Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8190818_Historical File_20200114
ROY COOPER Governor MICHAEL S. REGAN secretory S. DANIEL SMITH Director January 14, 2020 NORTH CAROLINA Environmental QuaW Aftew Properties, LLC Attn: Mr. Arnold L. Sobol, Manager 2020 S. Churchill Drive Wilmington, NC 28403 Subject: State Stormwater Management Permit No. SW8190818 The Village at Motts Landing Phase 2E High Density Subdivision Project New Hanover County Dear Mr. Sobol: The Wilmington Regional Office received a complete, State Stormwater Management Permit Application for the subject project on January 10, 2020. Staff review of the plans and specifications has determined that the project, as proposed, complies with the Stormwater Regulations set forth in Title 15A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules). We are hereby forwarding Permit No. SW8 190818 dated January 14, 2020, for the construction of the built -upon areas (BUA) and stormwater control measures (SCMs) associated with the subject project For clarification, SDMH #6 is stubbed out outside of the project area, but it will not collect water. The permittee has overbuilt the pond in anticipation of being able to modify this permit to use additional capacity at a later date. Installing SDMH #6 at this time is intended to avoid a construction disturbance later. This permit shall be effective from the date of issuance until January 10, 2028 and the project shall be subject to the conditions and limitations as specified therein and does not supersede any other a envy permit that may be required. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. This cover letter, attachments, and all documents on file with DEMLR shall be considered part of this permit and is herein incorporated by reference. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. � North Carolina Department of Environmental � Pa Quality I Division of Energy, Mineral and Land Resources __EQ Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 ern carauNn owe..Rdru+a 910.796.7215 If you have any questions concerning this permit, please contact Kelly Johnson in the Wilmington Regional Office, at (910) 796-7215 or kelly.p..johnson@ncdenr.gov. Sincerely, S. Daniel mith, Director Division of Energy, Mineral and Land Resources Enclosures: Attachment A -Designer's Certification Form Application Documents GDS/kpj: \\\Stormwater\Permits & Projects\2019\190818 HD\2020 01 permit 190818 cc: Phil Tripp, PE, Tripp Engineering 419 Chestnut Street, Wilmington, NC 28401 New Hanover County Building Safety Department. New Hanover County Engineering NCDOT District Engineer Wilmington Regional Office Stormwater File State Stormwater Management Permit No. SW8 190818 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations promulgated and adopted by the North Carolina Environmental Management Commission, including 15A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules) (the "stormwater rules"), PERMISSION IS HEREBY GRANTED TO Aftew Properties, LLC The Village at Motts Landing Phase 2E 360 Glen Ellen Road, Wilmington, New Hanover County FOR THE construction, management, operation and maintenance of built -upon area (BUA) one (1) wet pond ("stormwater control measures" or "SCMs") outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until January 14, 2028 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. BUA REQUIREMENTS. The maximum amount of BUA allowed for the entire project is 313,078 square feet. a. SCM BUA LIMITS. The SCM has been designed using the runoff treatment method to handle the runoff from 313,078 square feet of BUA within the delineated drainage area. The BUA for the future development is limited to 110,000 square feet, which has been included in the total. b. BUA FOR INDIVIDUAL LOTS. Each of the 31 lots are limited to a maximum of 5,nOO square feet of BUA, as indicated in the approved plans and specifications. The maximum BUA assigned to each lot via this permit and the recorded deed restrictions and protective covenants may not be increased or decreased by either the individual lot owner or the permittee unless and until the permittee notifies the Division and obtains written approval from the Division. Page 1 of 6 State Stormwater Management Permit No. SW8 190818 2. SCM REQUIREMENTS. The following requirements pertain to the SCMs on this project: a. SCM DESIGN. The SCM is permitted based on the design criteria presented in the sealed, signed and dated supplement and as shown in the approved plans and specifications. This SCM must be provided and maintained at the design condition. b. PLANTING PLAN. The SCM landscape planting plan shown in the approved plans shall be followed in its entirety during construction. After the plants are established, the operation and maintenance agreement must be followed. c. FOUNTAINS. At this time, a decorative spray fountain has not been proposed within the wet pond. Decorative spray fountains will be allowed in the wet pond if documentation is provided demonstrating that the proposed fountain will not cause resuspension of sediment within the pond or cause erosion of the pond side slopes. d. IRRIGATION. If the wet pond is to be used for irrigation, it is recommended that some water be maintained in the permanent pool, the vegetated shelf is planted with appropriate species that can handle fluctuating conditions, and human health issues are addressed. 3. STORMWATER OUTLETS. The peak flow from the 10-year storm event shall not cause erosion downslope of the discharge point. 4. VEGETATED SETBACKS. A 50-foot wide vegetative setback must be provided and maintained in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The setback is measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. a. BUA IN THE VEGETATED SETBACK. BUA may not be added to the vegetated setback except as shown on the approved plans or in the following instances where the BUA has been minimized and channelizing runoff from the BUA is avoided: i. Water dependent structures; and ii. Minimal footprint uses such as poles, signs, utility appurtenances, and security lights that cannot practically be located elsewhere. b. RELEASE OF STORMWATER NOT TREATED IN AN SCM. Stormwater that is not treated in an SCM must be released at the edge of the vegetated setback and allowed to flow through the setback as dispersed flow. 5. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following documents to be recorded with the Office of the Register of Deeds prior to the sale of individual lots or -groups of lots: a. ACCESS AND/OR EASEMENTS. The entire stormwater conveyance system, including any SCMs, and maintenance accesses must be located in public rights -of -way, dedicated common areas that extend to the nearest public right-of-way, and/or permanent recorded easements that extend to the nearest public right-of-way for the purpose of inspection, operation, maintenance, and repair. b. OPERATION AND MAINTENANCE AGREEMENT. The operation and maintenance agreement must be recorded with the Office of the Register of Deeds. c. FINAL PLATS. The final recorded plats must reference the operation and maintenance agreement and must also show all public rights -of -way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans. Page 2 of 6 State Stormwater Management Permit No. SW8 190818 d. DEED RESTRICTIONS AND PROTECTIVE COVENANTS. Recorded deed restrictions and protective covenants must include, at a minimum, the following statements related to stormwater management: i. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 190818, as issued by the Division of Energy, Mineral and Land Resources (the "Division") under 15A NCAC 02H.1000, effective January 1, 2017. ii. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. iii. These covenants are to run with the land and be binding on all persons and parties claiming under them. iv. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the Division. V. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division. vi. The maximum built -upon area (BUA) per lot is 5,000 square feet. This allotted amount includes any BUA constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement not shown on the approved plans. BUA has the same meaning as G.S. 143-214.7, as amended. vii. The maximum allowable BUA shall not be exceeded on any lot until the permit is modified to ensure compliance with the stormwater rules, permit, and the approved plans and specifications. viii. All runoff from the BUA on the lot must drain into the permitted system. This may be accomplished via grading, a stormwater collection system and/or a vegetated conveyance. ix. A 50-foot wide vegetative setback must be provided and maintained adjacent to all surface waters in accordance with 15A NCAC 02H.1003(4) and the approved plans. X. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143, Article 21. e. DEEDS FOR INDIVIDUAL LOTS. The permittee shall record deed restrictions and protective covenants prior to the issuance of a certificate of occupancy to ensure the permit conditions and the approved plans and specifications are maintained in perpetuity. 6. CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded areas of the on -site stormwater system will be repaired immediately. a. SCM OPERATIONAL PRIOR TO DEVELOPMENT. During construction, all operation and maintenance for the project shall follow the Erosion Control Plan requirements until the Sediment -Erosion Control devices are converted to SCMs. Once the device is converted to a SCM, the permittee shall provide and perform the operation and maintenance as outlined in the applicable section below. b. SCM RESTORATION. If one or more of the SCMs are used as an Erosion Control device and/or removed or destroyed during construction, it must be restored to the approved state stormwater design condition prior to close-out of the erosion control plan and/or project completion and/or transfer of the state stormwater permit. Upon restoration, a new or updated certification will be required for the SCM(s) and a copy must be submitted to the appropriate DEQ regional office. Page 3 of 6 State Stormwater Management Permit No. SW8 190818 7. MODIFICATIONS. