August 3, 2012
Mr. Cecil Gurganus
Progress Energy Carolinas, Inc.
179 Tillery Dam Road
Mount Gilead, NC 27306
Subject: Renewal of coverage / General Permit NCG500000
Marshall Hydroelectric Plant
Certificate of Coverage NCG500591
Madison County
Dear Permittee:
The Division is renewing Certificate of Coverage (CoC) NCG500591 to discharge under NPDES
General Permit NCG500000. This CoC is issued pursuant to the requirements of North Carolina General
Statue 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental
Protection agency dated October 15, 2007 [or as subsequently amended].
If any parts, measurement frequencies or sampling requirements contained in this General Permit
are unacceptable to you, you have the right to request an individual permit by submitting an individual
permit application. Unless such demand is made, the certificate of coverage shall be final and binding.
Please take notice that this Certificate of Coverage is not transferable except after notice to the
Division. The Division may require modification or revocation and reissuance of the certificate of coverage.
Contact the Asheville Regional Office prior to any sale or transfer of the permitted facility.
Regional Office staff will assist you in documenting the transfer of this CoC.
This permit does not affect the legal requirements to obtain other permits which may be required by
the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area
Management Act or any other Federal or Local governmental permit that may be required.
If you have any questions concerning the requirements of the General Permit, please contact John
Hennessy [919 807-6377 or john.hennessy@ncdenr.gov].
Sincerely,
Original signed by John Hennessy
for Charles Wakild, P.E.
cc: Asheville Regional Office / Surface Water Protection
NPDES file
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
512 North Salisbury Street, Raleigh, North Carolina 27604
Phone: 919 807-6300 / FAX 919 807-6489 / Internet: www.ncwaterquality.org
An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper
NorthCarolina
Naturally
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NCG500000
CERTIFICATE OF COVERAGE NCG500591
TO DISCHARGE NON -CONTACT COOLING WATER, COOLING TOWER AND
BOILER BLOWDOWN, CONDENSATE AND SIMILAR WASTEWATERS UNDER THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and
the Federal Water Pollution Control Act, as amended,
Progress Energy Carolinas, Inc.
is hereby authorized to discharge Hydroelectric Dam Sumps & Non -contact Cooling Water
from a facility located at
Marshall Hydroelectric Plant
7602 Bear Creek Road
Marshall
Madison County
to receiving waters designated as the French Broad River in subbasin 04-03-04 of the
French Broad River Basin in accordance with the effluent limitations, monitoring
requirements, and other conditions set forth in Parts I, II, III and IV hereof.
This Certificate of Coverage shall become effective August 3, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day August 3, 2012
Original signed by John Hennessy
for Charles Wakild, Director
Division of Water Quality
By Authority of the Environmental Management Commission
Progress Energy
Mr. Charles H. Weaver
NCDENR/DWQ/NPDES
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
December 5, 2011
Subject: Carolina Power & Light Co. d/b/a Progress Energy Carolinas, Inc. (Progress Energy)
Blewett Falls Hydroelectric Plant — Certificate of Coverage NCG500190
Marshall Hydroelectric Plant — Certificate of Coverage NCG500591
Tillery Hydroelectric Plant — Certificate of Coverage NCG500189
Walters Hydroelectric Plant — Certificate of Coverage NCG500188
NPDES General Permit NC500000 Notice of Intent Renewal Application
Dear Mr. Weaver:
By this correspondence, Progress Energy respectfully requests continued coverage under the National
Pollution Discharge Elimination System (NPDES) General Permit NCG500000 for the referenced
hydroelectric facilities. Enclosed are three copies of the completed Notice of Intent renewal application
form with supporting documentation for each facility. The reported volume of discharge for each
discharge point represents the average instantaneous flow during sampling. Sampling is conducted only
during flow events and flow only occurs during plant operation.
Please note that these Notices of Intent do not require a separate application fee as indicated on the
checklist. Each permitted facility pays the annual fee for continued coverage under this NPDES General
Permit. Also note that because none of these facilities are new nor are expanding with this application, no
alternatives analyses are required.
If there are any questions regarding our requests or the enclosed application information, please contact
Ms. Robin Bryson at (919) 362-3962 or email at robin.bryson@pgnmail.com.
I certify, under penalty of law, that this document and all attachments were prepared
under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evaluate the information submitted Based on
my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fines and
imprisonment for knowing violations.
Enclosures
c: Ms. Robin Bryson
Progress Energy Carolinas, Inc.
Tillery Hydro Plant
179 lillery Dam Road
Mount Gilead, NC 27306
Sincerely,
e
Plant Manager, Hydro Orratinnc
ER@IEDWMp
DEC 7 2011
DENR-WATER QUALITY
POINT SOURCE BRANCH
ATA
NCDENR
NOTICE OF INTENT
Division of Water Quality / Water Quality Section
National Pollutant Discharge Elimination System
NC G 500000
5-0-1l
FOR AGENCY USE ONLY
Date Recoived
Year
Month
Day
Certihca.te of Cnvet::pc
NCG
CI:CCw Aii o At
Permit Assigned to
National Pollutant Discharge Elimination System application for coverage under General Permit
NCG500000: Non -contact cooling water, boiler blowdown, cooling tower blowdown, condensate, and
similar point source discharges.
