Loading...
HomeMy WebLinkAboutNCG500591_Permit (Issuance)_20010119State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor Sherri Evans -Stanton, Acting Secretary Kerr T. Stevens, Director January 19, 2001 Mr. Barry Amey, Manager — Hydroelectric Operations Carolina Power and Light P.O. Box 1551 Raleigh, NC 27602 Dear Mr. Arney: AVA NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: General Permit No. NCG500000 Marshall Hydroelectric Plant COC NCG500591 Madison County In accordance with your application for a discharge permit received on August 9, 2000 we are forwarding herewith the subject certificate of coverage to discharge under the subject state — NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. Upon issuance of this new Certificate of Coverage your existing permit, NC0027545, is rescinded simultaneously. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any questions concerning this permit, please contact Aisha Lau at telephone number (919) 733-5083 ext. 578. Sincerely, MNN Rfewn Po +; Kerr 6teverry cc: Asheville Regional Office Central Files Stormwater and General Permits Unit Files Point Source Compliance — Mr. Robert Farmer Budget — Ms. Fran McPherson 1617 Mail Service Center, Raleigh, NC 27699-1617 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG500000 CERTIFICATE OF COVERAGE No. NCG500591 TO DISCHARGE NON -CONTACT COOLING WATER, COOLING TOWER AND BOILER SLOWDOWN, CONDENSATE AND SIMILAR WASTEWATERS UNDER THE NATIONAL POLLUTANT DISCHARGE ELINIINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Carolina Power and Light Company is hereby authorized to discharge water associated with hydroelectic operations from a facility located at Marshall Hydroelectic Plant 40 N. Bear Creek Road Marshall Madison County to receiving waters designated as the French Broad River, a class C stream in the French Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III and IV hereof. This certificate of coverage shall become effective January 19, 2001. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day January 19, 2001. ORIINALVONMPI Kerr T. Stevens, Director Division of Water Quality By Authority of the Environmental Management Commission Copyright (C) 1997, Maptech, Inc. Markers Name: NCG500591 Marshall Hydroelectric Plant Short Name: 500591 Coordinates: 035° 47' 33.1" N, 082° 42' 36.7" W Comment: County: Madison, Map #: D8SW, Subbasin: 040304, Receiving Stream: French Broad River, Class: C CP&L Carolina Power & Light Company PO Box 1551 411 Fayetteville Street Mall Raleigh NC 27602 JUL 2 5 103 DENR-WATER QUALITY POINT SOURCE BRANCH Mr. David Goodrich North Carolina Department of Environment and Natural Resources Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: Marshall Hydroelectric Facility NPDES Permit No. NC0027545 Conversion of Individual to General Permit Dear Mr. Goodrich: Carolina Power and Light Company's Marshall Hydroelectric Plant currently discharges wastewater in accordance with an individual NPDES permit (NC0027545). CP&L is interested in modifying Marshall Plant such that it is similar in its operation as the other hydroelectric plants owned by CP&L. These hydroelectric plants — Blewett, Tillery, and Walters — are covered under general permit NGC500000. To allow Marshall Plant to be eligible for general permit NGC500000, CP&L would modify the plant to reroute all potentially contaminated wastewater to the sumps of the plant. The discharge of the sumps would be routed to the internal side of the intake screens for both units. An oil/water detector would be installed in the sump to secure the discharge in the event of an oil spill. The current oil/water separator will be removed from service. In the event of an oil spill, the oily waste will be pumped to holding tanks to await disposal by appropriate means. In a meeting with Tom Belnick of your office it was stated that an ATC for the proposed modifications would not be needed. A Notice of Intent (NOI) has been enclosed for the general permit NCG500000. CP&L formerly requests that the individual NPDES permit (NC0027545) be rescinded after the Marshall Plant is covered under the general permit. Flow schematics of the existing and proposed piping flow are attached to the NOI. Please contact Louise England at (919) 362-3522 with any questions. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties 2 submitting false information, including the possibility of fines and imprisonment for knowing violations. Sincerely, Barry Manager — Hydroelectric Operations Enclosures c: Asheville Regional Office - DWQ Brenda Brickhouse Maxie Gardner Dean Shults Louise England FOR AGENCY USE ONLY ATA NCDENR NORTH GROW. DEPARTMENT or ENVIRONMENT AND NANRAL RESOURCES Division of Water Quality / Water Quality Section National Pollutant Discharge Elimination System NCG500000 Date Received Year Month Day Certificate of Coverage NICIGI 1 1 1 1 1 check # Amount Permit Assigned to NOTICE OF INTENT National Pollutant Discharge Elimination System application for coverage under General Permit NCG500000: Non -contact cooling water, boiler blowdown, cooling tower blowdown, condensate, and similar point source discharges (Please print or type) 1) Mailing address of owner/operator: Company Name Carolina Power & Light Company Owner Name Barry Arney. Manager — Hydroelectric Operations Street Address P.O. Box 1551. 