Loading...
HomeMy WebLinkAboutNCC221091_FRO Submitted_20220323FINANCIAL RESPONSIBILITY/OWNERSHIP FORM SEDIMENTATION POLLUTION CONTROL ACT No person may initiate any land -disturbing activity on one or more acres as covered by the Act before this form and an acceptable erosion and sedimentation control plan have been completed and approved by the Land Quality Section, N.C. Department of Environmental Quality. Submit the completed form to the appropriate Regional Office. (Please type or print and, if the question is not applicable or the e-mail and/ or fax information unavailable, place NIA in the blank.) Part A. Fayetteville Regional Airport T-Han ar Area Development 1. Project Name y 9 p 9 p 2. Location of land -disturbing activity Highway/street Airport Road County. Cumberland CityorTownshi Latitu 3. Approximate date land -disturbing activity will co 34059'7.07"N Longitude_ ------ 01 /01 /2020 Fayetteville 78052'53.33"W 4. Purpose of development (residential, commercial, industrial, institutional, et,.) -.Airport 5. Total acreage disturbed or uncovered (including off -site borrow and waste areas): 1 .8 6. Amount of fee enclosed: $ 130 . The application fee of $65.00 per acre (rounded up to the next acre) is assessed without a ceiling amount (Example: a 9-acre application fee is $585). 7. Has an erosion and sediment control plan been filed? Yes No Enclosed X 8. Person to contact should erosion and sediment control issues arise during land -disturbing activity: Name Kristen L. Morris, PE E-mail Address kmorris@wkdickson.com Telephone 910-762-4200 cell # 407-697-4147 Fax # 9. Landowner(s) of Record (attach accompanied page to list additional owners): Fayetteville Regional Airport 910-433-1160 Name Telephone Fax Number 400 Airport Road, Suite 1 400 Airport Road, Suite 1 Current Mailing Address Current Street Address Fayetteville NC 28306 Fayetteville NC 28306 City State Zip City State Zip 10. Deed Book No. 4940 Page No. 0845 Provide a copy of the most current deed. Part B. 1. Company(ies) or firm(s) who are financially responsible for the land -disturbing activity (Provide a comprehensive list of all responsible parties on an attached sheet.) If the company or firm is a sole proprietorship, the name of the owner or manager maybe fisted as the financially responsible party. City of Fayetteville l3Whited@ci.fay.nc.us Name E-mail Address 400 Airport Road, Suite 1 400 Airport Road, Suite 1 Current Mailing Address Current Street Address Fayetteville NC 28306 Fayetteville NC 28306 City State zip City State Zip Telephone 910-433-1 160 Fax Number 2. (a) If the Financially Responsible Party is not a resident of North Carolina, give name and street address of the designated North Carolina Agent: Name Current Mailing Address City Telephone, E-mail Address Current Street Address State Zip City State Zip Fax Number (b) If the Financially Responsible Party is a Partnership or other person engaging in business under an assumed name, attach a copy of the Certificate of Assumed Name. If the Financially Responsible Party is a Corporation, give name and street address of the Registered Agent: Name of Registered Agent Current Mailing Address E-mail Address Current Street Address City State Zip City State Zip Telephone Fax Number The above information is true and correct to the best of my knowledge and belief and was provided by me under oath (This form must be signed by the Financially Responsible Person if an individual or his attorney -in -fact, or if not an individual, by an officer, director, partner, or registered agent with the authority to execute instruments for the Financially Responsible Person). I agree to provide corrected information should there be any change in the information provided herein. Mr. Bradley Whited Type or print name Airport Director Title or Authority [ Q c7_ 17 _ Signature Date ------------------------------------------------------------------------------------------------------------------------------------ �` , a Notary Public of the County State of North Carolina, hereby certify that �� �h l appeared personally before me this day and being duly sworn acknowledged that the above form was executed by him. Witness my haq and notarial seal this + Q.: N0TAR y •. • rJ 3L1C •'?,: MeeeeyM0"1 r A Pri 70tarvy My commission expire �) � t c-�Za� EROSION and SEDIMENTATION CONTROL PLAN PRELIMINARY REVIEW CHECKLIST The following items shall be incorporated with respect to specific site conditions, in an erosion & sedimentation control plan: NPDES Construction Stormwater General Permit NCG010000 Designation on the plans where the 7 or 14 day ground stabilization requirements apply per Section II.B.2 of the permit. Design of basins with one acre or more of drainage area for surface withdrawal as per Section I I.B.4 of the permit. LOCATION INFORMATION Project location & labeled vicinity map (roads, streets, landmarks) North arrow and scale Identify River Basin. Provide a copy of site located on applicable USGS quadrangle and NRCS Soils maps if it is in a River Basin with Riparian Buffer requirements. GENERAL SITE FEATURES (Plan elements) Property lines & ownership ID for adjoining properties Existing contours (topographic lines) Proposed contours Limits of disturbed area (provide acreage total, delineate limits, and label). Be sure to include all access to measures, lots that will be disturbed, and utilities that may extend offsite. Planned and existing building locations and elevations Planned & existing road locations & elevations, including temporary access roads Lot andlor building numbers Hydrogeologic features: rock outcrops, seeps, springs, wetland and their limits, streams, lakes, ponds, dams, etc. (include all required local or state buffer zones and any DWQ Riparian Buffer determinations) Easements and drainageways, particularly required for offsite affected areas. include copies of any recorded easements andlor agreements with adjoining property owners. Profiles of streets, utilities, ditch lines, etc. Stockpiled topsoil or subsoil locations If the same person conducts the land -disturbing activity & any related borrow or waste activity, the related borrow or waste activity shall constitute part of the land -disturbing activity unless the borrow or waste activity is regulated under the Mining Act of 1971, or is a landfill regulated by the Division of Waste Management. If the land -disturbing activity and any related borrow or waste activity are not conducted by the same person, they shall be considered separate land -disturbing activities and must be permitted either through the Sedimentation Pollution Control Act as a one -use borrow site or through the Mining Act. Location and details associated with any onsite stone crushing or other processing of material excavated. If the affected area associated with excavation, processing, stockpiles and transport of such materials will comprise 1 or more acres, and materials will be leaving the development tract, a mining permit will be required. Required Army Corps 404 permit and Water Quality 401 certification (e.g. stream disturbances over 150 linear feet) EROSION & SEDIMENT CONTROL MEASURES onplan) Legend (provide appropriate symbols for all measures and reference them to the construction details) Location of temporary measures Location of permanent measures Construction drawings and details for temporary and permanent measures. Show measures to scale on plan and include proposed contours where necessary. Ensure design storage requirements are maintained through all phases of construction. Maintenance requirements for measures Contact person responsible for maintenance SITE DRAINAGE FEATURES Existing and planned drainage patterns (include off -site areas that drain through project and address temporary and permanent conveyance of stormwater over graded slopes) Method used to determine acreage of land being disturbed and drainage areas to all proposed measures (e.g. delineation map) Size, pipe material and location of culverts and sewers Soil information: type, special characteristics Soil information below culvert storm outlets Name and classification of receiving water course or name of municipal operator (only where stormwaler discharges are to occur) STORMWATER CALCULATIONS ✓ Pre -construction runoff calculations for each outlet from the site (at peak discharge points). Be sure to provide all supporting data for the computation methods used (rainfall data for required storm events, time of concentrationlstorm duration, and runoff coefficients). Design calculations for peak discharges of runoff (including the construction phase & the final runoff coefficients for the site) ✓ Design talcs for culverts and storm sewers (include HW, TW and outlet velocities) ✓ Discharge and velocity calculations for open channel and ditch flows (easement & rights -of -way) ✓ Design talcs for cross sections and method of stabilization for existing and planned channels (include temporary linings). Include appropriate permissible velocity andlor shear stress data. ✓ Design talcs and construction details for energy dissipaters below culvert and storm sewer outlets (include stone/material specs & apron dimensions). Avoid discharges on fill slopes. Design talcs and dimension of sediment basins (note current surface area and dewatering standards as well as diversion of runoff to the basins). Be sure that all surface drains, including ditches and berms, will have positive drainage to the basins. VEGETATIVE STABILIZATION Area & acreage to be stabilized with vegetation Method of soil preparation Seed type & rates (temporary & permanent) Fertilizer type and rates Mulch type and rates (include mulch anchoring methods) NOTE: Plan should include provisions for groundcover in accordance with NPDES Construction Stormwater General Permit NCG010000. FINANCIAL RESPONSIBILITY/OWNERSHIP FORM ✓ Completed, signed & notarized FRIO Form ✓ Accurate application fee payable to NCDEQ ($65.00 per acre rounded up the next acre with no ceiling amount) Certificate of assumed name, if the owner is a partnership _ Name of Registered Agent (if applicable) ✓ Copy of the most current Deed for the site. Please make sure the deed(s) and ownership information are consistent between the plan sheets, local records and this form. ✓ Provide latitude & longitude (in decimal degrees) at the project entrance. ✓ Two hard -copies of the plans (some regional offices require additional plans or multiple sizes; please contact the regional coordinator prior to such submittal.) NOTE: For the Express Permitting Option, inquire at the local Regional Office for availability. Express Reviews are performed by appointment only. NARRATIVE AND CONSTRUCTION SEQUENCE Narrative describing the nature & purpose of the construction activity. Construction sequence related to erosion and sediment control (including installation of critical measures prior to the initiation of the land -disturbing activity & removal of measures after areas they serve are permanently stabilized). Address all phases of construction and necessary practices associated with temporary stream bypasses andlor crossings. Bid specifications related only to erosion control rev. 02222018