HomeMy WebLinkAbout20140267 Ver 1_Approval Letter_20140424NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III Governor Secretary April 24, 2014 Wilkes County NCDWR Project No. 20140267 Bridge No. 363 on SR 1575 Project No. 17BP.11.R.54 APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS Mr. Heath Slaughter, NCDOT, Division 1 1 P.O. Box 250 North Wilkesboro, NC 28659 Dear Mr. Slaughter: You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of replacing Bridge 363 in Wilkes County with a 3 -sided bottomless culvert: Stream Impacts in the Yadkin River Basin Total Stream Impact for Project: 86 linear feet. The project shall be constructed in accordance with your application dated received March 19, 2014. After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification Number 3886. This certification corresponds to the Nationwide Permit 14 issued by the Corps of Engineers. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non- Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the NCDWR and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification(s) and any additional conditions listed below. Transportation and Permitting Unit 1617 Mail Service Center, Raleigh, North Carolina 27699 -1617 Location: 512 N. Salisbury St Raleigh, North Carolina 27604 Phone: 919 - 807 -6300 \ FAX- 919 - 733 -1290 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer NorthCarolina Naturally Permanent Fill Temporary Fill Permanent Fill Temporary Fill Stream Impacts Total Stream Site in Intermittent in Intermittent in Perennial in Perennial Impact Requiring Stream Stream Stream Stream (linear ft) Mitigation (linear ft) (linear ft) (linear ft) (linear ft) (linear ft) Site 1 (Riprap 0 0 38 8 46 0 and dewatering) Site I (culvert) 0 0 40 0 40 0 TOTAL 0 0 78 8 86 0 Total Stream Impact for Project: 86 linear feet. The project shall be constructed in accordance with your application dated received March 19, 2014. After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification Number 3886. This certification corresponds to the Nationwide Permit 14 issued by the Corps of Engineers. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non- Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the NCDWR and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification(s) and any additional conditions listed below. Transportation and Permitting Unit 1617 Mail Service Center, Raleigh, North Carolina 27699 -1617 Location: 512 N. Salisbury St Raleigh, North Carolina 27604 Phone: 919 - 807 -6300 \ FAX- 919 - 733 -1290 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer NorthCarolina Naturally Condition(s) of Certification: Project Specific Conditions 1. The NCDOT Division Environmental Officer or Environmental Assistant will conduct a pre- construction meeting with all appropriate staff to ensure that the project supervisor and essential staff understand the potential issues with stream and culvert alignment at the permitted site. NCDWR staff shall be invited to the pre- construction meeting. 2. Two copies of the final construction drawings shall be furnished to the NCDWR Central Office prior to the pre- construction meeting. The permittee shall provide written verification that the final construction drawings comply with the permit drawings contained in the application dated March 19, 2014 or per date plans were revised or modified. Any deviations from the approved drawings are not authorized unless approved by the NC Division of Water Resources. General Conditions Unless otherwise approved in this certification, placement of culverts and other structures in open waters and streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis- equilibrium of wetlands or streambeds or banks, adjacent to or upstream and downstream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by the NCDWR. If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact the NCDWR for guidance on how to proceed and to determine whether or not a permit modification will be required. 2. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. 3. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. 4. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed floodplains and streams shall be restored to natural geomorphic conditions. 5. The use of rip -rap above the Normal High Water Mark shall be minimized. Any rip -rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. 6. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. 7. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of the NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. 8. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. 9. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 10. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. 1 1. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 12. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. 13. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification. 14. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on -site project manager. 15. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. 16. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc. 17. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery. 18. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division Engineer shall complete and return the enclosed "Certification of Completion Form" to notify the NCDWR when all work included in the 401 Certification has been completed., 19. Native riparian vegetation must be reestablished in the riparian areas within the construction limits of the project by the end of the growing season following completion of construction. 20. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities. 21. The post- construction removal of any temporary bridge structures must return the project site to its preconstruction contours and elevations. The impacted areas shall be revegetated with appropriate native species. 