411 Fayetteville Street Mall City Raleigh State NC ZIP Code 27602 Telephone No. 919 546-3791 Fax: 919 546-3688 * Address to which all permit correspondence will be mailed 2) Location of facility producing discharge: Facility Name Marshall Hydroelectric Plant Facility Contact Brenda Brickhouse Street Address 40 N. Bear Creek Road City Marshall State NC ZIP Code 28753 County Madison Telephone No. 828 486-5965 ext. 2111 Fax: 828 649-2841 3) Physical location information: Please provide a narrative description of how to get to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). 25/70 North. Left onto State Rd 1138 (Sweetwater Rd). Cross the river & turn left onto State Rd. 1114. Turn left at yellow gates. (A copy of a county map or USGS quad sheet with facility clearly located on the map is required to be submitted with this application) 4) This NPDES permit application applies to which of the following : D New or Proposed ■ Modification Please describe the modification: Rerouting of wastewater. removal of oiVwater separator (see D Renewal attachment 2) Please specify existing permit number and original issue date: 5) Does this facility have any other NPDES permits? D No ® Yes If yes, list the permit numbers for all current NPDES permits for this facility: The current NPDES Permit is an individual permit (NC0027545). 6) What is the nature of the business applying for this permit? Hydroelectric power generation with water turbines Page 1 of 4 SWU-212-062199 NCG500000 N.O.I. 7) Description of Discharge: a) Is the discharge directly to the receiving water? • Yes 0 No If no, submit a site map with the pathway to the potential receiving waters clearly marked. This includes tracing the pathway of the storm sewer to the discharge point, if the storm sewer is the only viable means of discharge. b) Number of discharge points (ditches, pipes, channels, etc. that convey wastewater from the property): 1 c) What type of wastewater is discharged? Indicate which discharge points, if more than one. ❑ Non -contact cooling water Discharge point(s) #: ❑ Boiler Blowdown Discharge point(s) #: ❑ Cooling Tower Blowdown Discharge point(s) #: ❑ Condensate Discharge point(s) #: M Other _ Discharge point(s) #: 1 (Please describe "Other") Turbine water. process water from sumps and drains d) Volume of discharge per each discharge point (in GPD): #1: 1,616,000.000 #2: #3: #4 e) Please describe the type of process (i.e., compressor, A/C unit, chiller, boiler, etc.) the wastewater is being discharged from, per each separate discharge point (if applicable, use separate sheet): Turbine water and process water from sumps and drains 8) Please check the type of chemical added to the wastewater for treatment , per each separate discharge point (if applicable, use separate sheet): ❑ Biocides Name: Manuf.: ❑ Corrosion inhibitors Name: Manuf.: ❑ Chlorine Name: Manuf.: ❑ Algaecide Name: Manuf.: ❑ Other Name: Manuf.: ® None 9) If any box in item (8) above, other than none, was checked, a completed Biocide 101 Form and manufacturers' information on the additive is required to be submitted with the application for the Division's review. 10) Is there any type of treatment being provided to the wastewater before discharge (i.e., retention ponds, settling ponds, etc.)? 0 Yes • No If yes, please include design specifics (i.e., design volume, retention time, surface area, etc.) with submittal package. Existing treatment facilities should be described in detail. Design criteria and operational data (including calculations) should be provided to ensure that the facility can comply with the requirements of the General Permit. The treatment shall be sufficient to meet the limits set by the general permits. Note: Construction of any wastewater treatment facilities requires submission of three (3) sets of plans and specifications along with the application. Design of treatment facilities must comply with the requirements of 15A NCAC 2H .0138. If construction applies to this discharge, include the three sets of plans and specifications with this application. Page 2 of 4 SWU-212-062199 NCG500000 N.O.I. 11) Discharge Frequency: a) The discharge is: ® Continuous 0 Intermittent 0 Seasonal i) If the discharge is intermittent, describe when the discharge will occur: ii) If seasonal check the month(s) the discharge occurs: 0 Jan. 0 Feb. 0 Mar. 0 Apr. 0 May 0 Jun. 0 Jul. 0 Aug. 0 Sept. 0 Oct. 0 Nov. 0 Dec. b) How many days per week is there a discharge? 