 911.61' NOTE: ALL DESIGN SLOPES ARE 3H:1V UNLESS OTHERWISE NOTED. at..ZANCHOR LLS1(..+G.rL� ANCHOR 0EA OF NORTH CAROLINA PLLC 221 HAYWOOD STREE1 ASHEVILLE, NC 28801 LICENCE: P-1649 M0r1MIMti (IEIOIK • rad IMforsyou REVISIONS 60 930 920 910 900 930 0 920 2 z z ▪ 910 z 0 • 900 890 890 o 2 Z_ 2 z 40 50 930 93 920 910 900 890 0 92 zz W W z 91 0 90 STA 10+00 89 STA 5+00 I r y3 DU-5 92 DU 6 911 _3L► 7711�'"' ...V.1r_ • T • .. F rr ,�rrfrr. Ji flT/ 90 891 -20 -10 0 10 20 30 OFFSET IN FEET (NO VERTICAL EXAGGERATION) 1 DU DU 2A l//.// //ff4re:44'/!/!///////// 1`grr77l/////:/! 3 J7 -20 -10 0 10 20 30 OFFSET IN FEET (NO VERTICAL EXAGGERATION) ISTA 13+201 40 50 930 920 910 900 890 40 77U 920 y3 1-- 92 910 _..._..._. I-DU2B _..._..._..._..._..._.. _......_..._..._..._.._..._..._.._. DU1 DU2A 911 900 3 390 - 90 ; -50 -40 -30 -20 -10 0 10 20 30 40 5n 891 REV DATE BY APP.DT DESCRIPTION OFFSET IN FEET (NO VERTICAL EXAGGERATION) DESIGNED BY SMITH J. DRAWN BY: HOLMEP. 0. CHECKED BY: COR8. R. APPROVED BY: DINICOLA W. SCALE AS NOTED DATE JULY 2021 NORTH CAROLINA WILDLIFE RESOURCES COMMISSION LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING LAKE ADGER NAVIGATION CHANNEL SECTIONS 0 0 C4 50 0 0 STATE CONSTRUCTION OFFICE ID #: 21-22971-01A SHEET # 11 OF 16 CULVERT cI c P J ! r I 1. I. • ..r,, • c j: - : . .. (.. .r , • •... <•L• e Q� .... �. f{/j % :♦ 't 0 i .1 --1" \ %-‘ 'il y ;�:. 4... ,.,,, .. f; ::1 C a j s ;WETLANDS EXTEND BEYOND �•: • .. • JIMITSOFDIS'URBANCE L'•. . ...f. • V', !• ) I: l" • Yi..' a Jul 20, 2021 1:45pm dholmer ANCHOR QEA ANCHOR QEA OF NORTH CAROLINA PLLC 231 HAYWOOD STREET ASHEVILLE, NC 28801 LICENCE: P-1644 u- I .. CI 4 .71 ti • . !T Y., r� Q • EXISTING CHANNEL MARKER (TYPICAL) FLOATING DOCK LAKE ADGER (FULL POOL ELEVATION 917.61) • —• •rti .1:• :"" Q E. 1.) P:-.',.....4..: C ` `.i '. ��. :',, 1::‘ v k. 1;.i • - ,•- f?• WETLANDS EXTEND BEYOND LIMITS OF DISTURBANCE II midiM1e below. CAI balmpBu Ss REV DATE BY APPD REVISIONS DESCRIPTION d DESIGNED BY: SMITH. 1. DRAWN BY: HOLME? D. CHECKED BY: CORk. R. APPROVED BY: DINICO:A W. SCALE AS NOTED DATE JULY2021 } • A LEGEND: 14+00 �H PROPOSED DREDGED MATERIAL PLACEMENT AREA DESIGNATION PROJECT STATIONING NAVIGATION CHANNEL DREDGE AREA APPROXIMATE EXTENTS DREDGE AREA APPROXIMATE EXTENTS — • • — • • — APPROXIMATE LIMITS OF DISTURBANCE - DREDGING AREA WETLAND DELINEATION —•••—•••—•••— SHORELINE (NORMAL POOL ELEVATION 911.61') EXAMPLE COIR LOG OR HAYBALE LOCATION •a000000ao• EXAMPLE EROSION AND SEDIMENT CONTROL MEASURES S EXAMPLE SILT CURTAIN OR SILT FENCE LOCATION — SF — EXAMPLE SILT FENCE LOCATION 0 NORTH 0 60 120 SCALE IN FEET NOTES: 1. DREDGED MATERIAL PLACEMENT AREAS ARE APPROXIMATE, CONTRACTOR TO UTILIZE COMBINED COIR LOGS, HAYBALES, SILT CURTAINS, SILT FENCES, OR OTHER CONTROL STRUCTURES TO MANAGE SEDIMENTS WITHIN PLACEMENT AREA EXTENTS TO ELEVATIONS STATED IN SECTION 35 20 23. 