Loading...
HomeMy WebLinkAboutNC0020648_PAR review form with signature_20220321Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Does it have two copies? Did they send an v other submissions with it? Included? ADEQUATE? POTW noted Corrections? Narrative /1 YES ❑ NO ❑ NA 11 YES ❑ NO ❑ NA PPS Form /1 YES ❑ NO /1 YES ❑ NO SNCR /1 YES ❑ NO 11 YES ❑ NO IDSF r YES ❑ NO /1 YES ❑ NO Allocation Table 0 YES ❑ NO i1 YES ❑ NO Compliance Schedules ❑ YES ❑ NO /1 NA ❑ YES ❑ NO L NA Public Notice ❑ YES ❑ NO /1 NA ❑ YES ❑ NO /1 NA Program Information /1 YES ❑ NO /1 YES ❑ NO ❑ YES a NO Historical SNC ❑ YES ❑ NO i1 NA ❑ YES ❑ NO /1 NA ❑ YES ❑ NO /1 NA Regional Office: Washington POTW: City of Washington NPDES Permit No. NC0020648 Report Period:1/1/2021 to 12/31/2021 ® Full ❑ Modified For modified programs evaluate shaded items only. A Narrative is required for a modified program only if there are SIUs in SNC. If No, check recommendation below: 1. Have at least 90% of SIU permits been issued within 180 days of expiration? (See Allocation Table). i1 Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 2. Were at least 80% of SIUs inspected? (See PPS Form) /1 Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 3. Has effective enforcement been taken against industries in SNC, including those causing pass -through or interference? (See Narrative and SNCR Form) ❑ Yes ❑ No /1 NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 4. Does public notice cover all SIUs in SNC? ❑ Yes ❑ No /1 NA ❑ NOD ❑ NOV QNCR ❑ NCP ❑ Civil Penalty Assessment Note: Exceptions should be explained in the comment section below: Reviewed By: �.66� 56dieDate: 3/21 /2022 Regional Pretreatment Annual Report Review PAR review form City of Washington 202116