HomeMy WebLinkAbout20140371 Ver 1_Application_20140414�F W A 7F9
O� QG Offce Use Only;
� � Corps action ID no.
o � DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification (PCl� Form
_ A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps: � Section 404 Permit ❑ Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number:
1 c. Has the NWP or GP number been verified by the Corps? � Yes
1d. Type(s) of approval sought from the DWQ (check all that apply):
� 401 Water Quality Certification — Regular � Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1e. Is this notification solely for the record For the record only for DWQ 401
because written approval is not required? Certification:
❑ Yes � No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below.
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
2. Project Information
2a. Name of project: Culvert #31
2b. County: Randolph
2c. Nearest municipality / town: New Market
2d. Subdivision name:
2e. NCDOT only, T.I.P. or state 41665.4A-31
project no:
3. Owner Information
3a. Name(s) on Recorded Deed: NA
3b. Deed Book and Page No.
3c. Responsible Party (for LLC (f
3d. Street address:
3e. City, state, zip:
3f. Telephone no.:
3g. Fax no.:
3h. Email address:
❑ No
For the record only for Corps Permit:
❑ Yes � No
� Yes ❑ No
❑ Yes � No
❑ Yes � No
Page 1 of 10
PCN Form — Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ❑ Agent � Other, specity: Division Engineer
4b. Name: Robert W. Stone II, PE
4c. Business name NCDOT Hi hwa Division S
(if aoolir.ahle\� 9 Y
4d. Street address: 902 North Sandhill Blvd
4e. City, state, zip: Aberdeen NC 28315
4f. Telephone no.: 910-944-2344
4g. Fax no.: 910-944-5623
4h. Email address: robstone@ncdot.gov
5. Agenf/Consultant Information (if applicable)
5a. Name: Art C. King
5b. Business name NCDOT Hi hwa Division 8
!if annlir.ahleY 9 y
5c. Street address: 902 North Sandhill Blvd.
5d. City, state, zip: Aberdeen NC 28315
5e. Telephone no.: 910-944-2344
Sf. Fax no.: 910-944-5623
5g. Email address: acking@ncdot.gov
Page 2 of 10
PCN Form — Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1 a. Property identification no. (tax PIN or parcel ID):
1b. Site coordinates (in decimal degrees): Latitude: 35.84657 Longitude: - 79.882580
(DD.DDDDDD) (-DD.DDDDDD)
1c. Property size: acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to gob's Branch
proposed project:
2b. Water Quality Classification of nearest receiving water: WS-IV
2c. River basin: Cape Fear Rive
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Culvert is a on secondary road in an rural/commercial area
3b. List the total estimated acreage of all existing wetlands on the property:
NA
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
100ft or to the limit of the right of way.
3d. Explain the purpose of the proposed project:
to replace a deficient, outdated culvert with a new updated, safer structure.
3e. Describe the overall project in detail, including the type of equipment to be used:
To replace the existing culvert with a new structure. Equipment used: Track Loader, Tire(rubber wheeled) loader, Dump
truck , Crane, Backhoe.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past? ❑ Yes � No ❑ Unknown
Comments:
4b. If the Corps made the jurisdictional determination, what type
of determination was made? ❑ Preliminary ❑ Final
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if known): Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ❑ Yes � No
6b. If yes, explain.
Page 3 of 10
PCN Form — Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
❑ Wetlands � Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f,
Wetland impact Type of jurisdiction
number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ — non-404, other) (acres)
Tem ora T
W1 ❑ P❑ T NA ❑ Yes ❑ Corps
❑ No ❑ DWQ
W2 � P� T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W3 ❑ P � T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W4 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W5 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W6 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3 a. 3 b. 3 c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type ofjurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent
Tem ora T DWQ — non-404, width (linear
P ry � ) (INT)? other) (feet) feet)
S1 � P❑ T Structure Bob's Branch � PER � Corps �Z_18ft 50ft
❑ INT � DWQ
S2 � P❑ T rip-rap „ � PER � Corps „
stabilization ❑ INT � DWQ 63ft
S3 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S4 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
SS ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S6 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
3h. Total sheam and tributary impacts 113
3i. Comments: installation and stabilization of the culvert.
Page 4 of 10
PCN Form — Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number — (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Tem ora T
01 ❑POT NA
02 ❑P❑T
03 ❑P❑T
04 ❑P❑T
4E Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If ond or lake construction ro osed, then com lete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1 NA
P2
Sf. Total
Sg. Comments:
5h. Is a dam high hazard permit required?
❑ Yes � No If yes, permit ID no:
Si. Expected pond surtace area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require miti ation, then ou MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar-Pamlico ❑ Other:
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. gg.
Buffer impact
number— Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Tem ora T im act re uired?
B1 ❑P❑T NA ❑Yes
❑ No
B2 ❑P❑T ❑Yes
❑ No
B3 ❑P❑T ❑Yes
❑ No
6h. Total buffer impacts
6i. Comments:
Page 5 of 10
PCN Form — Version 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Minimum amount of culvert installed to allow for safe roadway construction.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
see 1a
2. Compensatory Mitigatian for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
26. If yes, mitigation is required by (check all that apply):
2c. If yes, which mitigation option will be used for this
project?
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter)
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
❑ Yes � No
❑ DWQ ❑ Corps
❑ Mitigation bank
❑ Payment to in-lieu fee program
❑ Permittee Responsible Mitigation
Type
4a. Approval letter from in-lieu fee program is attached. ❑ Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature:
4d. Buffer mitigation requested (DWQ only):
4e. Riparian wetland mitigation requested:
Quantity
❑ warm ❑ cool
NA square feet
na acres
4f. Non-riparian wetland mitigation requested: na acres
4g. Coastal (tidal) wetland mitigation requested: na acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
❑cold
Sa. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3(2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 7 of 10
PCN Form — Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules? ❑ Yes � No
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
Comments:
❑ Yes ❑ No
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? 33 %
2b. Does this project require a Stormwater Management Plan? ❑ Yes � No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program
❑ DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
❑ Phase II
3b. Which of the following locally-implemented stormwater management programs ❑ NSW
apply (check all that apply): ❑ USMP
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No
attached?
4. DWQ Stormwater Pro rem Review
❑ Coastal counties
❑ HQW
4a. Which of the following state-implemented stormwater management programs apply � QRW
(check all that apply):
❑ Session Law 2006-246
❑ Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ❑ Yes ❑ No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? � Yes ❑ No
5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1.3 December 10, 2008 Version
F. Supplementary Information
7. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the
use of public (federal/state) land? � Yes ❑ No
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ❑ Yes � No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ❑ Yes ❑ No
Camments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ❑ Yes � No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in � yes � No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Page 9 of 10
PCN Form — Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or � Yes
habitat? ❑ No
5b. Have you checked with the USFWS concerning Endangered Species Act � Yes
impacts? � No
❑ Raleigh
5c. If yes, indicate the USFWS Field Offce you have contacted.
❑ Asheville
Sd. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
On site survey by NCDOT staff, SDV natural heritage data (esri) review
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
SDV natural heritage data (esri)
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation � Yes � No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
NCDOT staff and SHPO review
8. Flood Zone Designation (Corps Requirement)
Sa. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes � No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
�� �` ��z C� �' �/-�i-i�
ApplicanUAgenYs Printe�Name Applica geni's S�qr�2 re Date
(AgenYs signature is valid only if an authorization letter from the applicant
is provided.)
Page 10 of 10
PCN Form — Version 1.3 December 10, 2008 Version
BM ttle RR SPIKE IN BASE OF 24"PINE TREE, 77' LEFT OF STA. 11+00 -L-, ELEV. 736.87
STA.13+14.00 -L- o WOODS
�j N
CLASS I RIP RAP �.
w/ GEOTEXTILE FABRIC N
� t&DPAY�ITEM) o I 90°-00'-00" �.
�
-� ...
.�� •
' �.,: •s..1:�'�:
+ L CLASS B RIP RAP
W/ COIR MATTING
(RDWY OETAIL
& PAY ITEM)
�
� PROPpSEO
2 c� 10' X 7' RCBC
-
(US
PROPOSED GUARDRAIL
tROADWAY DETAIL
& PAY ITEM)
POND `,',
,
.
�
�
�
� /��/
�. � 2' HIGH CONC.
/SILL (TYPa)
CLASS I RIP RAP
w/ GEOTEXTILE FABRIC
(RDWY DETAIL
� & PAY ITEM)
� _ � ��
.
---- ---- -- `
� � �
�
0
?_3'-6" 24'-6„
48'-0" �
GRASS
�
/
�...1 ' . �.I ' �
REMOVE
EXISTING BRIDGE
PAVED DRIVE
WOODS
��
FOR UTILITY INFpRMATION,SEE UTILITY PLANS AND SPECIAL PROVISIONS.
LOCATION SKETCH
� -L-
4 3'
50'
50'
�---------------------------•-------------...----------- --------------.........---- ---- ----------.........
�EL. 727e2± �EL. 728.2± EL.. 728.0± �EL. i27.9±
PROIFI�E ALONG � CU�VERT
�
> DRAWN BY : S.WANCE � DATE : 12-13
0
z CHECKED BY : W.F.PARKER _ pqTE ; 12-13
°w DESIGN ENGINEER OF RECORD: S.WraNCE _ DATE : 12-13
0
a DRAWN BY ; R.W. WRIGHT _ DATE : JULY. 19R0
CHECKED BY : D.A. GLADDEN _ DATE : JU�Y. I990
�. 727.s±
NOTES
ASSUMED LIVE LOAD ----------H�-93 OR ALTERNATE LOADING.
DESIGN FILL-----------------3,31'
FOR OTHER DESIGN DATA AND NOTES SEE STANDARO NOTE SHEET.
3"fd WEEP HOLES INDICATED TO BE IN ACCORDANCE WITH THE SPECIFICATIONS.
CONCRETE IN CULVERTS TO BE POURED IN THE FOLLOWING ORDER:
PAHSE I
l.WING FOOTINGS AND FLOOR SLAB OF WEST BARREL INCLUOING 4"OF ALL VERTICAL
WA�LS,AND PORTIQN OF CURTAIN WALLS.
2eTHE REMAINING PORTIONS OF WALLS,SILLS.AND WINGS FULL HEIGHT.
PHASE II
1.WING FOOTINGS AND FLOOR SLAB OF EAST BARREL INCLUDING 4"OF EXTERIOR WALL,
AND REMAINING P�RTION OF CURTAIN WALLS.
2,THE REMAINING PQRTIONS OF THE WALLS AND WINGS FUL� HEIGHT.
3.ROOF SLAB INCLUDING REMAINING PORTION OF WALLS FOLLOWED BY THE HEADWA��S.
PHASE II SHALL NOT BE STARTED UNTIL PHASE I IS COMPLETE,
FOR CONSTRUCTION SEQUENCE.SEE EROSION CONTROL PLANS.
FOR MAINTENANCE OF TRAFFIC SEE TRAFFIC CONTROL PLANS.
THE RESIDENT ENGINEER SHALL CHECK THE LENGTH OF CULVERT BEFORE
STAKING IT OUT TO MAKE: CERTAIN THAT IT WILL PROPERLY TAKE CARE
OF THE FI�L<
DIMENSIONS FOR WING LAYOUT AS WELL AS ADOITIONAL REINFpRCING STEEL
EMBEDDED IN BARREL ARE SHOWN ON WING SHEET.
AT THE CONTRACTOR'S OP7ION,HE MAY SPLICE THE VERTICAL REINFORCING STEEL
IN THE INTERIOR FACE OF EXTERIOR WALL AND BOTH FACES OF INTERIOR WALLS
ABOVE LOWER WALL CONSTRUCTION JOINT.THE SPLICE LENGTH SHAL� BE AS PROVIQED
IN THE SPLICE LENGTH CF�ART SHOWN ON THE PLANS.EXTRA WEIGHT OF STEEL OUE
TO THE SPLICES SHALL BE PAID FOR BY THE CONTRACTOR,
AT THE CONTRACTOR'S OPTION HE MAY SUBMIT.TO THE ENGINEER FOR APPROVALq
DESIGN AND DETAIL DRAWINGS FOR A PRECAST REINFORCED CONCRETE BOX CU�VERT
IN LIEU OF THE CAST-IN-PLACE CULVERT SHOWN ON THE PLANSeTHE DESIGN SHALL
PROVIDE THE SAME SIZE AND NUMBER OF BARRELS AS USED ON THE CAST-IN-PLACE
OESIGN<FpR PRECAST REINFORCED CONCRETE BOX CULVERT,SEE SPECIAL PROVISIONS.
THE CONTRACTOR SHALL REMOVE THE EXISTING BRIDGE ANO SUBMIT PLANS FOR
DEMOLITION IN ACCORDANCE WITH ARTICLE 402-2 OF THE STANDARD SPECIFICATIONS.