2. CONTRACTOR TO UTILIZE EBtSC MEASURES APPROVED BY G.S. 113A-57.3 AND WHICH PROVIDE STRUCTURAL SUPPORT (SUCH AS COIR LOGS). HAY BALES ARE NOT APPROVED E&SC MEASURES. 3. CONTRACTOR MAY ADJUST PROPOSED DREDGED MATERIAL PLACEMENT AREA ALIGNMENTS AS NEEDED TO BALANCE PLACEMENT OPERATIONS AND SEQUENCE THE WORK. 4. CONTRACTOR SHALL NOT BLOCK FLOW FROM CULVERT AND GREEN RIVER BRANCHES DURING MATERIAL PLACEMENT OPERATIONS. 5. ONLY BIODREGRADABLE FEATURES MAY BE LEFT IN PLACE FOLLOWING MATERIAL PLACEMENT. ANY SILT CURTAINS, SILT FENCES, ANCHORS, METAL STAKING, OR OTHER INSTALLED ITEMS MUST OTHERWISE BE REMOVED. 6. CONTRACTOR MATERIAL TRANSPORT LINE SHOULD BE ROUTED THROUGH WORK AREAS IDENTIFIED WHERE POSSIBLE. SOURCES: 1. AERIAL PHOTOGRAPH ©2019 MICROSOFT CORPORATION C2019 DIGITALGLOBE OCNESS (2019) DISTRIBUTION AIRBUS DS 2. TOPOGRAPHIC SURVEY BY HAYESIJAMES DATED AUGUST 27, 2018. NORTH CAROLINA WILDLIFE RESOURCES COMMISSION LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING DREDGED MATERIAL PLACEMENT LAYOUT C5 STATE CONSTRUCTION OFFICE ID #: 21-22971-01A SHEET N 12 OF 16 New Additional Approximate Limits of Disturbance - Dredging Area; proposed 3/17/2022. Approx 550' x 125' New Additional Approximate Limits of Disturbance - Dredging Area; proposed 3/17/2022. Approx 550' x 125' E 20" DIAMETER COIR LOGS WOOD STAKE 16" MINIMUM JOINT DETAIL NOT TO SCALE WOOD STAKE TO ONLY PENETRATE NETTING EXISTING SURFACE 20" DIAMETER COIR LOGS WOOD STAKE TO ONLY PENETRATE NETTING fi STAKING DETAIL NOT TO SCALE NOTES: 1. COIR LOGS SHALL BE PLACED AS SHOWN ON DRAWING C4, AND IN A ROW WITH ENDS TIGHTLY ABUTTING ADJACENT COIR LOGS. COIR LOGS SHALL BE USED WITH SILT CURTAINS AS SHOWN IN THESE COIR LOG AND SILT CURTAIN DETAILS AND DRAWING C4. 2. COIR LOGS SHALL BE SECURELY ANCHORED IN PLACE BY TWO STAKES DRIVEN THROUGH THE COIR LOG NETTING AS SHOWN IN THE COIR LOG DETAIL STAKES SHALL BE DRIVEN FLUSH WITH THE COIR LOG. 3. COIR LOGS SHALL BE REMOVED AS DIRECTED 8Y THE ENGINEER. COIR LOG DETAIL SCALE NOT TO SCALE L C. • TT'T .i TT �Lv Le l�4�4ila L!'L,L,•h.. L;LI1. ... ...... o.........." f�i'rl .3 1.i • w3 bl i LI 43 41 1 �11�L�i 3. L� Li.4�Li 41 LI 11 +I lip u 41 LI LI ljZi LI l LI IiLI LI 41 114.