Loading...
HomeMy WebLinkAboutNC0050342_Authorization to Construct_20141015NPDES DOCUMENT !MCANNINO COVER !;CIEET NPDES Permit: NC0050342 Muddy Creek WWTP Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC)'l Permit Modification Complete File - Historical Engineering Alternatives (EAA) Correspondence Owner Name Change Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: October 15, 2014 This document is printed on reuse paper - ignore any content on the re' erne side Berry, Ron From: Berry, Ron Sent: Wednesday, October 15, 2014 4:15 PM To: 'James N. Struve, P.E.' Cc: 'Ron Hargrove'; Basinger, Corey; Leggett, Michael Subject: Review of Changes at Muddy Creek WWTP NC0050342 Tracking: Recipient Delivery Read 'James N. Struve, P.E.' 'Ron Hargrove' Basinger, Corey Delivered: 10/15/2014 4:15 PM Read: 10/15/2014 4:15 PM Leggett, Michael Delivered: 10/15/2014 4:15 PM James N. Struve, PE Vice President Hazen and Sawyer 4944 Parkway Plaza Blvd, Ste. 375 Charlotte NC 28217 Mr. Struve: As requested the Division reviewed the proposed Muddy Creek Temporary Pump Station as well as the planned addition of the South Fork Influent Diversion Box at the Muddy Creek WWTP NC0050342. Based on the information provided, no compromise of the Muddy Creek WWTP operational integrity or minimum design standards was noted. It was stated the on -site temporary pump stations operations will be retired in conjunction with completion of the approved Authorization to Construct permit 050342A05. Therefore, the Division deems the temporary pump stations and addition of the diversion box covered by the existing permit 050342A05, and no further permitting is necessary. A statement indicating the temporary pump stations were retired and the diversion box was installed is to be written by the signing party on the Engineer Certificate form as confirmation these items were completed. I recommend a copy of this email be attached to Winston-Salem CORRECTED Authorization to Construct permit 050342A05 issued August 1, 2014 for future reference. If you have any questions you can contact Ron Berry at (919) 807-6396 or ron.berry@a,ncdenr.gov. Sincerely, Ron Berry, Engineer Division of Water Resources/NCDENR Phone: (919) 807 - 6396 Email: ron.berry@ncdenr.gov Location Address - Archdale Building, Office 925Y 512 N. Salibury St. Raleigh, NC 27699 Mailing Address - Archdale Building, NCDENR/DWR 1 ATA NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III Govemor Secretary August 1, 2014 Ron Hargrove Utilities Director City of Winston Salem P. O. Box 2511 Winston-Salem, North Carolina 27102-2511 SUBJECT: CORRECTED Authorization to Construct A to C No. 050342A05 City of Winston-Salem Muddy Creek WWTP Dear Mr. Hargrove: The initial letter of request for an Authorization to Construct was received March 26, 2014, by the Division of Water Resources (Division), and the A to . C permit was issued July 3, 2014. The Division was advised by Black & Veatch on July 29, 2014 that subsequent changes/corrections as the result of the reduction in influent flow from the loss of Davie County wastewater, the availability of alternative emergency power from the recently approved CHP project, and other noted corrections were requested for the issued A to C permit 050342A05. The submitted revised design, specifications, and corrections for the A to C permit 050342A05 project have been reviewed and revisions/corrections applied where appropriate in this CORRECTED A to C permit 050342A05. The CHP project is independent of the A to C permit construction, and its completion is anticipated prior to the completion of the A to C permit 050342A05 construction. As a mandatory requirement to provide stand-by power for the additional electrical load, the 2,000 KW diesel generator narrative must remain in the A to C permit. Upon completion of the CHP project and connection to the Muddy Creek WWTP electrical grid, the CORRECTED A to C permit 050342A05 Engineer Certificate narrative should be edited by the signing party prior to submittal to the Division to reflect the substitution of the CHP project for the listed stand-by diesel generator system. Authorization is hereby granted for the construction of modifications as corrected to the existing 21 MGD Muddy Creek WWTP, with discharge of treated wastewater into the Yadkin River in the Yadkin -Pee Dee River Basin. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Phone: 919-807-6300 l Internet: www.ncwaterquality.org An Equal OpportunityWffirmative Action Employer Ron Hargrove, Utilities Director August 1, 2014 Page 2 of 4 Please discard the original July 3, 2014 A to C permit 050342A05 and Engineer Certificate form, and replaced it with this CORRECTED A to C permit 050342A05 and Engineer Certificate form issued August 1, 2014. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Installation of new influent pump station consisting of three (3) 17,400 GPM influent pumps, (2) 8,700 GPM influent pumps, two (2) 7,000 GPM transfer pumps, all with variable speed drive, piping, and controls; installation of new headworks consisting of three (3) 50 MG self-cleaning mechanical screens with three (3) screening wash/press systems, two (2) 50 MG grit removal systems with four (4). 