NO WORK SHALL BE DONE ON THE CULVERT AT STA.13+14 -L- UNTI� THE AREA OF THE
CULVERT HAS BEEN EXCAVATED TO COMPETENT MATERIAL AT THE DISCRETION OF THE
ENGINEER AND UNSUITABLE MATERIAL REPI.ACED WITH FOUNDATION CONDITIONING MATERIAL
AND PROPERLY COMPACTED TO THE ELEVATION OF THE BOTTOM OF THE PROPOSED CULVERT
FLOOR SLAB AND WING FOOTINGS AS REQUIRED TO CONSTRUCT THE PROPOSED CULVERT.
PAYMENT FOR EXCAVATION DOWN TO ONE FOOT BELOW THE BOTTOM OF THE CULVERT FLOOR
SLAB AND WING FOOTINGS WILL BE FOR ALL WORK INCLUDING FOUNDATION CONDITIONING
MATERIAL OOWN TO ONE FOOT BELOW THE CULVERT AND SHALL BE INCLUDED IN THE LUMP
SUM PRICE FOR CULVERT EXCAVATION. PAYMENT FOR EXCAVATION BEYOND ONE FOOT BELOW
THE BOTTOM OF THE CULVERT FLOOR S�AB AND WING FOOTINGS WILL BE FOR ALL WORK
INCLUDING EXCAVATION.ANY TEMPORARY SHEETING,FOUNDATION CONDITIONING MATERIALo
AND ANY OTHER MISCELLANEOUS ITEMS,AND SHALL BE INCLUDED IN THE PRICE PER CUBIC
YARD FOR FOUNDATION CONDITIONING MATERIAL.
THE ESTIMATEO QUANTITY FOR THE FOUNDATION CONDITIONING MATERIAL THAT IS INCLUDED
IN THE LUMP SUM PAYMENT FOR CULVERT EXCAVATION IS 75 TONS. THE ESTIMATEQ QUANTITY
THAT IS FOR THE FOUNDATION CONDITIONING MATERIAL THAT IS PLACEO BEYOND ONE FOOT
BELOW THE BOTTOM OF THE CULVERT FLOOR SLAB AND WING FOOTINGS IS 170 TONS.THESE
QUANTITIES ARE ESTIMAI'ES ONLY.
ROADWAY DATA
GRADE POINT ELEV. (a� STA. 13+14,00 -L- = 737.52
BED ELEV. C� STA. 13+14a00 = 726.90
ROADWAY SLOPE = 2al
HYDROGRAPHIC DATA
DESIGN OISCHARGE 640 CFS
FREQUENCY OF DESIGN F�OOD 50 YRS.
DESIGN HIGH WATER E�EVATION 734.9
DRAINAGE AREA 0.8 SQ. MI.
BASIC DISCHARGE (Q100) 750 CFS
BASIC HIGH WATER ELEVATION 735.40
OVERTOPPING FL000 DATA
OVERTOPPING DISCHARGE 950 CFS
FREQUENCY OVERTOPPING F�p00 100+ YR.
OVERTOPPING FL000 E�EVATION 737e3
10-JAN-2014 16:49
5:\DPG2\Ting\Div_proJeCtS\ROndolph3l\finai pians\41665.4A_SD_t
swonce
THE EXISTING STRUCTURE CONSISTING OF ONE SPAN ca 19'-0"WITH A CLEAR
ROADWAY WIOTH OF 37'-10"AND A 17�/Z"REINFORCED CONCRETE DECK WITH
FULL HEIGHT CONCRETE BU�KHEADS �OCATED AT THE PROPOSED STRUCTURE SITE
SHALL BE REMOVED. THE EXISTING BRIDGE IS PRESENTLY NOT POSTED FOR
LOAD �IMIT,
THE SUBSTRUCTURE OF THE EXISTING BRIOGE INDICATED ON THE PLANS IS
FROM THE BEST INFORMATION AVAILAB�E. SINCE THIS INFORMATION IS SHOWN
FOR THE CONVENIENCE OF THE CONTRACTOR,THE CONTRACTOR SHALL HAVE NO
CLAIM WHATSOEVER AGAINST THE DEPARTMENT OF TRANSPORTATION FOR ANY
DELAYS OR AOOITIONA� COSTS INCURRED BASED ON DIFFERENCES BETWEEN THE
EXISTING BRIDGE SUBSTRUCTURE SHOWN ON THE PLANS AND THE ACTUAL
CONDITIONS AT THE PROJECT SITEa
REMOVAL OF THE EXISTING BRIDGE SHALL BE PERFORMED SO AS NOT TO ALLOW
DEBRIS TO FALL IN THE WATER. THE CONTRACTOR SHALL REMOVE THE BRIDGE
AND SUBMIT PLANS FOR DEMOLITIpN IN ACCORDANCE WITH ARTICA� 402-2 OF
THE STANDARD SPECIFICATION.
NO SEPARATE PAYMENT SHALL BE MADE FOR REMOVAL OF EXISTING STRUCTURE.
COST FOR REMOVAL OF EXISTING STRUCTURE SHALL BE INCI.UDED IN THE LUMP
SUM BID PRICE FOR CULVERT EXCAVATIpN.
THE CONTRACTOR SHA�L PROVIDE INDEPENDENT ASSURANCE SAMPLES OF
REINFORCING STEEL AS FOLLOWS:FOR PROJECTS REQUIRING UP TO 400 TONS
OF REINFORCING STEEL.ONE 3Q INCH SAMPLE OF EACH SIZE BAR USED.AND
FOR PROJECTS REQUIRING OVER 400 TONS OF REINFORCING STEEL9TW0 30 INCH
SAMPLES OF EACH SIZE BAR USED.THE BARS FROM WHICH THE SAMPLES ARE
TAKEN MUST THEN BE SPLICED WITH REPLACEMENT BARS OF THE SIZE AND
LENGTH OF THE SAMPLE.PLUS A MINIMUM LAP SPLICE OF THIRTY BAR
DIAMETERS.PAYMENT FOR THE SAMPLES OF REINFORCING STEEL SHALL BE
CONSIDERED INCIDENTAL TO VARIOUS PAY ITEMSa
BACKFILL TO TOP OF SILLS WITH NATIVE BED MATERIAL. NATIVE BED MATERIAL
CONSISTS OF MATERIAL THAT IS EXCAVATED FROM THE STREAM BEO OR
FLOODPLAIN DURING CU�VERT CONSTRUCTION. ONLY MATERIAL THAT IS EXCAVATED
FROM THE STREAM BEO MAY BE USED IN THE LOW FLOW CULVERT BARREL. RIP RAP
MAY BE USEO TO SUPPLEMENT THE NATIVE BED MATERIAL IN THE HIGH FLOW
CULVERT BARREL. IF RIP RAP IS USED IN THE HIGH FLOW BARREL IT SHOULD BE
PLACED IN THE BOTTOM PORTION OF THE BARREL WITH NATIVE BED MATERIAL
PLACED ON TOP TO FILL VOIDS AND PROVIDE A FLAT SURFACE FOR ANIMAL
PASSAGE.NATIVE BED MATERIAL IS SUBJECT TO APPROVA� BY THE ENGINEER AND
MAY BE SUBJECT TO PERMIT CONDITIONS.
A 3 FOOT STRIP OF FILTER FABRIC SHA�L BE ATTACHED TO THE FILL FACE
pF THE WING COVERING THE ENTIRE LENGTH OF THE EXPANSION JOINT.
FOR CULVERT DIVERSION DETAILS AND PAY ITEM.SEE EROSION CONTROL PLANS.
FOR SUBMITTAL OF WORKING DRAWINGS.SEE SPECIAL PROVISIONS.
FOR FALSEWORK AND FORMWORK,SEE SPECIAL PROVISIONS.
FOR CRANE SAFETY,SEE SPECIAL PROVISIONS.
FOR GROUT FOR STRUCTURES.SEE SPECIAL PROVISIONS
TOTA� STRUCTURE QUANTITIES
CLASS A CONCRETE
PHASE I 47.8 C.Y.
PHASE II 73.8 C.Y.
TOTAL 121.6 C.Y.
REINFORCING STEEL
PHASE I 5,836 LBS.
PHASE II 8,388 LBS.
TOTAL 14.224 LBS.
FOUNDATION CONDITIONING MAT'L 170 TONS
CULVERT EXCAVATION LUMP SUM
REMOVAL OF EXISTING STRUCTURE LUMP SUM
CARO��'<
SS�n. • y4
SEAL
16301
3/
� �
��11,` _
PROJECT No. q1665o4A-31
RANDOLPN COUNrY
STATION• 13+14e00 —L—
.
SHEET 1 OF 8
REPLACES BRIDGE N0.31
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
RALEiCH
DOUBLE 10 FTa X 7 FTe
CONCRETE B�X CULVERT
90 ° SKEW
REVISIONS
BY: pATE: N0. BY: DATE:
SHEET N0.
C-1
TOTAL
SHEETS
7
+
�
�
�
a
�}
3 �
�c
�
Y
m�
LL
_
o�
Y
v�
i�
U ~
� }
�
�
>P
m�
�-
�>
��
_Z
�3
N a
_ �
> C
W LL
� �
WING SLOPE-
FOR 2s1 FILL
N
J
J
Q
�
�
0
H
�
W
� �
� X
W
O
N N
W
U
Q
�
w
0
H
�
Z
�
4 tt5 G1 Ce� 3" CTS.
(TYPJ
3„ 3„
i�n � �
��us�• —
�0 � /
„
I
�
I o
1
L_
I
�--�---•--
1
i
i
W1
SEE ROADWAY PLANS
ROADWAY FILL SLOPE 2a1
on �
: I \
�
� ' z
0
H
tt4 B2 BARS- FILL FACE � a Z�,; GRADE 0.3%
Q F--� W �
m �ZNQ
.--� C� a�, J m
v . oa
tt4 B1 BARS- STREAM FACE Q��,Ho E�EV.726.9
tt @ �.
�
----i — �— �
N
0
�
'-3" � WEEP HOLES C� 10'- 0" ± CTS.
EXTERIOR WALL
M
ROADWAY FILL SLOPE 2el
1'- 3"
(TYP.)
•�e•
CONST. JTa�
� � v °w "4 B3 BARS &
m �� w "4 A2 BARS
� o = � EACH FACE
_p � N Q � STAGGERED
u @ W v�
_ CONST. JT.�
---------- i
2'-0" X i'-0" SILL-'
(EA. END OF PHASE 1 BARREL)
INTERIOR WALL
CULVERT SECTIQN N4RMAL TQ ROADWAY
LENGTH OF CULVERT= 48'-0"
23'-6„
#4 A1 C� 5�/2"CTS. CORNER BARS EACH
EXTERIOR WALL (SEE BARREL SECTION)
�
� J��� �������� �L���.���������
m
�, a
F— J Z
C� N O
H
. �
� � � t� ~
v
@�� ° aN
J
ti � �' N
QOm O ��
°�ov � pa
v�a v �m
E- w
Q o �` w
u m N
� CULVERT
:k=====._________ ___�_______:
�
�'e � �I � �� � �� � � �� �� �� � �� � � ��
4�-tt5 G1 C� 3" CTS. I
IN HEADWALL STA.13+14.00 -L-
� _—_ � ------- ------ ----------
Wl
tt4 A100 BARS C� 5°CTS.- BOTTOM OF ROOF SLAB
'�4 A300 BARS C�a 5�/�"CTS.- TOP OF ROOF SLAB
�' ' � '�� �:
24'-6„
OI �
�
WING SLOPE
FOR 2al FI�L
0
L�`�'
I
� � � � � � � ,
I
I
I
#4 A400 BARS (� 5%2"CTS.- BOTTOM OF FLOOR S�AB
tt4 A200 BARS Ca� 6" CTS.- TOP OF FLOOR SLAB
'�4 A2 (a� 5�/Z" CTSe CORNER BARS-EXTERIOR WALL
tSEE BARREL SECTION)
"4 Bl BARS (�a 12" CTS, STREAM FACE
#4 B2 BARS C� 5�/�"CTS. FILL FACE
.
� �•
� �
o�
O
� �
LONGITUDINAL CONST. JT. � �
IN BOTTOM SLAB o �
& CURTAIN WALL a �
O
90°-00'-00" EXTEND tt4 A200 1'-6" a 1
(TYP.) & tt4 A400 1'-10" I
INTO PHASE II
----- -------------------- I,
_ I
\� � �
Z
0
H
�
� w
� N
Q
m J
� w
�
V �
tt a
m
w
w
N
12"
#4 B3 & tt4 A2 BARS C� 1'-0"CTS.
EACH FACE STAGGERED
IN INTERIOR WAL�
2'-0" X 1'-0" SILL
(EA. END OF PHASE 1 BARREL)
I �•
tt4 B2 BARS (� 5'/2"CTS. FILL FACE`
tt4 Bi BARS C� 12" CTS. STREAM FACE
tt4 A2 (�a 5�/2" CTS. CORNER BARS-EXTERIOR WALL
(SEE BARRE� SECTION)
tt4 A500 BARS c� 6" CTS.- TOP OF F�OOR SLAB
#4 A600 BARS C� 5%Z"CTS.- BOTTOM OF FLOOR SL
PART PLAN-FL�OR SLAB
�
��
T�
a '
i �
� '
� �
V (
a�
�
(
�
, 1
W3
u
0
�
H
H
W
Q
�
H
�.L.)