•. TOP VIEW HAYBALE WITH ORGANIC BAILING TWINE 6" (APPROX) EXISTING SURFACE SIDE VIEW 2"X2" STAKES, 2 PER BALE, DRIVEN COMPLETELY THROUGH BOTTOM ROW OF BALES TOP OF PLACED SEDIMENT UP TO 2" BELOW HAYBALES 2"X2" STAKES, 2 PER BALE, DRIVEN AT LEAST 1.5' OR THROUGH SEDIMENT INTO COMPETENT GROUND 1111111111111111 wimaimmumma 36" (TYP.)-' 16" (TYP.) ANGLE FIRST STAKE TOWARD PREVIOUSLY LAID BALE FRONT VIEW NOTES: 1. HAYBALES SHALL BE PLACED AS SHOWN ON DRAWING C4, AND IN A ROW WITH ENDS TIGHTLY ABUTTING THE ADJACENT HAYBALES. HAYBALES SHALL BE USED WITH SILT FENCES AS SHOWN IN HAYBALES AND SILT FENCE DETAIL UNLESS OTHERWISE INDICATED ON DRAWING C4. 2. EACH HAYBALE SHALL BE PLACED SO THE BINDINGS ARE HORIZONTAL 3. HAYBALES SHALL BE SECURELY ANCHORED IN PLACE BY TWO STAKES DRIVEN THROUGH THE HAYBALE. THE FIRST STAKE IN EACH HAYBALE SHALL BE DRIVEN TOWARD THE PREVIOUSLY LAID HAYBALE AT AN ANGLE TO FORCE THE HAYBALES TOGETHER. STAKES SHALL BE DRIVEN FLUSH WITH THE HAYBALE 4. HAYBALES SHALL BE REMOVED AS DIRECTED BY THE ENGINEER. 5. HAYBALES ARE NOT APPROVED E&SC MEASURES. IsZ■A�■N�CHOR QE l ANCHOR QEA OF NORTH CAROLINA, PLLC 231 HAYWOOD STREET ASHEVILLE, NC 23801 LICENCE: P-1642 TYPICAL DOUBLE STACK HAYBALE DETAIL NOT TO SCALE • CBIbalm pmlg. PROTECTED AREA AREA OF DISTURBANCE METAL CONNECTOR CABLE 1/8" 0 MIN 2"x 2"x 4'-0" MAX OAK POST DRIVEN INTO TRENCH, SEE NOTE 2 COMPACTED BACKFILL IN TRENCH EXISTING GRADE ANCHOR BUOY BUOY NYLON ROPE ANCHOR DEVICE 18' FLOTATION DEVICE SILT CURTAIN GALVANIZED CHAIN SIDE VIEW GENERAL NOTES: 1. THE DETAILS SHOWN IN THESE ENGINEERING DRAWINGS ARE CONCEPTUAL IN NATURE. THE CONTRACTOR SELECTED METHODOLOGIES FOR CONTAINING DREDGED MATERIAL AND TURBIDITY CONTROL WILL BE DETAILED IN THE DREDGING WORK PLAN TO BE APPROVED BY NCWRC. 2. THE CONTRACTOR METHODOLOGIES FOR CONTAINING DREDGED MATERIAL AND TURBIDITY CONTROL SHALL BE ALTERED TO MEET PROJECT OBJECTIVES AND REQUIREMENTS, AS DETERMINED BY NCWRC DURING PERFORMANCE OF THE WORK. CONTAINMENT OF PLACED SEDIMENT WILL AIM TO PREVENT THE MIGRATION OF PLACED MATERIAL INTO DELINEATED WETLANDS ADJACENT TO THE PLACEMENT AREAS. REVISIONS HEAW DUTY CORD SEWN IN SILT FENCE FABRIC (TOP AND BOTTOM) AND LOOPED AROUND POST. ( SEE DETAIL "A" FOR TOP CORD TO EVERY OTHER SILT FENCE POST) SUPPORT NETTING (HEAW DUTY PLASTIC MESH) FILTER FABRIC r ll_ill� it -- UNDISTURBED GROUND (TYP) BURY FLAP OF FILTER FABRIC IN BOTTOM OF TRENCH SILT FENCE DETAIL SCALE: NOT TO SCALE TOP LOAD LINE (OPTIONAL) WATER LEVEL FLOTATION DEVICE 1'-5' (TYP) BALLAST LINE (GALVANIZED CHAIN) BOTTOM SEDIMENT SILT FENCE POST SILT FABRIC AND LOOP CABLE OVER POST SILT FENCE FABRIC DETAIL A NOTE: POSTS FOR SILT FENCE MUST BE LOCATED EIGHT FEET MAXIMUM, ON -CENTER. TOP LOAD LINE (OPTIONAL) BALLAST LINE (GALVANIZED CHAIN) SILT CURTAIN CONNECTOR WATER LEVEL/ BOTTOM SEDIMENT 1' 5' (TYP) NOTE: IF THE SEDIMENT ALONG THE SILT CURTAIN ALIGNMENT IS EXPOSED DURING CONSTRUCTION, SILT FENCES SHALL BE USED IN PLACE OF SILT CURTAINS. REV DATE BY APP'D DESCRIPTION TYPICAL SILT CURTAIN DETAIL NOT TO SCALE DESIGNED BY. SMITH. J- DRAWN BY: HOLMER D. CHECKED BY: CORK R. APPROVED BY: DINICOLA. W- SCALE AS NOTED DATE JULV 2021 • SECTION VIEW NORTH CAROLINA WILDLIFE RESOURCES COMMISSION LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING DETAILS STATE CONSTRUCTION OFFICE ID #: 21-22971-01A C8 SHEET• 15 OF 16 I:\Projects\1713-NC Wildlife Resources Commission\Lake Adder Dredgin$Construction Plans\1713-PL-C SERIES.rN.J C9 Jul 20, 2021 1:45pm dholmer TABLE 1: PLANTING ELEVATIONS PLANTING ZONE MIN. ELEVATION (FT, NAVD88) MAX. ELEVATION (FT, NAVD88) A 912.0 913.7 B 911.3 912.0 USE PILOT STAKE TO MAKE HOLE, AND PLANT PLUG DIRECTLY IN BACKFILL PLANT FLUSH 1 WETLAND PLANTING DETAIL NOT TO SCALE CONTAINERIZED TREE OR SHRUB (IYP) UNDISTURBED SUBGRADE (PROVIDES FIRM BASE SO THAT ROOTBALL WILL NOT SINK) ROOTBALL + 1'-0"MIN ALL SIDES NOTE: STAKE ALL TREES 4 FT & TALLER. SET ROOT CROWN AT 1" ABOVE FINISHED GRADE SHRUB PLANTING PIT PREPARATION = ROOTBALL DEPTH & WIDTH PLUS 1.-0" ADDITIONAL ALL SIDES FINISH GRADE TOPSOIL REMOVE CONTAINER COMPLETELY 2 SMALL TREE/SHRUB DETAIL NOT TO SCALE TABLE 2: EMERGENT VEGETATION SPECIES Common Name Scientific Name Planting Zone Broadleaf Cattail Tjpha lotifolra 8 Common Arrowhead Sagittorrolahfalia B Wool Grass Scirpus cyperinus A, B Soft Stem Bulrush Schoenoplectus tabemaemontani A, B Fringed Sedge Carex crinita A Pickerelweed Pontederia cordata B Soft Rush Juncos effuses A, B NOTES: 1. ALL LISTED PLANTS ARE OBLIGATED WETLAND PLANTS 2. PLANTS SHALL BE 2-INCH PLUGS AND PLANTED AT A DENSITY OF 10,900 (2-FOOT SPACING) PER ACRE. 3. SIMILAR SPECIES CAN BE SUBSTITUTED BASED ON SITE CONDITIONS WITH APPROVAL OF THE CONSTRUCTION MANAGER. TABLE 3: WETLAND SEED MIX Common Name Scientific Name Planting Zone Common Water Plantain Alisma subcordatum A, B Swamp Milkweed Asclepius inrornata A, B Common Hop Sedge Carex lupulina A, B Lance -Fruited Oval Sedge Carex scoparia A, B Brown Fox Sedge Carex