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. Adding the option to use permeable pavement or #57 stone within the lots as a permeable surface. The request may require a proposed amendment to the deed restrictions and protective covenants for the subdivision to be submitted and recorded. g. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material within the common areas to be considered a permeable surface that were not included in the approved plans and specifications. h. Other modifications as determined by the Director. 8. DESIGNER'S CERTIFICATION. Upon completion of the project, the permittee shall determine if the project is in compliance with the approved plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division; ii. A copy of the recorded operation and maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights -of -way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approved plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline, to bring the site into compliance. 9. OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and maintenance necessary, as listed in the signed operation and maintenance agreement, to assure that all components of the permitted on -site stormwater system are maintained at the approved design condition. The approved operation and maintenance agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. a. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by the Division and the stormwater rules such as the construction of additional or replacement on - site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. b. MAINTENANCE RECORDS. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were takers. Page 4 of 6 State Stormwater Management Permit No. SW8 190818 10. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(3). 11. CURRENT PERMITTEE NAME OR ADDRESS CHANGES. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; c. A mailing address change of the permittee. 12. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2) and must be submitted upon occurrence of any one or more of the following events: i. The sale or conveyance of the project and/or property area in whole or in part, except in the case of an individual residential lot sale that is made subject to the recorded deed restrictions and protective covenants, ii. The assignment of declarant rights to another individual or entity; iii. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); iv. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; V. Bankruptcy; vi. Foreclosure, subject to the requirements of Session Law 2013-121; b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 13. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this permit and the approved plans and specifications until the Division approves the transfer request. a. REVIEWING AND MONITORING EACH LOT FOR COMPLIANCE. The permittee is responsible for verifying that the proposed BUA on each individual lot and for the entire project does not exceed the maximum amount allowed by this permit. The permittee shall review all individual lot plans for new construction and all subsequent modifications and additions for compliance. The plans reviewed must include all proposed BUA, grading, and driveway pipe placement. The permittee shall not approve any lot plans where the maximum allowed BUA limit has been exceeded or where modifications are proposed to the grading and/or to the stormwater collection system and/or to the vegetated conveyance unless and until a permit modification has been approved by the Division. The permittee shall review and routinely monitor the project and each lot to ensure continued compliance with the conditions of the permit, the approved plans and specifications, and the recorded deed restrictions and protective covenants. The permittee shall notify any lot owner that is found to be in noncompliance with the conditions of this permit in writing and shall require timely resolution. b. ARCHITECTURAL REVIEW BOARD (,ARB) OR COMMITTEE 0%RC)_ The permittee may establish an ARB or ARC to conduct individual lot reviews. However, any approval given by the ARB or ARC on behalf of the permittee does not relieve the permittee of the responsibility to maintain compliance with the conditions of the permit and the approved plans and specifications. Page 5 of 6 State Stormwater Management Permit No. SW8 190818 c. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. d. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. e. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. f. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. g. OTHER PERMITS. The issuance of this permit does not preclude the permittee from obtaining and complying with any and all other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which are imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit issued this the 14t�' day of January 2020. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION S. Daniel�ith,�Uirec�tor���� Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 190818 Page 6 of 6 State Stormwater Management Permit No. SW8 190818 Attachment A Certification Forms The following blank Designer Certification forms are included and specific for this project: • As -Built Permittee Certification • As -Built Designer's Certification General MDC • As -Built Designer's Certification for Wet Detention Pond Project A separate certification is required for each SCM. These blank certification forms may be copied and used, as needed, for each SCM and/or as a partial certification to address a section or phase of the project. Page 1 of 1 State Stormwater Management Permit No. SW8 190818 AS -BUILT PERMITTEE CERTIFICATION I hereby state that I am the current permittee for the project named above, and I certify by my signature below, that the project meets the below listed Final Submittal Requirements found in NCAC 02H.1042(4) and the terms, conditions and provisions listed in the permit documents, plans and specifications on file with or provided to the Division. H Check here if this is a partial certification. Section/phase/SCM #?_ Check here if this is part of a Fast Track As -built Package Submittal. Printed Name I, County of Signature a Notary Public in the State of do hereby certify that personally appeared before me this day of , 20 and acknowledge the due execution of this as -built certification. (SEAL) Witness my hand and official seal My commission expires _T rn Penittee's Certifical�ion NCAC' .1042(4) L'c; lete_d I p gTDVlded 1� A. DFE° 0- RMELYME ONS / BUA REC DIUM 1. The deed restrictions and protective covenants have been recorded and contain the necessary language to ensure that the project is maintained consistent with the stormwater regulations and with the permit conditions. Y or N 2. A copy of the recorded deed restrictions and protective covenants has been provided to the Division. Y or N 3. Records which track the BUA on each lot are being kept. (See Note 1) Y or N 3I MAINTENANCE ACCESS 1. The SCMs are accessible for inspection, maintenance and repair. Y or N 2. The access is a minimum of 10 feet wide. Y or N 3. The access extends to the nearest public right-of-way. Y or N C. EASEWNTS 1. The SCMs and the components of the runoff collection / conveyance system are located in recorded drainage easements. Y or N 2. A copy of the recordedplat(s) is provided. Y or N Ik " SINCaX FAMILY RESIDENTM LOTS - Plaits for residential lots that have xi SCM include the follovwirg; Y or N 1. The specific location of the SCM on the lot. Y or N 2. A typical detail for the SCM. Y or N 3. A note that the SCM is required to meet stormwater regulations and that the lot owner is subject to enforcement action as set forth in NCGS 143 Article 21 if the SCM is removed, relocated or altered without prior approval. Y or N E. OPERATION .AND MAINTENANCE AGREEMENT Y or N j 1. The O&M Agreement is referenced on the final recorded plat. Y or N 2. The O&M Agreement is recorded with the Register of Deeds and appears in the chain of title. Y or N F. OPERATION AND MIATON —JENAN P - tnafflienwice records ana b6a • kep' is a'mown set location for each SCM arid are available for review. Y ut N G. DESIGNER'S CERTMCATION FIRM- has been provided to the Division. ; Y 9r N j Note 1- Acceptable records include ARC approvals, as -built surveys, and county tax records. Page 1 of 6 State Stormwater Management Permit No. SW8 190818 Provide an explanation for every requirement that was not met, and for every "N/A" below. Attach additional sheets as needed. Page 2 of 6 State Stormwater Management Permit No. SW8 190818 AS -BUILT DESIGNER'S CERTIFICATION GENERAL MDC I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets the below listed General MDC found in NCAC 02H.1050 in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS - BUILT" drawings, such that the intent of the stormwater rules and statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is a part of a Fast -Track As -Built Package Submittal per .1044(3). Check here if the designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name Signature NC Registration Number Date yVIIN Consultant's Mailing Address: City/State/ZIP Phone Number Consultant's Email address: 0 Circle N if the as -built value differs from the Plan. if N is circled, provide an explanation on Page 2. ON/E = not evaluated (provide explanation on page 2) ON/A = not applicable to this SCM or project. Consultant's Certification NCAC .1(X13((3) fit. General MDC .1050 OAs-built ON/E 3N/A 4%. rREATIVIINTRUQUIREMENTS 1. The SCM achieves runoff treatment. Y or N 2. The SCM achieves runoff volume match. Y or N 3. Runoff from offsite areas and/or existing BUA is bypassed. Y or N 4. Runoff from offsite areas and/or existing BUA is directed into Y or N the permitted SCM and is accounted for at the full build -out potential. 