500 GPM grit pumps, four (4) grit cyclones, two (2) grit separators, a bypass channel, area containment, piping, and controls; installation of new primary clarifiers distribution box, piping, and controls; installation of new plant drain pump station consisting of two (2) 1,000 GPM pumps, two (2) 150 GPM pumps, piping, and controls; installation of two(2) new 1 MG EQ day tanks with eight (8) 5 HP mixers (4 per tank), piping, and controls; installation of two (2) new 11,000 gallon Ferric Chloride storage tanks with containment, (4) 56 GPH chemical feed pumps, piping, and controls; installation of new odor control system consisting of three (3) carbon absorption units with three (3) 9,670 CFM fans, ductwork, and controls; installation of new 4160V/3PH 2,000 KW diesel generator with 1,200 gallon double wall fuel oil tank, piping, and controls; installation of new instrument air bubbler system consisting of two (2) 2 HP air compressors, air dryer, piping, and controls; conversion of two (2) existing lagoons to two (2) storm water EQ basins , approximately 3.85 MG each, piping, and controls; conversion of one existing lagoon to a 4.2 MG centrate EQ basin, piping, and controls; replacement of existing NPW pumps with lower capacity pumps, two (2) new 400 GPM pumps, two (2) new 1,000 GPM pumps, piping, and controls; in conformity with the project plans, specifications, demolition, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0050342 issued with an effective date of September 1, 2009, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0050342. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. Ron Hargrove, Utilities Director August 1, 2014 Page 3 of 4 The Winston-Salem Regional Office, telephone number (336) 771 - 5000, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: NPDES Unit, DWR/DENR, 1617 Mail Service Center, Raleigh, NC 27699-1617. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. Ron Hargrove, Utilities Director August 1, 2014 Page 4 of 4 If you have any questions or need additional information, please contact Ron Berry at telephone number (919) 807-6396. Sincerely, Th•"' as A. Reeder, Director Division of Water Resources/NCDENR cc: Randall Ashburn, P.E. Black & Veatch International Company 10715 David Taylor Drive Suite 240 Charlotte, NC 28626 DWR/Winston-Salem Regional Office, Water Quality Programs Central Files NPDES File Without Engineer's Certificate attached: Forsyth County Health Department DWI/Ken Pohlig NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Ron Hargrove Utilities Director City of Winston Salem P. O. Box 2511 Winston-Salem, North Carolina 27102-2511 Dear Mr. Hargrove: John E. Skvarla, III Secretary July 2, 2014 SUBJECT: Authorization to Construct A to C No. 050342A05 City of Winston-Salem Muddy Creek WWTP A letter of request for an Authorization to Construct was received March 26, 2014, by the Division of Water Resources (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 21 MGD Muddy Creek WWTP, with discharge of treated wastewater into the Yadkin River in the Yadkin -Pee Dee River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Installation of new influent pump station consisting of four (4) 17,400 GPM influent pumps, (2) 8,700 GPM influent pumps, two (2) 7.000 GPM transfer pumps, all with variable speed drive, piping, and controls; installation of new headworks consisting of three (3) 50 MG self-cleaning mechanical screens with three (3) screening wash/press systems, two (2) 50 MG grit removal systems with four (4) 500 GPM grit pumps, four (4) grit cyclones, two (2) grit separators, a bypass channel, area containment, piping, and controls; installation of new primary clarifiers distribution box, piping, and controls; installation of new plant drain pump station consisting of two (2) 1,000 GPM pumps, two (2) 150 GPM pumps, piping, and controls; installation of two(2) new 1 MG EQ day tanks with eight (8) 5 HP mixers (4 per tank), piping, and controls; installation of two (2) new 11,000 gallon Ferric Chloride storage tanks with containment, (4) 56 GPH chemical feed pumps, piping, and controls; installation of new odor control system consisting of three (3) carbon absorption units with three (3) 9,670 CFM fans, ductwork, and controls; installation of new 4160V/3PH 2,000 KW diesel generator with 1,200 gallon double 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Phone: 919-807-6300 l Internet: www.ncwaterquality.org An Equal OpportunitylAffirmative Action Employer Ron Hargrove, Utilities Director July 2, 2014 Page 2 of 3 wall fuel oil tank, piping, and controls; installation of new instrument air bubbler system consisting of two (2) 2 HP air compressors, air dryer, piping, and controls; conversion of two (2) existing lagoons to two (2) storm water EQ basins , approximately 2.85 MG each, piping, and controls;conversion of one existing lagoon to a 4.2 MG concentrate EQ basin, piping, and controls; replacement of existing NPW pumps with lower capacity pumps, two (2) new 400 GPM pumps, two (2) new 1,000 GPM pumps, piping, and controls; in conformity with the project plans, specifications, demolition, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0050342 issued with an effective date of September 1, 2009, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0050342. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Office, telephone number (336) 771 - 5000, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: NPDES Unit, DWR/DENR, 1617 Mail Service Center, Raleigh, NC 27699-1617. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. Ron Hargrove, Utilities Director July 2, 2014 Page 3 of 3 A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits, ;from the State. Failure to -abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions or need additional information, please contact Ron Berry at telephone number (919) 807-6396. Sincerely, Thas A. Reeder, Director Division of Water Resources/NCDENR cc: Randall Ashburn, P.E. Black & Veatch International Company 10715 David Taylor Drive Suite 240 Charlotte, NC 28626 DWR/Winston-Salem Regional Office, Water Quality Programs Central Files NPDES File Without Engineer's Certificate attached: Forsyth County Health Department DWI/Ken Pohlig