Loading...
HomeMy WebLinkAboutSW8060608_Historical File_20070710. WAIF � a0 . R Michael F. Easley, Governor r William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality July 10, 2007 Mr. Brian D. Dilsheimer, Manager Dilsheimer Communities of North Carolina, LLC, Manager DCNC North Carolina I, LLC 2528 Independence Blvd., Suite 104 Wilmington, NC 28412 Subject: Stormwater Permit No. SW8 060608 Modification The Villages at Turtle Creek Phases I and II High Density Subdivision Project Pender County Dear Mr.. Dilsheimer: The Wilmington Regional Office received a complete, modified Stormwater Management Permit Application for The Villages at Turtle Creek Phases I and II, on April 23, 2007. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 060608 Mod. dated July 10, 2007, for the construction of the subject project. This permit shall be effective from the date of issuance until November 30, 2016, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 796-7215. Sincer , Edward Beck Regional Supervisor Surface Water Protection Section ENB/arl: S:\WQS\STORMWATER\PERMIT\060608_ju107 cc: Eric Tomczak, P.E., Cavanaugh & Associates Pender County Planning Department Linda Lewis Wilmington Regional Office Central Files 1Vo lthCarolina Xtura!!y North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.ncwaterguality.org Fax (910) 350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper State Stormwater Management Systems Permit No. SW8 060608 Modification STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Brian D. Dilsheimer, Dilsheimer Communities of North Carolina, LLC & DCNC North Carolina 1, LLC The Villages at Turtle Creek Phases I and 11 NC 210 & Lodge Hall Rd, Surf City - Pender County FOR THE construction, operation and maintenance of 7 infiltration basins in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until November 30, 2016, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 &1.7 on pages 3 & 4 of this permit. The subdivision is permitted for 71 lots; each allowed the maximum amount of built - upon area specified in Section 11.15 of this permit. The stormwater systems have been designed to handle the following amounts of impervious 'rea: 1A-1 011,025 ft2; 1A-2 6ft2; ft@1A-3 @2,361 f2; B @339,953 f; 1C @137,639 ft 1 D-1 @20,771 ; and 1 D-2 @42,810 ft2. Basins #1 B and #1 C must be operated with a 50' vegetated filter. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The runoff from all built -upon area within each permitted drainage area of this project must be directed into the permitted stormwater control system. Puna 9 of Q State Stormwater Management Systems Permit No. SW8 060608 Modification 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. The following design elements have been permitted for the infiltration basin stormwater facilities, and must be provided in the system at all times. Units Basin Basin Basin . Basin Basin Basin Basin 1A-1 1A-2 1A-3 16 1C 1D-1 1D-2 Drainage Area 29,988 16,454 7,072 752,249 283,381 38,878 90,306 Onsite ft2 29,988 16,454 7,072 752,249 283,381 38,878 90,306 Offsite 0 0 0 0 0 0 0 Total BUA 11,025 6,75 2,361 339,953 137,639 20,771 42,810 Lot BUA 0 0 0 188,569 84,875 1,066 12,382 Roads/Parking ft 2 8,876 5,238 1,697 113,771 36,273 16,068 24,043 Sidewalks 2,149 1,637 664 37,613 22,809 3,637 6,385 Other 0 0 0 0 4,682 0 0 Offsite 0 0 0 0 0 0 0 Basin Depth Feet 0.75 1.25 1.25 5.5 2.25 2.25 2.05 Design Storm Inches 4.5 4.5 4.5 1.5 1.5 4.5 4.5 SHWT FMSL 29.0 28.0 28.0 19.0 10.0 24.0 23.7 Bottom Elevation FMSL 31.0 30.0 30.0 21.0 12.0 27.0 25.70 Surface Area Bottom ft2 6,025 2,208 1,085 4,802 9,377 2,790 6,534 Storage Volume ft3 4,879 3,331 1,757 56,450 26,859 7,887 17,335 Storage/Bypass Elevation FMSL 31.75 31.25 31.25 26.5 14.25 29.25 27.75 Expected Infiltration Rate in/hr 0.52 0.52 0.52 4.0 3.0 2.6 2.6 Time to Draw Down Hours 16 28 20 27 7 13 12 Type of Soii Woodington Fine Sandy Onslow Sandy Loam Loam Receiving Stream Becky's Creek y River Basin Cape Fear Stream Index Number 18-87-8 Classification of Water Body "SA;HQW' II. SCHEDULE OF COMPLIANCE No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. Panes I of Q State Stormwater Management Systems Permit No. SW8 060608 Modification 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 4. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. The bioretention area may not be used as a sediment and erosion control device once the planting soil has been placed. 5. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 6. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below-, a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 7. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 8. The Director may determine that other revisions to the project should require a modification to the permit. 9. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 10. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 11. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 12. Prior transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. Panadnf0 State Stormwater Management Systems Permit No. SW8 060608 Modification 13. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 14. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 15. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 060608, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built -upon area per lot is as follows: Lot # Max BUA Lot # Max BUA Lot # Max BUA Lot # Max. BUA Lot # Max. BUA 1 4,152 16 3,731 31 3,659 46 4,176 61 4,187 2 4,152 17 3,695 32 3,633 47 4,165 62 4,189 3 4,152 18 3,676 33 3,602 48 1 4,149 63 4,187 4 4,152 19 4,211 34 3,601 49 4,226 64 4,195 5 4,300 20 4,269 35 3,599 50 4,145 65 4,187 6 4,186 21 4,350 36 3.551 51 4,152 66 4,187 7 3,668 22 4,161 37 4,480 52 4,151 67 4,187 8 3,608 23 4,165 38 3,849 53 4,151 68 4,187 9 3,607 24 4,162 39 3,828 54 4,151 69 4,183 10 3,607 25 40 4,022 55 4,147 70 4,186 11 3,517 26 41 4,255 56 4,166 71 4,186 12 4,156 27 3,681 42 4,087 57 4,165 72 4,232 13 3,692 28 3,672 43 3,829 58 4,213 73 4,289 14 3,776 29 4,186 44 4,128 59 4,253 15 3,691 30 3,664 45 1 4,425 60 4,189 Panes 9 of Q State Stormwater Management Systems Permit No. SW8 060608 Modification This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. h. Built -upon area in excess of the permitted amount will require a permit modification. 16. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 17. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 18. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. Ill. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality, signed by the parties involved, along with the appropriate documentation as listed on page 2 of the form. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) that have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Pans A of 0 State Stormwater Management Systems Permit No. SW8 060608 Modification 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division in writing of any name, ownership or mailing address changes within 30 days. S. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Permit issued this the 10th day of July 2007. NORTH CAROLINA EN RONMENTAL MANAGEMENT COMMISSION for Coleen H. Sulles<W66tor Division of Water Quality By Authority of the Environmental Management Commission Pana 7 of 0 State Stormwater Management Systems Permit No. SW8 060608 Modification The Villages at Turtle Creek Phases 1 & 2 Page 1 of 2 Stormwater Permit No. SW8 060608 Modification Pender Counly Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Pona R of Q State Stormwater Management Systems Permit No. SW8 060608 Modification Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DWQ Regional Office Pender County Planning Department Pans Q of Q OFFICE USE ONLY Pate Received Fee Paid Permit Number 1111311AboqD State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER-MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): _„rwc NaaFtl. _ 1 4 - T. . r p Br;ah NA e4 Mer- !'I�n2 DJ--)r,1~ Cgn),m 1* hes of k" CzrC7 1112� U-C,, a01254P- o C IVCr h !;q2 j.LC. . 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): J.B. Dilsheimer, Vice President/Member of DCNC North Carolina I, LLC 3. Mailing Address for person listed in item 2 above: 2528 Independence Blvd, Suite #104 City: Wilmington State: NC Zip: 28412 Telephone Number: ( 910 ) 790 - 9 B B 0 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): The Villages at Turtle Creek f:+)25e?5 $. 5. Location of Project (street address): NC 210 and Lodge Hall Road City: Surf City County: Pender 6. Directions to project (from nearest major intersection): From the intersection of Us 17 and NC 210, travel east on NC 210 two (2) miles. Turn left after Lodge Hall Road. 7. Latitude: 34 27' 0.45" N Longitude: 71' 32' 55.24" w of project 8. Contact person who can answer questions about the project: Name: Tom Miner Telephone Number: ( 610 ) 617-9703 II. PERMIT INFORMATION: 1. Specify whether project is (check one): New Renewal Modification Form SWU-101 Version 3.99 Page 1 of 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number SW8 060608 and its issue date (if known) JULY 20 , 2 006 3. Specify the type of project (check one): __Low Density x High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): �CAMA Major X Sedimentation/Erosion Control x 404/401 Permit �NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated, Also attach a detailed narrative . (one to two pages) describing stormwater management for the project. StormWater runoff from the impervious and non -impervious areas will sheet flow to a valley curb for eventual discharge to six (6) proposed infiltration ponds by way of swales, curb inlets, yard inlets, valley curbs, and a piped stormwater conveyance system. 2. Stormwater runoff from this project drains to the cape Fear River basin. 3. Total Project Area: 27.73 acres 4. Project Built Upon Area: 46.9 % 5. How many drainage areas does the project have? 7 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Bashi Igfonna ion Drainage Areal {1A-:1) ! Drainage Area 2 {1A 2) :° Receiving Stream Name Becky's Creek Becky's Creek Receiving Stream Class SA SA Drainage Area 29,988 Sq. Ft. 16,454 Sq. Ft. Existing Impervious* Area o Sq. Ft. a Sq. Ft. Proposed Impervious*Area 11,025 Sq. Ft. 6,875 Sq. Ft. % Impervious* Area (total) 36 .8% 41. 8% Imperyiggs* Surface:Area Drainage Area„1 {iA a} ;: Dramage Area 2 {iA-2) On -site Buildings o sq. Ft. o Sq. Ft. On -site Streets 8,876 Sq. Ft. 5,238 Sq. Ft. On -site Parking o Sq. Ft. 0 Sq. Ft. On -site Sidewalks 2,149 Sq. Ft. 1 637 Sq. Ft. Other on -site 0 Sq. Ft. 0 Sq. Ft. Off -site o sq. Ft. a Sq. Ft. Total: 11,025 Sq. Ft. Total: 6,875 Sq. Ft. Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Porm SWU-101 Version 3.99 Page 2 of 4 ev LL • LL �¢��� »-_ Q(nLLU)Cn��Cn r Carr , - cn � � � a� rl-L LO ,� o LO co is m Co C N p ' n N LL U- 'r l0 w' LL •-: LL r-% U- LL -6 w U-� .U)a acn em u, co ucr LL: U) ,Y� a{/Cy V! r T 6 0 w M I � cr w T ``'' O L� CDCCOO cn CO CD CCOO C,; N CO r �': CO O C'M T LL LL LL U< OR ¢m�U)co cr _ _cr U- CC► M V] CO C") CD leI- U) ch O O N cr U) m M O coCO, p p N CO O CO �yy S m C`7 CON ti CO CO V C 0 ©! r m m N LL LL LL Ua�LLmN ;< rn CD(1) U) M U) CM to COO U) P� Cr) U) M N CA w w O p n p o tipM p� �ti C'7 o' cM i�. CQ' Y ++ LL ++ LL _ LL +� LL OL LL c < r LL LL w : LL LL a w - < V] U) N • U) (n r ,t ch 0) U) ci m U) r- U) m U) T C0 0co ch. 0 0 000 O O M w W Q !— CU v ca �Q D m _Oca • ' N Co _ Q N ..Nl U) c Z E U E w o o E � N m co a) ? tm I a CX E�aY r Q -N N. c Ccm N � omacnU) �FD.C► E v,v,CAcoCDW m'wOfowa`o 00005 C1 N M N d 7. How was the off -site impervious area listed above derived?_ Computer Generated IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run mith the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form ET • One copy of the applicable Supplement Form(s) for each BMP ET • Permit application processing fee of $420 (payable to NCDENR) ET • Detailed narrative description of stormwater treatment/management ET • Two copies of plans and specifications, including: ET - Development/Project name - Engineer and firm -Legend North arrow - Scale Revision number & date Mean high water line Dimensioned property/project boundary Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations Details of roads, drainage features, collection systems, and stormwater control measures Wetlands delineated, or a note on plans that none exist Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): CAVANAUGH & ASSOCIATES, P.A. Mailing Address: 130 NORTH FRONT STREET SUITE 202 City: WILMINGTON State: NC Zip: 28401 Phone: ( 9 J. 0 ) 3 9 2- 4 4 6 2 Fax: ( 910 ) 3 9 2- 4 612 VIII. APPLICANT'S CERTIFICATION I, (print or type name ofperson listed in General Information, item 2) lsj of r certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants a recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. e Date: r Form SWU-101 Version 3.99 Page 4 of 4 Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : The Villages at Turtle Creek Contact Person: DCNC North Carolina I, LLC Phone Number: ( 910 ) 790- 9880 This worksheet applies to: Basin No. Phase 1 - 1A-1 (as identified on plans) in Drainage Area 1A-1 (from Form SWU-101) IL DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Woodington Fine Sandy Loam 0.52 in/hr in/hr or cfbr/sf (circle appropriate units) 29.0 fn1S1 (Seasonal High Water Table elevation) 4.5 inch (1.5 inch event for SA waters, I inch event for others) 4,283 c.f. 0.7 days Basin Size Varies ft. x Basin Volume Provided q,9 c.f. Basin Elevations (��b 31.00 f 1 Varies ft. = 6,025 sq. ft. (bottom dimensions) Bottom Elevation ms Storage Elevation 31.75 fhisl Top Elevation 32.75 finsl Form SWU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials ET a. System is located 50 feet from class SA waters and 30 feet from other surface waters. ET b. System is located at least 100 feet from water supply wells. ET _ c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. ET f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. ET g. Drainage area for the device is less than 5 acres. ET h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. ET i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. ET j System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). ET 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. ET in. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. ET n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). ET o. Flow distribution mechanism within the basin is provided. ET p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). ET r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. ET s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon. initial operation once the project is complete and the entire drainage area is stabilized. Form SW-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, snow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 0.19 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Ti Address: 2528 1 Phone: J.B. Dilsheimer, Vice President/Member of DCNC North Carolina I, LLC )endence Blvd, Suite #104, Wil , NC 28412 Date: Note: The legally r- lly responsible party should not be a homeowners association unless more than 50% grthe lots have been .sold and a resrrent of the subdivision has been named the president. M 4CC('/P_1)L/ , a Notary Public for the State of li7V/Q5 / WMfJ4unty of a CmvvP , do hereby certify that -T3 6 : L.S1f er-7y on_ personally appeared before me this day of )�o-7 , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires Notarial Seal Thomas M. McCurdy, Notary Public Page 3 of 3 Lower Merlon Twp., MorrVmwy CM#* Form SWU-103 Rev 3.99 g My Cor;w trssion FVires 8ept.1, 2= Member, PennsAvRnia Assodaflon Of Notaries Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name: The Villages at Turtle Creek Contact Person: DCNC North Carolina I, LLC Phone Number: ( 910 ) 790- 9880 This worksheet applies to: Basin No. Phase 1 - IA-2 (as identified on plans) in Drainage Area - 1A-2 (from Form SWU-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Woodington Fine Sandy Loam 0.52 in/hr in/hr or c9hr/sf (circle appropriate units) 28.0 fmsl (Seasonal High Water Table elevation) 4.5 inch (1.5 inch event for SA waters, 1 inch event for others) 2,629 c.f. 1.2 days Varies f X Varies ft — 2,208 sq. ft. (bottom dimensions) 3,331 c.f 30.00 fmsl 31.25 fmsl 32.25 fmSl Form SWU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials ET a. System is located 50 feet from class SA waters and 30 feet from other surface waters. ET b. System is located at least 100 feet from water supply wells. ET c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited, on or in fill material or DWQ approval has been obtained. ET f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. ET g. Drainage area for the device is less than 5 acres. ET h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. ET i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. ET j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). ET 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. ET m. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. ET n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). ET o. Flow distribution mechanism within the basin is provided. ET p A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). ET r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. ET s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 0.31 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: J.B. Dilsheimer, Vice President/Member of DCNC North Carolina I, LLC Address: 2528 Phone: Blvd, Suite #104, Wilmington, NC 28412 Date: Note: The legally>f esponsible party should not be a homeowners association unless more than 50% of the lots have been sold and a residen f the subdivision has. been named the president. a Notary Public for the State of UP-15 County of t"Gaibf do hereby ce 'fy that S/tL�-1;'P./t/�- personally appeared before me this 0 day of tet/ , 07 and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires 144Z, /i'r %U` 9 COMMONWEALTH OF PENNSYLVAN Notarial Seal Thomas M. McCurdy, Notary Public Form SWU-103 Rev 3.99 Page 3 of 3 Lower wion Twp., moritimisryc tly W Cam"xssra i Expires Sept 1, 20M :Member, Pennsvivanis Assncintion Of Notaries Pen -nit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Naive : The Villages at Turtle Creek Contact Person: 13CNC North Carolina 1, LLC Phone Number: ( 910 ) 790- 9880 This worksheet applies to: Basin No. Phase 1 - 1A-3 (as identified on plans) in Drainage Area 1A- 3 (from Form SWU-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation woodington Fine Sandy Loam 0.52 in/hr in/hr or cf/hr/sf (circle appropriate units) 28.0 fmsl (Seasonal High Water Table elevation) 4.5 inch (1.5 inch event for SA waters, I inch event for others) 929 c.f. 1.2 days Varies ft. X 1,757 c.f. 30.00 fmsl 31.25 fmsl 32.25 finsl Varies ft. = 1,085 sq. ft. (bottom dimensions) Form SWU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials ET a. System is located 50 feet from class SA waters and 30 feet from other surface waters. ET b. System is located at least 100 feet from water supply wells. ET c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. ET f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. ET g. Drainage area for the device is less than 5 acres. ET h. Soils have a minimum hvdraulic conductivitv of 0.52 inches ner hour and soils rennrt is attached. ET i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). ET 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. ET in. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. ET n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). ET o. Flow distribution mechanism within the basin is provided. ET p A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). ET r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. ET s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 0.31 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stonmwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: J•B. Dilsheimer, Vice President/Member of DCNC North Carolina I, LLC Phone: Signature: 2528 Independence Blvd, Suite #104, Wilmington, NC ?8412 Da Note: The !',gully responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a res ent of the subdivision has been named the president. n f 1 �10" yj5 A4 M t ' C� R � �/ , a Notary Public for the State of ,fE7U Jll S t l L J/�iTaunty of ' c T(rt,pVli, , do hereby certify that r. .. 1i> Ll 5 r4i5wr7wt CYZ— personally appeared before me this! �• day of :j and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, SEA;_, My commission expires ' COMMONWEALTH OF PENNSYLVANI Notarial Seal Thonias M. McCurdy, Notary PubNc Form SWU-103 I?ev 3.99 Page 3 o 3L0VWMedonTwp•.MorrgomeryCau My Commisslon Expires Sept 1, 2008 Member _,�­ I;nn Of Notaries Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : The Villages at Turtle Creek Contact Person: DCNC North Carolina I, LLC Phone Number: ( 910 ) 790- 9880 This worksheet applies to: Basin No. Phase 1 - B (as identified on plans) in Drainage Area 1B (from Form SWU-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (finsl). Soils Report Summary Soil Type infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Onslow Loamy Fine Sand 3.96 in/hr in/i]r or Cf/hr/Sf (circle appropriate units) 19 finSl (Seasonal High Water Table elevation) 1.5 inch (1. S inch event for SA waters, I inch event for others) 42,946 c.f 0.7 days Varies $ X Varies ft — 4,802 sq. ft. (bottom dimensions) 56,450 C.f 21.00 fiml 26.50 finsl 27.50 finsl Form SWU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials ET a. System is located 50 feet from class SA waters and 30 feet from other surface waters. RT b. System is located at least 100 feet from water supply wells. ET c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. ET f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. NA g. Drainage area for the device is less than 5 acres. ET h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. ET i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. ET j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). ET 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. ET in. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or ET dense vegetative cover is provided. n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). ET o. Flow distribution mechanism within the basin is provided. ET p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). ET r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. ET s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 1.38 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: J.B. Dilsheimer, Vice President/Member of DCNC North Carolina I, LLC 2528 Indep9ndence Blvd, Suite #104, Wilmington, NC 28412 910 Signature: Date: Note. The legally responsible parry should not be a homeowners association unless more than 50% of'the lots have been sold and a 7wnt of the subdivision has been named the president. I I, O /1/I 14" , a Notary Public for the State of ,llR LV14r /T41 County of imatirkomG do hereby c rtify that ng tom- personally appeared before me this 0- day of "7/Zt//d� 6 -7 and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, SEAL. My commission expires ' COMMONWEALTH OF PENN8YLVANI Notarial Seal M. McCurdy, Ndary Publlc Forrn SWIT-103 R.ev 3.99 Page 3 of[;MM-Gs MerlortTwp., M YOn /onvnisao" Eores Sept.1. 2WO Mrsmber. pen nsvlvanie AS90d", 0! Of Notaries Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : The Villages at Turtle Creek Contact Person: DCNC North Carolina I, LLC Phone Number: ( 910 ) 7 9 0 - 9 8 B 0 This worksheet applies to: Basin No. Phase 1 - C (as identified on plans) in Drainage Area lc (from Form SWU-101) H. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Onslow Loamy Fine Sand 2.99 in/hr in/hr or cf/hr/sf (circle appropriate units) 10 fmSl (Seasonal High Water Table elevation) 1.5 inch (1.5 inch event for SA waters, 1 inch event for others) 17,256 c.f. 0.4 days varies ft. X Varies ft = 9.377 sq. ft. (bottom dimensions) 26,859 C.f. 12.00 fmsl 14 .25 fmSl 15.75 fnsl Form SWU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials ET a. System is located 50 feet from class SA waters and 30 feet from other surface waters. ET b. System is located at least 100 feet from water supply wells. ET c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. ET f System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. NA g. Drainage area for the device is less than 5 acres. ET h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. ET i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. ET System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or ET sediment trap is provided. m. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or ET dense vegetative cover is provided. n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum ET length is 50 feet for SA waters, 30 feet for other waters). o. Flow distribution mechanism within the basin is provided. ET p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). ET r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. ET s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 0.56 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title J.B. Dilsheimer, Vice President/Member of DCNC North Carolina I, LLC Address: 2528 Independ Phone: (910) A /9880 Signature: Blvd, Suite #104, Wilmington, NC 28412 Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a rlldent of the subdivision has been named the president. &MY l -41,a Notary Public for the State of S(/G J�, County of ' a v1 qA , do her y certify that `j-6 ��S CSYL personally appeared before me this day of '1G jLv jjjUj ,'�, and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, �f/ SEAL My commission expires/U` COMMONWEALTH OF PE LVANIA Notarial Seal Thomas M. McCurdy, Notary Pubic Lower Melon Twp., MonVomery County Form SWU-103 Rev 3.99 Page 3 of 3 My Comnbsion E)Ores Sept 1, 2006 Rember. Penrtt!.tvlv+nie Ass-od- Eon Of Notades Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : The Villages at Turtle Creek Contact Person: DCNC North Carolina I, LLC Phone Number: ( 910 ) 790- 9880 This worksheet applies to: Basin No. Phase 1D-1 (as identoed on plans) in Drainage Area 1D-1 (from Form SWU-101) H. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Onslow Loamy Fine Sand 2.55 in/hr in/hr or cf/br/sf (circle appropriate units) 24.0 fmsl (Seasonal High Water Table elevation) 4.5 inch (1.5 inch event for SA waters, 1 inch event for others) 8,093 C.f. 0.5 days Varies ft X Varies ft — 2,790 sq. ft. (bottom dimensions) 9,450 C.f 27.00 fnsl 29.25 finsl 30.00 fmsl Form SWU-103 Rev 3.99 Page 1 of 3 Ill. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Ston-nwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials ET a. System is located 50 feet from class SA waters and 30 feet from other surface waters. ET b. System is located at least 100 feet from water supply wells. ET c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. ET f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. ET g. Drainage area for the device is less than 5 acres. ET h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. ET i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. ET j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). ET 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. ET in. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. ET n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). ET o. Flow distribution mechanism within the basin is provided. ET p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). ET r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. ET s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 0.63 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, .other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: J.B. Dilsheimer, Vice President/Member of DCNC North Carolina I, LLC 2528 Independence Blvd, Suite #104, Wilmington, NC 28412 Da Signature: Note: The leg ly responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resi4fi4l of the subdivision has been named the president. r/� /n� 1 I, ( G(✓Ad , a Notary Public for the State of &V1V5'VL6'.Qnlr44county of p do hereb certify that'J IbVL-5K rr_ (/y( _e_A_ personally appeared before me this day of , � and acknowledge the due execution of the. forgoing infiltration basin maintenance requirements. Witness my hand and o cial seal, SEALMy commission expires 7/1 - -i ThaMcCurdy, Nolany PUAC FormSWU-1p3 Rev3.99 Page 3 of 3 Low 1EXpbw Sept 1, 2006 Member, Pennsvlvarim RsZWation (f Notar Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : The Villages at Turtle Creek Contact Person: DCNC North Carolina 1, LLC Phone Number: ( 910 ) 790- 