5. The project controls runoff through an offsite permitted SCM Y or N that meets the requirements of the MDC. 6. The net area of new BUA increase for an existing project has Y or N been accounted for at the appropriate design storm level. 7. The SCM(s) meets all the specific minimum design criteria. Y or N $. VEGETATED SETRACKS / BUA 1. The width of the vegetated setback has been measured from Y or N the normal pool of impounded waters, the MHW line of tidal waters, or the top of bank of each side of rivers or streams. 2. The vegetated setback is maintained in grass or other Y or N vegetation. 3. BUA that meets the requirements ofNCGS 143-214.7 (b2)(2) Y or N is located in the setback. 4. BUA that does not meet the requirements of NCGS 143-214.7 Y or N (W)(2) is located within the setback and is limited to: a. Publicly funded linear projects (road, greenway sidewalk) b. Water -dependent structures c. Minimal footprint uses (utility poles, signs, security lighting and appurtenances) 5. Stormwater that is not treated in an SCM is released at the Y or N edge of the setback and allowed to flow through the setback as dispersed flow. Page 3 of 6 State Stormwater Management Permit No. SW8 190818 (As -built ONIE ONL4, G. S'TOI . 'ER OUTLETS -- dn+ outlet handles the peak, tim Y N Y N -� from dAie vear storm w-iffi -no downsloye erosion. or cx D. VARLkTIONIS 1. A variation (alternative) from the stormwater rule provisions Y N has been implemented. or 2. The variation provides equal or better stormwater control and Y N e ual or better protection of surface waters. or 'E. ANC R FUJ:G X WRY PROGRAMS has been met. Y or N _ F. SIZING -the volume of the Makes the runoff from all - surfaces into account and is sufficient to handle the required rx m depth. Y or N i CONTANUNATED SOR.S - infiltrating SCM's are not located ` Y or in or on areas with contaminated snails. ---- - - - H. SIDE SLOPES 1. Vegetated side slopes are no steeper than 3H:IV. Y or N 2. Side slopes include retaining walls, gabion walls, or other Y or N surfaces that are steeper than 3H:1V. 3. Vegetated side slopes are steeper than 311:1 V (provide Y or N supporting documents for soils and vegetation). L MROSION PROTEMO 1. The inlets do not cause erosion in the SCM. Y or N 2. The outlet does not cause erosion downslope of the discharge Y or N point qj!!iRg the peak flow from the 10 year storm. J. EXCL" FLOWS —.An overflow / kyposs has been pmvided. Y or N l K. DEWATFJMG —A met icd to dmwdown standing wat.€.T has Y or 'N . boen provided to facilitate maintenance and inspectiorst. r j 1, CLEANOUT AFTER CONSTRUCTION- the SCSI'` has been j V or N cleaned out and converted to its approved design sMu—, -� _K r'V_BM ENiANCE ACCESS 1. The SCM is accessible for maintenance and repair. Y or N 2. The access does not include lateral or incline slopes >3:1. Y or N X DYESIGNER Q A ITS f - Cl a RMM -- Tl-te designer is licensedqua,1rx Chairs 89.A, t9C, 89E, or R917.eu Y or N Generall Statute. Provide an explanation for every MDC that was not met, and for every item marked "N/A" or "N/E", below. Attach additional pages as needed: Page 4 of 6 State Stormwater Management Permit No. SW8 190818 AS -BUILT DESIGNER'S CERTIFICATION FOR WET DETENTION POND PROJECT I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in NCAC 02H.1053, in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is part of a Fast -Track As -Built Package Submittal per .1044(3). Check here if the Designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name NC Registration Number SEAL: Signature Date Consultant's Mailing Address: City/State/ZIP Phone Number Consultant's Email address: i0 Circle N if the as -built value differs from the Plan/permit. If N is circled, provide an explanation on page 2 ©N/E = not evaluated (provide explanation on page 2) OO N/A = not applicable to this project or SCM. This Certification must be completed in conjunction with the General MDC certification under NCAC 02H.1050 Consul€ant's Certification (MDC .1053) 1 0h"U iit ? `N/E ZI /A A. Forebuy / Depths / Fountain 1. The available Sediment storage is consistent with the approved y N plan and is a minimum of 6 in. or 2. Water flow over the forebay berm into the main pond occurs at a Y N non -erosive velocity. or 3. The provided Forebay Volume is 15%-20% of the main pool y N volume. or 4. The Forebay entrance elevation is deeper than the exit elevation y N into the pond. or 5. The Average Design Depth of the main pond below the y N permanent pool elevation is consistent with the permitted value? or 6. Fountain documentation is provided. Y or N B.. Sias skMn /BaoksI Vegoetxted Shelf 1. The width of the Vegetated Shelf is consistent with the approved y N Tans and is a minimum of 6 feet. or 2. The slope of the Vegetated Shelf is consistent with the approved y N Tans and is no steeper than 6:1. or C. As-buiit Main Pool I Aneas i V uiume<< i Ekvationc 1. The permanent pool surface area provided is consistent with the Y N ermitted value. or 2. The Temporary Pool Volume provided is consistent with the y N permitted value. or 3. The permanent pool elevation is consistent with the permitted y N value. or 4. The temporary pool elevation is consistent with the permitted y N value. or Page 5 of 6 State Stormwater Management Permit No. SW8 190818 -- -- - - --- j ';DAs- uijf LJN/r. I WA p. 1Rll"AS / Ouikt / DrXW �-N ft 1. The design volume draws down in 2-5 days. Y or N 2. The size of the Orifice is consistent with the permitted value. Y or N 3. A trash rack is provided on the outlet structure. Y or N 4. Hydrologic impacts to the receiving channel are minimized from the 1 yr 24 hr storm discharge? Y or N 5. The inlets and the outlet location are situated per the approved plan and avoid short-circuiting. —� y or N E. VmUtion J 1. The vegetated shelf has been planted with a minimum of 3 diverse species. Y or N 2. The vegetated shelf plant density is consistent with the approved plans and is no less than 50 plants per 200 sf or no less than 24 inches on center. Y or N Provide an explanation for every NOC that was not met, and for every item marked "N/A" or "N/E" below. Attach additional pages as needed: Page 6 of 6 DEMLR USE ONLY DatellReAceived Fee Paid Permit Number ao a ,505 =1 "Swg i Applicable Rul ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph Il - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina`' Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources w BY: — STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): The Village at Mons Landing Phase 2E 2. Location of Project (street address): 360 Glenn Ellen Road City:Wilmington County:New Hanover Zip:28412 3. Directions to project (from nearest major intersection): From the intersection of Sanders Road (SR1187) and Motts Village Road (SR 2427), travel approx. 0.33 mile north. Turn right onto Tacob Mott Drive and travel approx. 0.2 mile east Turn left onto Glenn Ellen Road 4. Latitude:340 07 55" N Longitude:77° 54' 09" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): NNew ❑Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SWU 102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known)_ and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density NHigh Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major NSedimentation/Erosion Control: ac of Disturbed Area ❑NPDES Industrial Stormwater N404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name; Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? NNo ❑Yes If yes, see S.L. 2012-200, Part VI: http://portal.ncdenr.org/web/lr/rules-and-regulations Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the-roject): Applicant/Organ Signing Official & b. Contact information for person listed in item 1a above: Street Address:2020 S. Chruchill Drive ` a 19 City:Wilmington State:NC Zip:28403 Mailing Address (if applicable City: Phone: (910 763-2629 Email:lobos251@aol.com State: Zip: Fax: 910 7634742 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: Phone: ( 1 Email: State: Zip: Fax: ( 1 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: Fax: ( ) Email: 4. Local jurisdiction for building permits: New Hanover County Point of Contact: Phone #: Form SW-101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. one 1 wet detention basin, L _ 2. a. If claiming vested rights, identify the supporting documents provided and the date thravere approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph H - Post Construction Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area:19.25 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:19.25 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHM line. The resultant project area zs used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MH[M line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 37.3 % 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area Drama a Area Receiving Stream Name Motts Creek _ _ Stream Class * C;Sw Stream Index Number * 18-82 Total Drainage Area (so 838,626 On -site Drainage Area (sf) 838,626 Off -site Drainage Area (sf) 0 -Proposed Impervious Area** s 208,078 % Impervious Area** total 37.3 Impervious" Surface Area Drainage Area 1 Drainage Area _ Drainage Area Drama e Area On -site Buildings/Lots (sf) 155,000 _ _ On -site Streets (sf) 40,844 On -site Parking (sf) 0 On -site Sidewalks (sr) 7,234 Other on -site (sf) 0 Future (sf) 110,000 Off -site (s 0 . Existing BUA*** (SO 0 Total (sf): 1.L.