HomeMy WebLinkAboutSW1220301_Stormwater Narrative_20220322Section 1 PROJECT OVERVIEW
1.1 Narrative
The Asheville Regional Airport Terminal Expansion — Contractor Staging Area project includes the
construction of a new parking lot, staging areas, and associated grading, drainage, landscaping and
erosion control.
This report includes the computations that show compliance with the NCDEQ High Density Project. A
Primary SCM (Bioretention cell ) will be used to treat the stormwater runoff from the proposed site.
1.2 Introduction and Site Description
The site is located at Asheville Regional Airport in Fletcher, NC, south of Asheville, North Carolina near
Airport Road (35° 26' 17.43" N. 82° 32' 13.40"W).
The area that includes airport related operations
encompasses approximately 580 acres. For a larger
vicinity map, see Appendix A. The Asheville
Regional Airport Terminal Expansion — Contractor
Staging Area project site is located on an existing
pad graded area in the eastern portion of the
airport, located along Airport Road.
For hydrologic planning purposes, the site is
comprised of Hydrologic Soil Group (HSG) B soils.
Appendix A contains the NRCS Soil Survey Maps for
the parking lot. The existing land use of the project
_ o
Asheville
Regional
a,....a.m o Airport
is grass, gravel, forest, and impervious. The
proposed land use will impervious (parking lot) with a small amount of grass for landscaping and
bioretention.
As shown in the FEMA FIRM 3700964300K (January 6, 2010) in Appendix A, the disturbance is not
located within 200ft of a FEMA floodplain.
1.3 Construction Sequence and Cost
As explained later in the report, a bioretention cell is proposed as a primary stormwater conveyance
measure (SCM). The rough outline of the permanent bioretention area will occur during the grading
phase of the project and a portion of it will be used as a temporary sediment trap to protect
downstream receiving stormwater systems from construction activity. After the site is stabilized, the
sediment trap will be cleaned out and re -graded to final bioretention design grades. No mechanical
stabilization will occur. The cost of the bioretention area is unknown at this time and will be finalized
during bidding. The Asheville Regional Airport will be the end -user and responsible for annual
inspection, maintenance and repairs of the system. Section 2.3 discusses the operation and
maintenance of the cell.
9
AVL TERMINAL EXPANSION -CONTRACTOR STAGING AREA
INITIAL SUBMITTAL: MARCH 2O22
STORMWATER MANAGEMENT REPORT
Section 2
HYDROLOGY
2.1 Project Methodology
In order to qualify for a primary Stormwater Conveyance Measure (SCM) for a Bioretention, several
minimum design criteria (MDC) must be met. The recommendations will also be met to maximum
extent practical.
MDC 1 Separation from the SHWT
Boring logs for the parking lot did not observe water levels at 10ft depths so the season high water
table is assumed to be deeper than 10ft below ground. Therefore, the lowest point of the
bioretention cell will be a minimum of two feet above the SHWT.
MDC 2 Maximum Ponding Depth for Design Volume
The maximum ponding depth for the bioretention cell is 12 inches.
MDC 3 Peak Attenuation Volume
The maximum depth of the entire cell is 18 inches for peak attenuation. See plans with spillways
at the 12 inch depth and the overall dam height of 18 inches.
MDC 4 Underdrain
An underdrain with internal water storage is designed. See plan view on SW-01 and details on
SW-02 and SW-03 showing the underdrain location and details.
MDC 5 Media Depth
The media depth is 36 inches, see detail on SW-02 showing media depth.
MDC 6 Media Mix
The media shall be a homogeneous soil mix engineered media blend with approximate volumes
of:
(a) 75 to 85 percent medium to coarse washed sand (ASTM C33, AASHTO M 6/M 80,
ASTM C330, AASHTO M195, or the equivalent)
(b) 8 to 15 percent fines (silt and clay); and
(c) 5 to 10 percent organic matter (such as pine bark fines).
See detail on SW-02 showing media mix.
MDC 7 Media P-Index
The phosphorus index (P-index) for the media shall not exceed 30 in NSW waters as defined in
15A NCAC 02B .0202 and shall not exceed 50 elsewhere.
MDC 8 No Mechanical Compaction
The media shall not be mechanically compacted. It is recommended to either water it or walk on
it as it is placed. This note is on the detail, sheet SW-02.
