Loading...
HomeMy WebLinkAbout20130494 Ver 1_Monitoring Report_20140421April 8, 2014 W Corey Basinger Regional Supervisor, Water Quality Operations Division of Watei Resouices NC DENR Winston -Salem Regional Office 585 Waughtown Street Winston - Salem, NC 27107 Dear Mi Basinger R °EC�lv�o 2050 Northpoint Drive • Suite A N C Dept of ENR Winston - Salem, NC 27106 AFB 2 1 2014 Phone (336) 896 -1300 Fax (336) 896 -1020 Winston -Salem geosci @ geotec com Reg tonal office www geotec corn NOTICE OF DEFICIENCY NOD - 2013 -PC -0428 DWU 13 -0494 Danch Stream Stabilization Project Forsyth County Oui Project # 12 365 The remedial work described in the NOD dated Noy , ember 25 2013 was undertaken and substant] ally completed in the first week of January As directed, we oversaw the work by the contractor We met with Ms Homewood at the site February 27, which was after a few substantial rainstorms, to review the conditions The stretches of the stream banks that we had agreed with Ms Iloniewood as needing modification had been treated as intended The eiosion control fabric was in place The silky willow stakes weic in place in the soil lifts We obscived no riprap out of place and no erosion The contractor has agreed to return periodically through the end of December 2014, to re -set any riprap that may have moved, and to snake repairs to his work for damage resulting fioni stornli of intensity less than that of storms with 25 yeas return period In OUr opinion, the project may be closed Please call if you have any questions Thank you for the help your office has given us, m pai ticular through Ms Homewood Sincerely, GeoScienc & logy, PA HESS /p Carl von Isenbur , PI? Senior Civil Engines = SEALdV,¢ 024697 0 Cc John Thomas, ACoE, by • FNCitvE��' ��� Michael Danch, Property C% �4 VON \'5 \ \0\``�� Lee Bowman, Hardscape Conc &jt�kk ,\\contractor