Loading...
HomeMy WebLinkAboutNCC214882_NOT Closeout Documents (2)_20220316North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Cleveland Project: Apex Solar 44kV Tap Line River basin: Broad Person financially responsible: Duke Energy Carolinas, LLC - Randy N Veltri, Project #: CLEVE-2021-027 Manager, Siting & Permitting Address: 526 South Church Street, EC09Q, Charlotte, NC 28202 1. Project Location: Pony Barn Road, Fallston Pictures: No 2. Weather and soil conditions: Sunny, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one on site at the time of inspection Title: Inspection report: Gave Report Date given/sent: March 04, 2022 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:Hedocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Matthew Gigante Others present: Date of inspection: March 02, 2022 Time arriving on site: 11:00 AM Time leaving site: 11:05 AM cc: You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)