Loading...
HomeMy WebLinkAboutNC0050342_Authorization to Construct_20030325NPDES DOCUHENT SCANNING COVER SHEET NPDES Permit: NC0050342 Muddy Creek WWTP Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC) -., Y Permit Modification Complete File - Historical Engineering Alternatives (EAA) Correspondence Owner Name Change Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: March 25, 2003 This document is printed on reuse paper - ignore arty content on the reirerse aside 1tAR-25-2003 TUE 11:37 AM HAZEN SAWYER FAX NO 7043573152 P. 01 QF 4Michael !. rasley, l,ovemor 19 William G. Russ Jr., Secretary Q. �— n ;1 - North Carolina Department of Environment and Natural Resources U /� !/If Gregory J Thorpe, Ph.D. / Acting Director 1 rC Division Of Water Quality Ar'( Mr. Michael Parker Hazen and Sawyer 4944 Parkway Plaza Blvd., Suite 375 Charlotte, North Carolina 28217 January 17, 2002 Subject: Winston-Salem Muddy Creek WWTP Dechlorination I:acility Mixing Improvements Dear Mr. Parker, Thank you for consulting with the Division prior to starting construction on the dechlorination facilities at the Winston-Salem Muddy Creek WWTP. The Division hereby grants your request. An Authorizations to Construct is not required for the project proposed in your December 18, 2001 letter. If the projects expands beyond the scope outlined in this letter an Authorization to Construct may be required. The Division request that after construction is complete that the attached Engineering Certification be returned to the Division at the address listed on the certification. The Division will then update the Muddy Creek WWTP's permit during the next scheduled permit renewal. If you have any questions, please do not hesitate to call me at 919-733-5083 x508 JAN ?CZ N FEE it • • 5incerely, �u-a- Michael J. Myers Post -it" Fax Note 7671 Co /Dept. Phone II Date From / • Go. Phone W/voN VaiMae �� Fax , �() pe(tes 3Ea -3iso 35.,-3/5 N. C, Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 ix ego) 333- 991 `I rVI..UTA Customer Service 1 800 623.77.18 HAZEN AND SAWYER Environmental Engineers & Scientists December 18, 2001 Mr. Michael Myers NC DENR — Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Re: Winston-Salem Muddy Creek WWTP Dechlorination Facility Mixing Improvements Dear Michael: Hazen and Sawyer, P.C. 4944 Parkway Plaza Blvd. Suite 375 Charlotte, NC 28217 704 357-3150 c Fax: 704 357-3152 c .141:7:)5 z" ,9 I am writing with regard to the Dechlorination Facility Mixing Improvements project proposed for the Winston-Salem Muddy Creek WWTP. The project will provide an oxidation-reduction potential (ORP) analyzer and a mixing chamber to optimize sodium bisulfite feed associated with the dechlorination process currently utilized for the plant effluent flow. A remote dechlorination facility located on Frye Bridge Road currently feeds sodium bisulfite directly into the existing Muddy Creek WWTP 66" outfall line to dechlorinate the treated effluent. The plant consistently meets its chlorine limit of 28 µg/L, but the current control strategy does not allow adjustment of the sodium bisulfite dose setpoint, and overfeeding can occur during low flow conditions. The current control strategy is configured to flow pace sodium bisulfite in accordance with plant effluent flow rate via a remote 4-20 mA signal. The proposed improvements include installation of an ORP analyzer that will provide an output signal to the existing programmable logic controller (PLC) to adjust the sodium bisulfite dose periodically. The sodium bisulfite feed rate will continue to be flow -paced continuously during these intervals. The automatic adjustment of dose will refine the sodium bisulfite demand as effluent flow characteristics change, providing chemical cost savings to the plant while still complying with its chlorine limit. Additionally, a mixing vault will be constructed upstream of the proposed ORP analyzer to enhance mixing of sodium bisulfite into the plant effluent. Hazen and Sawyer, on behalf of the City of Winston-Salem, requests that no modification be required to the existing operating permit for the Muddy Creek WWTP due to the proposed improvements described above and that an authorization -to -construct (ATC) not be required. This request is made considering that flow pacing will continue to be the primary control mechanism New York, NY • Armonk, NY • Upper Saddle River, NJ • Raleigh, NC • Charlotte, NC • Vienna, VA • Hollywood, FL • Boca Raton, FL • Fort Pierce, FL • Jupiter, FL • Miami, FL • Bogota, D.E. Colombia utilized to feed sodium bisulfite, but that the ORP analyzer will periodically adjust the dose setpoint to optimize chemical usage. Please provide Hazen and Sawyer with written confirmation that permit modification and subsequent ATC is not required. Should you need additional information to facilitate your review, please contact me at (704) 357-3150. Thank you for your consideration of this request. Sincerely, H ZEN AND SAWYER P.C. Michael D. Parker, P.E. Principal Engineer Cc: NC DENR — Winston-Salem Branch Stan Webb — City of Winston-Salem Chris Shamel — City of Winston-Salem Jim Struve — Hazen and Sawyer File