--- 1____ 313,078 1 v�tcwn" �."uaa unu ir,Lxx tvumber can ve aeterminea at: litft7.aortat.ncdenr.orSyeb/wq/ps/csu/classifications Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 11. How was the off -site impervious area listed above determined? Provide documentation. NA Proiects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements asfer I5A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS y F The applicable state stormwater management permit supplement andoperation and irtteii ee''(O&IV) fQr s must be submitted for each BMP specified for this project. The latest versions of the ms can be download from http:/ /portal.ncdenr.org/web/wq/ws/su/bmp-manual. BY: VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from bdp://portal.licdenr.org/web/wg/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http://12ortal.ncdenr.org/web/3yg/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. I is 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M_ agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelv.org/pages/onestol2express.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor_ the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including:_ a. Development/ Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MhW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 3497 Page No: 0245 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC !�$ Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per 15A NCAC 2H.1003(e)., The corporation or LLC must be listed as an active corporation in good standing with the NC<: f. 6:, Secretary of State, otherwise the application will be returned. h //www.secreta state.nc.us Cor orations CSearch.as x d VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS RY. For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/lr/state-stormwater- forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Phillip C. Tripp, P.E. Consulting Firm: Tripp Engineering Mailing Address:419 Chestnut Street City:Wilmington Phone: (910 ) 763-5100 Email:trippeng@ec.rr.com State:NC Zip:28401 Fax: (910 ) 763-5631 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) with (print or type name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version Oct. 31, 2013 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: a Notary Public for the State of , County of do hereby certify that personally appeared before me this _ day of , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL BY: My commission expires X. APPLICANT°S CERTIFICATION I, (print or type name of person listed in Contact Information, item 1a) Arnold L. Sobol certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable sto water rule der A NCAC 2H .1000 and any other applicable state jj slasrawater requirements. 'mil V►lJl�`�'� Signature: Date: I, a Notary Public for the State of�(#�� I cn� , County of )�- afar do hereby certify that Awal d L personally appeared before me this 221 day of k lit L and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, 2),am— c pUBV, . .. SEAL My commission expires 10-15 JJ Form SW-101 Version Oct. 31, 2013 Page 6 of 6 High Density Residential Subdivisions Deed Restrictions & Protective Covenances In accordance with Title 15 NCAC 21-1.1000 and S.L. 2006-246, the Stormwater Manageriient Regulations, deed restrictions and protective covenants are required for High Density Residential Subdivisions where lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the design criteria used to size the stormwater control facility. I, Arnold L. Sobol , acknowledge, affirm and agree by my signature below, that I will cause the following deed restrictions and covenants to be recorded prior to the sale of any lot: 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number , as issued by the Division of Water Quality under the Stormwater Management Regulations. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. The maximum allowable built -upon area per lot is 5000 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-wa_y between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 7. Each lot will maintain a 30** foot wide vegetated buffer between all impervious areas and surface waters. **50 foot for projects located in the 20 coastal counties. 8. All runoff from the built -upon areas on the lot ,must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swa/es to collect the lot runoff and directing them into a component of the stormwater collection system. Lots that will naturally drain into the system are not required t rovide these additional measures. Signature: Date.�/-ZC 1- J I, , a Notary Public in the State of North Carolina , County of r do hereby certify that Arnold L. Sobol personally appeared before me this the —2.,b� day of JtlAJ— , and acknowledge the due execution of the foregoing instrument. Witness �14, eayofcial seal, `Ot.`,••.........••'��Q.,�. SEAL . Q y' Signatu = �4TA My Commission expires g OG Form DRPC-3 Rev.2 05Nov2009 Page 1 of 1 s.c�ti• Avv sir AIDo Wfb W 11S PM W- TRIPP ENGINEERING, P.C. 419 Chestnut Street Wilmington, North Carolina 28401 Phone: (910) 763-5100 • FAX: (910) 763-5631 January 9, 2020 NCDEQ Division of Energy, Mineral and Land Resources 127 Cardinal Drive Wilmington, NC 28405-3845 Attn: Ms. Kelly Johnson Re: The Village at Motts Landing Phase 2E Permit No. SW8190818 TE 18012 Dear Kelly: J A N 1 W In response to your comments dated November 6, 2019, we offer the following: 1. Project Area a. Please provide dimensioned project or project phase boundary with bearings and distances all the way around the project. We enclose a copy of the Phase 2E survey plat for your use. b. SDMH #6 appears to be collecting water outside of the project boundary? • SDMH #6 is stubbed out to collect stormwater runoff from the remaining land to the east if necessary. We propose installing it at this time to avoid major construction disturbance of the completed Phase 2E. We include 110,000 sf for future impervious if needed and recognize resubmittal will be required for any new development draining to SDMH #6. c. Please verify that you will or have obtained 404/401 permitting for the wetland crossing for the pipe draining from SDMH #6 to the forebay. Wetland crossing permitting is in process. If necessary, a dry bore beneath the wetland will be installed, avoiding disturbance should construction proceed prior to issuance of a USACOE Permit. 2. Drainage area: Please show the drainage area map on the plans. • Drainage area map is enclosed. 3. Topography: Please provide proposed contours and drainage patterns. v,'* Please note existing contours are provided and existing spot elevations are provided along the roadway corridors. We include proposed contours around thepond and proposed spot elevations with flow arrows along the streets. All lots drain to the street as to prevent short circuiting the pond. Fill will be added to lot Nos. 295 thru 299 and 313 thru 320 with proposed contours added. All other lots drain naturally to street. 4. General a. Note 6 on Sheet C 1 says that the HOA will be responsible for the sidewalk maintenance, stormwater facilities, and recreation area. Please be advised that Aftew Properties, LLC will be responsible for maintaining the stormwater system until the permit is transferred to the HOA. i� lievemper recogmzes it is a requirement to maintain all stormwater facilities until permit is transferred. 5. Every SCM installed for this project shall be made accessible for maintenance and repair. Please identify the maintenance access routes and easements as well as the utility and drainage easements on the plans, if necessary. These shall have a minimum width of 10 feet, slopes that do not exceed 3:1, and extend to the nearest public right-of-way. These easements shall be granted in favor of the party responsible for operating and maintaining the SCMs. I see the easements for the pipes entering the forebay. Is the pond itself also in an easement? • ccess and maintenance easement nas been added around the pond and connecting to Glenn Ellen Road between lot Nos. 285 and 290. Please review for approval and contact us with any questions, comments or if you need additional information. Thank you. Sincerely, T En ee , P.C. Phillip G. Tripp, P.E PGT:dcb Enc. Johnson, From: Johnson, Kelly Sent: Friday, December 20, 2019 2:18 PM To: office@trippengineering.com Cc: 'Phil Tripp' Subject: RE: [External] FW: FW: The Village at Motts Landing Phase 2E - State Stormwater (SW8 190818) Goodness, I hope things take a turn for the better. I have you down for 1/10/20. Merry Christmas! Keliy From: office@trippengineering.com [ma ilto:office@trippengineering.com] Sent: Thursday, December 19, 2019 4:10 PM To: Johnson, Kelly <kelly.p.johnson@ncdenr.gov> Cc:'Phil Tripp' <ptripp@trippengineering.com> Subject: RE: [External] FW: FW: The Village at Motts Landing Phase 2E - State Stormwater (SW8 190818) Kelly, It seems Phil has not gotten caught up as quickly as we had hoped after his surgery. We are therefore requesting an additional extension until January 101h to respond to these comments. We apologize for the delay. Thank you for your consideration. Della Baird Tripp Engineering, P.C. 419 Chestnut Street Wilmington, NC 28401 910-763-5100 From: Johnson, Kelly Sent: Tuesday, November 