(Please print or type)
1) Mailing address+ of owner/operator:
Company Name Carolina Power & Light Company d/b/a Progress Energy Carolinas, Inc.
Owner Name Ken Kennedy, Plant Manager
Street Address 179 Tillery Dam Road
City Mount Gilead State NC ZIP Code 27306
Telephone Number 910 439-5211 Fax:
Address to which all permit correspondence should be mailed
2) Location of facility producing discharge:
Facility Name Marshall Hydroelectric Plant
Facility Contact Max J. Gardner
Street Address 7602 Bear Creek Road
City Marshall
County Madison
State NC ZIP Code 28753
Telephone No. 910 439-5211 ext. 1205 Fax:
3) Physical location information:
Please provide a narration description of how to get to the facility (use street names, state road
numbers, and distance and direction from a roadway intersection). From Asheville, follow US-74 Alt
West. Exit right onto New Leicester Hwy/NC-63. Turn right onto Martin Branch Rd (take first left to stay
on Martin Branch Rd. Turn left onto Bear Creek Rd (keep left at fork) to plant. ( Attathetgritl;G:\/"/ f
(A copyof a countymapor USGS quad sheet with facility clearlylocated on the mapis required to be sub id="n:ialariis ap�tlio t�thpl,t---1
9' S' required 4,]
4) This NPDES permit application applies to which of the following:
❑ New or Proposed
❑ Modification
Please describe the modification:
X Renewal
Please specify existing permit number and original issue date: NCG500591 01/19/2001
5) Does this facility have any other NPDES permits?
DEC -7 2011
DENR-WATER QUALITY
POINT SOURCE BRANCH
X No
❑ Yes
If yes, list the permit numbers for all current NPDES permits for this facility:
6) What is the nature of the business applying for this permit? Hydroelectric power plant
1 of 4 04/05
NCG500000 N.O.I.
7) Description of discharge:
a) Is the discharge directly to the receiving water? X Yes ❑ No
If no, submit a site map with the pathway to the potential receiving waters clearly marked. This
includes tracing the pathway of the storm sewer to the discharge point, if the storm sewer is the
only viable means of discharge.
b) Number of discharge points (ditches, pipes, channels, etc. that convey wastewater from the
property): 1 (tailrace)
c) What type of wastewater is discharged? Indicate which discharge points, if more than one.
❑ Non -contact cooling water Discharge point(s) #:
❑ Boiler Blowdown Discharge point(s) #:
❑ Cooling Tower Blowdown Discharge point(s) #:
• Condensate Discharge point(s) #:
X Other Discharge point(s) #: Outfall 001
(Please describe "Other") drains and sumps; generator cooling water; turbine feed water
d) Volume of discharge per each discharge point (in GPD): (average when operating)
#1: 808,000,000 #2: #3: #4:
e) Please describe the type of process (Le., compressor, A/C unit, chiller, boiler, etc.) the wastewater
is being discharged from, per each discharge point (if applicable, use separate sheet): Incidental
seepages common to hydroelectric facilities; generator; and turbine
8) Please check the type of chemical(s) added to the wastewater for treatment, per each separate
discharge point (if applicable, use separate sheet):
O Biocides Name: Manuf.:
❑ Corrosion inhibitors Name: Manuf.:
O Chlorine Name: Manuf.:
Cl Algaecide Name: Manuf.:
• Other Name: Manuf.:
X None
9) If any box in item (8) above, other than none, was checked, a completed Biocide 101 Form and
manufacturers' information on the additive is required to be submitted with the application for the
Division's review.
10) Is there any type of treatment being provided to the wastewater before discharge (Le., retention
ponds, settling ponds, etc.)? 0 Yes X No
If yes, please include design specifics (i.e., design volume, retention time, surface area, etc.) with
submittal package. Existing treatment facilities should be described in detail. Design criteria and
operational data (including calculations) should be provided to ensure that the facility can comply with
the requirements of eth General Permit. The treatment shall be sufficient to meet the limits set by the
general permits.
Note: Construction of any wastewater treatment facilities requires submission of three (3) sets of
plans and specifications along with the application. Design of treatment facilities must comply
with the requirements of 1SA NCAC 2H .0138. If construction applies to this discharge, include
the three sets of plans and specifications with this application.
2 of 4 04/05
NCG500000 N.O.I.
