HomeMy WebLinkAboutNCC221091_FRO Submitted_20220323FINANCIAL RESPONSIBILITY/OWNERSHIP FORM
SEDIMENTATION POLLUTION CONTROL ACT
No person may initiate any land -disturbing activity on one or more acres as covered by the Act before this
form and an acceptable erosion and sedimentation control plan have been completed and approved by
the Land Quality Section, N.C. Department of Environmental Quality. Submit the completed form to the
appropriate Regional Office. (Please type or print and, if the question is not applicable or the e-mail and/
or fax information unavailable, place NIA in the blank.)
Part A. Fayetteville Regional Airport T-Han ar Area Development
1. Project Name y 9 p 9 p
2. Location of land -disturbing activity
Highway/street Airport Road
County. Cumberland CityorTownshi
Latitu
3. Approximate date land -disturbing activity will co
34059'7.07"N Longitude_
------ 01 /01 /2020
Fayetteville
78052'53.33"W
4. Purpose of development (residential, commercial, industrial, institutional, et,.) -.Airport
5. Total acreage disturbed or uncovered (including off -site borrow and waste areas): 1 .8
6. Amount of fee enclosed: $ 130 . The application fee of $65.00 per acre (rounded
up to the next acre) is assessed without a ceiling amount (Example: a 9-acre application fee is $585).
7. Has an erosion and sediment control plan been filed? Yes No Enclosed X
8. Person to contact should erosion and sediment control issues arise during land -disturbing activity:
Name Kristen L. Morris, PE E-mail Address kmorris@wkdickson.com
Telephone 910-762-4200 cell # 407-697-4147 Fax #
9. Landowner(s) of Record (attach accompanied page to list additional owners):
Fayetteville Regional Airport
910-433-1160
Name
Telephone Fax Number
400 Airport Road, Suite 1
400 Airport Road, Suite 1
Current Mailing Address
Current Street Address
Fayetteville NC 28306
Fayetteville NC 28306
City State Zip
City State Zip
10. Deed Book No. 4940 Page No. 0845 Provide a copy of the most current deed.
Part B.
1. Company(ies) or firm(s) who are financially
responsible for the land -disturbing activity (Provide a
comprehensive list of all responsible parties on an attached sheet.) If the company or firm is a sole proprietorship,
the name of the owner or manager maybe fisted as the financially responsible party.
City of Fayetteville
l3Whited@ci.fay.nc.us
Name
E-mail Address
400 Airport Road, Suite 1
400 Airport Road, Suite 1
Current Mailing Address
Current Street Address
Fayetteville NC 28306
Fayetteville NC 28306
City State zip
City State Zip
Telephone 910-433-1 160
Fax Number
2. (a) If the Financially Responsible Party is not a resident of North Carolina, give name and street address
of the designated North Carolina Agent:
Name
Current Mailing Address
City
Telephone,
E-mail Address
Current Street Address
State Zip City State Zip
Fax Number
(b) If the Financially Responsible Party is a Partnership or other person engaging in business under an
assumed name, attach a copy of the Certificate of Assumed Name. If the Financially Responsible
Party is a Corporation, give name and street address of the Registered Agent:
Name of Registered Agent
Current Mailing Address
E-mail Address
Current Street Address
City State Zip City State Zip
Telephone Fax Number
The above information is true and correct to the best of my knowledge and belief and was provided
by me under oath (This form must be signed by the Financially Responsible Person if an individual
or his attorney -in -fact, or if not an individual, by an officer, director, partner, or registered agent with
the authority to execute instruments for the Financially Responsible Person). I agree to provide
corrected information should there be any change in the information provided herein.
Mr. Bradley Whited
Type or print name
Airport Director
Title or Authority
[ Q c7_ 17 _
Signature Date
------------------------------------------------------------------------------------------------------------------------------------
�` , a Notary Public of the County
State of North Carolina, hereby certify that �� �h l appeared
personally before me this day and being duly sworn acknowledged that the above form was
executed by him.
Witness my haq and notarial seal this
+
Q.: N0TAR
y •.
• rJ
3L1C •'?,:
MeeeeyM0"1
r
A Pri
70tarvy
My commission expire �) � t c-�Za�
EROSION and SEDIMENTATION CONTROL PLAN PRELIMINARY REVIEW CHECKLIST
The following items shall be incorporated with respect to specific site conditions, in an erosion & sedimentation control plan:
NPDES Construction Stormwater General Permit NCG010000
Designation on the plans where the 7 or 14 day ground stabilization requirements apply per Section II.B.2 of the permit.
Design of basins with one acre or more of drainage area for surface withdrawal as per Section I I.B.4 of the permit.
LOCATION INFORMATION
Project location & labeled vicinity map (roads, streets, landmarks)
North arrow and scale
Identify River Basin.
Provide a copy of site located on applicable USGS quadrangle and
NRCS Soils maps if it is in a River Basin with Riparian Buffer
requirements.
GENERAL SITE FEATURES (Plan elements)
Property lines & ownership ID for adjoining properties
Existing contours (topographic lines)
Proposed contours
Limits of disturbed area (provide acreage total, delineate limits,
and label). Be sure to include all access to measures, lots that will
be disturbed, and utilities that may extend offsite.