12, 2019 12:51 PM To: office(o)trippenaineerine.com Subject: RE: [External] FW: FW: The Village at Motts Landing Phase 2E State Stormwater (SW8 190818) Della, I hope all goes well with the surgery. I have you down for 12,113. Thanks, Kelly From: office@trippengineering.com [mailto:officeCd)trippengineerine.com] Sent: Tuesday, November 12, 2019 12:34 PM To: Johnson, Kelly <kelly.p.iohnson@ncdenr.gov> Subject: [External] FW: FW: The Village at Motts Landing Phase 2E State Stormwater (SW8 190818) Send all suspicious—��a'as an attachment to Kelly, Phil has been out of the office for surgery and will not be returning until 11/22. Your comments for the Village at Motts Landing Phase 2E specify a return reply by no later than 11/21. Obviously this isn't going to happen. We respectfully request an extension of the response time until 12/13. Thank you for your consideration. Della Baird Tripp Engineering, P.C. 419 Chestnut Street Wilmington, NC 28401 910-763-5100 From: Phil Tripp Sent: Thursday, November 7, 2019 1:29 PM To: Della Baird <office trippengineering.com> Subject: Fwd: FW: The Village at Motts Landing Phase 2E State Stormwater (SW8 190818) ---------- Forwarded message --------- From: Johnson, Kelly <kelly.P.iohnson@ncdenr.gov_> Date: Wed, Nov 6, 2019 at 2:02 PM Subject: FW: The Village at Motts Landing Phase 2E - State Stormwater (SW8 190818) To: ptripp trippengineerine.com <ptripp trippengineering.com> From: Johnson, Kelly Sent: Wednesday, November 6, 2019 2:01 PM To: Arnold Sobol (lobos251@aol.com) <lobos251@aol.com> Cc: 'Della' <trippene@ec.rr.com> Subject: The Village at Motts Landing Phase 2E - State Stormwater (SW8 190818) Mr. Sobol, Please see the attached request for additional information. Thanks, Kelly V-CI. W0klA.SOV%, Kelly Johnson Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910.796.7331 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. \ NCO ROY COOPER Governor MICHAEL S. REGAN sec,a'ary S. DANIEL SMITH Director November 6, 2019 Via email only. lobos2510aol.com Aftew Properties, LLC Attn: Mr. Arnold L. Sobol, Manager 2020 S. Churchill Drive Wilmington, NC 28403 NORTH CAROLINA Envirvmnodd Quality Subject: Request for Additional Information Stormwater Project No. SW8 190818 The Village at Motts Landing Phase 2E New Hanover County Dear Mr. Sobol: The Wilmington Regional Office received and accepted a State Stormwater Management Permit Application for the subject project on August 20, 2019. A preliminary in-depth review of that information has determined that the application is not complete and that additional information is needed. To continue the review, please provide the following additional information: Project Area [15A NCAC 02H. 1 042(2)(g)(ii)]: a. Please provide dimensioned project or project phase boundary with bearings and distances all the way around the project. b. SDMH #6 appears to be collecting water outside of the project boundary? c. Please verify that you will or have obtained 404/401 permitting for the wetland crossing for the pipe draining from SDMH #6 to the forebay. 2. Drainage Area [15A NCAC 0214_1042(2), .1042(2)(g)(iv), .1042(3)(b), and .1050(1) to support .1042(2)(a)(iv)]: Please show the drainage area map on the plans. 3. Topography [15A NCAC 02H.1042(2)(g)(iv)]: Please provide proposed contours and drainage patterns. Recommendation: In the case where the contour interval on a "topographic" map is too large to adequately reflect the existing and proposed drainage patterns of a relatively flat property, spot elevations and/or a site -specific elevation survey may be needed. - General a. Note 6 on Sheet C1 says that the HOA will be responsible for the sidewalk maintenance, Stormwater facilities, and recreation area. Please be advised that Aftew Properties, LLC will be responsible for maintaining the Stormwater system until the permit is transferred to the HOA. 5. 15A NCAC 02H.1042(2)(g)(vi), .1042(2)(1), .1050(8), and .1050(9): Every SCM installed for this project shall be made accessible for maintenance and repair. Please identify the maintenance access routes and easements as well as the utility and drainage easements on the plans, if necessary. These shall have a minimum width of 10 feet, slopes that do not exceed 3:1, and extend to the nearest public right-of-way. Thesc easements shall be granted in favor of the party responsible for operating and maintaining the SCMs. I see the easements for the pipes entering the forebay. Is the pond itself" also in an easement? North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources z!5:fD.E0S1$ Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 NMTH CAROLWI Please remember to confirm that any revised information is presented consistently throughout the application documents including calculations, supplements, narrative, and plans. Please also remember to provide two hard copies of any updated documents per 15A NCAC 02H.1042(2). All of the requested information listed above should be received in this Office by November 21, 2019, or the application will be returned as incomplete. If additional time is needed to submit the requested information, please email your extension request prior to this due date to the email address provided below with a justification and a date of when the requested information will be submitted, which shall be no later than 15 days past the original due date. Please note that only two letters requesting additional information is allowed in the State Stormwater Program for a total of 30 days to submit the requested additional information. If the information is not satisfactorily provided after either the second request or 30 days, the project will be returned. If the project is returned and you wish to re -submit later, you will need to resubmit all required items at that time, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Sincerely, � A Kelly Johnson Environmental Engineer GDS/kpj: \\\Stormwater\Permits & Projects\2019\190819 HD\2019 11 addinfo 190819 cc: Phil Tripp, PE; via email: trippeng@ec.rr.com Wilmington Regional Office Stormwater File Johnson, Kelly From: Johnson, Kelly Sent: Wednesday, November 6, 2019 2:01 PM To: Arnold Sobol (lobos251 @aol.com) Cc: 'Della' Subject: The Village at Motts Landing Phase 2E - State Stormwater (SW8 190818) Attachments: 2019 11 addinfo 190818.docx Mr. Sobol, Please see the attached request for additional information. Thanks, Kelly W-eLLI�Oki vusoV. Kelly Johnson Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910.796.7331 E-mail correspondence to andfrom this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. I ri IvEW HANOVER COUNTY Engineering Department 230 Government Center Drive - Suite 160 Beth E. Wetherill, C.P.E.S.I Wilmington, North Carolina 28403 Soil Erosion Specialist TELEPHONE (910)7798-7139 Fax (910) 798-7051 Memorandum Date: q / l b I lei To: NCDENR - WQ 90 1 qc)(� I? From: Beth Easley Wetherill Soil Erosion Engineer Re: Sedimentation and Erosion Control Plans Grading Permit # 0-18 LSC n 4 Vil (asp C IU.o im ZE Lb -Is The attached plans have been submitted for approval to New Hanover County Engineering. If you have any questions regarding these plans, please contact this office. Burd, Tina ! From: Burd, Tina J Sent: Tuesday, September 10, 2019 11:00 AM To: lobos251 @aol.com; trippeng@ec.rr.com Subject: SW8 190818 - The village at Motts Landing Phase 2E The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted the Stormwater Permit Application and $505.00 fee for the subject project on August 20, 2019. The project has been assigned to Kelly Johnson and you will. be notified if additional information is needed. Please be advised that the construction of built -upon area may not commence until the Stormwater Permit is issued. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 D-EO-'-tl Email correspondence to ar,d fiom this address is subject to IMP fVc.0h Carolina FLIbIic Records Law aid may be disclosed to dried partie6:. Application Completeness Review Checklist Project Name; i i • Z- � 2(. �_F{� � � �� Date Delivered to WIRO: BIMS Received/Accepted Di Project County/Locatiwj: *BIMS Acknowledged Date: Rule(s): 1 121r Coastal 02008 Coastal 1:31995 Coastal Phase II ElUniversal Permit Action " Major Mod / Minor Mod / Renewal / Transfer Permit Type: EQl LD / LD Overall / HD &LD Combo General Permit / Offsite / Exempt / Rescission SCM Type(s): c ncC Development Type.-Commercial�Residentll�al / Other Subdivided?: ,- ubdivisi r, or Sinele 01)ewfloper Lessee Purchaser 1988 Coastal (Existing Permit #: OPE Cert on File? OfFsite to SW8: Paperwork Emailed Engineer on: Ekiipplement(s) (1 original per BMP) I_ 16 M with correct/origins! signatures (1 original per 8MP except LS/VFS and swales) Application with correct/original signatures Elf-orp or LLC: Sig. Aut_h. per Soy or Signature Authorization letter or report �05 (within 6mo) Check#�(s): � �{�{ E]No Fee H il eport: w/SHWT or General Report Clculations (siyrred%sewed,! �eed Restrictions, it subdivided: & Notarized Template Correct Template Comm Res & HD LDJ or Dec. Covenants & Master PE Cert on File? Stream Class: MSA Map Sc .