Q
�
20-DEC-2013 12:38
5:\DPG2\Ttng\Oiv_proJeCtS\ROndOiph31\final plons\41665.4A_50_(
swonce
22'-0.,
�v�vvl i uvl�vr+� i.viva i...i �.
IN BOTTOM SLAB & CURTAIN WALL
PHASE I PHASE II
IN�ET END ELEVATION
(�OOKING DOWNSTREAM)
22'-p„
LVIVI�l I UUlIVHL I,VIVJ I. J 1.
IN BOTTOM SLAB & CURTAIN WALL
PHASE II PHASE I
OUT�ET END ELEVATI4N
(LOOKING UPSTREAM)
,o°�ZN
�`�.•;SI
` SEAL �
21545
F���
� ' /
� ..
PROJECT No. q1665o4A-31
RANDOLPH COUNTY
STATION: 13+14000 -�-
SHEET 2 OF 7
ii
�
�AYERS OF 30 LE
ROOFING FE�T Tp
PREVENT BOND
(TYP.)
SILL-,
N
H
v
N
�
N
�
a
m
v
ELEVATION
ONE SILL AT INLET
AND OUTLET FACE
t�00KING DOWNSTREAM)
6"
�r
�
�
1'-0"
N�
�T 3'-0"CTS.
AYERS OF 30 L.B.
OFING FELT TO
�REVENT BOND
(TYP.)
ENO OF CULVERT
SECTION THROUGH SILL
� OOWELS MAY BE PUSHED INTO GREEN CONCRETE
AFTER SLAB HAS BEEN FLOAT FINISHED.
CULVERT SILL DETAILS
" 10'-0"
2"HIGH BEAM BOLSTERS
(B.B.) (� 4'-0" CTS.
. � .
NI
`—`CONST. JT.
B2 BARS
-Bl BARS
3" Q1 WEEP HOLES
� AZ BARS
A200 BARS
�
N �'`
H Q
u
U L
O �
�F
N V
�
@�
�
N �
� u
a�
m�
��
v ,,
A400 BARS -'
C1 BARS C� 12" CTS.
2" CL
63 BARS
, ,
'-C
8„
�
6"
10'-0"
ARS (� 12° CTS.
� 6�/q" HIGH CaH.C.U.
A300 BARS �
A100 BARS
" CL.
" T Y�
2" CL.
� ALL CONTINUOUS
HIGH CHAIR UPPER
(C.H,C.U.) C� 3'-0"CTS.
� 3%q" HIGH CeH.CaU.
'-0" 1'-5"
MIN. , J
SPLICE A500 BARS-� N,v
I A600 BARS -'
LONGITUDINAL CONST. JT. IN
" BOTTOM SLAB AND CURTAIN WALL
PHASE I
1'-9" (
MIN ►
SPLICE
PHASE II
RIGHT ANGLE SECTION OF BARREL
(LOOKING DOWNSTREAM)
THERE ARE 77 "C" BARS IN SECTION OF BARREL.
DRAWN BY : S.WANCE _ DATE : 12-13
CHECKEO BY : W.F.PARKER _ DATE : 12-13
OESIGN ENGINEER OF RECORD: S.WANCE _ DATE : 12-13
�
zo-oEC-zots iz:ss
S:\OPG2\Ttnq\Div_proJects\Randoiph3l\finol plans\41665.4A_SD_CULV31.dgn
swonce
8„
�
6"
. ;.-
-B1 BARS
-B2 BARS
2" CL.
, �
�
� �
�I o
A2 BARS
�
�
o �
�
ti �
AR TYPE
O
6" RAD.
Ai 1'-10�/Z"
A2 1'-10�/�„
� N
Q Q
NI O
,�
ALL BAR DIMENSIONS
ARE OUT TO OUT
SPLICE LENGTHS
CHART
BAR SIZE SP�ICE
LENGTH
A200 tt4 1'-5"
A400 tt4 1'-9"
B1 tt4 1,-5„
63 tt4 1,,_5„
C1 tt4 1'-11"
BILL OF MATERIAL
PHASE I PHASE II
BAR N0. SIZE TYPE LENGTH WEIGHT BAR N0. SIZE TYPE LENGTH WEIGHT
Ai 105 tt4 1 5'-2" 362 Ai 105 tt4 1 5'-2" 562
A2 201 tt4 1 4'-8" 627 A2 105 �4 1 4'-8" 327
A200 96 tt4 STR 13'-8" 876 A100 116 �4 STR 21'-7" 1672
A300 105 tt4 STR 21'-7" 1514
A400 105 tt4 STR 14'-0" 982 A500 96 �4 STR 9'-5" 604
A600 105 tt4 STR 9'-5" 660
B1 48 tt4 STR 8'-3" 265
B2 105 tt4 STR 6'-4" 444 Bl 48 #4 STR 8'-3" 265
B3 96 #4 STR 8'-3" 529 62 105 #4 STR 6'-4" 444
Ci 60 tt4 STR 24'-11" 999 C1 94 �4 STR 24'-11" 1565
O1 8 tt6 STR 2'-5" 29 G1 8 tt5 STR 21'-8" 181
REINFORGING STEEL
CLASS A CONCRETE
BARREL Ca� Oe710 CY/FT
SILLS
TOTAL
FOUNDATION COND. MAT'L
LBS. 5.113 REINFORCING STEEL
CLASS A CONCRETE
34.1 CY BARREL C� 1.277 CY/FT
1.5 CY
35e6 CY TOTAL
42 TONS I FOUNDATION COND. MAT'L
LBS. 7.794
61e3 CY
61.3 CY
33 TONS
PHASE I STRUC.TURE �UANTITIES PHASE II STRUCTURE QUANTITIES
CLASS A CQNCRETE CLASS A CONCRETE
BARREL 34.1 C.Y. BARREL 61.3 C.Y.
SILLS 1.5 C.Y. WINGS ETCa 12.5 C.Y.
WINGS ETC. 12.2 C.Y. TpTAL 73.8 C.Y.
TOTAL 47a8 C.Y.
REINFORCING STEEL REINFORCING STEEL
BARREL & SILLS 5q113 LBS, BARRE� 7,794 LBS.
WINGS ETC. 723 �BS. WINGS ETC. 594 �BS.
TOTAL 50836 LBS. TOTAL 8,388 LBS.
FOUNDATION CONDITIONING MAT'L 42 TONS FOUNDATION CONDITIONING MAT'L 33 TONS
CULVERT EXCAVATION LUMP SUM CULVERT EXCAVATION LUMP SUM
�o`�ZH
e��. _i'
SEAL
21545
�N L. ;�.�� 1
'_•nnw ( G
� .,
� �o / 3
��-� r
PROJECT No. q1665o4A-31
RANDOLPH COUNTY
STATION: 13+1qo00 —L—
SHEET 3 OF 7
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
RALEIGH
DOUB�E 10 FTa X 7 FTa
CONCRETE BOX CULVERT
90 ° SKEW
REVISIONS �) SHEET N0.
BY; OATEs N0. BY: DATEa C' 3
7
�
+
�
:
�
�
�
�
fn
0
�
�
�
�
3"
__.
�-tt4 75 �-tt4 74 �-tt4 7� �-tt4 7� 4-tt4 71
PLAN W1
2-tt4 V6 2-tt4 V5 2-tt4 V4
3"—►{ 2-�4 V3 2-tt4 V2 2-tt4 Vi
I "V" BARS aC� 1'-0" CTS.
� 1" EXP. JT.
MATERIAL
2-tt4 H5
H3
H2
'—V6 Hl
V5 _ _ _V4_ _ V3 s V2 _ _ _ _
Z N6 N5 N4 N3 N2 N1
2-tt4 N6 2-tt4 N5 2-tt4 N4
3" 2-tt4 N3 2-tt5 N2 2-tt5 Nl
�� "N" BARS C� 1'-0" CTS.
ELEVAT ION W1
ORAWN BY : S. WANCE _ pATE : 12-13 SPECIAL
CHECKED BY : W.F.PARKER _ DATE : 12-13
DESIGN ENGINEER OF RECORD: S.WANCE _ DATE : 12-13 S T A NO ARD
DRAWN BY : CCJ _ DATE : 10/99
CHECKEO BY : RWW _ DATE : 3/00
� V1
� —
-tt6 S1
OTTOM OF FLOOR SLAB
NO FOOTING
Q
N Z
_
v
v u
tt �
i N
N �--'
= M
v
_
tt Q
� tt
� �
N
�
�
V
�
i
=-� w
@ U
a
N �
� Q
a w
m�-
S
V
x
�
�
2" CL.
..v„ BaRs
STREA
FACE
CONST. JT.
�I.
io��
2" CL.
�
"N" BARS
FILL FACE
J
..Z„ BARS "'
Ti J
(TYP.) �
�
TYPICAL WING SECTION
0
:
T
�
\Rondolph3l\final plons\41665.4A
BAR TYPES
�
6" RAD.
,�
I �
$„
Z1
Z2
Z3
Z4
Z5
������
�
� � � � � o
N Q �O P— O�
i � i i i '�'
o� i�- �o �n 'v �
4'-g„
4'-2„
3'-8"
3'-2„
2'-7„
�
6"
6"
6"
6"
6"
HK.
ALL BAR OIMENSIONS ARE OUT TO OUT,
SEA�
21545
,,,�'' �� n i "�,,�'�
���� u,�<3
l�-�
BILL OF MATERIAL
FOR 1 OUTLET WING
2 REQUIRED
BAR N0. SIZE TYPE LENGTH WEIGHT
H1 6 tt4 STR 9'-4" 37
H2 2 �4 STR 6'-3" 8
H3 2 tt4 STR 2'-11" 4
H4 12 tt4 1 3'-3" 26
H5 2 tt4 STR 10'-3" 14
N1 2 tt5 2 9'-8" 20
N2 2 tt5 2 8'-10" 18
N3 2 tt4 2 8'-0" 11
N4 2 tt4 2 7'-1„ 9
N5 2 tt4 2 6'-3" 8
N6 2 tt4 2 5'-4" 7
S1 3 tt6 STR 6'-6" 29
T1 3 tt5 STR 11'-3" 35
V1 2 tt4 STR 7'-8" 10
V2 2 "4 STR 6'-10" 9
V3 2 tt4 STR 6'-0" 8
V4 2 �4 STR 5'-1" 7
V5 2 tt4 STR 4'-2" 5
V6 2 tt4 STR 3'-4" 4
Zl 4 �4 3 5'-2" 14
Z2 2 tt4 3 4'-8" 6
Z3 2 tt4 3 4'-2" 6
Z4 2 tt4 3 3'-8" 5
Z5 2 �4 3 3'-1" 4
TOTAL REINFORCING STEEL
FOR 1 WING 304 LBSe
PHASE I 4UTLET WING
QUANTITIES
REINFORCING STEE�
FOR 1 WING 304 LBS.
CLASS A CONCRETE
i WING 4.5 CY
i PARTIAL END p.7 CY
CURTAIN WALL•
TOTAL 5a2 CY
PHASE II OUTLET WING
QUANTITIES
REINFORCING STEEL
FOR 1 WING 304 LBS.
CLASS A CONCRETE
1 WING 4.5 CY
1 PARTIAL END
CURTAIN WALL 0.6 CY
1 HEADWAL� 1.5 CY
TOTAL 6.6 CY
PROJECT No. q1665o4A-31
RANDOLPH COUNTY
STATION: 13+1qe00 —L—
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
RALEIGH
OUTLET WINGS
FoR
CONCRETE BOX CULVERT
H = 7'-0" SLOPE = 20l
90° SKEW
REV�SIONS SHEET N0.
). BY: pATE: N0. BYs DATEi ( C-4
7
�_
■
�
ASSEMB�ED BY : S. WANCE
CHECKED BY : We F. PARKER
DESIGN ENGINEER OF RECORD : S. WANCE
ORAWN BY : CCJ 11/99
CHECKED BY : RWW 03/00
3" 2-tt4 Zl 3-tt4 Z2 4-tt4 Z3 4-#4 Z4 4-tt4 Z5
"Z" BARS C� 1'-0" CTS.
TOP OF FOOTING
tt5 Ti�
�
� �
N �
/
�
00
Z5
�
Z3
3"
�N
ci
�"
r�
PLAN W2
Z2
=XP. JT.
,TERIAL
/
2-tt4 V1 3-tt4 V2 4-tt4 V3 4-tt4 V4 4-tt4 V5
"V" BARS C� 1'-0" CTS.
