Loading...
HomeMy WebLinkAboutSW6211206_Email_20220321Georgoulias, Bethany From: Farkas, Jim J Sent: Monday, March 21, 2022 10:28 AM To: George Rose; bobdoran88@gmail.com Subject: RE: SW6211206; Baywood Terrace Subdivision George, I was looking over the information you provided on 3/17/2022. Please provide a second hard copy of plan sheets SP2, SP 5, and SP6 (all dated 3/10/22). We require 2x hard copies of plan sheets (per 15A NCAC 02H .1042(2) and as indicated in my previous email, highlighted) but only one was provided. ORii1 From: Farkas, Jim J Sent: Tuesday, March 8, 2022 8:15 AM To: George Rose <george@gmrpe.com>; bobdoran88@gmail.com Subject: RE: SW6211206; Baywood Terrace Subdivision George, I was looking over the information you provided on 3/3/2022. Everything looks good except for a few small issues: Please correct the following: - Application: o Prior Comment — Section IV, 7 — Please use the property area (10.35 ac) as the project area. An updated page 3 of the Application with this information corrected was not provided in the prior submission. - Supplement-EZ Form: o Drainage Areas Page: ■ Line 4—This project only has one low -density drainage area (since both swales ultimately drain to the same place it is considered as one drainage area). Please revise (the individual swale drainage area information is shown on the Low -density Page). ■ Line 12, Roof — Since the prior submission, 2,680 sf of "roof" BUA has been added to this form and is not accounted for in the calculations/plans. Please clarify what/where this BUA is and revise as needed. o Prior Comment — Low -Density Page — It appears as though the drainage areas for the swales have been swapped. Per the plans, the western drainage area (Lots 12-22) should have a larger drainage area than the eastern drainage area (Lots 1-11). The additional information section (Line 15) states that swale 1 (with the larger drainage area) is the eastern ditch and that swale 2 (with the smaller drainage area) is the western ditch. Please revise. - Calculations: o Prior Comment — Similar to the prior comment about the calculations, "eastern" and "western" appear to be switched in the calculations. The calculations show the swale with the larger drainage area as the eastern ditch and the swale with the smaller drainage area as the western ditch. Please revise. - Electronic Submission: o Prior Comment — I have not yet received the electronic file submission for this project. Internally, it can take a couple of days to process the uploaded electronic files so if you have uploaded them fairly recently, they may not have come through yet (and you can ignore this item) but if you have not yet done so, please upload the electronic files associated with this project at the following link: https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload Please provide the following: - 1x electronic copy of all of the submittal files. This information was requested in the 12/29/2021 email but was not provided. - 1x hard copy and 1x electronic copy of the revised pages of the Application. - 1x hard copy and 1x electronic copy of the revised pages of the Supplement-EZ Form. - 1x hard copy and 1x electronic copy of the revised pages of the calculations. - 1x hard copy (2x hard copies for plans) and 1x electronic copy of any other items needed to address these comments. Hard copies should be mailed to me at the following address: For Fed Ex/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 Hand Delivery: Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group) will be able to receive the submission. Do not leave the package in the foyer with the security guard. NOTE: Hard copies should not be sent to a Regional Office. Doing so will delay the review process and the submission package may be lost while being sent from the Regional Office to me in the Central Office. Electronic copies should be uploaded at the following location: https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload Since these are really minor things, once I get the hard copies, anything else that may have changed from addressing these issues, and the documents are uploaded to Laserfiche (Provided everything is still in order), we can issue the permit without doing another formal 30-45 day review. Let me know if you have any questions. Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources — Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim.Farkas@ncdenr.gov e��Q E q:�� 4yb4'YnYrL oI EIrtY8w�n7W OrMTt ft�l Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Farkas, Jim J Sent: Thursday, February 24, 2022 3:20 PM To: George Rose <Reorge@gmrpe.com>; bobdoran88@gmail.com Subject: RE: SW6211206; Baywood Terrace Subdivision George, I was looking over the information you provided on 12/29/2021. Everything looks good except for a few small issues: Please correct the following: - Application: o Section I, 2 —The address on the Application is listed as "NC-210 South at Ray Rd." (it looks like the project should have a Sanderosa Rd. address), the project is listed as being in Harnett County (it's in Cumberland County), and please provide the town/city that the project is located in ("Adjacent/west of 4305 Sanderosa Road" was provided). o Section 11, 2 — Both the high and low density options are selected (and the project does not appear to be a high density project). Please revise or explain how this project is also a high density project. o Sections III, 2 & IX — Since the Applicant is also the Property Owner, Sections III, 2 & IX of the Application do not need to be completed. Please revise. o Section IV, 7 — Please use the property area (10.35 ac) as the project area. - Supplement-EZ Form: o Drainage Areas Page, LD1 Column — Please fill out this column. For this project, it will be the exact same as the entire site column. o Low -Density Page, Drainage Area Column — It appears as though the drainage areas for the swales have been swapped. The eastern swale (swale 1) should have a drainage area of 3.08 ac per the calculations/DA map and the western swale (swale 2) should have a drainage area of 3.28 ac per the calculations/DA map. - Calculations: o See attached (the calculations are correct, but it looks like "eastern" and "western" were switched). Please revise for clarity. Please provide the following: - 1x electronic copy of all of the submittal files. This information was requested in the 12/29/2021 email but