-� RW Map E]tmail Address: Design Engineer mail Address: Property Owner ed Email Address: Lessee ]Lease Agreement FlE;mail Address: Purchaser Purchase Agreement MEmaii Address: Developer or Recorded Covenants Email Address: HOA Representative Recorded Plats 050% or more Lots Sold List aProjer_t Narrative MbS-GS Map Plans - O�Sets oWetlands: Delineated _o_rNo W_ etlands inity Map roject Boundaries Legend ®La out (proposed BUA dimensions) Fq�� Maps Details (roads, cul-de-sacs. curbs. sidewalks, BMPs, Buildings, etc) 7E-4 is ing Conditions �L=r i cape Plan grading ff,-E Seal REVIEWER NAME: NOTES TO REVIEWER: *Enteru owledged Date on this Sheet **FOR NE�Proj cts-Enter New Permit # on + Supplements & ed Restiction Templates. GNQ\\\Reference ubrary\Procedures\Checklists\Completeness Review Checklist 2018 03 13 TRIPP ENGINEERING, P.C. 419 Chestnut Street Wilmington, North Carolina 28401 Phone: (910) 763-5100 - PAX: (910) 763-5631 August 16, 2019 NCDEQ Division of Energy, Mineral and Land Resources 127 Cardinal Drive Wilmington, NC 28405-3845 Attn: Ms. Kelly Johnson Re: The Village at Motts Landing Phase 2E TE 18012 Dear Kelly: ECEIVF x We are requesting a high density stormwater permit for the Village at Motts Landing Phase 2E subdivision. Enclosed please find the following items for review: • 2 sets of plans • $505 check • Narrative • Stormwater application — one original and one copy • EZ Supplement • Operation and Maintenance Agreement • Deed Restrictions • Calculations • USGS map • Secretary of State info. • Copy of the Deed Please review for approval and contact us with any questions, comments or if you need additional information. Thank you. P. Phillip G1Triiip.E. PGT:dcb Enc. 07/09/19 Stormwater & Erosion Control Narrative The Village at Motts Landing Phase 2E New Hanover County, NC TE 18012 The Village at Motts Landing (VAML) Phase 2E is a residential site consisting of 31 single-family lots in New Hanover County, Parcel ID# R07600-006-012-000, owned by AFTEW Properties, LLC. The project area is approximately 19.25 acres. Wetlands exist on the site. VAML Phase 2E proposes 31 single-family lots, asphalt roadway with curbing, concrete sidewalks, one (1) wet detention basin, and utility extensions. The site has one (1) drainage area of approximately 5.92 acres. The total impervious area includes 31 lots at 5,000 sf ea, 40,844 sf of asphalt roadway, and 7,234 sf of concrete sidewalk, and 110,000 sf of future impervious for a total BUA of 313,078 sf or 7.19 acres. The project will be treated by erosion control measures such as drop inlets with inlet protection, temporary silt fence, gravel construction entrance, and one (1) sediment basin. One (1) wet detention basin provides sufficient storm water management to meet the State's 1.5" requirement, provides 90% TSS removal, and alternately sized for the 2-, 10-, and 25-yr storm events and analyzed for the 100-yr storm event. An emergency spillway has been designed for the 100-year storm assuming the principal spillway is obstructed or not operating properly. Prior to clearing of the site, one temporary construction entrance and temporary silt fence will be installed. After clearing of the project site, the wet detention basins will be constructed to include the proposed forebays. The roadway locations will then be graded. Underground utilities, including the stormwater drainage system will be installed and inlet protection put into place. The proposed roadways and sidewalks will be constructed, final site grading, and stabilization of the site. Temporary erosion control measures will remain in -place until such time as when areas are stabilized. Permanent measures include permanent stands of grass and energy dissipaters. Specific measures and directions to the contractor are noted on the plans. _::. dY: • File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online • Add Entity to My Email Notification List • View Filings - Print a Pre -Populated Annual Report form • Print an Amended a Annual Report form Limited Liability Company LegaL Name Aftew Properties, LLC Information Sosld: 0637949 Status: Current -Active Annual Report Status: Current Citizenship: Domestic Date Formed: 7/11/2002 Registered Agent: Sobol, Arnold Addresses Mailing 2020 South Churchill Drive Wilmington, NC 28403 Reg Mailing 2020 South Churchill Drive Wilmington, NC 28403 Company Officials Principal Office 2020 South Churchill Drive Wilmington., NC 28403 Reg Office 2020 South Churchill Drive Wilmington, NC 28403 All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Manager Arnold L Sobol 2020 South Churchill Drive Wilmington NC 28403 Manager Florence S Sobol 2020 South Churchill Drive Wilmington NC 28403 r _ +to 77 ,/�'• ��. �`� r � ` �'' f.r t Yi i I � �+ I � 1 T � f � � �1,/ � � �� Y�� • >"_ .yam r*��'�L, � � { � '��t ` Cr '� r:. vS Tt'• 'yC""+"'t.��_� a "mod,,`,: 'r• • a�•� c�, ��'* �,• •` g : % ` ay }17i� i '.�j S:« .. }may '���_• ��we� ?7 Y[kI T I } LZ'i F _ w . �.s.. �,r a ' ' _ sir P �! � '" 1�1L"'+y � °� � faj, *v'q y � ,.�{"�y�'.• "rt Y' £. _.,/! s" , /�r '� ,T � L�' ,! '� �'� t 1 �Y �J.�.�,�ke�ers'cM•rW'�=-.. ,� r C ** •�- s . - � 1. e' E Y. « AI +� � ,ri� t �+� ,a r« f � � `4 .Y��. \ � f T,, r' � -'! / i lea^ '��" �" s �i-", , !� \ �'a:..,dy q �� Q.r� dt� ��t �1 s�'� •'! ,,./'Z.• ,.r�J.ir r'""^1y,G#•..-.�^• ` 1 1_ '. '1. #�`".r�� � %; 7 �t �7'• • -. J `�.r`�.ty`yf.��j� �i'ic"��. �. .+�,�y�+,% ( 7« ?i fpps .';af. 1..-•."-'A� �, .•-"` 44 rr "�,J'<. iiyyiy,,I�. � n� lam: '« .+7. • '� '� n � x♦ -{. 1e � �44,�� �T 1 fl �S4rjf,i�f ~^� �V/ • ��-� !. �'- a ; a. �... -k. .+...eY^' uw>`a*i� F �,�� �:.'�: y `�'C �•u- !, '� 11M ,�J• �'-�`S`r.r ��1-' e * :a - ..+Ir 'S%!v' „..« t ,• � � f'� �', ,r � �._ � a��4 �. la N* •t,•� > ��,�-r«T�. �� n � � :'�••µi�����_��^r''�y $ '�s'1 c�,�..: t �� �,� a �Z :., �N��;`�+� �F � 'I y���' �� '71+ti 'ry®/ �i�✓'�•t.: '� ..'-''a. .f ±P„��i .:.� / 9 " 1t �79 fip'/ 1.�. ''�[�.,,,, `� .,max i j �iylx� '.�' t°.�, `P` r ./r' {�3 �,q1 �..�T.'ihl�h.'��.xw.�N .�';+•IY��..d`�i%1 �tkd i�i��,�R'i�l t +�f 1 j �.e« a' - -'zi- _ .'� •ll t.?'�< 3 � .+ ''� % t >!' ,t {i [,,g-v,�'•.} :'` `., - i ♦. rysa ,�• a.X ..ram e t 1, t .sll ��a t+•e , 1. Yr: `1_ .�' �i ry � �h'. S''�� ��i � r N ' e I 'Z'� ♦ AI�E�'`a!'A�lff,^ >`+1 `� J�1�)% -L411 � ►y ..� r= Q �, 1. /i %t tw � ? tw ." -� i f y <` al Frr j fIR �. �`•'�. � r «q♦<e.'.�� " [t�� � ' .i� r * �ti4 �i n y`'' "� .%4',"• � f `/ /%%��t•1a,�' /�1 �i �� 1 k L.a✓� , t e, '' '� f S i ✓i •Fe P.•� 1 �� I �91' •�•� t�'+'� , �d i.' r.-"y¢s✓ 1\l j� t � �f' 'r`• � ��i/. Ib pSvl'. � Fr i � I I� �i *y•Y�/ � (47 110 fie _ a .. " I � t ty ` I ` r `�l� ! I ♦ yla \ ,x fht ; �' 4 �, 6k . dF `�vf �+�` '^� ' ' �. � � '� I � . � ! t -,w.• � I t ! I' � ;e� ����y i\� -.«� � -�aaC !, t 1' Q yi hie' '.i•• _ PI � �/�s� ��-..,, \. i t ' �.� pyi'' 1I�",�ry� ��� �•lr.,` '� i �,I _ 4 �./.���^ �' i _a.....,.rc'�� l'Y.•_•<ea- �%�f �� 'M ♦ � F`�?� i 1 rlr..S.a^`�t.� I � :�A r_uuy�• ���,I,'�y (, '�e. a: � 8 ♦ � ' *,,�,w.� '`-; � K a� �, � ,_ A. ;� % �-r`�� ! - �•+T «!SS ;�,.h�l 4 ' Fc}, � a ���A 'A 4� ice' �, � �;,'�ti .��`�`� � • _ '� ; r ` ' I .. '� i � �•� ��� `' .�y 12 s f r r F y L ..t I r 1 4 b-• Pj "5. yr; '. r; y� ` ' - 11► 07/25/2019 VAML PHASE 2E 18012 PGT Stormwater Pond Calculations Total Drainage Area sq. ft. I acres 784,980 1 18.00 Impervious Area Land Use sq. ft. acres Lots 155,000 3.56 Roads 40,844 0.94 Sidewa!ks 7.234 0.17 Offsite 0 0.00 Future Total 11 .00Q 2.53 313,078 7.19 Stormwater Calculations: Time of Concentration: Hydraulic Length (L) = 1,028 ft. change in Height (H) = 6-5 ft. Tc = (L3 /H).3M / 128 11.45 min. Flow for 1 year, 24 hour Storm (Q,): QPRE _ (CPRE) x 01) x (Area) 14.04 cfs QPosT = (CPosT) x (I1) x (Area) 35.06 cfs Detention Pond Design: Is Area Win 1/2 mile of SA Waters? n % impervious = 0.399 = 39.9% ` ;2 CPRE = 0.2 GPOST = (% imp.)(.95)+(1 % imp.)(.20) .: 0.50 BY:1, = 3.90 in/hr I10 = 7.23 in/hr Flow for 10 year, 24 hour Storm (Q10): QPRE - (CPRE) x (I10) x (Area) 26.03 cfs QPosT = (CPosT) x (lio) x (Area) 65.00 cfs State Surface Area Required at normal pool: Pond side slopes = 3 :1 Depth b/w Bot. of V.S. & 9.00 Bat. Pool = SA/DA = 0.0226 for 4.0' ave. de th Chart for 90% TSS Removal for Wet Detention Pond without Vegetative Filter Red SA = SA/DA x Total Drainage Area = 17,720 s . ft. Provided SA = 41,486 sq. ft. Onk I., 'svJ 2 Main Pond Size: Forebay Pond Size: Elevation Surface Area Incr. Vol Cuml. Vol. Elevation Surf. Area Incr. Vol. Cuml. V ft. (sq. ft.(CO_ (ft.) (sq (29 (0 Top of Bank 22.00 46,778 130,683 379,916 Top of Bank 22.00 21,983 60,552 141,871 Temp. Pool 19.00 40,344 108,095 249,233 Temp. Pool 19.00 18,385 49,131 81,327 Top of V.S. 16.00 31,719 29,418 141,138 16.00 14,369 13,690 32,196 Penn. Pool 1&00 27,117 111,720 %X11,720 Perm. Pool 15.00 13,011 18,506 18,506 �--a �a Bot. of Pool 9.00 10,123 0 0 Bot. Pool 13.00 5,495 0 0 Provided Normal Main Pond Volume: Bottom SA = 10,123 sq. ft. Permanent Pool SA = 27,117 sq. ft. Vol. _ [((PP SA + Bottom VS SA)/2) x (PP el. - Bottom VS el.)] + [((Bottom VS SA + Bpttom Pool SA)/2) x (Bottom VS el. - Bottom Pool el.)] 111,720 cu. ft. Fore bay: Provided Normal Forebav Pond Volume Bottom of Pool SA= 5,495 sq. ft. Permanent Pool SA = 13,011 sq. ft. Vol. _ [(P.P. SA + Bottom SA) / 2] x (P.P. el. - Bottom el.) = 18,506 cu. ft. Depth= 2.00 ft. Required Forebay Volume 15%-20% required) Vol. = 17.5% of Permanent Pool volume of Main Pool = 19,551 cu. ft. Volume required to contain from design storm(ft3)= 36,242 Therefore; maximum sta a is between stages and cumulative volumes (main pond plus forebay): Stage Cum!. Volume 15.00 0 22.00 268,186 18012 Pond Calcs Total Provided PP Volume 130,225 cu.ft. Total Provided Main PP Volume 111,720 cu.ft. Actual % of Forebay Volume 16.56 oe,eiii61111' C AR Using Interpolation to determine stage at volume = 36,242do q'i• i Maximum Stage (feet) = 15.95 _ Therefore set Temporary Pool Elevation at or higher than Maximum Stage 7H in �. i� rr 1 of 4 , 07/25/2019 VAML PHASE 2E PGT Stormwater Pond Calculations Pond Size for Determining Storage Volume: Elev. SA Incr. Vol. Cum. Vol. (ft) (sq.ft.) (cuff) (cu.ft.) Temp. Pool 19.00 40,344 134,922 134,922 Perm. Pool 15.00 27,117 0 0 Provided Storage Volume: Vol. _ [((PP SA + TP SA)/2) x (TP Elev. — PP Elev.)] Vol. = 134,922 cu. ft. State Volume Req. for Storage of first 1.5" runoff: Rv = .05+ .009(% imp) 0.409 V= (Design rainfall)(Rv)(Drainage Area) = 40,122 cu. ft. M\k ')-- 0 AL*31/ Outlet Structure Design: Flow for 2-day drawdown: for Min. Volume required of stormwater, Q = Min. Vol. Req. / 172,800 sec. (2-days) 0.210 cfs Required Area of Pipe for 2-day drawdown: A= Q/[CdxSQRT(2xgxh)] Cd = 0.6 g = 32.2 ft./s' h = (T.P. elev.