9880 This worksheet applies to: Basin No. Phase 1D-2 (as identified on plans) in Drainage Area 1D-2 (from Form SWU-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation onslow Loamv Fine Sand 2.55 in/hr in/hr or cf/hr/sf (circle appropriate units) 23.70 frnsl (Seasonal High Water Table elevation) 4.5 inch (1.5 inch event for SA waters, 1 inch event for others) 17,258 c.f 0.4 days Varies ft. X Varies ft = 6,534 sq. ft. (bottom dimensions) 17,335 c.f 25.70 fmsl 27.75 fmsl 28.75 fmsl Form SWU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design .requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials ET a. System is located 50 feet from class SA waters and 30 feet from other surface waters. ET b. System is located at least 100 feet from water supply wells. ET c. Bottom of system is at least 2 feet above the seasonal high water table. ET d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. ET e. System is not sited on or in fill material or DWQ approval has been obtained. ET f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. ET g. Drainage area for the device is less than 5 acres. h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. ET i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. ET j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. ET k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). ET 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. ET in. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. ET n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). ET o. Flow distribution mechanism within the basin is provided. ET p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. ET q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). ET r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. ET s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After.every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The .benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 0.51 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the perfonnance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: J.B. Dilsheimer, Vice President/Member of DCNC North Carolina I, LLC Address: 2528 Phone: Blvd, Suite #104, Wilmington, NC 28412 Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resi!eht of the subdivision has been named the president. Pvwj'S 1 (.� cm (� j Cjo a Notary Public for the State of LVo4 J l County of VA o,JT-(Va (, do hereby personally appeared before me this day of , d�X -I_, and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, M commission expires 14` 11 SEAL Y P COMMONWEALTH OF PENNSZWVANI Notarial Seal Thorns M. McCurdy, Notary Publc Form S'NU-103 Rev 3.99 Page 3 of 3 L.clwerMarion Up., MonWnM00ufY* ' My Commission E)#res Sept- 1, `M� hEDmhPr rlp-n-.•.•.A,7fnir. Arvvi^!! Inn Of Notaries ,SW,YO6G6rIfod /e2GV & Z-/S_0?_ LG�R9 In accordance with 'Title 15 NCAC 2H.1000, the Coastal Stormwater Management Regulations, deed restrictions and protective covenants are required for High Density Residential Subdivisions where lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the design criteria used to size the stormwater control facility. t, , acknowledge, affirm and agree by my signature below, that 1 will cause the following deed restrictions and covenants to be recorded prior to the sale of any lot: 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit NumberSWB QLcg6o8 , as issued by the Division of Water Quality under NCAC 2H. 1000. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under. them. 4. The covenants pertaining to starrriwatermay not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. T ximu llowabl ill- on r to a s ua e . loft a tin de ny ipon a cons ed in of proy boun tie a at ortion the nigh -way a he fro line a tha a pav m It up a cl s, b is ofli to, s c ms, h , ore rave, ck, sto s e ' a an rkirrg a , but Ps include ed, o d de r or a wet s rfac of s i inq o . OR; if the proposed built -upon- areas per lot will vary, please REPLACE #6 above with the following: a7We al 72Wle5 ­11 6. The maximum built -upon area per lot, in square feet, is as #64d bele;: $� / S s Please see attached table Lot # BUA Lot # BUA Lot # BUA Lot # BUA This allotted amount includes any built -upon � area constructed within; thb lot propaly boundaries, and that portion of the right of --war between the front lot line and the edge of the pavement. Built upon area Includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking,. or the water surface of swimming pools. 7. All runoff from the built -upon areas on the lot must drain into the permitted system. This maybe accompiished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain ward the street, or grading perimeter swales to collect the lot runoff and directing them ' component of the stormwater collection system. Lots that will naturally drain into the syste re not required to provide these additional measure . Signature: Date: .? 1, NI tar Public in the State of , Count of U!Yl7UV�c , II y do hereby certify that J. I�1 4 el 1�-_personally a ed `�nam1� �ilnjri/r before me this the day of , 2 `` °e 9y �. the due executio f the foregoing instrument. Witness my Arid and offs 1 se*®TAy SEAL ®� ;fir= 41ganature �9G , jo00 r, ion ex lies J s�jCKCOO �\\V\-\ My Commis p rrurrrr,,„ � Table 5.1 MAXIMUM IMPERVIOUS SURFACE AREAS FOR PHASE 1 RESIDENTIAL LOTS LOT NUMBER MAXIMUM IMPERVIOUS SURFACE AREA. (SQ. FT.) LOT NUMBER MAXIMUM IMPERVIOUS SURFACE AREA (SQ. FT.) 1 4,152 24 4,162 2 4,152 25 3 4,152 26 4 4,152 27 3,681 5 4,300 28 3,672 6 4,186 29 3,668 7 3,668 30 3,664 8 3,608 31 3,659 9 3,607 32 3,633 10 3,607 33 3,602 11 3,517 34 3,601 12 4,156 35 3,599 13 3,692 36 4,151 14 3,776 37 4,480 15 3,691 38 3,849 16 3,731 39 3,828 17 3,695 40 4,022 18 3,676 41 4,255 19 4,211 42 4,087 20 4,269 43 3,829 21 4,350 44 4,128 22 4,161 45 4,425 23 4,165 NOTE 1: AVG SQ. FT. PER LOT IS 3,923 SO. FT. (168,669 SQ. FT. / 43 LOTS = 3,923 SO. FT.) NOTE 2: TOTAL BUA FOR EACH LOT INCLUDES 55' X 55' BUILDING ENVELOPE, PLUS 18' WIDE DRIVEWAY (VARYING LENGTHS), PLUS SECTION OF DRIVEWAY WITHIN ROW (124 to 180 SF, DEPENDING ON LOCATION IN PHASE 1), UNLESS OTHERWISE NOTED. SIDEWALKS AND CURB RE NOT INCLUDED IN BUA. u w 14;tj f h e .o. W, Qy L 5*- -0-' i _, FEB 15 2007 DWQ nRoa # sGv go cvowo Table 5.5 MAXIMUM IMPERVIOUS SURFACE AREAS FOR PHASE 2 RESIDENTIAL LOTS MAXIMUM -1 MAXIMUM IMPERVIOUS IMPERVIOUS LOT SURFACE AREA LOT SURFACE AREA NUMBER SQ. FT. NUMBER SQ. FT. 46 4,176 60 4,189 47 4,165 61 4,187 48 4,149 62 4,189 49 4,226 63 4,187 50 4,145 64 4,195 51 4,152 65 4,187 52 4,151 66 4,187 53 4,151 67 4,187 54 4,151 68 4,187 55 4,147 69 4,183 56 4,166 70 4,186 57 4,165 71 4,186 58 4,213 72 4,232 59 4,253 73 4,289 MOTE 1: AVG SQ. FT, PER LOT IS 4,185 SQ. FT. (117,181 SQ. FT. / 28 LOTS = 4,185 SQ. FT.) NOTE 2: TOTAL BUA FOR EACH LOT INCLUDES 55' X 55' BUILDING ENVELOPE, PLUS 18' WIDE DRIVEWAY (VARYING LENGTHS), PLUS SECTION OF DRIVEWAY WITHIN ROW (126 to 164 SF, DEPENDING ON LOCATION IN PHASE 2), UNLESS OTHERWISE NOTED. SIDEWALKS IAND CURB RA E� NOT INCLUDED IN,BUA. �.01M.1041 9 S FEB 15 2007 DWQ "xoa # 5we ouoC003 Ato/9 WAN OF NONIN CAROUTA CDUFM OF-PBDEII . L R.WD R. HARM% CETHEY