HomeMy WebLinkAboutNC0026000_Report_19990719NPDES DOCUHENT SCANNING COVER SHEET
NC0026000
Tabor City WWTP
NPDES Permit:
Document Type:
Permit Issuance
Wasteload Allocation
Authorization to Construct (AtC)
Permit Modification
Complete File - Historical
Engineering Alternatives (EAA)
Correspondence
Owner Name Change
Instream Assessment (67b)
Speculative Limits
Environmental Assessment (EA)
Document Date:
July 19, 1999
This document is printed on reuse paper - ignore any
content on the rem erise side
8
NCDENR/DIVISION OF WATER QUALITY
WATER QUALITY SECTION/NPDES UNIT
JuLY 19, 1999
MEMORANDUM
To: BILL REID
POINT SOURCE BRANCH HEAD
FROM: MARK MCINTIRE
SUBJECT: INFLOW/INFILTRATION EVALUATION
TABOR CITY- NC0026000
COLUMBUS COUNTY
Attached are graphs supporting the I/1 evaluation for Tabor City in Columbus County. The first graph presents
permitted flow, reported daily effluent flow, and daily precipitation. The precipitation data was provided by the
North Carolina State Climate Office. The closest precipitation station was in Whitesville, close to 25 miles away.
The data does not suggest an I/1 problem, though there may be problem with their flow meter. I say this because
there are times when the flow goes from 0.2 MGD one day to over 5.0 MGD the next day.
Let me know ifyou have any Questions.
Cc: NPDES Permit File
0.
a 7
0 6
L 4
06 3
V 2
- 1
0 O
Tabor City 1/1 Evaluation (January I , 1996 - May 31, 1999)
'MN h 1
!I
1
•
thin it V1,1(1w r0 io i A 14011Pi , N 01, ws41 1.����1 , w
C0 CO C0 C0 N. I` I` N 00 00 00 0o cm O
a) a) am a) a) am a) a) a) a) a) am a) a)
N N CV N N N N CV N CV N N N C\I
N- 'd' 1 O d' t` 0 d' I` 0 r- d'
Day
Flow(MGD)
Precip(in)
Permitted
Tabor City I/I Evaluation (Januaiy 1, 1996 - dune 30, 1996)
-,:d 1.8
_au
1.6
.......
1.4
To' 1.2
V
1
i'm 0.8
oa
0.6
Es
v 0.4
0.2
0 0
La_
f\l\-,P1/04
r1-
A
A
\,
ri\c,
A
,cpcpcpcpcpcbbC3C3Cocob Cc)
\ cc: 'Z \ A\ (1 c3 .33 4)
N \t• N b f3 '• tx R)
N N 9/ (V 4 41/ tx t) b (fP q' co\t\
Day
— Flow(MGD)
— Precip(in)
Permitted
a
O 6
:25... 'Ft.;
4
Q..
06 3
c 2
L.,
0 0
Tabor City 1/1 Evaluation (July 1, 1996 - December 3 I , 1996)
r
0) 0) 0) 0) 0) 0)
f) a) N CS) 0) CO
ti x- N N Ch N O
N N 00 CO CO
Day
0) a) 0) 0) 0)
,:- CO N O
▪ N ▪ CIO
A- N- A- N N
— Flow(MGD)
— Precip(in)
Permitted
V
C
C
0
CCI
f-45- 1.5
V
6: 1
c
v 0.5
0 0
Tabor City 1/1 Evaluation (January 1, 1997 - June 30, 1997)
2.5 -
2-
r�
iM
AP
I
A
A
i
AkilL.,
A1, A
AAAA AA AAAAAAA
.:6 e c;c3 r'" '‘ °P Af3 e o 43 4:3 cbcb
N tt\ 45 (-1t\ le 4N rb tlot\ 0/ 4 <e) 4 cP
Day
— Flow(MGD)
— Precip(in)
Permitted
a)
V
c
.0 5.,
ca
.6-4
V
°- 3
06
2
V
2 1
0
u. 0
Tabor City 1/1 Evluation (July 1, 1997 - December 3 I , 1997)
0) 0)
L)
ti N-
ti
lk"
0)
0)
N
N.
,
n
tvia
N. N. N. N- ti N.�� N. N. N.-
(3) CD (3) (3) 0) 0) 0) (3) CD a) (3)
▪ N N N N .%— M
CO CO 0 CD0' N N N
Day
Flow(MGD)
Precip(in)
Permitted
Flow (MGD) & Preciptitation (inches)
Tabor City I/I Evaluation (January 1, 1998 - June 30, 1998)
6
5
4
3
2
1
0
Iltr\A
#(,04)
I'V,"\YP41
CP CP
(.19/ 4I\ 153
t) 43 4)
t*
Day
Flow(MGD)
Precip(in)
Permitted
Tabor City 1/1 Evaluation (July I , 1998 - December 3 I , 1998)
-r-4- 4
s
c 3.5
-....-...
0 3
:47.:
cv
..._, 2.5
:ii.
0
(I)
6......
2
ozs 1.5
0 1
L.,
4.5
0u.. 0
- Flow(MGD)
— Precip(in)
Permitted
c393 p) 93 cb C5 93.
Q 2 2 p�
00393 (§) cb
� \/\�������� ���C' (�v�` e A� Vf3f 4Z)'i,`1�0\ O�V1 l��\��l��Cb\1�V ���� �JO�
v
V
Day
Tabor City I/I Evaluation (January I , 1999 - May 30, 1999)
17)
a)
4
s
3.5
0 3
.-r,-;
2.5
2 2
0.
as 1.5
0
V 1
0.5
0
�. 0
1
0) 0) 0) 0)
0) 0) 0) 0) 0)
N - N
✓ N- N- N N
_ nrA
0) 0)
0)
N
M
Day
1
1
f\A
a) cm cm
0) 0) cm
co 0) C)
c\i d. N
C"'€5 d'
4.14V\
AH
N.
in N
to
Flow(MGD)
Precip(in)
Permitted