2-tt4 H5
� 1" EXPe JT. MATERIAL —►{
�
H3
H2
.�-
�'8-,
Z1 � �
•� .
��
�
♦
i
4-tt6 S1�
� I�
6-.
'-6" I
�
y' V5 V4 V3 V2
° CONST.
=-� JT. ----- ------ --- H1 — —
N5 N4 N3 N2
�� -----------------------------
3" 2-tt5 Nl 3-tt5 N2 4-#4 N3 4-tt4 N4 4-tt4 N5
"N" BARS C� 1'-0" CTS.
oaTE : 12/13
DATE : 12/13
DATE : 12/13
ELEVATION W2
Vl
N1
.�
�,
H4
(TYP.)
.�
.�
�
.
"� /
�
� BOTTOM OF FLOOR
S�AB & FOOTING
10"
2° CL.
—.� 2" C�e
li I
_ _ � „�„ gARS �
� tt � STREAM
u � �
' `� FACE
N � @
"" M
_ = N
v �
Q Q
", tt m
� N
2
" CONST. JT. �
v
u
�
�
N
J
v
M
8 ��
"N" BARS
FILL FACE
J
U O
"Z" BARS M �
"T" BARS
(TYP.)
TYPICAL WING
SECTION
�
O
��. .
6" RAD,
I/
,
:
Z1
Z2
Z3
Z4
Z5
z� z� z� z� z
� \ \ \ \
� v v Q v
, � � � �
�, i� �o �n v
5'-6"
5'-0"
q'-2„
3'-5"
2'-7„
�
6"
6"
6"
6"
6"
HK.
A�L BAR DIMENSIONS ARE OUT TO OUT.
�uciL�. � R s
215� P =
y��s���� � ���C``` �
.
,�lF�Jiiv �1���
�!���'�02 / ya� 3
r
20-DEC-2013 12:38
S:\DPG2\Ting\Div_proJects\Randolph3l\finoi plans\41665.4A_SD.
swonce
BILL OF MATERIAL
FOR PHASE I INLET WING
1 REQUIRED
BAR N0. SIZE TYPE LENGTH WEIGHT
H1 6 tt4 STR 13'-10" 55
H2 2 tt4 STR 10'-4" 14
H3 2 tt4 STR 4'-3" 6
H4 12 tt4 1 3'-3" 26
H5 2 �4 STR 14'-3" 19
Nl 2 tt5 2 9'-5" 20
N2 3 tt5 2 8'-10" 28
N3 4 tt4 2 7'-10" 21
N4 4 tt4 2 6'-10" 18
' N5 4 tt4 2 5'-10" 16
' S1 4 tt6 STR 6'-0" 36
, T1 3 tt5 STR 15'-9" 49
' V1 2 �4 STR 7'-5" 10
V2 3 tt4 STR 6'-9" 14
V3 4 tt4 STR 5'-9" 15
V4 4 tt4 STR 4'-9" 13
V5 4 #4 STR 3'-9" 10
Zi 2 tt4 3 6'-0" 8
Z2 3 #4 3 5'-6" 11
Z3 4 tt4 3 4'-8" 12
Z4 4 tt4 3 3'-11" 10
Z5 4 �4 3 3'-1" 8
TOTAL REINFORCING STEE� 419 LBS
FOR 1 WING
CLASS A CONCRETE
1 WING 6.3 CY
i PARTIAL END
CURTAIN WALL 0.7 CY
TOTAL 7.0 CY
PROJECT No. q1665a4A-31
RANDO�PH CouNTY
STATION: 13+1qo00 -�-
SHEET 5 OF 7
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
RALEIGH
PHASE I INLET WING
FOR
C�NCRETE B�X CULVERT
H = 7'-0" SLOPE = 2a1
90 ° SKEW
REVISIONS SHEET N0.
0. BY: DATE: N0. BY: DATE: C-rJ
� � TOTAL
SHEETS
% L� 7
+
+
3-tt6 S
BOTTOM OF FLOOR SLA'
AND FOOTIN
4-tt4 71 �-tt4 7� �-#4 7� 7-tt4 74 �-#4 7F
�„
M
_
v �
tt =
�
N Q'
tt
N �
= N
v ~
x Q.
� _
N
= u�
Q N
�
�
v
PLAN W3
2-tt4 V1 2-tt4 V2 2-tt4 V3
2-tt4 V4 2-�4 V5 2-�4 V6
"V" BARS (a� 1'-0" CTS.
�_ � 1" EXP. JT.
MATERIAL
H4 H3
H2 �
2-tt4 H6
I I H1 V6 —`
Vi _ _ _ _ V2 _ V3 _ V4_ _ V5
N1 � N2 N3 N4 N5 N6 S
�---------------------------
2-tt5 N1 2-tt5 N2 2-�4 N3
2-#4 N4 2-tt4 N5 2-tt4 N6
"N" BARS C� 1'-0" CTS.
ELEVATION W3
ORAWN BY : 5. WANCE _ OATE : 12/13 SPECIAL
CHECKEO BY : W.F.PARKER _ pp7E ; 12/13
OESIGN ENGINEER OF RECORD: S.WA.NCE _ DATE : 12/13 S T AN D A RD
DRAWN BY : CGJ _ DATE : IO/99
CHECKED BY : RWW _ DATE : 3/00
3"
3"
�
0
.�
i
V'
M
0
�
=
�
,
�
vi
H
U
�
�
w
@ U
Q
N �`
� Q
a ,.,�
m--
v
u
�
N
2" CL.
"V" BARS
STREA
FACE
CONST. JT.
�
•
W
0"
2" CL.
�
"N" BARS
FILL FACE
J
v
"Z" BARS '�'
Tl
(TYP.)
J
U
rn
TYPICAL WING SECTION
c
S:\DPG2\
C
C
s\Rondolph3l\fiinal p
BAR TYPES
$„
Z1
Z2
Z3
Z4
Z5
��i
z� z� z� z� z� z
� � � � � �
o� � O � m v
i '�' i i i i
r- �p ia � 'v ih
q'-5„
q'-p„
3'-6"
3'-1"
2'-7„
6"
6"
6"
6"
6"
O_./ HK.
3
ALL BAR DIMENSIONS ARE OUT TO OUT.
SEAL
2i545
�����, c,�
1, /�/3
�-r �
BILL OF MATERIAL
FOR PHASE II INLET WING
1 REQUIRED
BAR NOe SIZE TYPE LENGTH WEIGHT
Hl 4 tt4 STR 9'-4" 50
H2 2 tt4 STR 8'-6" il
H3 2 tt4 STR 5'-1" 7
H4 2 tt4 STR 1'-9" 2
H5 12 tt4 1 3'-3" 26
H6 2 tt4 STR 10'-3" 14
Nl
N2
N3
N4
N5
N6
�
�
�
0
0
�
#5
tt5
ttq
ttq
ttq
ttq
�
�
�
0
�
0
9'-2„
8'-q„
7'-6„
6'-7„
5'-g„
4'-10„
S1 3 #6 STR 6'-0"
T1 3 tt5 STR 11'-3"
V1
V2
V3
V4
V5
V6
Zi
Z2
Z3
Z4
Z5
2
2
2
2
2
2
�
0
0
�
0
�
�
�
.%r
.%r
��
ir
�
�
�
m
STR
STR
STR
STR
STR
STR
3
3
3
3
3
7'-2„
6'-4„
5'-6"
4'-7„
3'-g„
2'-10"
4'-11"
4'-6„
q'-p„
3'-7„
3'-1"
�
m
�
0
0
0
27
35
�
�
0
0
0
0
�
0
�
0
n
TOTAL REINFORCING STEEL 290 LBS.
FOR 1 WING
CLASS A CONCRETE
1 WING 4.3 CY
1 PARTIAL END
CURTAIN WALL 0.6 CY
1 HEAOWA�L 1.0 CY
TOTAL 5.9 CY
PROJECT No. q1665oqA-31
RANDOLPH COUNTY
STATION: 13+1qo00 —L—
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
RALEIGH
PHASE II IN�ET WING
FOR
C�NCRETE BOX CULVERT
H = 7'-0" SLOPE = 201
90 ° SKEW
REVISIONS SHEET N0.
). BYs DATE: N0. BY� DATE: I C-6
7
�
+
LOAD AND RESISTANCE FACTQR RATING tLRFR)
SUMMARY FOR REINF4RCED CONCRETE B�X CULVERTS
��
STRENGTH I LIMIT STATE
MOMENT 1 SHEAR
ON �
� � � � � � W
O � O O � O m
C� c.� F- � �- � t,.. .� � � � .� �
Z Z C.� X � U ti. O U t.i p �
� H H a o� a `} a � z
J F- ti � Q I.L W p L� W p
t� JQ � pN F- UZF- � UZt- �'
.J E- O� =C.� ii J� (.7 O Z ZWZ C� O Z ZWZ Z
J t, SN � �Z i O Z Z W a W Z Z W a W w
w H C7 Z F- 0 t--� H In W f- �'"'� � W �-' F- r1 F"{ � w F"' I- � �
�j 'L H� ZQ ZF-� Z �iU f- X WQ. tnlLW F- X W� lnl.iW �
(y� t,�J W� O O F"{ Q� O H Q Q CJ J�" F"� W J a O J�" H W.__I O
J :> �.r U_I ��._. 1- JL� � m WH OJW � �] WH OJW U
HL-93 (INVENTQF2Y) N/A lO 1.07 -- 1.75 1.07 1 TOP SLAB 4e53 1.13 1 BOTTOM SLAB 9.73
OESIGN HL-93 (Of'ERATING) N/A 1.39 -- 1.35 1.39 1 TOP SLAB 4.53 1.46 1 BOTTOM SLAB 9.73
LOAD
RATING HS-20 (INVENTOI�Y) 36.000 O2 1.13 40.52 1.75 1.17 1 BOTTOM S�AB 9.87 1.13 1 BOTTOM SLAB 9.73
HS-20 (OPERATING) 36.000 1e46 52.52 1.35 1.51 1 BOTTOM S�AB 9.87 1.46 1 BOTTOM SLAB 9.73
SNSH 13.500 2.15 29.08 1.40 2.15 1 TOP SLAB 4,53 2.46 1 TOP S�AB 9.64
SNGARBS2 20.000 2.02 40.34 1.40 2.02 1 TOP SLAB 4,53 2.25 1 BOTTOM SLAB 9e73
w
� SNAGRIS?_ 22.000 2.05 45.08 1.40 2.13 1 BOTTOM SLAB 9,87 2.05 1 BOTTOM SLAB 9.73
H
w.-. SNCOTTS'3 2i.250 1.35 36.68 1.40 1.35 1 TOP SLAB 4.53 1.44 1 TOP SLAB 9.64
»
wN SNAGGRS� 34.925 1.30 45.33 1e40 1.32 1 BOTTOM SLAB 9.87 1.30 1 BOTTOM SLAB 9.73
J
�
H SNS5A 35.550 ie43 50.92 1e40 1.43 1 BOTTOM SLAB 9<87 1.44 1 BOTTOM SLAB 9.73
N
SNS6A 39.950 1e29 51.56 1.40 1.39 1 BOTTOM SLAB 9.87 1.29 1 BOTTOM SLAB 9.73
LEGAL SNS7B 42<000 1,29 54.36 1.40 1.38 1 BOTTOM SLAB 9.87 1.29 1 BOTTOM S�AB 9.73
LOAD
RATING w TNAGRIT3 33.000 1.43 47.22 1.40 1.54 1 BOTTOM SLAB 9.87 1.43 1 BOTTOM SLAB 9.73
J
a TNT4A 33.075 1.60 53.02 1.40 1.60 1 TOP SLAB 4e53 1.66 1 BOTTOM SLAB 9.73
�
,_, TNT6A 41.600 1.42 59.19 1.40 1.42 1 BOTTOM SLAB 9.87 1,43 1 BOTTOM SLAB 9.73
v�= TNT7A 42.000 1.42 59.58 1,40 1.55 1 BOTTOM SLAB 9.87 1.42 1 BOTTOM SLAB 9.73
N
� H
�� TNT7B 42.000 1.51 63.47 1.40 1.51 1 BOTTOM SLAB 9.87 1.53 1 BOTTOM SLAB 9e73
c�
� TNAGRIT� 43.000 1.39 59.64 1e40 1a41 1 BOTTOM SLAB 9.87 1.39 1 BpTTOM SLAB 9.73
Y TNAGT5A 45.000 1.18 52.95 1.40 1.23 1 BOTTOM SLAB 9.87 1.18 1 BOTTOM SLAB 9.73
v
� TNAGTSB 45.000 �3 1.08 48.67 1.40 1.15 1 BOTTOM SLAB 9.87 1.08 1 �OTTOM S�AB 9.73
ASSEMBLED BY :
CHECKED BY :
�RAWN BY : WMC
CHECKED BY : GM
WANCE OATE : 12/13
F. PARKER oaTE : 12/13
7��� REV.10/I/II MAAi
7/II
0
�
10'-0"
(TYP.)