THAT INS MT WAS CRAM tN= w YJWrMa1 FRGY AN ACNAL SIRIEY BADE Nm! MY stranONpI o® oamw11011 RE.pOFD N DFID ROeR :eos PArF rxt• THAT I E NPMDARES NOT ONVEYED ARE CLEARLY NAa,RD AS ORNIN iNQI NFpNANN FOUR N DEM BOON PAGE • THAT TIE RAND OF PREMON AS CALCULATED 18 1, MAW,-- THAT THIS PLAT WA PREPARED N ACCORDANCE VAIN G.S. 47-M A4 AM YY ORNNAL RERBMUCK NUMBER AND SEAL ARM DAY 6 A.D., 2007. I AM H EEBY CER6Y ALIT THIS 9BVEY IS OF AE FOUCYND TEMMED AS DFSCRBm N GM 47-3O(t)(I* ® a) THAT TK SURVEY CREATES A SIMEMMa1 OF LAND NOW THE AREA OF A CNEDY OR MUNICIPALITY WAY HAS AN CNDINANDE THAT RERU1E8 PARCELS OF LAID: O S) THAT THE a1NEY IS LOCATED N A PORTION OF THE COMM INKY IS IMIE ULATED AS TD ANORDSNNCE THAT REDULATES PARCELS OF LAD{ p a) ANY ONE OF THE FQLOM R E3 1) THAT AIS SIRIVEY 18 CF AN DOSING PARCEL ON PARCELS A LAID AND DOES NOT CREATE A NEW EVERY ON CHANGE AN COMM �' VUIRM DEYEIWYENT- S6BE5 0 R) THAT TIE SUROEY IS OF AN ELISING SURNNG OR OILER SIMMUNE Ti NPOUNB HLN'iDN OF : DGIC NORTHLLC OR NATURAL MTURL SUCH AS A N„lMMLRM ON ❑ 31 THAT THE SURVEY IS A CONFIRM SURVEY. 2M5�, PAL PIN N(k 422$-BB-4577 04 RIAT THE BIRYEY IS Oi ANOTIEA cATEoaRT;.ww AS 11E RECd.ElA71a1 a EDBING PAROfld A COURT OME/lm 9BKL aR am DWEPNO m TIE DEEM DN OF A SUSDMONI (3 4) THAT THE NFONYATON AYAIANE 7D 71E SLRIEVOR IS Dial ANT AE RCNAD FLiNRONO. PLL L DB 440..-.o STATE OF NORTH CARMEN SURF OUT' / PBDBI ONMY FN/1 S�t9N1 MT APPIBYAL INS IS 10 CERTIFY THAT TIES MT 1EEE78 ROBIMBIEIAS OF THE WEED LSII �EW� Ftl! s1AF aEr, Na 6— PoR SURF Ott. NR — TINT 70 AEON i ®NM m IS AFPD® MMFNNDOS Fat RECaBE1G DEVELOPMENT INS THE J-V PAY OF COMAE OF ONBRR! AND DEDICAMON TIE UNDDBam HERESY ACIOIGN®fE OBE7B 6111E PBPELNY SXONI AND 7Hla I (AE) IEAELIY ADOPT INS PLAN IF 0f IIX1 FIIFE COII!ET/T AND UPON APPROVAL AANSNC BOAC OF SM CRY AND PE DER ANT iNM MT BE RECaBED N 71E OFRON CE PENOB! CONNIY. E. jo 44 \ OP Oy¢•-A72��1� \ STALE OF NORM CA (KM CDUNTY OF PE/DER FLED FOR FEQSNAIM OR IRE I DAY W A�I[�20D7. AT 3 . 5 ,%L AND tDDRL)ED N MT BOa( PAGE SLR Br .10141 O1TR shplDPxDL&GTD,�R ooDOLyD�» �F t. v-0-did aatiFgMw, " of a r_(tD A W 1Q NOTNX.TD ACRRU 13d / rAaeTr rae POD NAItE)IIPTi \ H � \ \ as C12 \\ TEA T. ROC ELLE S L RINVIPI._e A, IL 415. P.GL 84 4225-75-OW \ a C3 °e REMAININGA RAON OFF \ DCNC NORTHTH CARNINA I. LLC D8 28BS. P.C.226 PIN Nlk 4225-55-4577 A �-- w l - CAVANAU G SGARDGI MMUyI sI(RBFRI'NIDINNSmaw CBBANDASANGaDAAPA April 23, 2007 Ms. Linda Lewis Environmental Engineer NC Department of Environment and Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: The Villages4t Turtle Creek Phases 1 & 2 Request for Additional Information Stormwater Project No. SW8 060608 Dear Ms. Lewis: CAVANAU G H Solutions through integrity and partnersht, Via Hand Delivery :---- APR 2 1 70107 We received a request for additional information dated April 19, 2007, regarding our February 15, 2007, permit modification submittal. We appreciate your requests and have enclosed our responses to address your comments. Please find your comments below in italics with my bulleted responses following: Please provide legible calculations. Unfortunately, some of the numbers had been highlighted on, the original, which copied very dark and obscured the numbers. • Revised "Drainage Area Design Sheets" have been revised to be legible and are attached. 2. For Basins 1-B, 1-C and 1 D-2, the drainage areas and built -upon areas reported on the application do not match up with the numbers used in the calculations. Please correct and revise the plans, supplements and calculations as needed. • Drainage areas and built -upon areas reported on the application were incorrect. These numbers have been revised to coincide with the drainage areas and built -upon areas on the "Drainage Area Design Sheets" and are included in the attachment. 3. The plan view detail of Basin ID-1 on sheet C. 7.7 indicates that the emergency outlet elevation is 31.25. Should this be 30.25? • The annotation of the spillway has been revised to reflect an elevation of 30.25'. Please find sheet C.7.7 included in the revised documents. 4. Please label the spillway elevation on the plan view detail of Basin ID-2 on sheet C. 7.8 as 27.75'. An annotation was added to sheet C.7.8 indicating a "15' Spillway Elevation @ 27.75'." Please find sheet C.7.8 included in the revised documents. To help facilitate your review of the enclosed documentation, the following is an itemized breakdown: 1. One (1) copy of the revised Stormwater Management Application pages indicating the drainage areas and built -upon areas for each individual infiltration basin. 2. Two (2) conies of revised calculations including legible "Drainage Area Design Sheets" for each basin. 3. Two (2) copies of revised sheets C.7.7 and C.7.8. This additional information deals mainly with administrative, non -technical issues and therefore, we hope this modification can be processed in an expeditious manner. If you have any other questions regarding this project, please feel free to contact us as we are more than pleased to do whatever we can to help this process along. Thank you for your attention to this project, and we look forward to getting a revised permit in the near future. Very truly yours, CAVANAUGH & ASSOCIATES, P.A. "Ot-e, &4t7E:� APR 2 1 7nn7 Everett C. Gupton, E.I. T14—E VILLAGES S AT rT-IURTLECREEK, TOWN OF SURF CITY, PENDER COUNTY, NORTH CAROLINA MODIFICATION TO PHASE 1 AND 2 STORMWATER MANAGEMENT HIGH DENSITY PERMIT APPLICATION RFI RESPONSE CALCLUATIONS Submitted: February 13, 2007 ECEIVEDesponse: April 20, 2007 APR 2 3 2007 �o�=��C�•O�( SS o ° ° � nw@ SE. I �• - # Sw 2roc&og C'i AVA N A U G H 32 . Solutions through integrity and partnership Ili UM K♦ We provide superior client service and environmentally sound designs through integrity, communication and partnership. . Consulting Engineers Land Surveyors Environmental Professionals Design Professionals 130 N. Front Street, Suite 202, Wilmington, North Carolina 28401, Phone 910/392-4462, Fax 910/392-4612 THE VILLAGES A]- 7 LIR10 T ECRE K TOWN OF SURF CITY, PENDER COUNTY, NORTH CAROLINA MODIFICATION TO PHASE 1 AND 2 STORMWATER MANAGEMENT HIGH DENSITY PERMIT APPLICATION SUPPLEMENTAL REPORT ', July 5, 2006 ',D VE vised February 13, 2007 FEB 15 2007DWQ C AVA N A U G H Solutions through integrity and partnership We provide superior client service and environmentally sound designs through integrity, communication and partnership. Consulting Engineers Environmental Professionals Land Surveyors Design Professionals 130 N. Front Street, Suite 202, Wilmington, North Carolina 28401, Phone 910/392-4462, Fax 910/392-4612 Narrative Site Description The subject development, formally identified as The Villages at Turtle Creek, is located in the Town of Surf City, Pender County, North Carolina. The 248.2 (+/-) acre property has frontage along NC 210 and US Highway 17. Please note that the site will be permitted and constructed in multiple phases, and the current application is for the modification of the stormwater permit for Phases 1 and 2 only. Phases 1 and 2 have a total limit of disturbance of approximately 37 acres and an updated assessed drainage area of approximately 