Loading...
HomeMy WebLinkAbout20211515 Ver 1_More Info Requested_20211117Moore, Andrew W From: Moore, Andrew W Sent: Wednesday, November 17, 2021 4:00 PM To: Fuemmeler, Amanda J CIV USARMY CESAW (USA); Butler, Derek Cc: Hyatt, Daniel Subject: RE: [External] RE: West Asheville S/D PCN - Request for more info Derek, Please copy me on your response to the Corps' request below. Thanks, Andrew W. Moore, PG Environmental Specialist II — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4684 office email: Andrew.W.Moore@ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Fuemmeler, Amanda J CIV USARMY CESAW (USA) <Amanda.Jones@usace.army.mil> Sent: Wednesday, November 17, 2021 12:53 PM To: Butler, Derek <dbutler@wadetrim.com> Cc: Hyatt, Daniel <rhyatt@wadetrim.com>; Moore, Andrew W <andrew.w.moore@ncdenr.gov> Subject: [External] RE: West Asheville S/D PCN - Request for more info CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Thanks, Derek. We will still need to cross-section showing the pipe buried/embedded as mentioned in DWR's attached email. Also, what is the length of pipe to be removed? We will condition the permit for this removal and stream banks to be stabilized so will need a plan/spec to reference in that condition as part of the permit. Amanda Jones 828-271-7980 ext. 4225 From: Butler, Derek <dbutler@wadetrim.com> Sent: Tuesday, November 2, 2021 10:57 AM 1 To: Fuemmeler, Amanda J CIV (USA) <Amanda.Jones@usace.army.mil> Cc: Hyatt, Daniel <rhyatt@wadetrim.com> Subject: [Non-DoD Source] West Asheville S/D PCN - Request for more info Good Morning Amanda in regards to your questions about the stream crossing. 1. The proposed pipe size is 48" and the new crossing is approximately 35' up stream of the headwall of the existing crossing. 2. Please see the attached Cross section and plan of the pipe detail. 3. Outfall for OS-1 has relocated outside of the stream. 4. There will be no new sewer crossings, the only other crossing will be the water at the same location as the road crossing. Thank you, Derek re WADE TRIM Derek Butler, EIT 53 N Market Street, Suite 200, Asheville, NC 28801 828.237.7695 MIMEO 2