O
0
O
BOX 1
(:��}.��
LRFR SUMMARY
tL00KING DOWNSTREAM)
20-DEC-20t3 12:38
S:\OPG2\Ting\Otv_proJects\ROndolph3l�fiinol plons\41665.4A_SD_CULV31.dgn
swance
L4A0 FACTORSo
DESIGN LOAO RATING FACTORS
LOAD TYPE MAX MIN
FAGTOR FACTOR
OC 1.25 0.90
DW 1e50 0.65
EV 1e30 0.90
EH 1e35 0.90
ES 1.35 Oa90
LS 1.75 --
Wia 1.00
NOTEo
RATING FACTORS ARE BASED ON THE STRENGTH I LIMIT STATEe
COMMENTSa
i.
2.
3e
�
�H C
SEAL
21545
V �L�,�O°
m���
`�20,�
1�
O CONTROLLING LOAD RATING
O1 DESIGN LOAO RATING (HL-93)
O2 DESIGN LOAD RATING (HS-20)
�3 LEGA� LOAD RATING � �
�� SEE CIiART FOR VEHICLE TYPE
PROJECT No. q1665o4A-31
RANDOLPH CouNTY
STATIONs
T 7 OF 7
14+13000 -�-
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
RALEIGH
STANDARD
LRFR SUMMARY FOR
REINFORCED CONCRETE
BOX CULVERTS
(NON-INTERSTATE TRAFFIC)
REVISIONS
BY: DATE:• N0. BYs
NJ
4
STDa �
OATEs
a LRFRS
SHEET N0.
�-7
7
e
(V
e
r
s
i
o
n
1
.
2
;
R
e
l
e
a
s
e
d
J
u
l
y
2
0
1
2
)
41
6
6
5
.
4
A
Co
u
n
t
y
(
i
e
s
)
:
Ra
n
d
o
l
p
h
Page 1of 1
Pr
o
j
e
c
t
T
y
p
e
:
D
a
t
e
:
Ph
o
n
e
:
Ph
o
n
e
:
Em
a
i
l
:
Em
a
i
l
:
Co
u
n
t
y
(
i
e
s
)
:
CA
M
A
C
o
u
n
t
y
?
De
s
i
g
n
/
F
u
t
u
r
e
:
Ex
i
s
t
i
n
g
:
Su
p
p
l
e
m
e
n
t
a
l
:
Pr
i
m
a
r
y
:
Sy
c
a
m
o
r
e
C
r
e
e
k
Ca
p
e
F
e
a
r
N/
A
Tw
o
1
2
'
l
a
n
e
s
Tw
o
1
1
'
l
a
n
e
s
Ra
n
d
l
e
m
a
n
L
a
k
e
NC
D
W
Q
S
t
r
e
a
m
I
n
d
e
x
N
o
.
:
Pr
o
j
e
c
t
/
T
I
P
N
o
.
:
NC
D
O
T
C
o
n
t
a
c
t
:
Pr
o
j
e
c
t
N
o
.
:
41
6
6
5
.
4
A
Co
n
t
r
a
c
t
o
r
/
D
e
s
i
g
n
e
r
:
gc
a
i
l
@
n
c
d
o
t
.
g
o
v
Ge
n
e
r
a
l
P
r
o
j
e
c
t
I
n
f
o
r
m
a
t
i
o
n
Ad
d
r
e
s
s
:
4/1/2014
Ra
l
e
i
g
h
,
N
C
2
7
6
9
9
-
1
5
9
0
No
r
t
h
C
a
r
o
l
i
n
a
D
e
p
a
r
t
m
e
n
t
o
f
T
r
a
n
s
p
o
r
t
a
t
i
o
n
Hi
g
h
w
a
y
S
t
o
r
m
w
a
t
e
r
P
r
o
g
r
a
m
S
T
O
R
M
W
A
T
E
R
M
A
N
A
G
E
M
E
N
T
P
L
A
N
FO
R
L
I
N
E
A
R
R
O
A
D
W
A
Y
P
R
O
J
E
C
T
S
Ga
l
e
n
C
a
i
l
,
P
E
Br
i
d
g
e
R
e
p
l
a
c
e
m
e
n
t
ac.
Ge
n
e
r
a
l
P
r
o
j
e
c
t
N
a
r
r
a
t
i
v
e
:
Th
i
s
p
r
o
j
e
c
t
i
n
v
o
l
v
e
s
t
h
e
r
e
p
l
a
c
e
m
e
n
t
o
f
B
r
i
d
g
e
N
o
.
9
7
o
v
e
r
S
y
c
a
m
o
r
e
C
r
e
e
k
o
n
U
S
3
1
1
.
T
h
e
a
p
p
r
o
a
c
h
w
o
r
k
w
i
l
l
c
o
n
s
i
s
t
o
f
m
a
i
n
t
a
i
ning the existing roadway grade
an
d
p
r
o
v
i
d
i
n
g
g
r
a
s
s
s
h
o
u
l
d
e
r
s
a
n
d
g
u
a
r
d
r
a
i
l
s
.
B
r
i
d
g
e
N
o
.
9
7
e
x
i
s
t
i
ng
1
s
p
a
n
s
t
r
u
c
t
u
r
e
(
2
2
'
t
o
t
a
l
l
e
n
g
t
h
)
w
i
l
l
b
e
r
e
p
l
a
c
e
d
w
i
t
h
2
@
1
1
'
x
8
'
R
C
B
C
w
i
t
h
h
e
a
d
w
a
l
l
s
.
Be
s
t
M
a
n
a
g
e
m
e
n
t
P
r
a
c
t
i
c
e
s
:
-M
a
i
n
t
a
i
n
e
x
i
s
t
i
n
g
d
i
t
c
h
e
s
-R
e
m
o
v
a
l
o
f
e
x
i
s
t
i
n
g
r
o
a
d
f
i
l
l
u
n
d
e
r
b
r
i
d
g
e
w
i
l
l
i
m
p
r
o
v
e
c
o
n
v
e
y
a
n
c
e
a
n
d
r
e
d
u
c
e
t
h
e
v
e
l
o
c
i
t
i
e
s
.
Ty
p
i
c
a
l
C
r
o
s
s
S
e
c
t
i
o
n
D
e
s
c
r
i
p
t
i
o
n
:
Re
f
e
r
e
n
c
e
s
13,000 (2009)
0.
1
3
Av
e
r
a
g
e
D
a
i
l
y
T
r
a
f
f
i
c
(
v
e
h
/
h
r
/
d
a
y
)
:
ac
.
Ot
h
e
r
S
t
r
e
a
m
C
l
a
s
s
i
f
i
c
a
t
i
o
n
:
Ci
t
y
/
T
o
w
n
:
15
9
0
M
a
i
l
S
e
r
v
i
c
e
C
e
n
t
e
r
Ad
d
r
e
s
s
:
Gl
e
n
o
l
a
91
9
.
7
0
7
.
6
7
1
1
Ra
n
d
o
l
p
h
No
NC
D
W
Q
S
u
r
f
a
c
e
W
a
t
e
r
C
l
a
s
s
i
f
i
c
a
t
i
o
n
f
o
r
P
r
i
m
a
r
y
R
e
c
e
i
v
i
n
g
W
a
t
e
r
30
3
(
d
)
I
m
p
a
i
r
m
e
n
t
s
:
Ri
v
e
r
B
a
s
i
n
(
s
)
:
Pr
i
m
a
r
y
R
e
c
e
i
v
i
n
g
W
a
t
e
r
:
Wa
t
e
r
S
u
p
p
l
y
I
V
(
W
S
-
I
V
)
Bu
f
f
e
r
R
u
l
e
s
i
n
E
f
f
e
c
t
Pr
o
j
e
c
t
D
e
s
c
r
i
p
t
i
o
n
No
n
e
Su
r
r
o
u
n
d
i
n
g
L
a
n
d
U
s
e
:
Ur
b
a
n
0.
0
4
8
m
i
l
e
s
14
,
0
0
0
(
2
0
1
1
)
0.
3
5
0
.
1
3
Pr
o
j
e
c
t
B
u
i
l
t
-
U
p
o
n
A
r
e
a
(
a
c
.
)
Pr
o
p
o
s
e
d
P
r
o
j
e
c
t
E
x
i
s
t
i
n
g
S
i
t
e
Pr
o
j
e
c
t
L
e
n
g
t
h
(
l
i
n
.
M
i
l
e
s
o
r
f
e
e
t
)
:
BUFFER IMPACTS PERMIT
S
:
\
M
a
i
n
t
e
n
a
n
c
e
\
C
e
n
t
r
a
l
\
R
a
n
d
o
l
p
h
\
B
r
g
#
0
9
7
S
F
7
5
0
0
9
7
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
7
5
0
0
9
7
_
H
y
d
_
p
r
m
_
b
u
f
_
t
s
h
.
d
g
n
a
m
k
e
e
t
e
r
1
0
/1
6
/2
0
1
3
SHEET 1 OF 5
BUFFER DRAWING
SITE 1
Bob Branch
M uddy
Cedar
J
a
s
p
e
r
D
r
.
Living Word
Church of the
Baptist
Glenola
1783
1781
1929
1773
1782
Glenola
Edgar
New Market
1528
1533
1532
1526
Rd.
ChurchRd.
Marlboro
LoflinDairy
Rd.
Square Rd.Cedar
311
311
1526
1531
S
pencer
CORPORATION
S
O
U
T
H
E
R
N
2041
2042
19292027
E
d
g
a
r
R
d
.
Lawson
Rd.
Bronzie
1930
1719
1669
1526
3167 1529
1931
1529
1528
1929
1945
2029
1936
1528 15273105
1527
3272
1858
15343146
1858
1526
1534
3125
3124
E
d
g
a
r
R
d
.
Old
Edgar
R
d.
Bra
d
Rd.
R
o
y
F
arl
ow
R
d.
E
u
g
e
n
e
S
t
.
MarlboroRd.
H
a
r
d
in
s
F
a
r
m
Hog Slide Rd.
Old
E
d
gar
R
d.
Glenview
Dr.
Glenola
Rd.
Church
Marlboro
Banner
Whitehead Rd.
Plenty
Farlow
Rd.
1946
T
a
l
l
w
o
o
d
D
r
.
3230
3239
1928
1697
1928
1932
1858
O
l d
Allred
HeightsDr
1533
N
O
R
F
O
L
K
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’
2 @ 11’x 8’ RCBC
SEE NOTE UNDER ADDITIONAL INFORMATION & COMPUTATIONS.
NOTE: BACKFILL TO TOP OF SILLS W/ NATIVE BED MATERIAL.
SILL
65’LT
R/W
+50
65’LT
R/W
+75
55’LT
R/W
+55
55’LT
R/W
+55
60’LT
R/W
+85
60’LT
R/W
+45
50’RT
R/W
+65
50’RT
R/W
+30
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
LICENSE NO. F-0165
RALEIGH, NC 27601
SUITE 1500
434 FAYETTEVILLE STREET
NAD 83NC GRID
PROJECT
LOCATION
10
15
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’
TO HIGH POINT -L-
US HWY 311
-L-
25 50 10050
25 50 10050
5 10 20 10
=ADT
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
0
0
0
PROFILE (HORIZONTAL)
PROJECT LENGTH
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATA
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
P.E.
SIGNATURE:
SIGNATURE:
P.E.
P.E.
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEER
ROADWAY DESIGN
LOCATION:
TYPE OF WORK:
0
9
/
0
8
/
9
9
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0
00
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
C
O
N
T
R
A
C
T
:
STATE HIGHWAY DESIGN ENGINEER
D
E
P
A
R
T
MEN
T
O
F TRA N SPORTA
T
IO
N
S
T
A TEOFNORT
H
CAR
O
LI
N
A
VICINITY MAP
See Sheet 1-B For Symbology Sheet
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
PLANS PREPARED BY:PLANS PREPARED FOR:
DIVISION OF HIGHWAYS
Raleigh NC, 27610
1000 Birch Ridge Dr.
NCDOT CONTACT:
DIVISION BRIDGE - PROGRAM MANAGER
=V
TO THE LIMITS ESTABLISHED BY METHOD II.
CLEARING ON THIS PROJECT SHALL BE PERFORMED
PE
LICENSE NO. F-0165
RALEIGH, NC 27601
SUITE 1500
434 FAYETTEVILLE STREET
DETOUR ROUTE
2012 STANDARD SPECIFICATIONS
R/ W, UTILITIES
RANDOLPH COUNTY
REPLACE EXISTING CULVERT NO. 97
US HWY 311
= 0.049 MI
= 0.004 MI
= 0.053 MI
See Sheet 1-A For Index of Sheets (Not Included in R/W Plans)
DAVID KEISER, PE
2011
* PER ALLOWANCE IN LIBR POLICY VERTICAL ALIGNMENT HAS BEEN REDUCED TO V = 35 MPH
GRADING, DRAINAGE, BOX CULVERT
AND PAVEMENT MARKINGS
55 MPH
NAD 83NC GRID
TIM WELCH, PE
PROJECT
LOCATION
TO RANDLEMAN
SY C A M
O R E C R E E K
10
15
-L- POT Sta. 13+90.00
END RESURFACING
41665.4A-97
14,000
4
1
6
6
5
.
