HomeMy WebLinkAbout20211515 Ver 1_More Info Requested_20211117Moore, Andrew W
From: Moore, Andrew W
Sent: Wednesday, November 17, 2021 4:00 PM
To: Fuemmeler, Amanda J CIV USARMY CESAW (USA); Butler, Derek
Cc: Hyatt, Daniel
Subject: RE: [External] RE: West Asheville S/D PCN - Request for more info
Derek,
Please copy me on your response to the Corps' request below.
Thanks,
Andrew W. Moore, PG
Environmental Specialist II — Asheville Regional Office
Water Quality Regional Operations Section
NCDEQ — Division of Water Resources
828 296 4684 office
email: Andrew.W.Moore@ncdenr.gov
2090 U.S. Hwy. 70
Swannanoa, N.C. 28778
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Fuemmeler, Amanda J CIV USARMY CESAW (USA) <Amanda.Jones@usace.army.mil>
Sent: Wednesday, November 17, 2021 12:53 PM
To: Butler, Derek <dbutler@wadetrim.com>
Cc: Hyatt, Daniel <rhyatt@wadetrim.com>; Moore, Andrew W <andrew.w.moore@ncdenr.gov>
Subject: [External] RE: West Asheville S/D PCN - Request for more info
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Thanks, Derek.
We will still need to cross-section showing the pipe buried/embedded as mentioned in DWR's attached email. Also,
what is the length of pipe to be removed? We will condition the permit for this removal and stream banks to be
stabilized so will need a plan/spec to reference in that condition as part of the permit.
Amanda Jones
828-271-7980 ext. 4225
From: Butler, Derek <dbutler@wadetrim.com>
Sent: Tuesday, November 2, 2021 10:57 AM
1
To: Fuemmeler, Amanda J CIV (USA) <Amanda.Jones@usace.army.mil>
Cc: Hyatt, Daniel <rhyatt@wadetrim.com>
Subject: [Non-DoD Source] West Asheville S/D PCN - Request for more info
Good Morning Amanda in regards to your questions about the stream crossing.
1. The proposed pipe size is 48" and the new crossing is approximately 35' up stream of the headwall of the
existing crossing.
2. Please see the attached Cross section and plan of the pipe detail.
3. Outfall for OS-1 has relocated outside of the stream.
4. There will be no new sewer crossings, the only other crossing will be the water at the same location as the road
crossing.
Thank you,
Derek
re WADE
TRIM
Derek Butler, EIT
53 N Market Street, Suite 200, Asheville, NC 28801
828.237.7695
MIMEO