- N.P. Elev.) /3 = 1.33 ft. A = 0.0377 s . ft. Diameter of Pipe for 2-day drawdown: DIA. = SQRT[(A x 4) / pi] 0.2192 ft. 2.63 in. Drawdown Calculation _ Orifice Used= 2 Drawdown rate= 0cfs 3.46 Drawdown time= 3.46 days Outlet Structure Check: Using a 4' x 4' Basin, Perimeter L = 16 ft. Q = CIA C = (% imp.)(.95) + (1 % imp.)(.25) 0.50 1 = 7.23 in. for a 10 yr. Storm A = 18.00 Acres 65.00 cfs Flow for 5-day drawdown: for Min. Volume required of stormwater, Q = Temp. Pool Vol. / 432,000 sec. (5-days) = 0.084 cfs Required Area of Pipe for 5-day drawdown: A= Q/[Cd xSQRT(2xgxh)] Cd = 0.6 g = 32.2 ft./sZ h = (F.P. elev. - N.P. Elev.) / 3 1.333333 ft. A= 0.0151sq. ft. Diameter of Pipe for 5-day drawdown: DIA. = SQRT[(A x 4) / pi] 0.1386 ft. 1.66 in. Q= CwxLxH"5 H = [Q / (Cw x L)]2/y Cw = 3 = 1.22 ft. Peak elevation = flood pool elevation + H 20.22 ft. 18012 18012 Pond Calm 2 of 4 07/25/2019 VAML PHASE 2E PGT Stormwater Pond Calculations 18012 Storage Volume - Non SA Waters - Minimum Volume Required Volume of Runoff = V = (3630) (Design Rainfall Depth) (Rv) (Drainage Area) where Rv= 0.05+0.009(IA) Rv = Runoff Coefficient = storm runoff (inches) / storm rainfall (inches) IA = Impervious Fraction = Impervious portion of the drainage area (acres) / Drainage area (acres) IA= 39.9 % Rv= 0.409 Design Rainfall Depth = 1.50 in. Drainage Area = 18.00 acres Volume = 36,242 ff3 Storage Volume - SA Waters - Pre -Development Runoff 7 - Year. 24 hour Runoff Volume Volume of Runoff = V = (3630) (Design Rainfall Depth) (Rv) (Drainage Area) where Rv= 0.05+0.009(IA) Rv = Runoff Coefficient = storm runoff (inches) / storm rainfall (inches) IA = Impervious Fraction = Impervious portion of the drainage area (acres) / Drainage area (acres) Pre-Dev. Impervious Area = 0 f1:2 Pre-Dev. Drainage Area = 620,730 ft2 IA= 0.00 % Rv= 0.050 Design Rainfall Depth = 1.50 in. Drainage Area = 14.25 acres Volume = 3,880 ff3 Storage Volume - SA Waters - Post -Development Runoff 5 - Year, 24 hour Runoff Volume Volume of Runoff = V = (3630) (Design Rainfall Depth) (Rv) (Drainage Area) where Rv= 0.05+0.009(IA) Rv = Runoff Coefficient = storm runoff (inches) / storm rainfall (inches) IA = Impervious Fraction = Impervious portion of the drainage area (acres) / Drainage area (acres) Post-Dev. Impervious Area = 313,078 ft2 Post-Dev. Drainage Area = 784,080 ft2 IA= 39.9 % Rv= 0.409 Design Rainfall Depth = 1.50 in. Drainage Area = 18.00 acres Volume = 40:122 ft3 18012 Pond Calcs 3 of 4 07/25/2019 VAML PHASE 2E PGT Stormwater Pond Calculations 18012 Average Depth Calculated Main Permanent Pool Volume (ft) 111,720.0 Main Permanent Pool Area (ft) 27,117.0 Non -submerged Shelf - Average Depth (ft) 4.12 Round to nearest 0.5 for SA/DA (ft) 400 18012 Pond Calm 4 of 4 E m CD n 0 n o W in v LO u� N n o 0 0 Q 0 o u to o In In o 0 0 0 K W N N A N It N Cl) N Cl)M CC CD Lo N v n o o o N N N N N N N N N N N N N GO OR n N- �t > O O W W Cl) O In N W N O aD W m m n m W C W ao C�N N O CM M In W W M n1 N 07 0) O) W Cn OD N co O ap IC'J ri N n CCj n •�} W O O 0. In O O O O Cn O O 47 O COI CD to . ;.I In inl a O O N N W Q N n -IN N N 10 n N 47I M N M W M ao OI cv M' P.: O � ti v M et N N N co, N O W n C CP C W M co Co W a M aD co M N M In In N Cn q O O lO n W W O co O 00 NI _N n N N_ N N Cn M N co, M M Cf)le CC07 c07 O O M M N P N co LL J O O O O O O O O O O O O O O O C7 O O coj O J OMD O In O n O st O n n u� N N O O O CCpp Q 4 C'7 CO+1 N cp N CD CO O M M O O W W Cn Q cc ccO Go N co N ( N n COI C O M M I � �I NI N M M M M M M jJ M n N In N O O n ti CO CO N N 19 CO CO �� er lL '4 CM N C+) M N CV N O In w In at Ch M M a � N e coLU co O O co vv v v O O O co N N N CD co aO y M M N N N N M M M CM 9"V et v o 0 0 0 0 0 0 0 o a o 0 0 N N ? V M M Co M CO CO IO n N In OD O M m n ap co W W O O O O at O O N O C O O O O O O In O M O M O N O N O O C O S z �+ 2 11 N co N N O O O N O m O O M n M O O M O O O O ui N � Cp N M M CD N N N R co J M M M M M M M M M M M M M_ M M M M M M M Z O O O O O O O O O O O O O O O p O p 0 0 O O O C O O O O O O t7 G u O O O O O O O a U a U a s a s n- n, a a a a a n. a s IL a a a y U U U U U U U U U U U U U U U U U U Go In v H O cy O LC co W W CO I" � W CO W ,n In `o co O o 0 0 0 y o Cn it n n N N N CO O CO 6 CQ M In N M ICY a U. U w N of M M ao pp CO CO N CO N N N N N N N m M M M M J F I{Zj 7 g O 47 O IL Cp Of M n O st CO a Cl) M N M O O CO O Cl) (Z)M W o 0 0 0 LU U W N N M ^^ CD Go O IO O CO O CD CDO LL C7 er Y O G C7 CO Cn O C7 O O n 2 O I17 O F i M O Cn 1l7 lO M lO O M I/7 Cn O to N u'f M 2 Op Oo Op c6 Of) OC) a0 aD o0 00 00 ao Op Oo aD a0 ao W OC) a0 LL ZW ii M N Cn O CO U[ IO O In Cn ICI O IO CO CO In IO CO It) M IO O M I[') O O M lO CO WC LO Cn CO II') Cn O CO Ifl M Cn InV O O C) G n C; � CD, C C O C C .C7 C. J f0 N 0 0 N N N O Q ODD. OHO. II CO CO OM1 N N F CDC C a� O W 0.' Q_ m 7 ~ 0 (/7 O Q CO CO O CO O O O I n n I O n O O O O W O WI O O O n O O O MI O OI n COI 0 OI 0 OI 0 O 0 O 0 OI O O O C7 O CD CD O O O O O O CD O MI CN I NI 1 I I 1 M N n O M N OO. W. c d Z I o I o i d I Z cn �' o O z M n O z Ni 6 -I d O z OI z 47 I O Z p z cn H Z T Z Z Z I S w Z 2 Z x Z x Z� x xI W S 2� w o �o �, o� �io�o�o�ooLLoo� rn a co cn co cn cn rn to cn U Q U, In C+1 N a co W O Q CO n M N O O �' O M O N O — O O 'S in O O O O O O O O Z Z O Z O Z O Z o Z Z Z Z LL z z z z Z x= ZO z= z x z x� z x x x a Uto a U o W a a a 0 CA F o d o 0 o b ui Cn Cn l o 0 0 0 o Ino Cn 0 o 0 0 0 E m r r rnl v, v v v N N aD rn r vl N a r o o o W— N N v N v l N m N m N M N 0 N 1 LO N v N v N v N to N M N of It N r N of N N Cnl CD r CD v v G) CA v h v O v h q O � 1: a0 IT IQ: r M v: vN O w oD 6 h N m r v, C-: M M aO CW- W C) N N CA dD h N N N N CA aD a0 r r a O r O CO O Cn O O O W� O Cn 'i Q O �` 7 CnI� In "7 • aD ! '!? In O N Ln N rl% W cql ch! M O c'J O cc, a O CO i N I N O N h N N N N NC, NI v It M O r C O .� M O) CD O .0 m O co N o N CO O r I CD O cC) O vi O N u� W N to CAI In r Cn M er N I N Kl M M r M M OI O Ln h fD r O � U. a O O Cn O G O O O I O O M r 0 O O O N O •-- O .- O W) O W)! Oi M O to O M O M O O Cl M O M O Co v r hl In NI N OI O O m CD M M Cn N CD h N O 0 CO O M CM O O O O) q O O m O N NI N r O N N Q M M M C07 C07 M M M a I ~ I J O CDI O M Cl)I Cl) Co •- CD CD O Oi It IT v 0 Oi O IL1— N M C7 N N �� N m m 'n Cn M Lol O W) M v vl v aui I I N C O O v v CD O CO CD N N N O CO CD C, 11 N N N N M M M M M v- v 0 0 0 0 0 0 0 cm 0 o 0 0 0 0 0 0 0 0 o 0 o a F. a a a a a a a � N � M M m r N u� w o O M M h ao aD CA CA O_ O_ O ry) v M CD CD Cn I N Cn Cn O o M O to N N 0 o O O v O O o 0 0 0 o O o 0 0 0 0 0 S CD N 40 n M O ZN co N N N O I N CD M M O N CD CD W U.)N N M J M M M M M M M M M M M M M M M M M M M Z _M O O O O O O O O O O O O O O 0 0 0 0 0 0 0 o c o M o o c c o c o o c 6 cil o o 6 6 a a a a a s a s a a a a a a a a a a a a a U U U U U U U U U U U U U 0 U 0 U U 0 0 a' a' of o it r x O ir cc cc Ix cr ir w x ir w Of It it w It F D g Cn G CO N N CD N N M M V CLL b y I� N O r r r CA r [-- N N N N N O J II v W d m CD in � M N N V' CA ci r r �i' N �' N M O M CO M O M 00 m O m F LL 0: J Q F /; CO �� CO n O C O O m O!S O O CD Q U.CD, CO O M O CD O O O O J0 w IL O V K M M N N O r o v O 0 0 o 0 0 0 R V Z 0 O o z F L o a 0 0 0 0 0 0 0 0 0 00 0 0 0 0 Z - C CD O CD CD CD CD CD CD Co CD CD CD CD CD CD O CD CD CD O Di ci M M ni 0 of m M CD of o CD IM IM CO CM of CD Cri U. LL Cn n M n o In n In n if) n n n O n W C.) n Cn Cn Cn Cn u) U') � � MMO � M n � M Cn M nZV O O O O C O O O O o Cl Co O O O o C O r O I co r 0 0 N O' V Qo CC'1 L'1 N N tn N O a CD o N o r 0 r 0 o O v o �n M Cn of CO v C. v O) vil N h N rl Q LU Q CD `Ii of N O Q o of o of v o f l o 0 0 0 o CDc o c 0 o o c N r Cl) N I m M O Cl)C NU . v C O N O O O l Z o O Z I ZZ6 Z C I Z Z A ZI Z U)Z pF I Z Z Z Z Z LLI 2 ' U- ^20 LO LL LL O Uto U UQIO p N f Cl) Uh r Cn vNM- N- DW J N v ci M UO ZZ Z Z Z Z Z Z Z m Z Z Z Z Z 2 2 Z Z 2 Z 2 Z 2 Z 2 2 2 2 2 U. o 0 O D 0 o 0 0 U U U U U U U U U U 0 ❑I co w Cl) CO U co U U U 07/25/2019 VAML Phase 2E 18012 PGT Forebay Weir Velocity Calculations Qioo= 76.32 CFS L= 50 WEIR LENGTH (FT) H= 0.64 HEIGHT OF WATER ABOVE WEIR (FT) Cw= 3.0 WEIR COEFFICIENT WEIR EQUATION: VELOCITY: Cw* L* H3/2 H= (Q/Cw*L)2/3 H= 0.64 FT V= Q/A A= L*H A= 31.87 SF V= 2.39 FPS By. � 07/25/2019 VAML Phase 2E 18012 PGT Pond Outlet Velocity Calculations 30"RCP outlet pipe wet detention basin): V= 4*Q / D2*Pi Q70= 57.87 cfs V= 2.05 fps D= 6 ft 40' Emergency Spillway: 0 V= Q/A Q100= 76.32 cfs V= 2.09 fps d= 0.73 ft L= 50 ft BY: A= d*L A= 36.5 s . ft. 18012 Pond Outlet Velocity 1 of 1 FOR REGI5TRAT10N REGISTER OF DEEDS RE9ECCA T. CHRISTIAN NEW HOOVER COUNTY NC 2002 OCT 30 09:409 M gKIN4^ INSTRUMENT �200205472270 6.00 2 DEED Parcels: R07600-006-014-000; R07600-006-012-000; R07600-006-013-000; R07500-004-003-000; R07600-006-010-000; R07600-006-008-001; R07500-001-001-000; R07500-004-004-000 Revenue Stamps STATE OF NORTH CAROLINA COUNTY OF NEW HANOVER 9 THIS DEED, made and entered into this the 4th day of September, 2002, by and between ARNOLD L. SOBOL and wife, FLORENCE S. SOBOL, ELLEN SOBOL STEIN and husband, ALVIN L. STEIN, WARREN M. SOBOL and wife, MARLENE GANZ SOBOL and TODD L. SOBOL and wife, JODY GLASSER SOBOL, parties of the first part; and AFTEW PROPERTIES, LLC, a North Carolina limited liability company, having an address