HomeMy WebLinkAbout20130494 Ver 1_Monitoring Report_20140421April 8, 2014
W Corey Basinger
Regional Supervisor, Water Quality Operations
Division of Watei Resouices
NC DENR Winston -Salem Regional Office
585 Waughtown Street
Winston - Salem, NC 27107
Dear Mi Basinger
R °EC�lv�o 2050 Northpoint Drive • Suite A
N C Dept of ENR Winston - Salem, NC 27106
AFB 2 1 2014 Phone (336) 896 -1300
Fax (336) 896 -1020
Winston -Salem geosci @ geotec com
Reg tonal office www geotec corn
NOTICE OF DEFICIENCY
NOD - 2013 -PC -0428
DWU 13 -0494
Danch Stream Stabilization Project
Forsyth County
Oui Project # 12 365
The remedial work described in the NOD dated Noy , ember 25 2013 was undertaken and substant] ally
completed in the first week of January As directed, we oversaw the work by the contractor
We met with Ms Homewood at the site February 27, which was after a few substantial rainstorms, to
review the conditions The stretches of the stream banks that we had agreed with Ms Iloniewood as
needing modification had been treated as intended The eiosion control fabric was in place The silky
willow stakes weic in place in the soil lifts We obscived no riprap out of place and no erosion
The contractor has agreed to return periodically through the end of December 2014, to re -set any
riprap that may have moved, and to snake repairs to his work for damage resulting fioni stornli of
intensity less than that of storms with 25 yeas return period
In OUr opinion, the project may be closed Please call if you have any questions
Thank you for the help your office has given us, m pai ticular through Ms Homewood
Sincerely,
GeoScienc & logy, PA
HESS /p
Carl von Isenbur , PI?
Senior Civil Engines = SEALdV,¢
024697 0
Cc John Thomas, ACoE, by • FNCitvE��' ���
Michael Danch, Property C% �4 VON \'5 \ \0\``��
Lee Bowman, Hardscape Conc &jt�kk ,\\contractor