Loading...
HomeMy WebLinkAbout20140022 Ver 1_Approval Letter_20140421NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III Governor Secretary April 21, 2014 Ms. Karen Fussell, P.E., Division Engineer NCDOT, Division 3 5501 Barbados Blvd. Castle Hayne, N.C. 28429 Subject: 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL CONDITIONS for proposed replacements of Bridge Nos. 16 and 20 on NC 211 over Honey Island Swamp in Brunswick County, State Project No. 17BP.3.R.26. NCDWR Project No. 20140022 Dear Ms. Fussell: Attached hereto is a copy of Certification N6.3989 issued to The North Carolina Department of Transportation (NCDOT) dated April 21, 2014. If we can be of further assistance, do not hesitate to contact us. Sincerely, Thomas A Reeder, Director Division of Water Resources Attachments cc: Brad Shaver, US Army Corps of Engineers, Wilmington Field Office Stoney Mathis, Division 3 Environmental Officer Audrey Burnette, RK &K Engineers Cynthia Van Der Wiele, Environmental Protection Agency Travis Wilson, NC Wildlife Resources Commission Jason Elliott, NCDOT, Natural Environment Section Steve Sollod, Division of Coastal Management Sonia Carrillo, NCDWR Central Office File Copy Transportation and Permitting Unit 1617 Mail Service Center, Raleigh, North Carolina 27699 -1617 Location- 512 N Salisbury St. Raleigh, North Carolina 27604 Phone, 919 -807 -63001 FAX. 919 - 733 -1290 Internet www.ncwaterguallty.org An Equal Opportunity 1 Affirmative Action Employer NorthCarofina Naturally 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL CONDITIONS THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92 -500 and 95 -217 of the United States and subject to the North Carolina Division of Water Resources (NCDWR) Regulations in 15 NCAC 2H .0500. This certification authorizes the NCDOT to impact 1.05 acres of jurisdictional wetlands in Brunswick County. The project shall be constructed pursuant to the revised application dated received February 28, 2014. The authorized impacts are as described below: Wetland lmaacts in the Lumber River Basin (riverine) Station Fill (ac) Fill (temporary) (ac) Excavation (ac) Mechanized Clearing (ac) Hand Clearing (ac) Total Wetland Impact (ac) 20 +35 to 36 +50 0.56 0 0 0.01 0.02 0.59 BR 16 & 20 0 0 0 0.01 0.06 0.07 21 +00 to 36 +00 0.23 0 0 0.16 0 039 Total 0.79 0 0 0.18 0.08 1.05 Total Wetland Impact for Project: 1.05 acres. NOTE: applicant is proposing 1.29 acres of onsite wetland restoration by removing the existing roadway fill for 404 permitting requirements. The application provides adequate assurance that the discharge of fill material into the waters of the Lumber Rivei Basin in conjunction with the proposed development will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92 -500 and PL 95 -217 if conducted in accordance with the application and conditions hereinafter set forth. This approval is only valid for the purpose and design that you submitted in your revised application dated received February 28, 2014. Should your project change, you are required to notify the NCDWR and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If any additional wetland impacts, or stream impacts, for this project (now or in the future) exceed one acre or 150 linear feet, respectively, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you are required to comply with all the conditions listed below. In addition, you should obtain all other federal, state or local permits before proceeding with your project including (but not limited to) Sediment and Erosion control, Coastal Stormwater, Non - discharge and Water Supply watershed regulations. This Certification shall expire on the same day as the expiration date of the corresponding Corps of Engineers Permit. Condition(s) of Certification: Project Specific Conditions 1. Strict adherence to the most recent version of NCDOT's Best Management Practices For Bridge Demolition and Removal approved by the US Army Corps of Engineers is a condition of the 401 Water Quality Certification. 2. Bridge piles and bents shall be constructed using driven piles (hammer or vibratory) or drilled shaft construction methods. More specifically, jetting or other methods of pile driving are prohibited without prior written approval from the NCDWR first. 3. No drill slurry or water that has been in contact with uncured concrete shall be allowed to enter surface waters. This water shall be captured, treated, and disposed of properly. n 4. A turbidity curtain will be installed in the stream if driving or drilling activities occur within the stream channel, on the stream bank, or within 5 feet of the top of bank. This condition can be waived with prior approval from the NCDWR. 5. Erosion control matting placed in riparian areas shall not contain a nylon mesh grid, which can impinge and entrap small animals. Matting should be secured in place with staples, stakes, or wherever possible, live stakes of native trees. Riparian areas are defined as a distance 25 feet landward from top of stream bank. 6. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the bridge and pre- treated through site- appropriate means (grassed swales, pre- formed scour holes, vegetated buffers, etc.) before entering the stream. Please refer to the most current version of Stormwater Best Management Practices. 7. The project shall be constructed in accordance with the provisions of the NCDOT's National Pollutant Discharge Elimination (NPDES) Stormwater Permit NCS000250, including the applicable requirements of the NCGO 1000. General Conditions 8. Unless otherwise approved in this certification, placement of culverts and other structures in open waters and streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis- equilibrium of wetlands or streambeds or banks, adjacent to or upstream and downstream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by the NCDWR. If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact the NCDWR for guidance on how to proceed and to determine whether or not a permit modification will be required. 9. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. 10. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. 11. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed floodplains and streams shall, be restored to natural geomorphic conditions. 12. The use of rip -rap above the Normal High Water Mark shall be minimized. Any rip -rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. 13. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. 14. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of the NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. 15. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. 16. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 17. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. 18. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 19. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. r 20. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification.. 21. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on -site project manager. 22. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. 23. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc. 24. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery. 25. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division Engineer shall complete and return the enclosed "Certification of Completion Form" to notify the NCDWR when all work included in the 401 Certification has been completed. 26. Native riparian vegetation in must be reestablished in the riparian areas within the construction limits of the project by the end of the growing season following completion of construction. 27. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities. 28. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina. Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 29. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and /or civil penalties. This Certification shall become null and void unless the above conditions are made conditions of the Federal 404 and /or Coastal Area Management Act Permit. This Certification shall expire upon the expiration of the 404 or CAMA permit. If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and 5:OOpm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed - provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699 -6714 Telephone: (919) -431 -3000, Facsimile: (919) -431 -3100 A copy of the petition must also be served on DENR as follows: Mr. Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center This the 21 st day of April 2014 DIVISION OF WATER RESOURCES Thomas A Reeder, Director --C` Division of Water Resources WQC No. 3989