4
A
-
9
7
BEGIN RESURFACING
-L- POT Sta. 11+60.00
-L- POT Sta. 12+94.56
BEGIN BOX CULVERT-97
-L- POT Sta. 13+18.26
END BOX CULVERT-97
41665.4A
41665.4A
LAUREN WILSON, EI
PART 1
-L- POT Sta. 14+42.00
N/A
N/A
MARCH 11, 2014
END PROJECT 41665.4A-97 PART 1
BEGIN PROJECT 41665.4A-97
P
R
O
J
E
C
T
:
LENGTH ROADWAY PROJECT 41665.4A-97
LENGTH STRUCTURE PROJECT 41665.4A-97
TOTAL LENGTH PROJECT 41665.4A-97
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
4750097
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
S
:
\
M
a
i
n
t
e
n
a
n
c
e
\
C
e
n
t
r
a
l
\
R
a
n
d
o
l
p
h
-
7
5
\
B
r
g
#
0
9
7
S
F
7
5
0
0
9
7
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
7
5
0
0
9
7
_
H
y
d
_
p
r
m
_
b
u
f
.
d
g
n
r
f
j
a
c
k
s
o
n
4
/1
/2
0
1
4
SITE 1
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
SCALE 1"=25’
0’25’25’
SHEET 2 OF 5
BUFFER DRAWING
10
15
0
2
0
2
GRAU 350
GRAU 350
GRAU 350
SEE NOTE UNDER ADDITIONAL INFORMATION & COMPUTATIONS.
NOTE: BACKFILL TO TOP OF SILLS W/ NATIVE BED MATERIAL.
SILL
2 @ 11’x 8’ RCBC
31 CU.YDS. GEOTEXTILE
EST. 33 TONS
CLASS I RIP RAP
25 CU.YDS. GEOTEXTILE
EST. 25 TONS
CLASS I RIP RAP
10
15
0
2
0
2
GRAU 350
GRAU 350
GRAU 350
EIP EIP
EIP
EIP
RICHARD HOLLINGSWORTH, II
HOLLY RIDGE GOLF LINKS INC.
US 311 22’ PAVED ROADWAYTO HIGH POINT
C
O
N
C
R
E
T
E
C
A
R
T
PA
T
H
2
4
"
R
C
P
2
4
"
R
C
P
2
4
"
R
C
P
8’ CHAIN LINK
WVWM
ELECTRIC GATE
OPEN GATE
KEYPAD TO
CULVERT #1
ONE BARREL
NORTH EAST ELEV.
CUL1 769411.11 1734687.79 725.69
CUL2 769397.06 1734700.96 725.70
CE1 769407.71 1734698.46 734.06
HW1 769407.31 1734697.87 736.54
CUL3 769377.81 1734679.91 725.87
CUL4 769389.59 1734664.77 725.90
CE2 769381.96 1734671.60 734.09
HW2 769381.97 1734671.85 736.58
NC GRID
NAD 83 NA 2011
DRIVE
PAVED
18" RCP
MTL
3’ SPLIT RAIL 3’ SPLIT RAIL
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’MTL
WOODS
WOODS
GRASS FIELD
GRASS FIELD
GRASS FIELD
GOLF COURSE
GOLF COURSE
TEE BOX
TEE BOX
CONC HW & WW
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "RAN97-1"
WITH NAD 83/NA 2011 STATE PLANE GRID COORDINATES OF
NORTHING: 769425.666(ft) EASTING: 1734680.651(ft)
ELEVATION: 736.216(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.99989860
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
"RAN97-1" TO -L- STATION IS
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAVD 88
WATER AUTHORITY
PIEDMONT TRIAD
MILFORD FARLOW
MILFORD FARLOW
TO US HWY 220
SEE NOTE UNDER ADDITIONAL INFORMATION & COMPUTATIONS.
NOTE: BACKFILL TO TOP OF SILLS W/ NATIVE BED MATERIAL.
SILL
2 @ 11’x 8’ RCBC
31 CU.YDS. GEOTEXTILE
EST. 33 TONS
CLASS I RIP RAP
25 CU.YDS. GEOTEXTILE
EST. 25 TONS
CLASS I RIP RAP
EIP EIP
EIP
EIP
RICHARD HOLLINGSWORTH, II
HOLLY RIDGE GOLF LINKS INC.
US 311 22’ PAVED ROADWAYTO HIGH POINT
C
O
N
C
R
E
T
E
C
A
R
T
PA
T
H
2
4
"
R
C
P
2
4
"
R
C
P
2
4
"
R
C
P
8’ CHAIN LINK
RR SPIKE IN BASE OF 24" ASH
EL STATION 12+41.00 66’ LEFT
N 769484 E 1734692
BM1 ELEVATION = 735.60’
WVWM
7
ELECTRIC GATE
OPEN GATE
KEYPAD TO
CULVERT #1
ONE BARREL
NORTH EAST ELEV.
CUL1 769411.11 1734687.79 725.69
CUL2 769397.06 1734700.96 725.70
CE1 769407.71 1734698.46 734.06
HW1 769407.31 1734697.87 736.54
CUL3 769377.81 1734679.91 725.87
CUL4 769389.59 1734664.77 725.90
CE2 769381.96 1734671.60 734.09
HW2 769381.97 1734671.85 736.58
NC GRID
NAD 83 NA 2011
DRIVE
PAVED
18" RCP
MTL
3’ SPLIT RAIL 3’ SPLIT RAIL
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’MTL
WOODS
WOODS
GRASS FIELD
GRASS FIELD
GRASS FIELD
GOLF COURSE
GOLF COURSE
TEE BOX
TEE BOX
CONC HW & WW
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "RAN97-1"
WITH NAD 83/NA 2011 STATE PLANE GRID COORDINATES OF
NORTHING: 769425.666(ft) EASTING: 1734680.651(ft)
ELEVATION: 736.216(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.99989860
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
"RAN97-1" TO -L- STATION IS
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAVD 88
WATER AUTHORITY
PIEDMONT TRIAD
MILFORD FARLOW
MILFORD FARLOW
TO US HWY 220
F
F
F
FF
F F
F
NC GRID
NAD 83/NSRS 2007
F
F
F
FF
F F
F
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
4A750097
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
SHEET 3 OF 5
BUFFER DRAWING
S
:
\
M
a
i
n
t
e
n
a
n
c
e
\
C
e
n
t
r
a
l
\
R
a
n
d
o
l
p
h
-
7
5
\
B
r
g
#
0
9
7
S
F
7
5
0
0
9
7
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
7
5
0
0
9
7
_
H
y
d
_
p
r
m
_
b
u
f
_
4
A
.
d
g
n
r
f
j
a
c
k
s
o
n
4
/1
/2
0
1
4
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
SCALE 1"=25’
0’25’25’
HOLLY RIDGE GOLF LINKS INC.
MILFORD FARLOW
WATER AUTHORITY
PIEDMONT TRIAD
MILFORD FARLOW
RICHARD HOLLINGSWORTH, II
SITE 1
EIP EIP
EIP
EIP
US 311 22’ PAVED ROADWAYTO HIGH POINT
C
O
N
C
R
E
T
E
C
A
R
T
P
A
T
H
2
4
"
R
C
P
2
4
"
R
C
P
2
4
"
R
C
P
8’ CHAIN LINK
RR SPIKE IN BASE OF 24" ASH
EL STATION 12+41.00 66’ LEFT
N 769484 E 1734692
BM1 ELEVATION = 735.60’
FH
WVWM
7
ELECTRIC GATE
OPEN GATE
KEYPAD TO
DRIVE
PAVED
18" RCP
MTL
3’ SPLIT RAIL 3’ SPLIT RAIL
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’MTL
WOODS
WOODS
GRASS FIELD
GRASS FIELD
GRASS FIELD
GOLF COURSE
GOLF COURSE
TEE BOX
TEE BOX
CONC HW & WW
TO US HWY 220
10
15
0
2
0
2
GRAU 350
GRAU 350
GRAU 350
SILL
2 @ 11’x 8’ RCBC
31 CU.YDS. GEOTEXTILE
EST. 33 TONS
CLASS I RIP RAP
25 CU.YDS. GEOTEXTILE
EST. 25 TONS
CLASS I RIP RAP
10
15
0
2
0
2
GRAU 350
GRAU 350
GRAU 350
EIP EIP
EIP
EIP
RICHARD HOLLINGSWORTH, II
HOLLY RIDGE GOLF LINKS INC.
US 311 22’ PAVED ROADWAYTO HIGH POINT
C
O
N
C
R
E
T
E
C
A
R
T
P
A
T
H
2
4
"
R
C
P
2
4
"
R
C
P
2
4
"
R
C
P
8’ CHAIN LINK
FH
WVWM
ELECTRIC GATE
OPEN GATE
KEYPAD TO
CULVERT #1
ONE BARREL
NORTH EAST ELEV.
CUL1 769411.11 1734687.79 725.69
CUL2 769397.06 1734700.96 725.70
CE1 769407.71 1734698.46 734.06
769407.31 1734697.87 736.54
769377.81 1734679.91
CUL4
HW2
CE2
CUL3
CUL1 CUL2
CE1
HW1
CONC WW(END BURIED)
NC GRID
NAD 83 NA 2011
DRIVE
PAVED
18" RCP
MTL
3’ SPLIT RAIL 3’ SPLIT RAIL
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’MTL
WOODS
WOODS
GRASS FIELD
GRASS FIELD
GRASS FIELD
GOLF COURSE
GOLF COURSE
TEE BOX
TEE BOX
CONC HW & WW
STRUCTURE #97 = 8’ X 19’ CONCRETE BOX CULVERT
CULVERT #1
BURIED)
CONC WW(END
WATER AUTHORITY
PIEDMONT TRIAD
MILFORD FARLOW
MILFORD FARLOW
TO US HWY 220
SILL
2 @ 11’x 8’ RCBC
31 CU.YDS. GEOTEXTILE
EST. 33 TONS
CLASS I RIP RAP
25 CU.YDS. GEOTEXTILE
EST. 25 TONS
CLASS I RIP RAP
F
F
F
FF
F F
F
F
F
F
FF
F F
F
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
750097
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
S
:
\
M
a
i
n
t
e
n
a
n
c
e
\
C
e
n
t
r
a
l
\
R
a
n
d
o
l
p
h
\
B
r
g
#
0
9
7
S
F
7
5
0
0
9
7
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
7
5
0
0
9
7
_
H
y
d
_
p
r
m
_
b
u
f
_
P
F
L.
d
g
n
a
m
k
e
e
t
e
r
9
/2
4
/2
0
1
3
SHEET 4 OF 5
PERMIT DRAWING
0’100’100’
730
740
720
USGS QUAD - GLENOLA
2:12:1
NWS=728.2’
Q100=733.51’Q50=733.1’
TB LT
TB RT
L
SLOPE=0.4%
C INV.=725.8’
SKEW=104
GRADE PT.=737.2’
2 @ 11’ x 8’ RCBC W/ HEADWALLS
-L- STA. 13+06
1 @ 22’; REINFORCED CONCRETE SLAB ON FULL-HEIGHT CONCRETE ABUTMENTS
Rev. May 2006
ROAD
CROSSING BRIDGE
PARALLEL
IMPACT
ZONE 1
(ft2)
ZONE 2
(ft2)
TOTAL
(ft2)
ZONE 1
(ft2)
ZONE 2
(ft2)
TOTAL
(ft2)
ZONE 1
(ft2)
ZONE 2
(ft2)
1 2 @ 11'x8' RCBC X 4241 1115 5356
TOTAL:4241.0 1115.0 5356.0 0.0 0.0 0.0
SHEET 5 OF 5
PROJECT: 41665.4A (SF-750097)
9/24/2013
N.C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
RANDOLPH COUNTY
IMPACT
BUFFER IMPACTS SUMMARY
TYPE
SITE NO.
STRUCTURE SIZE /
TYPE
STATION
(FROM/TO)
ALLOWABLE MITIGABLE
BUFFER
REPLACEMENT
S
:
\
M
a
i
n
t
e
n
a
n
c
e
\
C
e
n
t
r
a
l
\
R
a
n
d
o
l
p
h
\
B
r
g
#
0
9
7
S
F
7
5
0
0
9
7
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
7
5
0
0
9
7
_
H
y
d
_
p
r
m
_
w
e
t
_
t
s
h
.
d
g
n
a
m
k
e
e
t
e
r
1
0
/1
6
/2
0
1
3
SURFACE WATER IMPACTS PERMIT
SITE 1
SHEET 1 OF 6
PERMIT DRAWING
Bob Branch
M uddy
Cedar
J
a
s
p
e
r
D
r
.