11) Discharge Frequency:
a) The discharge is: ❑ Continuous X Intermittent C Season&
i) If the discharge is intermittent, describe when the discharge will occur: Discharge occurs on an
as needed basis, when water level in containment structure reaches the predetermined depth.
ii) If seasonal check the month(s) the discharge occurs: ❑ Jan E Feb ❑ Mar El Apr
❑Jun ❑Jul ❑Aug ❑Sept 010ct ❑Nov 0 Dec
b) How many days per week is there a discharge? Usually 7 days per week (run of river)
c) Please check the days discharge occurs:
X Sat X Sun X Mon X Tue X Wed X Thu X Fri
12) Pollutants:
Please list any known pollutants that are present in the discharge, per each separate discharge point {if
applicable, use separate sheet): O&G; minute amounts of pesticides from infrequent usage on site
13) Receiving waters:
a) What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility
wastewater discharges end up in? If the site wastewater discharges to a separate storm sewer
system (4S), name the operator of the 4S (e.g. City of Raleigh). French Broad River
b) Stream Classification: Class B (from Mills River to NC/TN state line)
14) Alternatives to Direct Discharges:
Address the feasibility of implementing each of the following non -discharge alternatives
a) Connection to a Municipal or Regional Sewer Collection System
b) Subsurface disposal (including nitrification field, infiltration gallery, injection wells, etc.)
c) Spray irrigation
The alternatives to discharge analysis should include boring logs and/or other information indicating
that a subsurface system is neither feasible nor practical as well as written confirmation indicating that
connection to a POTW is not an option. It should also include a present value of costs analysis as
outlined in the Division's "Guidance for the Evaluation of Wastewater Disposal Alternatives".
15) Additional Application Requirements:
For new or proposed discharges, the following information must be included in triplicate with this
application or it will be returned as incomplete.
a) 7.5 minute series USGS topographic map (or a photocopied portion thereof) with discharge
location clearly indicated.
b) Site map, if the discharge is not directly to a stream, the pathway to the receiving stream must be
clearly indicated. This includes tracing the pathway of a storm sewer to its discharge point.
c) If this application is being submitted by a consulting engineer (or engineering firm), include
documentation from the applicant showing that the engineer (or firm) submitting the application
has been designated an authorized Representative of the applicant.
d) Final plans for the treatment system (if applicable). The plans must be signed and sealed by a
North Carolina registered Professional Engineer and stamped- "Final Design -Not released for
construction".
3 of 4 04/05
NCGS00000 N.O.I.
e) Final specifications for all major treatment components (if applicable). The specification must be
signed and sealed by a North Carolina registered Professional Engineer and shall include a narrative
description of the treatment system to be constructed.
I certify that I am familiar with the information contained in this application and that to the best of my
knowledge and belief such information is true, complete, and accurate.
Printed Name of Person Signing: Ken Kennedy
Title: Plant Manager
(Sigriature_ef Applicant)
(Date Signed)
North Carolina General Statute 143-215.6 b (i) provides that:
Any person who knowingly makes any false statement, representation, or certification in any
application, record, report, plan or other document filed or required to be maintained under Article 21
or regulations of the Environmental Management Commission implementing that Article, or who
falsifies, tampers with or knowingly renders inaccurate any recording or monitoring device or method
required to be operated or maintained under Article 21 or regulations of the Environmental
Management Commission implementing that Article, shall be guilty of a misdemeanor punishable by a
fine not to exceed $25,000, or by imprisonment not to exceed six months, or by both. (18 U.S.C. Section
1001 provides a punishment by a fine of not more than $25,000 or imprisonment not more than 5
years, or both, for a similar offense.)
Notice of Intent must be accompanied by a check or money order for $100.00 made payable to:
NCDENR
Mail three copies of the entire package to:
NPDES Permit Unit
Division of Water Quality
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Final Checklist
This application will be returned as incomplete unless all of the following items have been
included:
❑ Check for $100 made payable to NCDENR NA
X 3 copies of county map or USGS quad sheet with location of facility clearly marked on map
X 3 copies of this completed application and all supporting documents
• 3 sets of plans and specification signed and sealed by a North Carolina P.E. NA
X Thorough responses to items 1-7 on this application
O Alternatives analysis including present value of costs for all alternatives NA
Note
The submission of this document does not guarantee the issuance of an NPDES permit
4 of 4 04/05
Attachment 1
Topographic map of Marshall Hydroelectric Plant site area
K
�,g{ Yt �.� �I 7
591 /
M'S ,„;.64,~
j'.
.�2. v
' . it'1J`Y, .
•
T.�arspa II.
Ii:cr C.r�alt cnFiy6+:.iatectric
P I&ntAite
5lennerhassett
J'
•
Brxitr,n Ctctt:••,
0
0.d
0.8
Source: TopoZone USGS Map 1:24K/25K Series
Redmon Dam/Marshall Quadrangle View Scale 1:50,000
Plant Site Location:35"47'33'N 82-42'38'W
1.2
1.6
Marshall Hydroele tric
PI ar t Site
•
NORTH CAROUNA
2 and es
Ma •6.82e.