HomeMy WebLinkAbout20210806 Ver 1_Certification of Completion_20220321 WR Project No.: County:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable
Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to
the 401 and Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service
Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the
applicant’s authorized agent, or the project engineer. It is not necessary to send certificates from all
of these.
Applicant’s Certification
I, _, hereby state that, to the best of my abilities,
due care and diligence was used in the observation of the construction such that the construction was
observed to be built within substantial compliance and intent of the 401 Water Quality Certification
and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature: Date:
Agent’s Certification
I, _, hereby state that, to the best of my abilities,
due care and diligence was used in the observation of the construction such that the construction was
observed to be built within substantial compliance and intent of the 401 Water Quality Certification
and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
I, , as a duly registered Professional (i.e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized
to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby
state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and
intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature:
Date
Registration No.
2021-0806 McDowell
City of Marion
Catawba River Greenway Bank Restoration
September 14, 2021
Zan Price
Engineer
33141
03/21/22
01 Water Quality C
porting materials.
1/22