Living Word
Church of the
Baptist
Glenola
1783
1781
1929
1773
1782
Glenola
Edgar
New Market
1528
1533
1532
1526
Rd.
ChurchRd.
Marlboro
LoflinDairy
Rd.
Square Rd.Cedar
311
311
1526
1531
S
pencer
CORPORATION
S
O
U
T
H
E
R
N
2041
2042
19292027
E
d
g
a
r
R
d
.
Lawson
Rd.
Bronzie
1930
1719
1669
1526
3167 1529
1931
1529
1528
1929
1945
2029
1936
1528 15273105
1527
3272
1858
15343146
1858
1526
1534
3125
3124
E
d
g
a
r
R
d
.
Old
Edgar
R
d.
Bra
d
Rd.
R
o
y
F
arl
ow
R
d.
E
u
g
e
n
e
S
t
.
MarlboroRd.
H
a
r
d
in
s
F
a
r
m
Hog Slide Rd.
Old
E
d
gar
R
d.
Glenview
Dr.
Glenola
Rd.
Church
Marlboro
Banner
Whitehead Rd.
Plenty
Farlow
Rd.
1946
T
a
l
l
w
o
o
d
D
r
.
3230
3239
1928
1697
1928
1932
1858
O
l d
Allred
HeightsDr
1533
N
O
R
F
O
L
K
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’
2 @ 11’x 8’ RCBC
SEE NOTE UNDER ADDITIONAL INFORMATION & COMPUTATIONS.
NOTE: BACKFILL TO TOP OF SILLS W/ NATIVE BED MATERIAL.
SILL
65’LT
R/W
+50
65’LT
R/W
+75
55’LT
R/W
+55
55’LT
R/W
+55
60’LT
R/W
+85
60’LT
R/W
+45
50’RT
R/W
+65
50’RT
R/W
+30
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
LICENSE NO. F-0165
RALEIGH, NC 27601
SUITE 1500
434 FAYETTEVILLE STREET
NAD 83NC GRID
PROJECT
LOCATION
10
15
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’
TO HIGH POINT -L-
US HWY 311
-L-
25 50 10050
25 50 10050
5 10 20 10
=ADT
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
0
0
0
PROFILE (HORIZONTAL)
PROJECT LENGTH
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATA
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
P.E.
SIGNATURE:
SIGNATURE:
P.E.
P.E.
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEER
ROADWAY DESIGN
LOCATION:
TYPE OF WORK:
0
9
/
0
8
/
9
9
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0
00
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
C
O
N
T
R
A
C
T
:
STATE HIGHWAY DESIGN ENGINEER
D
E
P
A
R
T
MEN
T
O
F TRA N SPORTA
T
IO
N
S
T
A TEOFNORT
H
CAR
O
LI
N
A
VICINITY MAP
See Sheet 1-B For Symbology Sheet
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
PLANS PREPARED BY:PLANS PREPARED FOR:
DIVISION OF HIGHWAYS
Raleigh NC, 27610
1000 Birch Ridge Dr.
NCDOT CONTACT:
DIVISION BRIDGE - PROGRAM MANAGER
=V
TO THE LIMITS ESTABLISHED BY METHOD II.
CLEARING ON THIS PROJECT SHALL BE PERFORMED
PE
LICENSE NO. F-0165
RALEIGH, NC 27601
SUITE 1500
434 FAYETTEVILLE STREET
DETOUR ROUTE
2012 STANDARD SPECIFICATIONS
R/ W, UTILITIES
RANDOLPH COUNTY
REPLACE EXISTING CULVERT NO. 97
US HWY 311
= 0.049 MI
= 0.004 MI
= 0.053 MI
See Sheet 1-A For Index of Sheets (Not Included in R/W Plans)
DAVID KEISER, PE
2011
* PER ALLOWANCE IN LIBR POLICY VERTICAL ALIGNMENT HAS BEEN REDUCED TO V = 35 MPH
GRADING, DRAINAGE, BOX CULVERT
AND PAVEMENT MARKINGS
55 MPH
NAD 83NC GRID
TIM WELCH, PE
PROJECT
LOCATION
TO RANDLEMAN
SY C A M
O R E C R E E K
10
15
-L- POT Sta. 13+90.00
END RESURFACING
41665.4A-97
14,000
4
1
6
6
5
.
4
A
-
9
7
BEGIN RESURFACING
-L- POT Sta. 11+60.00
-L- POT Sta. 12+94.56
BEGIN BOX CULVERT-97
-L- POT Sta. 13+18.26
END BOX CULVERT-97
41665.4A
41665.4A
LAUREN WILSON, EI
PART 1
-L- POT Sta. 14+42.00
N/A
N/A
MARCH 11, 2014
END PROJECT 41665.4A-97 PART 1
BEGIN PROJECT 41665.4A-97
P
R
O
J
E
C
T
:
LENGTH ROADWAY PROJECT 41665.4A-97
LENGTH STRUCTURE PROJECT 41665.4A-97
TOTAL LENGTH PROJECT 41665.4A-97
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
4750097
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S
:
\
M
a
i
n
t
e
n
a
n
c
e
\
C
e
n
t
r
a
l
\
R
a
n
d
o
l
p
h
-
7
5
\
B
r
g
#
0
9
7
S
F
7
5
0
0
9
7
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
7
5
0
0
9
7
_
H
y
d
_
p
r
m
_
w
e
t
.
d
g
n
r
f
j
a
c
k
s
o
n
4
/1
/2
0
1
4
SITE 1
SCALE 1"=25’
0’25’25’
SHEET 2 OF 6
PERMIT DRAWING
MILFORD FARLOW
WATER AUTHORITY
PIEDMONT TRIAD
RICHARD HOLLINGSWORTH, II
HOLLY RIDGE GOLF LINKS INC.
10
15
GRAU 350
GRAU 350
GRAU 350
STANDARD DRAWING 1250.01
REFER TO ROADWAY
YELLOW PAINTED ISLAND
SEE NOTE UNDER ADDITIONAL INFORMATION & COMPUTATIONS.
NOTE: BACKFILL TO TOP OF SILLS W/ NATIVE BED MATERIAL.
SILL
2 @ 11’x 8’ RCBC
31 CU.YDS. GEOTEXTILE
EST. 33 TONS
CLASS I RIP RAP
25 CU.YDS. GEOTEXTILE
EST. 25 TONS
CLASS I RIP RAP
10
15
GRAU 350
GRAU 350
GRAU 350
STANDARD DRAWING 1250.01
REFER TO ROADWAY
YELLOW PAINTED ISLAND
EIP EIP
EIP
EIP
US 311 22’ PAVED ROADWAYTO HIGH POINT
C
O
N
C
R
E
T
E
C
A
R
T
PA
T
H
2
4
"
R
C
P
2
4
"
R
C
P
2
4
"
R
C
P
8’ CHAIN LINK
WVWM
ELECTRIC GATE
OPEN GATE
KEYPAD TO
CULVERT #1
ONE BARREL
NORTH EAST ELEV.
CUL1 769411.11 1734687.79 725.69
CUL2 769397.06 1734700.96 725.70
CE1 769407.71 1734698.46 734.06
HW1 769407.31 1734697.87 736.54
CUL3 769377.81 1734679.91 725.87
CUL4 769389.59 1734664.77 725.90
CE2 769381.96 1734671.60 734.09
HW2 769381.97 1734671.85 736.58
NC GRID
NAD 83 NA 2011
DRIVE
PAVED
18" RCP
3’ SPLIT RAIL 3’ SPLIT RAIL
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’
WOODS
WOODS
GRASS FIELD
GRASS FIELD
GRASS FIELD
GOLF COURSE
GOLF COURSE
TEE BOX
TEE BOX
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "RAN97-1"
WITH NAD 83/NA 2011 STATE PLANE GRID COORDINATES OF
NORTHING: 769425.666(ft) EASTING: 1734680.651(ft)
ELEVATION: 736.216(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.99989860
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
"RAN97-1" TO -L- STATION IS
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAVD 88
TO US HWY 220
SEE NOTE UNDER ADDITIONAL INFORMATION & COMPUTATIONS.
NOTE: BACKFILL TO TOP OF SILLS W/ NATIVE BED MATERIAL.
SILL
2 @ 11’x 8’ RCBC
31 CU.YDS. GEOTEXTILE
EST. 33 TONS
CLASS I RIP RAP
25 CU.YDS. GEOTEXTILE
EST. 25 TONS
CLASS I RIP RAP
EIP EIP
EIP
EIP
US 311 22’ PAVED ROADWAYTO HIGH POINT
C
O
N
C
R
E
T
E
C
A
R
T
PA
T
H
2
4
"
R
C
P
2
4
"
R
C
P
2
4
"
R
C
P
8’ CHAIN LINK
RR SPIKE IN BASE OF 24" ASH
EL STATION 12+41.00 66’ LEFT
N 769484 E 1734692
BM1 ELEVATION = 735.60’
WVWM
ELECTRIC GATE
OPEN GATE
KEYPAD TO
CULVERT #1
ONE BARREL
NORTH EAST ELEV.
CUL1 769411.11 1734687.79 725.69
CUL2 769397.06 1734700.96 725.70
CE1 769407.71 1734698.46 734.06
HW1 769407.31 1734697.87 736.54
CUL3 769377.81 1734679.91 725.87
CUL4 769389.59 1734664.77 725.90
CE2 769381.96 1734671.60 734.09
HW2 769381.97 1734671.85 736.58
NC GRID
NAD 83 NA 2011
DRIVE
PAVED
18" RCP
3’ SPLIT RAIL 3’ SPLIT RAIL
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’
WOODS
WOODS
GRASS FIELD
GRASS FIELD
GRASS FIELD
GOLF COURSE
GOLF COURSE
TEE BOX
TEE BOX
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "RAN97-1"
WITH NAD 83/NA 2011 STATE PLANE GRID COORDINATES OF
NORTHING: 769425.666(ft) EASTING: 1734680.651(ft)
ELEVATION: 736.216(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.99989860
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
"RAN97-1" TO -L- STATION IS
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAVD 88
TO US HWY 220
F
F
F
FF
F F
F
F
F
F
FF
F F
F
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
4750097
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S
:
\
M
a
i
n
t
e
n
a
n
c
e
\
C
e
n
t
r
a
l
\
R
a
n
d
o
l
p
h
-
7
5
\
B
r
g
#
0
9
7
S
F
7
5
0
0
9
7
\
P
E
R
M
IT
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
7
5
0
0
9
7
_
H
y
d
_
p
r
m
_
w
e
t
.
d
g
n
r
f
j
a
c
k
s
o
n
4
/1
/2
0
1
4
SITE 1
SCALE 1"=25’
0’25’25’
SHEET 3 OF 6
PERMIT DRAWING
MILFORD FARLOW
WATER AUTHORITY
PIEDMONT TRIAD
RICHARD HOLLINGSWORTH, II
HOLLY RIDGE GOLF LINKS INC.