7 days/week c) Please check the days discharge occurs: ® Sat. ® Sun. ® Mon. I Tue. ® Wed. II Thu. ® Fri. 12) Pollutants: Please list any known pollutants that are present in the discharge, per each separate discharge point (if applicable, use separate sheet): See attachment 1 13) Receiving waters: a) What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility wastewater discharges end up in? If the site wastewater discharges to a separate storm sewer system (4S), name the operator of the 4S (e.g. City of Raleigh). French Broad River b) Stream Classification: C 14) Alternatives to Direct Discharge: NA Address the feasibility of implementing each of the following non -discharge alternatives a) Connection to a Regional Sewer Collection System - b) Subsurface disposal (including nitrification field, infiltration gallery, injection wells, etc.) c) Spray irrigation The alternatives to discharge analysis should include boring logs and/or other information indicating that a subsurface system is neither feasible nor practical as well as written confirmation indicating that connection to a POTW is not an option. It should also include a present value of costs analysis as outlined in the Division's "Guidance For the Evaluation of Wastewater Disposal Alternatives" 15) Additional Application Requirements: For new or proposed discharges, the following information must be included in triplicate with this application or it will be retumed as incomplete. a) 7.5 minute series USGS topographic map (or a photocopied portion thereof) with discharge location clearly indicated. b) Site map, if the discharge is not directly to a stream, the pathway to the receiving stream must be clearly indicated. This includes tracing the pathway of a storm sewer to its discharge point. c) If this application is being submitted by a consulting engineer (or engineering firm), include documentation from the applicant showing that the engineer (Or firm) submitting the application has been designated an authorized Representative of the applicant. d) Final plans for the treatment system (if applicable). The plans must be signed and sealed by a North Carolina registered Professional Engineer and stamped -"Final Design -Not released for construction". Page 3 of 4 SWU-212-062199 NCG500000 N.O.I. e) Final specifications for all major treatment components (if applicable). The specifications must be signed and sealed by a North Carolina registered Professional Engineer and shall include a narrative description of the treatment system to be constructed. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: Barry L. Arney Title: Manager — Hydroelectric Operations (Signatures pph (Date Signed) North Carolina General Statute 143-215.6 b (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan or other document filed or required to be maintained under Article 21 or regulations of the Environmental Management Commission implementing that Article, or who falsifies, tampers with or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under Article 21 or regulations of the Environmental Management Commission implementing that Article, shall be guilty of a misdemeanor punishable by a fine not to exceed $10,000, or by imprisonment not to exceed six months, or by both. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than $10,000 or imprisonment not more than 5 years, or both, for a similar offense.) Notice of Intent must be accompanied by a check or money order for $80.00 made payable to: NCDENR Mail three (3) copies of the entire package to: Stormwater and General Permits Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Final Checklist This application will be returned as incomplete unless all of the following items have been included: ❑ Check for $80 made payable to NCDENR ❑ 3 copies of county map or USGS quad sheet with location of facility clearly marked on map ❑ 3 copies of this completed application and all supporting documents ❑ 3 sets of plans and specifications signed and sealed by a North Carolina P.E. ❑ Thorough responses to items 1-7 on this application ❑ Alternatives analysis including present value of costs for all alternatives Note The submission of this document does not guarantee the issuance of an NPDES permit Page 4 of 4 SWU-212-062199 Carolina Power & Light Company Marshall Hydroelectric Plant Attachment 1 The only substances that the Marshall Plant may add to the discharge are (1) trace amounts of metal from normal corrosion and erosion of the piping and equipment through which the water passes and (2) traces of oil and grease from the equipment that comes in contact with the water. 1 Forebay Area 1 Oil/Water Separator Over/under weir Upper Packing Leakoff UNIT 1 Lower Bearing Tailrace Area Draft Tube Drain Pump Draft Tube Extensions Inactive North Filter Tank Drain Upper Packing Leakoff UNIT 2 Lower Bearing Filter Sump Pumps ♦ Switchyard Area Catch basin Bearing Water Supply Settling Tank Penstock B-Bearing Water Pump A -Bearing Water Pump Filter Penstock Emergency Bearing Water Reservoir Tank Legend H Valve normally closed Attachment 2 Page 1 of 2 Carolina Power & Light Company Marshall Hydroelectic Plant NPDES Permit No. NC0027545 Madison County, NC Existing Water Flow Schematic Unit 1 Unit 2 Upper Packing Leakoff UNIT 1 Lower Bearing ♦ Tailrace 4— Area Draft Tube Drain Pump Forebay 1— Area 4-- Over/under Catch weir basin Temporary Commercial Waste Oil Disposal Holding 11 Inactive North Filter Tank Drain Draft Tube Extensions Unit 1 Unit 2 Upper Packing Leakoff UNIT 2 Lower Bearing Filter F Oil Detector/Alarm Sump Pumps Switchyard Area Bearing Water Supply Settling Tank B-Bearing Water Pump Penstock A -Bearing Water Pump 1 94 1 Filter Penstock Emergency Bearing Water Reservoir Tank Legend Val Valve normally open NValve normally closed Attachment 2 Page 2 of 2 Carolina Power & Light Company Marshall Hydroelectic Plant NPDES Permit No. NC0027545 Proposed Water Flow Schematic NOTE: Green indicates modifications Attachment 3 Carolina Power & Light Company Marshall Hydroelectric Plant NPDES Permit No. NC0027545 Site Plan