HomeMy WebLinkAboutSite inspection 3.18.22 Br 209 Mt Harmony RoadWetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20210304
NCDOT - Replace Bridge 209 on SR1623
Burke
NCDOT - Replace Bridge 209 on SR1623
NC DOT Division 13
3/18/2022
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-81° 26' 54''+35° 43' 40''
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted on March 18, 2022 by Kevin Mitchell with the Asheville Regional Office. Jordan Crump
was present during the inspection.
The NPDES inspection sheets for this week were not complete and/or at the site. Please ensure that these are up to
date and kept on site.
Continue to mulch and seed as required per the NPDES groundcover requirements.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20210304
3/18/2022
Bryan, Roger D
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Bridge decking has been pulled. Erosion control is installed.Comment:
page:2