10
15
GRAU 350
GRAU 350
GRAU 350
STANDARD DRAWING 1250.01
REFER TO ROADWAY
YELLOW PAINTED ISLAND
724
724
7
2
5
725
7
2
5
726
7
2
6
726
726
726
726
7
2
7
727
7
2
7
7
2
7
727
7
2
7
727
727
727
727
727
728728
7
2
8
7
2
8
728
728
728
728
7
2
8
729
729
729
7
2
9
729
729
729
729
729
729
730
7
3
0
7
3
0
7
3
0
7
3
0
7
3
0
730730
7
3
0
7
3
0
7
3
0
7
3
0
730
730
7
3
0
730
730
730
730
730
730
730
7
3
0
730
7
3
0
730
730
7
3
1
7
3
1
7
3
1
731
731
731
7
3
1
731
7
3
1
731
7
3
1
7
3
1
731
732
732
7
3
2
732
732
7
3
2
7
3
2
7 3 2
732
732
7 3 2
7
3
2
7
3
2
732
733
7
3
3
7
3
3
733
7
3
3
7
3
3
7
3
3
7
3
3733
7
3
3
733
7
3
3
7
3
3
7
3
3
733
733
733
734
734
7
3
4
7
3
4
734
7 3 4
7
3
4
7
3
4
734
7
3
4
7
3
4
734
734
734
7
3
4
734
7
3
4
734
735
7
3
5
735 7
3
5
73
5
735
735
735
735
735
7
3
5
7
3
5
7
3
5
7
3
5
735
735
735735
735
735
735
735
735
735735
7
3
5
7
3
5
735735
735
735
735
7
3
5
7
3
5
7
3
5
735
735
735
735
735
736
736
7
3
6
7
3
6
7
3
6
736
7
3
6
736
736
736
736
7
3
6
7
3
6
736
736
736
736
736
7
3
6
736
736
736
736
7
3
6
736
737
737
7
3
7
7
3
7
737
737
7
3
7
7
3
7
737
737
7
3
7
7
3
7
737
7
3
7
737
737
737
737
737
7
3
7
7
3
7
737
737
738
738
738
7
3
8
738
7
3
8
738
7
3
8
7
3
8
7
3
8
738
738
738
738
738
7
3
8
7
3
8
7
3
8
7
3
8
738
738
738
739
739
739
7
3
9
739
739
7
3
9
7
3
9
7
3
9
739
739
739
7
3
9
739
739
7
3
9
739
7
3
9
739
739
7
3
9
7
4
0
740
7
4
0
7
4
0
7
4
0
740
740
740
740
740
74
0
7
4
0
740
7
4
0
740
7
4
0
7
4
0
7
4
0
7
4
0
740
7
4
0
740
740
7
4
0
7
4
0
740
7
40
740
740
740
740
740
7
4
0
7
4
0
7
4
1
7
4
1
741
741
741
7
4
1
741
7
4
1
7
4
1
7
4
1
741
741
7
4
1
741
741
7
4
1
741
742
742
7
4
2
7
4
2
742
7
4
2
7
4
2
7
4
2742
742
7
4
2
742
7
4
2
742
7
4
2
7
4
2
742
7
4
2
743
7
4
3
7
4
3
743
7
4
3
7
4
3
7
4
3
743
743
7
4
3
743
7
4
3
743
7
4
3
743
743
743
7
4
3
7
4
3
744
744
744
7
4
4
7
4
4
744
7
4
4
744
7
4
4
744
7
4
4
744
7
4
4
744
744
744
7
4
4
7
4
4
7
4
4
744
744
744
744
745
7
4
5
745
745
745
745
74
5 745
745
745
745
7
4
5
745
7
4
5
7
4
5
745
7
4
5
745
745
745
745
745
745
7
4
5
745
745
7
45
745
7
4
5
7
4
5
745
745
745
7
4
5
7
4
5
745
7
4
5
745
7
4
5
7
4
5
746
746
746
7
4
6
746
7
4
6
7
4
6
746
7
46
746
7
4
6
746
7
4
6
746
7
4
6
746
7
4
6
7
4
6
746
746
746
747
747
7
4
7
747
7
4
7
747
7
4
7
7
4
7
747
747
747
7
4
7
747
7
4
7
747
747
747
7
4
7
747
7
4
8
748
7
4
8
748
748
748
7
4
8
748
748
7
4
8
748
748
7 4 8
748
7
4
8
748
748
748
749
7
4
9
749
749
749
7
49
749
7
4
9
7
4
9
749
749
749
7
4
9
7
4
9
749
7
4
9
7
4
9
7
4
9
750
750
750
750
750
7
5
0
750
7
5
0
750
7
5
0
750
750
7
5
0
7
5
0
7
5
0 750
7
5
0
750
7
5
0
750
750
750
750 750
750
750
750
7
5
0
7
5
0
7
5
0750 751
751
751
751
7
5
1
7
5
1
751
751
7
5
1
751
751
7
5
1
7
5
1
751
751
7
5
1
75
2
752
7
5
2
752
752
752
752
7
5
2
752
752
7
5
2
7
5
2
752
753
7
5
3
753
753
753
753
7
5
3
753
7
5
3
753
753
754
754
754
754
754
754
7
5
4
754
75
5
755
7
5
5
755
755
755 755
755
755
7
5
5
755
755
755
7
5
5
756
756
7
5
6
7
5
6
756
756
757
757
7
5
7
757
758
7
5
8
7
5
8
758
759
759
759
759
760
7
6
0
7
6
0
760
760
761
761
762
762
7
6
3
763
763
764
7
6
4
765
7
6
5
7
6
5
766
766
7
6
7
SEE NOTE UNDER ADDITIONAL INFORMATION & COMPUTATIONS.
NOTE: BACKFILL TO TOP OF SILLS W/ NATIVE BED MATERIAL.
SILL
2 @ 11’x 8’ RCBC
31 CU.YDS. GEOTEXTILE
EST. 33 TONS
CLASS I RIP RAP
25 CU.YDS. GEOTEXTILE
EST. 25 TONS
CLASS I RIP RAP
10
15
GRAU 350
GRAU 350
GRAU 350
STANDARD DRAWING 1250.01
REFER TO ROADWAY
YELLOW PAINTED ISLAND
EIP EIP
EIP
EIP
US 311 22’ PAVED ROADWAYTO HIGH POINT
C
O
N
C
R
E
T
E
C
A
R
T
PA
T
H
2
4
"
R
C
P
2
4
"
R
C
P
2
4
"
R
C
P
8’ CHAIN LINK
WVWM
ELECTRIC GATE
OPEN GATE
KEYPAD TO
CULVERT #1
ONE BARREL
NORTH EAST ELEV.
CUL1 769411.11 1734687.79 725.69
CUL2 769397.06 1734700.96 725.70
CE1 769407.71 1734698.46 734.06
HW1 769407.31 1734697.87 736.54
CUL3 769377.81 1734679.91 725.87
CUL4 769389.59 1734664.77 725.90
CE2 769381.96 1734671.60 734.09
HW2 769381.97 1734671.85 736.58
NC GRID
NAD 83 NA 2011
DRIVE
PAVED
18" RCP
3’ SPLIT RAIL 3’ SPLIT RAIL
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’
WOODS
WOODS
GRASS FIELD
GRASS FIELD
GRASS FIELD
GOLF COURSE
GOLF COURSE
TEE BOX
TEE BOX
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "RAN97-1"
WITH NAD 83/NA 2011 STATE PLANE GRID COORDINATES OF
NORTHING: 769425.666(ft) EASTING: 1734680.651(ft)
ELEVATION: 736.216(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.99989860
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
"RAN97-1" TO -L- STATION IS
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAVD 88
TO US HWY 220
SEE NOTE UNDER ADDITIONAL INFORMATION & COMPUTATIONS.
NOTE: BACKFILL TO TOP OF SILLS W/ NATIVE BED MATERIAL.
SILL
2 @ 11’x 8’ RCBC
31 CU.YDS. GEOTEXTILE
EST. 33 TONS
CLASS I RIP RAP
25 CU.YDS. GEOTEXTILE
EST. 25 TONS
CLASS I RIP RAP
EIP EIP
EIP
EIP
US 311 22’ PAVED ROADWAYTO HIGH POINT
C
O
N
C
R
E
T
E
C
A
R
T
PA
T
H
2
4
"
R
C
P
2
4
"
R
C
P
2
4
"
R
C
P
8’ CHAIN LINK
RR SPIKE IN BASE OF 24" ASH
EL STATION 12+41.00 66’ LEFT
N 769484 E 1734692
BM1 ELEVATION = 735.60’
WVWM
ELECTRIC GATE
OPEN GATE
KEYPAD TO
CULVERT #1
ONE BARREL
NORTH EAST ELEV.
CUL1 769411.11 1734687.79 725.69
CUL2 769397.06 1734700.96 725.70
CE1 769407.71 1734698.46 734.06
HW1 769407.31 1734697.87 736.54
CUL3 769377.81 1734679.91 725.87
CUL4 769389.59 1734664.77 725.90
CE2 769381.96 1734671.60 734.09
HW2 769381.97 1734671.85 736.58
NC GRID
NAD 83 NA 2011
DRIVE
PAVED
18" RCP
3’ SPLIT RAIL 3’ SPLIT RAIL
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’
WOODS
WOODS
GRASS FIELD
GRASS FIELD
GRASS FIELD
GOLF COURSE
GOLF COURSE
TEE BOX
TEE BOX
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "RAN97-1"
WITH NAD 83/NA 2011 STATE PLANE GRID COORDINATES OF
NORTHING: 769425.666(ft) EASTING: 1734680.651(ft)
ELEVATION: 736.216(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.99989860
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
"RAN97-1" TO -L- STATION IS
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAVD 88
TO US HWY 220
F
F
F
FF
F F
F
F
F
F
FF
F F
F
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S
:
\
M
a
i
n
t
e
n
a
n
c
e
\
C
e
n
t
r
a
l
\
R
a
n
d
o
l
p
h
-
7
5
\
B
r
g
#
0
9
7
S
F
7
5
0
0
9
7
\
P
E
R
M
IT
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
7
5
0
0
9
7
_
H
y
d
_
p
r
m
_
w
e
t
_
P
S
H
4
A
.
d
g
n
r
f
j
a
c
k
s
o
n
4
/1
/2
0
1
4
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
4A750097
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
SCALE 1"=25’
0’25’25’
SHEET 4 OF 6
PERMIT DRAWING
SITE 1
MILFORD FARLOW
WATER AUTHORITY
PIEDMONT TRIAD
RICHARD HOLLINGSWORTH, II
HOLLY RIDGE GOLF LINKS INC.
SILL
2 @ 11’x 8’ RCBC
31 CU.YDS. GEOTEXTILE
EST. 33 TONS
CLASS I RIP RAP
25 CU.YDS. GEOTEXTILE
EST. 25 TONS
CLASS I RIP RAP
10
15
GRAU 350
GRAU 350
GRAU 350
EIP EIP
EIP
EIP
US 311 22’ PAVED ROADWAYTO HIGH POINT
C
O
N
C
R
E
T
E
C
A
R
T
P
A
T
H
2
4
"
R
C
P
2
4
"
R
C
P
2
4
"
R
C
P
8’ CHAIN LINK
FH
WVWM
ELECTRIC GATE
OPEN GATE
KEYPAD TO
CUL4
HW2
CE2
CUL3
CUL1 CUL2
CE1
HW1
CONC WW(END BURIED)
NC GRID
NAD 83 NA 2011
DRIVE
PAVED
18" RCP
MTL
3’ SPLIT RAIL 3’ SPLIT RAIL
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’MTL
WOODS
WOODS
GRASS FIELD
GRASS FIELD
GRASS FIELD
GOLF COURSE
GOLF COURSE
TEE BOX
TEE BOX
CONC HW & WW
STRUCTURE #97 = 8’ X 19’ CONCRETE BOX CULVERT
CULVERT #1
BURIED)
CONC WW(END
TO US HWY 220
SILL
2 @ 11’x 8’ RCBC
31 CU.YDS. GEOTEXTILE
EST. 33 TONS
CLASS I RIP RAP
25 CU.YDS. GEOTEXTILE
EST. 25 TONS
CLASS I RIP RAP
10
15
GRAU 350
GRAU 350
GRAU 350
60’
+85
60’
+45
50’
+65 50’
+30
EIP EIP
EIP
EIP
US 311 22’ PAVED ROADWAYTO HIGH POINT
C
O
N
C
R
E
T
E
C
A
R
T
P
A
T
H
2
4
"
R
C
P
2
4
"
R
C
P
2
4
"
R
C
P
8’ CHAIN LINK
RR SPIKE IN BASE OF 24" ASH
EL STATION 12+41.00 66’ LEFT
N 769484 E 1734692
BM1 ELEVATION = 735.60’
WVWM
7
ELECTRIC GATE
OPEN GATE
KEYPAD TO
DRIVE
PAVED
18" RCP
3’ SPLIT RAIL 3’ SPLIT RAIL
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’
WOODS
WOODS
GRASS FIELD
GRASS FIELD
GRASS FIELD
GOLF COURSE
GOLF COURSE
TEE BOX
TEE BOX
CONC HW & WW
TO US HWY 220
F
F
F
FF
F F
F
F
F
F
FF
F F
F
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
750097
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
S
:
\
M
a
i
n
t
e
n
a
n
c
e
\
C
e
n
t
r
a
l
\
R
a
n
d
o
l
p
h
\
B
r
g
#
0
9
7
S
F
7
5
0
0
9
7
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
7
5
0
0
9
7
_
H
y
d
_
p
r
m
_
w
e
t
_
P
F
L.
d
g
n
a
m
k
e
e
t
e
r
9
/2
4
/2
0
1
3
SHEET 10 OF 11
PERMIT DRAWING
0’100’100’
730
740
720
USGS QUAD - GLENOLA
2:12:1
NWS=728.2’
Q100=733.51’Q50=733.1’
TB LT
TB RT
L
SLOPE=0.4%
C INV.=725.8’
SKEW=104
GRADE PT.=737.2’
2 @ 11’ x 8’ RCBC W/ HEADWALLS
-L- STA. 13+06
1 @ 22’; REINFORCED CONCRETE SLAB ON FULL-HEIGHT CONCRETE ABUTMENTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream
No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design
(ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft)
1 13+06-L-2 @ 11'x8' RCBC 0.01 48
Bank Stabliziation 0.01 0.01 53 17
TOTALS:0.02 0.01 101 17
ATN Revised 3/31/05 4/1/2014
RANDOLPH COUNTY
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
WBS - 41665.4A (SF 750097)
WETLAND PERMIT IMPACT SUMMARY
SURFACE WATER IMPACTSWETLAND IMPACTS
SHEET 6 OF 6