Planned and existing building locations and elevations
Planned & existing road locations & elevations, including
temporary access roads
Lot andlor building numbers
Hydrogeologic features: rock outcrops, seeps, springs, wetland
and their limits, streams, lakes, ponds, dams, etc. (include all
required local or state buffer zones and any DWQ Riparian Buffer
determinations)
Easements and drainageways, particularly required for offsite
affected areas. include copies of any recorded easements andlor
agreements with adjoining property owners.
Profiles of streets, utilities, ditch lines, etc.
Stockpiled topsoil or subsoil locations
If the same person conducts the land -disturbing activity & any
related borrow or waste activity, the related borrow or waste
activity shall constitute part of the land -disturbing activity unless
the borrow or waste activity is regulated under the Mining Act of
1971, or is a landfill regulated by the Division of Waste
Management. If the land -disturbing activity and any related
borrow or waste activity are not conducted by the same person,
they shall be considered separate land -disturbing activities and
must be permitted either through the Sedimentation Pollution
Control Act as a one -use borrow site or through the Mining Act.
Location and details associated with any onsite stone crushing or
other processing of material excavated. If the affected area
associated with excavation, processing, stockpiles and transport
of such materials will comprise 1 or more acres, and materials will
be leaving the development tract, a mining permit will be required.
Required Army Corps 404 permit and Water Quality 401
certification (e.g. stream disturbances over 150 linear feet)
EROSION & SEDIMENT CONTROL MEASURES onplan)
Legend (provide appropriate symbols for all measures and
reference them to the construction details)
Location of temporary measures
Location of permanent measures
Construction drawings and details for
temporary and permanent measures. Show measures to scale on
plan and include proposed contours where necessary. Ensure
design storage requirements are maintained through all phases of
construction.
Maintenance requirements for measures
Contact person responsible for maintenance
SITE DRAINAGE FEATURES
Existing and planned drainage patterns (include off -site areas that
drain through project and address temporary and permanent
conveyance of stormwater over graded slopes)
Method used to determine acreage of land being disturbed and
drainage areas to all proposed measures (e.g. delineation map)
Size, pipe material and location of culverts and sewers
Soil information: type, special characteristics
Soil information below culvert storm outlets
Name and classification of receiving water course or name of
municipal operator (only where stormwaler discharges are to
occur)
STORMWATER CALCULATIONS
✓ Pre -construction runoff calculations for each outlet from the site (at
peak discharge points). Be sure to provide all supporting data for
the computation methods used (rainfall data for required storm
events, time of concentrationlstorm duration, and runoff
coefficients).
Design calculations for peak discharges of runoff (including the
construction phase & the final runoff coefficients for the site)
✓ Design talcs for culverts and storm sewers (include HW, TW and
outlet velocities)
✓ Discharge and velocity calculations for open channel and ditch
flows (easement & rights -of -way)
✓ Design talcs for cross sections and method of stabilization for
existing and planned channels (include temporary linings). Include
appropriate permissible velocity andlor shear stress data.
✓ Design talcs and construction details for energy dissipaters below
culvert and storm sewer outlets (include stone/material specs &
apron dimensions). Avoid discharges on fill slopes.
Design talcs and dimension of sediment basins (note current
surface area and dewatering standards as well as diversion of
runoff to the basins). Be sure that all surface drains, including
ditches and berms, will have positive drainage to the basins.
VEGETATIVE STABILIZATION
Area & acreage to be stabilized with vegetation
Method of soil preparation
Seed type & rates (temporary & permanent)
Fertilizer type and rates
Mulch type and rates (include mulch anchoring methods)
NOTE: Plan should include provisions for groundcover in accordance with
NPDES Construction Stormwater General Permit NCG010000.
FINANCIAL RESPONSIBILITY/OWNERSHIP FORM
✓ Completed, signed & notarized FRIO Form
✓ Accurate application fee payable to NCDEQ ($65.00 per acre
rounded up the next acre with no ceiling amount)
Certificate of assumed name, if the owner is a partnership
_ Name of Registered Agent (if applicable)
✓ Copy of the most current Deed for the site. Please make sure the
deed(s) and ownership information are consistent between the
plan sheets, local records and this form.
✓ Provide latitude & longitude (in decimal degrees) at the project
entrance.
✓ Two hard -copies of the plans (some regional offices require
additional plans or multiple sizes; please contact the regional
coordinator prior to such submittal.)
NOTE: For the Express Permitting Option, inquire at the local Regional
Office for availability. Express Reviews are performed by
appointment only.
NARRATIVE AND CONSTRUCTION SEQUENCE
Narrative describing the nature & purpose of the construction
activity.
Construction sequence related to erosion and sediment control
(including installation of critical measures prior to the initiation of
the land -disturbing activity & removal of measures after areas they
serve are permanently stabilized). Address all phases of
construction and necessary practices associated with temporary
stream bypasses andlor crossings.
Bid specifications related only to erosion control
rev. 02222018