was not provided. - 1x hard copy and 1x electronic copy of the revised pages of the Application. - 1x hard copy and 1x electronic copy of the revised pages of the Supplement-EZ Form. - 1x hard copy and 1x electronic copy of the revised pages of the calculations. - 1x hard copy (2x hard copies for plans) and 1x electronic copy of any other items needed to address these comments. Hard copies should be mailed to me at the following address: For Fed Ex/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 Hand Delivery: Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group) will be able to receive the submission. Do not leave the package in the foyer with the security guard. NOTE: Hard copies should not be sent to a Regional Office. Doing so will delay the review process and the submission package may be lost while being sent from the Regional Office to me in the Central Office. Electronic copies should be uploaded at the following location: https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload Since these are really minor things, once I get the hard copies, anything else that may have changed from addressing these issues, and the documents are uploaded to Laserfiche (Provided everything is still in order), we can issue the permit without doing another formal 30-45 day review. Let me know if you have any questions. Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources — Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim. Farkas( a�ncdenr.gov e:!5fD,EQ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Farkas, Jim J Sent: Wednesday, December 29, 2021 9:21 AM To: George Rose <Reorge@gmrpe.com>; bobdoran88@gmail.com Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov> Subject: SW6211206; Baywood Terrace Subdivision Good Morning, We received your post -construction stormwater permit application for the above mentioned project on 12/29/2021. Reviews under the standard permitting process generally take 30 — 45 calendar days, but can take up to 90 calendar days per statute (our other reviewer, Corey Anen, no longer works for the State, so this review will probably be closer to 45 days than 30). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the "Add Another Post -Construction File Upload" link directly below the "State Stormwater Information Uploads" section of the form. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. Please type in permit #: SW6211206 If you have any questions, please contact Jim Farkas Jim. Farkas@ncdenr.gov 919-707-3646. Thank you, Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources — Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim. Farkas nncdenr. gov e��Q E q:�� 4yb4'YnYrL oI EIrtY8w�n7W OrMTt ft�l Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Farkas, Jim J Sent: Thursday, December 9, 2021 11:58 AM To: George Rose <george@gmrpe.com>; bobdoran88@gmail.com Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov> Subject: Baywood Terrace Subdivision; Sanderosa Road, Cumberland County Good Morning, We received your application for a new post -construction stormwater permit on 12/7/2021. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 1/7/2021) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. 1x complete hard copy of the Supplement-EZ Form. This item is required per Section IV, 3 of the Application. The Drainage Area Page of this form is missing information (Please provide a revised hard copy of this page, you do not need to revise/provide the other pages of the Supplement-EZ Form since they were completely provided). Please revise Line 4 to indicate that this project has 1 low -density drainage area (to correspond with Section IV, 9 of the Application). Please click on the "Click to load form" link under Line 5 to bring up the entire site/drainage area table (this table basically shows the same information as the table in Section IV, 10 of the Application). 1x original signed (in pen) & sealed hard copy of the complete O&M Agreement Form. This item is required per Section IV, 3 of the Application and 15A NCAC 02H .1042(2)(j). Please indicate the type of low -density area that this project contains (there is a drop -down list in the right column (just right of "Type:") on the "Low Density' line of the cover page) and provide the "Low Density' sheet of the spreadsheet (Listing the low -density maintenance requirements). A new signed hard copy of this form is required since there are changes being made to the cover page. 1x original signed (in pen) & sealed hard copy of the required Deed Restriction Document. These documents are required per Section VI, 2 of the Application and 15A NCAC 02H .1042(2)(k). The document can be found at the following address: https://deg.nc.gov/about/divisions/energy-mineral-and-land- resources/stormwater/stormwater-program/post-construction-program/post-construction-forms 2x hard copies of a full-sized plan sheet showing the following (NOTE: Only updated plan sheets need to be provided, we do not require brand new sets of plans): o Drainage area map for the vegetated conveyances. This item is required per Section VI, 8o of the Application and 15A NCAC 02H .1042(2)(g)(iv). o Wetland delineation or a note on the plans stating that there are no wetlands located on -site. This item is required per Section VI, 8m of the Application and 15A NCAC 02H .1042(2)(g)(iii). NOTE: This is an administrative completeness review, not a detailed engineering review. The detailed engineering review will be performed once the submission is administratively complete. It was noted during this administrative review that the project location (Section I, 2 of the Application) does not appear to be correct. Addressing this item is not required for administrative completeness, but if not addressed now it will be brought up during the in-depth. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process generally take 30 — 45 calendar days, but can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant so this review will probably be closer to 45 days than 30). Hard copies should be mailed to the following address: For Fed Ex/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Jim Farkas Jim. Farkas@ncdenr.gov 919-707-3646. Thank you, Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources — Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim. Farkas( a�ncdenr.gov d11o8inYr[iI i.1rtY8�aMilY �IiT�� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time.