22. Strict adherence to the most recent version of NCDOT's Best Management Practices For Bridge Demolition and Removal approved by the US Army Corps of Engineers is a condition of the 401 Water Quality Certification. 23. The project will impact Buckwheat Branch classified by the NC Environmental Management Commission as Trout Jr), High Quality Waters (HQW), and Water Supply 11 (WS11). Therefore, stormwater shall be directed to vegetated buffer areas, grass -lined ditches or other means appropriate to the site for the purpose of pre - treating storm water runoff prior to discharging directly into streams. Bridge deck drains shall not discharge directly into the stream. Mowing of existing vegetated buffers is strongly discouraged. 24. In- stream work and land disturbance within the 25 -foot buffer zone are prohibited during the trout - spawning season of October 15 through April 15 to protect the egg and fry stages of trout. 25. Because of the classifications mentioned in Condition 3 above, the permittee shall use Design Standards in Sensitive Watersheds (15A NCAC 413.0 124[a]-[e]). However, due to the size of the project, the NCDOT shall not be required to meet 15A NCAC 4B .0124(a) regarding the maximum amount of uncovered acres. Temporary cover (wheat, millet, or similar annual grain) or permanent herbaceous cover shall be planted on all bare soil within 15 business days of ground disturbing activities to provide erosion control. 26. Tall fescue shall not be used in the establishment of temporary or permanent groundcover within riparian areas. For the establishment of permanent herbaceous cover, erosion control matting shall be used in conjunction with an appropriate native seed mix on disturbed soils within the riparian area and on disturbed steep slopes with the following exception. Erosion control matting is not necessary if the area is contained by perimeter erosion control devices such as silt fence, temporary sediment ditches, basins, etc. Matting should be secured in place with staples, stakes, or wherever possible, live stakes of native trees. Erosion control matting placed in riparian areas shall not contain a nylon mesh grid, which can impinge and entrap small animals. For the establishment of temporary groundcover within riparian areas, hydroseeding along with wood or cellulose based hydro mulch applied from a fertilizer- and limestone -free tank is allowable at the appropriate rate in conjunction with the erosion control measures. Discharging hydroseed mixtures and wood or cellulose mulch into surface waters in prohibited. Riparian areas are defined as a distance 25 feet landward from top of stream bank. 27. NCDOT shall be in compliance with the NCS00250 issued to the NCDOT, including the applicable requirements of the NCGO 1000. Please note the extra protections for the sensitive watersheds. 28. Bridge piles and bents shall be constructed using driven piles (hammer or vibratory) or drilled shaft construction methods. More specifically, jetting or other methods of pile driving are prohibited without prior written approval from the NCDWR first. 29. No drill slurry or water that has been in contact with uncured concrete shall be allowed to enter surface waters. This water shall be captured, treated, and disposed of properly. 30. A turbidity curtain will be installed in the stream if driving or drilling activities occur within the stream channel, on the stream bank, or within 5 feet of the top of bank. This condition can be waived with prior approval from the NCDWR. 31. Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aquatic life passage. Bioengineering boulders or structures should be properly designed, sized and installed. 32. For the eight linear feet of stream being impacted due to site dewatering activities, the site shall be graded to its preconstruction contours and revegetated with appropriate native species. 33. The stream channel shall be excavated no deeper than the natural bed material of the stream, to the maximum extent practicable. Efforts must be made to minimize impacts to the stream banks, as well as to vegetation responsible for maintaining the stream bank stability. Any applicable riparian buffer impact for access to stream channel shall be temporary and be revegetated with native riparian species. 34. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 35. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification. If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and 5:OOpm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed - provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699 -6714 Telephone: (919) -431 -3000, Facsimile: (919)- 431 -3100 A copy of the petition must also be served on DENR as follows: Mr. Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please contact Dave Wanucha at (336) 771-495 ]or Dave.Wanucha @ncdenr.gov. incere2y,, � .Thomas A. Reeder, Director Division of Water Resources cc: Mike Pettyjohn, PE, Division 11 Engineer (electronic copy only) Andrew.Williams, US Army Corps of Engineers, Raleigh Field Office (electronic copy only) Marla Chambers, NC Wildlife Resources Commission (electronic copy only) Dave Wanucha, NCDWR Winston Salem Regional Office (electronic copy only) File Copy NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor NCDWR Project No.: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: County: John E. Skvarla, III Secretary Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Certification Partial Final Date: 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Date Transportation and Permitting Unit 1617 Mall Service Center, Raleigh, North Carolina 27699 -1617 Location: 512 N Salisbury St Raleigh, North Carolina 27604 Phone- 919 - 807 -63001 FAX 919 - 733 -1290 Internet www.ncwaterquality.orq An Equal Opportunity 1 Affirmative Action Employer Registration No. NorthCarohna Aatmallff