27.7 acres. Please reference the attached site location map located in the Appendix of this report. The following narrative discusses the modifications that have been made to the stormwater management system contained in these two phases. The site is currently undeveloped and heavily forested with Army Corp of Engineer field -approved 404 wetlands located throughout the property, as identified on the accompanying plans. Currently, the site drains by way of overland flow through the wetlands for ultimate discharge to Becky's Creek. Becky's Creek has a watershed classification of SA:HQW, as confirmed by DENR-DWQ and shown within the Appendix of this report. The property can be described as mildly sloping, with an average slope of approximately 1.0%. The elevations throughout the property range from 9 ft. mean sea level (MSL) near the wetlands to 65 ft MSL towards US 17. It is important to note that the area proposed under Phases 1 and 2 ranges in elevation from 10 ft MSL to approximately 32 ft MSL. The geotechnical site review conducted by an independent soil scientist found seasonal high water table elevations (SHWTE) ranging between 24 to 34 inches below ground surface (BGS) at the site. The soil scientist's geotechnical report is included in the Appendix. An estimated infiltration rate between 0.52-in/hr and 4.82-in/hr was determined by the soils evaluation. Mr. Vincent Lewis from the North Carolina Department of Environment and Natural Resources, Division of Water Quality (NCDENR-DWQ) also tested the site for the SHWTE on May 26, 2006, and January 23, 2007, and found the average depth to SHWTE ranged from approximately 24 to 40 inches BGS on average, which is in accordance with the soil scientist's geotechnical report. One (1) area was found to have a SHWTE of less than 12 inches BGS. However, based on the previously approved stormwater permit for Phases 1 and 2, approval had been given for fill to be brought to this area to achieve a 2 ft separation from the bottom of the proposed stormwater management device to the SHWTE. The Villages at Turtle creek 2 of 6 StormwaterManagsment Nigh Density PermltAppllcatlon Project Description Phase 1 of this multi -phased development consists of the construction of a portion of the subdivision containing 43 single family homes. Phase 2 consists of the construction of 28 single family homes. The homes in these two phases will be serviced with one (1) sanitary sewer pump station. These two phases of the project will include approximately 301,780 ft2 of dwelling and driveway area, 62,395 ft2 of sidewalk area, 197,500 ft2 of street and gutter area, and 4,682 ft2 of pump station area. Pursuant to the watershed classification of the site, HQW:SA, the project will employ infiltration type best management practices (BMPs). Specifically, seven (7) infiltration basins are proposed. Stormwater from the tributary drainage areas, as identified within the submission documents, will travel by sheet and shallow concentrated flow to a series of flat grate curb and yard inlets for eventual discharge to the seven (7) proposed stormwater management basins. Stormwater will be collected and conveyed from these inlets through a series of HDPE (DR 32.5) pipe. * TOTAL DRAINAGE AREA: 1,208,112 ft2 = 27.73 acres Impervious Areas Dwellings and Driveways: 301,780 ft2 = 6.93 acres Sidewalk: 62,395 ft2 = 1.43 acres Street and Gutter: 197,500 ft2 = 4.53 acres PS Drive (Gravel Access) 4,682 ft2 = 0.11 acres Calculation 6.93 + 1.43 + 4.53 + 0.11 = 13.00 acres 13.00 acres (impervious)J27.73 (total) = 0.4688 4 46.9% Stormwater Management Plan Collection and Conveyance: The residential lots, roads and streets will be graded so that runoff enters the stormwater management system by way of sheet flow over the residential lots and roadway system and shallow concentrated flow within the valley curb to the curb and yard inlets. From these inlets, the stormwater will be conveyed by way of the aforementioned HDPE (DR 32.5) for discharge to the seven (7) strategically -placed stormwater management basins. Please note, runoff from the rooftops will be collected by down spouts and directed to the right-of-way, The Magee at Turtle Creek 3 of 6 Stormwater Management High Density Permit Application as specified within the notes, where the runoff will then enter the stormwater management system. Yard inlets will also be utilized where necessary to collect runoff in the grassed and landscaped areas. Treatment; The project site is located in a coastal county and within ,h mile of SA; HQW waters. Therefore, the project requires stormwater to be treated with an infiltration type system. After discussions with NCDENR-DWQ's staff, it has been determined that the best option for stormwater treatment for this project is infiltration basins. The SHWTE investigation confirmed that the proposed locations of the seven (7) infiltration basins are appropriate for this type of BMP. As mentioned previously, all but one of the proposed locations had a SHWTE between 24-33 inches BGS. The remaining proposed location had a SHWTE of less than 12 inches BGS. However, based on the previously approved stormwater permit for Phases 1 and 2, approval had been given for fill to be brought to this area to achieve a 2 ft separation from the bottom of the proposed stormwater management device to the SHWTE. Basins IA-1, 1 A-2, 1 A-3, 1 D-1, and ID-2 are infiltration basins designed to treat the first 4.5 inches of rainfall runoff, three (3) times the DENR requirement of 1.5 inches. Rip -rap will be used to dissipate the velocities of the incoming runoff, and level spreaders will be used to prevent channelized flow at the entry points to each basin. Spillways will divert excess runoff in large storm events from Basins 1A-1 and 1A-3 to the ditches along NC Highway 210, from Basin 1A-2 to the adjacent jurisdictional stream on the property, and from Basins 1 D-1 and 1 D- 2 to the adjacent wetlands. A small portion of Infiltration Basin 1A-1 will require approximately 12 inches or less of suitable fill to achieve the required two (2) feet of separation from the SHWT, which was allowed by DENR-DWQ under prior applications for this project. Basins 1 B and 1 C are each designed to treat the first 1.5 inches of rainfall runoff. "Off-line" bypass systems will divert excess runoff from large storm events to 50 ft vegetative filters. Rip -rap will be used to dissipate the velocity of the incoming runoff to the stormwater basins as well as at the bypass box discharges. In addition, level spreaders will be employed to prevent channelized flow prior to discharge to the infiltration basins and vegetative filters. The 50 ft vegetative filters will be used to treat runoff in excess of the 1.5 inch volume flowing to the existing 404 wetlands, as shown on the accompanying plans, Using the computer program Hydraflow, the runoff potentially generated for Phases 1 and 2 in their natural state (pre -development) during a 10-year storm was modeled and equals approximately 41.93 ff/s. The runoff generated in the, post -development scenario for Phases i and 2 that will be routed through stormwater basins was also modeled for a 10-year storm and equals The Villages at Tudle Creek 4 of 5 Stommater Management High Density Permit Application approximately 2.58 ft3/s. Therefore, the flow was reduced from the pre - development scenario to the post -development scenario by 39.35 fts/s for a 18- year storm. The modeling results are shown in the Appendix. The proposed storrrynrater management system has been designed in accordance with NCDENR requirements and will not adversely affect .any downstream drainage patterns. Above -Ground Infiltration Basin Maintenance Agreement 1. Stormwater management facilities shall be regularly maintained to ensure they function at design capacity and to prevent health hazards associated with debris build-up and stagnant water. The privately -owned portion of the system must be privately maintained. 