AVL TERMINAL EXPANSION -CONTRACTOR STAGING AREA
INITIAL SUBMITTAL: MARCH 2O22
STORMWATER MANAGEMENT REPORT
MDC 9 Maintenance of Media
The bioretention cell shall be maintained in a manner that results in a drawdown of at least one
inch per hour at the planting surface. This is accomplished by not installing until the end of the
project phase, installing the correct soil type as outlined above, and not mechanically compacting.
MDC 10 Planting Plan
Not applicable due to sod.
MDC 11 Mulch
Water will enter the bioretention at less than 3 fps (see Recommendation 1 narrative below).
Therefore, sod is proposed in the bioretention area.
MDC 12 Clean -Out Pipes
A minimum of one clean -out pipe shall be provided on each underdrain line. Clean out pipes shall
be capped. As seen on plan and details, sheets SW-01 through SW-04, a cleanout is provided in
the bioretention cell.
Recommendation 1 Dispersed Flow or Energy Dissipation
The parking lot runoff will enter the bioretention via pipe flow from the parking lot into a
proposed forebay. The forebay spillway is spread over 40ft at 6inches depth, resulting in an
outlet velocity into the bioretention of less than 3 fps.
Recommendation 2 Pretreatment
The parking lot runoff will enter the bioretention via pipe flow from the parking lot into a
proposed forebay. The forebay will be 24 inches deep.
The Rational Method was used for the parking lot design on the development. The Intensity Duration
Frequency (IDF) curve for Fletcher, NC below was used for the calculations:
„ _■■■■■■■■■■
� ■■■■■■■■■■
■■■■■■■■■■■ ,
■.�■■■■■■■■■■ .
ME III E 11110 1 0 11111
9
AVL TERMINAL EXPANSION -CONTRACTOR STAGING AREA
INITIAL SUBMITTAL: MARCH 2O22
STORMWATER MANAGEMENT REPORT
The following runoff coefficients were also used for hydraulic (storm inlet, pipe) analysis of this
project:
c = 0.30 (Grass, HSG B)
c = 0.95 (Impervious area)
Design Volume
The design volume for a bioretention cell is equivalent to the volume that is contained above the planting
surface to the invert of the bypass mechanism for the design storm. See below for volume calculations:
Design Volume - Required
Drainage
Impervious
IA
Rv
Rp (Design
Design Volume
Basin
Area
Area
(Impervious
(0.05 * 0.9
Storm Depth)
(3630 * Rp * Rv * A)
(a c)
(ac)
Fraction)
* In)
(in)
(cf)
Bioretention 1
1.69
1.36
0.80
0.77
1.0
4,750
Design Volume
- Provided
Design Volume
Surface Area
Depth
Design Volume
Basin
Required
Provided
Provided
Provided
cf
sf
ft
cf
Bioretention 1
4,750
5,332
1.0
5,812
2.2 Drainage & Erosion Control Design
15" and 18" RCP are proposed along the curb and gutter of on the west and east sides of the parking
lot. Both lines collect water via curb inlets and travel south. At the southern edge of the parking lot,
the eastern line turns west to tie into the western line. From there, an 18" RCP sends all of this parking
lot drainage to a proposed forebay which will then spill into the bioretention area. Additionally, an
18" RCP is proposed from the bioretention outlet control structure. This 18" RCP will tie into an
existing inlet. These pipes have been designed to safely convey the 25-year storm. Pipe profiles and
Hydraflow Storm Sewers results can be found on sheet SW-02 of the stormwater plans (Appendix C1).
2.3 Operation and Maintenance Manual
The bioretention area requires maintenance in order to work properly. An O&M plan has been
developed and can be found in Appendix D.
2.4 Design Software and Manuals
The following design software programs were used in analysis and development of the stormwater
and documents:
• Hydraflow Hydrographs for AutoCAD Civil 3D 2021
• AutoCAD Civil 3D 2021
• Microsoft Office 2021
The following design manuals and literature were used in analysis and development of the stormwater
documents:
• NCDEQ Stormwater Design Manual— 2017 Edition
6
AVL TE RM I NAL EXPANSION —CONTRACTOR STAGING AREA INITIAL SUBMITTAL: MARCH 2O22
STORMWATER MANAGEMENT REPORT