vufpinoidea A, B Turtlehead Chelone glabra A, B Common Wood Reed Cinna arundinacea A, B Flat -Top Aster Doellingeria umbellara A B Virginia Wild Rye Elymus virginicus A, B Common Boneset Eupatarium perfoliatum A, B Hollowioe-Pye Weed Eutrochrum fistulosum A, B Sneezeweed Helenium autumnale A, B False Sunflower Heliopsis helianrhoides A B Common Rush Juncus effusus A, B Great Blue Lobelia Lobelia siphi'lirsca A, B Monkey Flower Mimulus ringer's A, B Ditch Stonecrop Penthorum sedoides A, B Dark Green Rush Scirpus elrovircns A, B Wool Grass Scirpus cyperinus A, B Side -Flowering Aster Symphyolrichum lateriffarum A, B New England Aster Symphyotrichum novae-ongliae A, B Marsh Shield Fen The(ypteris palustlis A, B Blue Vervain Verbena hastota A, B Boneset Eupaforium perfalialum A, B Needle Spikerush Eleocharis acicularis A B Silky Willow Salix sericea A, B TABLE 4: TREE AND SHRUB SPECIES Common Name i Scientific Name Planting Zone Trees American Elm U(mus americana A River Birch 8etutu nigra A Black Willow Solixnigra A Red Maple Acer rubrum A Box Elder Acer negundo A American Sycamore Plan ran us occidentalis A American Persimmon Diospyros viginiona A Black Gum Nysso sylvatira A Shrubs Spicebush Lindero benzoin A Smooth Alder Alnus serrulata A Silky Dogwood Comus amomun A NOTES: 1. TREES SHALL BE 5-GALLON CONTAINER AND INSTALLED ON 25 FT CENTERS. 2. SHRUBS SHALL BE 1-GALLON CONTAINER AND INSTALLED ON 10 FT CENTERS. REFERENCE WETLAND DATA LOCATIONS 0 Soo 1000 11 SCALE IN FEET SOURCE: AERIAL PHOTOGRAPH ©2020 MICROSOFT CORPORATION ©2020 DIGITALGLOBE ©CNESS (2020) DISTRIBUTION AIRBUS DS LEGEND: ,Rp_1 REFERENCE WETLAND DATA LOCATION AND DESIGNATION NOTE: VEGETATION SPECIES AND WETLAND SEED MIXES LISTED IN TABLES 2 AND 3 ARE GENERALLY BASED ON THE INFORMATION COLLECTED DURING THE REFERENCE WETLAND SURVEY COMPLETED BY CLEARWATER ENVIRONMENTAL CONSULTANTS, INC., ON AUGUST 21-22, 2018. REFERENCE ELEVATION (FT, NAVD88) RP-1 913.2 RP-2 911.9 RP-3 913.7 RP-4 912.2 RP-5 913.4 RP-6 911.3 STATE CONSTRUCTION OFFICE ID #: 21-22971-01A ANCHOR ()IA4 4.-4-- ANCHOR QEA OF NORTH CAROLINA, PLLC 231 HAYWOOD STREET ASHEVILLE, NC 28801 LICENCE P-1689 WmMuffs WOW Cal Wimps s d1g, r. %'•,'Y�7.�FNGMEER: •OsJJ.`- 1 REVISIONS REV DATE BY APP'D DESCRIPTION DESIGNED BY: SMITH_). DRAWN BY: HOLMER D. CHECKED BY: CORK R. APPROVED BY: DINICOL A, W. SCALE AS NOTED DATE JULY2021 NORTH CAROLINA WILDLIFE RESOURCES COMMISSION LAKE ADGER NAVIGATION CHANNEL MAINTENANCE DREDGING VEGETATION PLANTING DETAILS C9 SHEET# 16 OF 16