of 2020 S. Chiur%ill Drive, Wilmington, NC 28403, party of the second part; WITNESSETH: That the parties of the first part in consideration of the sum of Ten Dollars ($10.00) and other good and valuable considerations to said parties paid by the party of the second part, the receipt of which hereby is acknowledged, have bargained and sold and by these presents do bargain, sell and convey unto the party of the second part, said party's successors and assigns, the following described property, to wit: Prepared by Ward and Smith, P.A., 1001 College Court, New Bern, NC 28562 EURNED TO No opinion on title is rendered b59Vand and Smith, P.A. without a separate written opinion on title from Ward and Smith, P.A. 1� All those certain tracts or parcels of land lying and being situate in New Hanover County, North Carolina, and being more particularly described on Exhibit A attached hereto and incorporated herein by reference. TO HAVE AND TO HOLD said property and all privileges and appurtenances thereunto belonging to the party of the second part, said party's successors and assigns forever. Arnold L. Sobol and Florence S. Sobol covenant that they are seized of Tract 3, Tract 4, Tract 8, Tract 9, Tract 10 and Tract 11 as described above in fee and have the right to convey same in fee simple, that same are free from encumbrances except any encumbrances or restrictions mentioned above and that said parties will warrant and defend the title to same against the lawful claims of all persons whomsoever. Arnold L. Sobol and Florence S. Sobol covenant that they are seized of an eighty- five percent (85%) undivided interest in Tract 1, Tract 2, Tract 5, Tract 6, Tract 7 and Tract 12 as described above in fee, and have the right to convey said undivided interest in fee simple; that said undivided interest is free from encumbrances except any encumbrances or restrictions mentioned above and that said parties will warrant and defend the title to said undivided interest against the lawful claims of all persons whomsoever. Each of Ellen Sobol Stein, Warren M. Sobol and Todd L. Sobol covenant that they are seized of an undivided one-third (1/3) interest in an undivided fifteen percent (15%) interest in Tract 1, Tract 2, Tract 5, Tract 6, Tract 7 and Tract 12 as described above in fee; that they have the right to convey their undivided one-third (1/3) interest in an undivided fifteen percent (15 %) interest in fee simple; that their undivided one-third (1 /3) interest in an undivided fifteen percent (15%) interest is free from encumbrances except any encumbrances or restrictions mentioned above and that said party will warrant and defend the title to their individual 2 undivided one-third (1/3) interest in an undivided fifteen percent (150/6) interest against the lawful claims of all persons whomsoever. INN TESTIMONY WHEREOF, the parties of the first part have set said parties' hands hereto and have adopted as said parties' seals the typewritten word "SEAL" appearing beside said parties' names, this the day and year first above written. (Signatures appear on the following pages) BY: 3 gI0"L.l w ti STATE OF MGM CAROLINA COUNTY OF L)• . a Notary Public in and for said County and State, do hereby certify that ARNOLD L. SOBOL and wife, FLORENCE S. SOBOL personally appeared before me this day and acknowledged the due execution of the foregoing instrument. VATNESS my hand and notarial seal, this the c L� day of a 2002. My Commission Expires: 1 le � I � I L ZW OWL 41 ft Z r- T .`• . Notary seal or stamp must appear within above box. 4 �-Ii46 (SEAL) Ellen Sobol Stei (SEAL) Alvin L.Stern STATE OF Ji a COUNTY OF jI[.m,,J:�,c��� I, e , a Notary Public in and for said County and State, do hereby certify t ELLEN SOBOL STEIN and husband, ALVIN L. STEIN personally appeared before me this day and acknowledged the due execution of the foregoing instrument. A WITNESS my hand and notarial seal, this the el& day of 2002. My Commission Expires: _ MARY C. COFFMAIV, Notary PubtiC � In and For the State of Ohio Mr COMMISSIDA expires May eq.-2eft No ublic Notary seal or stamp must appear within above box. k, V � (SEAL) ('�� - Warren M. Sobo1 —�'V�.t^-^-�c )` • 1W (SEAL) Marlene Ganz Sobol STATE OF COUNTY OF a Notary Public in and for said County and State, do hereby certify that A)RREN M. SOBOL and wife, MARLENE GANZ SOBOL personally appeared before me this day an acknowledged the due execution of the foregoing instrument. WITNESS my hand and notarial seal, this the .5 day ofZ"72t4�2- 2002. My Commission Expires: r :ar within above ),— Notary Put i Txvborn M Zimmerman BY:_ Pi L�11"Zlv SEAL Todd L. Sobol r Ke—, /./ :.=w a�/.ate � ,. MeseA as fp4b@- STATE OF COUNTY OFM(nn\;)�Mer4_ L.eaa, i� .1� a Notary Public in and for said County and State, do hereby certify that TODD L. SOBOL and wife, JODY GLASSER SOBOL personally appeared before me this day and acknowledged the due execution of the foregoing instrument. WITNESS my hand and notarial seal, this the %rYN day of 2002. ®r Notary Public My Commission Expires: LESA A. KETTLER OHIO MY COMMISSi01�E EXPIRES 04-OM6 Notary seal or stamp must appear within above box. 7 APPLICATION FOR PERMIT FOR A LAND DISTURBING ACTIVITY Under the conditions set forth by The New Hanover County Soil Erosion and Sedimentation Control Ordinance "`v �✓ C-L VV ! J-7 R,W File* 1P I? - t SD LD Feet " Review Fee V2-oC Date Pd Date Pd VzjA' Engineering Department Applicant or Applicant's Agent: Aftew Properties, LLC Mailing Address: 2020 South Churchill Drive Telephone Number: 910-763-2629 Fax Number:_ 910-763-4742 Wilmington, NC 28403 Email Address: lobos251@aol.com Total Acres of Land Disturbance: 13.5 Purpose of Development: residential Description of Land Disturbance: residential subdivision Address of Land Disturbance: 360 Glen Ellen Road _ Latitude:N 34' 07' 55" Longitude: W 77" 54' 09" STATEMENT OF FINANCIAL RESPONSIBILITY Land owner(s) of record: Person or firm(s) financially responsible for the land disturbing activity. If not a North Carolina resident, you MUST have a N.C. agent. (List Below) Name: Aftew Properties, LLC Name: Aftew Properties, LLC Address: 2020 South Churchill Drive Address: 2020 South Churchill Drive City/State: Wilmington, NC 28403 City/State: Wilmin on, NC 28403 Telephone Number: 910-763-2629 Telephone Number: 910-763-2629 Email: lobos251@aol.com Fax # 910-763-4742 Email: lobos25I@aol.com Fax # 910-763-4742 Location of deed(s) or instrument(s): County: New Hanover Book: 3497 Page: 0245 The above information is true and correct to the best of my knowledge and belief and was provided by me while under oath. (This form must be signed by the financially responsible person if an individual and by an officer, director, partner, attorney -in - fact, or other person of authority to execute instruments for the financially responsible person if not an individual.) I agree to provide corr ted information shoul4d there be any change in the information provided herein. Date: ame Arnold L. Sobol Title Member Manager Signature I, l A. 0- a Notary Public of the County of &1140� State of North Carolina, hereby certify that Arnold L. Sobol appeared personally before me this day and being duly sworn acknowledged that the above form was executed by him. Witness my hand and notary seal, this 2b day of �(,(�, , 20 19 Notary _ / ��f�jj 1, C- a,,,,,. ��p. C Q� �i, My commission expires SEAL �OTA/Qy .�r' •�uI Permission to Enter on Land ., �._- .= % I certify that I am authorized to grant and'4� ��permission to the l questioninonnection related to thuJunu��.is permit application. Ad� Application Signature and Date EE91 111G QED'; " fT agents to enter on C201908604784 Aftew Properties, LLC SECRETARY•OF STATE ID NUMBER: 0637949 STATE OF FORMATION: NC n° co 8° y REPORT FOR THE CALENDAR YEAR; 2019 Ftia WE SECTION A. REGISTERED AGENT'S INFORMATION Changes 1. NAME OF REGISTERED AGENT: ARNOLD SOBOL SOSID: 0637949 Date Filed: 3/27/2019 11:59:00 PM Elaine F. Marshall North Carolina Secretary of State C2019 086 04784 2. SIGNATURE OF THE NEW REGISTERED AGENT: SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 3. REGISTERED OFFICE STREET ADDRESS & COUNTY 2020 South Churchill Drive Wilmington, NC 28403 New Hanover SECTION B: PRINCIPAL OFFICE INFORMATION 1. DESCRIPTION OF NATURE OF BUSINESS: Real Estate. 2. PRINCIPAL OFFICE PHONE NUMBER: (910) 763-2629 4. PRINCIPAL OFFICE STREET ADDRESS & COUNTY 2020 South Churchill Drive 4. REGISTERED OFFICE MAILING ADDRESS 2020 South Churchill Drive Wilmington, NC 28403 New Hanover 3. PRINCIPAL OFFICE EMA privacy Redaction 5. PRINCIPAL OFFICE MAILING ADDRESS MUM 2020 South Churchill Drive Wilmington, NC 28403 New Hanover Wilmington, NC 28403 New Hanover S. Select one of the following if applicable. (Optional see instructions) ❑ The company is a veteran -owned small business ❑ The company is a service -disabled veteran -owned small business SECTION C: COMPANY OFFICIALS (Enter additional company officials in Section E.) NAME: Arnold L Sobol a LIMITED LIABILITY COMPANY ANNUAL NAME"OF LIMITED LIABILITY COMPANY: NAME: Florence S SObol NAME: TITLE: Manager TITLE: Manager TITLE: ADDRESS: 2020 South Churchill Drive ADDRESS: 2020 South Churchill Drive ADDRESS: Wilmin , NC 28403 New Hanover Wilmington, NC 28403 New Hanover SECT N D: E Section D must be completed in its entirety by a person/business entity. I TURF TF Form be signed by a Company Official listed under Section C of This form. Print or Type Name of Company Official Prim or Type idle of Company Official SUBMIT THIS ANNUAL REPORT WITH THE REQUIRED FILING FEE OF $200 MAIL TO: Secretary of State, Business Registration Division, Post Office Box 29525, Relalgh, NC 77626.0625