2. Responsibility for operation and maintenance of stormwater facilities, including periodic removal and disposal of accumulated particulate material and debris, but not limited to the following: visual inspection of all system components at least twice each year; vacuuming of all storm sewer inlets once every six months (frequency of vacuuming may be adjusted to once a year if first year maintenance records indicate that sediment and debris accumulation is insignificant); reverse flushing and vacuuming if system inspections indicate significant accumulation of sediment in the pipes; and periodic removal and disposal of other material and debris shall remain with the owner or owners of the property, with permanent arrangements that shall pass to any successive owner, unless assumed by a governmental agency. 3. In the event that the facility becomes a danger to public safety or public health, or if it is in need of- maintenance, the owner shall effect such maintenance and repair of the facility in a manner that is approved by the township engineer or his designee. If the owner fails or refuses to perform such maintenance and repair, the municipality may immediately proceed to do so in accordance with the maintenance bond, Additional Information Construction Schedule 1. Perform construction stake out. 2. !nstall temporary gravel construction entrance. 3. Clear site, but do not grub. 4. Install all erosion and sediment control measures. 5. Grub site. 6. Construct sediment basins. The Villages at Turtle Creek 5 of 6 Stormwater Management High Density Permit Application 7. Commence rough grading of site. 8. Install stormwater management devices. 9. Construct sewer collection system. 10. Construct water system. 11. Rough grade the site. 12. Shape shoulders and cut -and -fill slopes. 13. Scarify, seed, fertilize, and mulch all disturbed areas. 14. Install dry utilities (electrical, fiber-optic, cable, phone, etc.). 15. Re -scarify, re -seed, re -fertilize, and mulch all disturbed areas. 16. Construct roadbed base course and intermediate asphalt course. 17. Apply final asphalt course. 18. After disturbed areas are stabilized with vegetation, the contractor shall return to the site and remove all temporary erosion control measures. Vegetation Plan 1. The contractor shall provide seeding and mulching on all disturbed areas within fifteen (15) working days following the completion of any phase of grading. Seeding requirements shall include soil preparation, seed mixtures, and mulching in accordance with the approved Erosion and Sediment Control Permit. 2. Contractor shall provide sod cover on all areas or comply with permanent seeding schedule in accordance with the approved Erosion and Sediment Control Permit. The iillfages at Turtle creek 6 of 6 5tormwater Management High Density Permit Appllcatlon DATE: PROJECT: PROJECT NO.: DESCRIPTION: DRAINAGE AREA DESIGN SHEET April 20, 2007 Turtle Creek - Phase 1 041.05.043 Drainage Area Analysis - Basin 1A-1 DRAINAGE AREA 1A-1 Post Development C A fe A ac 1 Dwelling & Driveway „ GQ;98_:.: I, .,:: ;, A.G0 . 2 Sidewalk A',99 :.'f : -149 01105" 3 Street & Gutter 4 Grass i10.25 968, it t71.0 .i 5 7 Weighted C 0.51 Total Area acres 29,9881 0.69 Impervious Area acres 11,0251 0.25 Percent Impervious 36.8% Volume Runoff to be Controlled From 3 Times a 1.5" Storm Rv=0.05+0.009(1) (Simple Method, Scheuler) 1= 368 Percent Impervious Rv= 0.38 Runoff Coefficient V=P*Rv*Ad Drawdown Calculation P= 4.5 in Design Rainfall V= 0 098 ac-ft Volume To Be Treated V= 4;283 ft3 Volume To Be Treated A= 6,025 fta Area of Treatment Device D= 0.75 ft Pool Depth V= 4,879 ft3 Volume of Treatment 79.00 ft Seasonal High Water Table Elevation 31.00 ft Bottom of Treatment Device 31.75 ft Water Suface Elevation V= 4,283 ft3 Volume To Be Drawn Down A= 6,025 fe Area of Treatment Device k= 0.52 inthr Most Restrictive Infiltration Rate t= 17 hrs Drawdown Time t= 0.7 days RECEIVED APR 2 3 2007 DWQ PROD # SHEET 1 OF 7 DESIGN BY: EG CHECKED BY: ET Pond Report Hydrallow Hydrographs by Intellsolve Tuesday, Feb 13 2007, 10:30 AM Pond No. 1 - Basin 1A-1 Pond Data Pond storage is based on known contour areas. Average and area method used. Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) ]nor. Storage (tuft) Total storage (cult) 0.00 31.00 6,025 0 0 0.75 31.75 6,985 4,879 4,879 1.25 32.25 7.842 3,657 8,536 Culvert I Orifice Structures [A] [B] [C] [0] Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft) = 0.00 0.00 0.00 0.00 Length (ft) = 0.00 0.00 0.00 0.00 Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .000 .000 .000 .000 OrIE Coeff. = 0.00 0.00 0.00 0.00 Multi -Stage = n/a No No No Stage (ft) Weir Structures [A] [B] [C] [D] Crest Len (ft) = 15.00 0.00 0.00 0.00 Crest El. (ft) = 31.75 0.00 0.00 0.00 Weir Coeif. = 3.33 0.00 0.00 0.00 Weir Type = Root --- --- --- Multi-stage, = No No No No Rdlltration = 0.520 In/hr (Contour) Taftater Elev. = 0.00 It Note: CuNertrOrlNce oulftowa have been analyzed under Inlet and outlet control. Stage I Discharge Stage (ft) 2.00 1.80 - 2.00 - 1.80 1.60 1.60 1.40 1.40 1.20 1.20 1.00 0.80 1.00 0•80 1 I I I 0.60 -II 0.60 0.40 0.40 0.20 - 0 00 - 0.20 0.00 O.0o 2.06 4.00 Total Q 6.00 8.00 10.00 12.00 14.00 16.00 18.00 Discharge (cfs) 9 DATE: aril 20, 2007 PROJECT: Turtle Creek - Phase 1 PROJECT NO.: 041.05.043 DESCRIPTION: Drainage Area Analysis -Basin 1A-2 DRAINAGE AREA DESIGN SHEET DRAINAGE AREA 1A-2 Post Development C A A (ac 1 Dwelling & Driveway„r. a:. 004 s' 2 Sidewalk ;I;'0 9.:? 't 1,637 3 Street & Gutter i 238. 4 Grass rj Weighted C 0.54 Total Area (acres) 16,454 0.38 Impervious Area (acres) 6,8751 0.16 Percent Impervious 41.8% Volume Runoff to be Controlled From 3 times a 1.5" Storm Rv=0.05+0.009(1) (Simple Method, Scheuler) 1= 41.8 Percent Impervious Rv= 0.43 Runoff Coefficient V=P`RV°Ad Drawdown Calculation P= 4.5 in Design Rainfall V= O.O80. ac-ft Volume To Be Treated V= 2',629 ft3 Volume To Be Treated A= 2,208 ft' Area of Treatment Device D= 1.25 ft Pool Depth V= 3,331 ft3 Volume of Treatment 28.0 ft Seasonal High Water Table Elevation 30.0 ft Bottom of Treatment Device 31.3 ft Water Suface Elevation V= 2,629 ft3 Volume To Be Drawn Down A= 2,208 It' Area of Treatment Device k= 0.52 inlhr Most Restrictive Infiltration Rate t= 29 hrs Drawdown Time t= 1.2 days RECEIVED APR 2- 3 2007 DWQ PROD # SHEET 2 OF 7 DESIGN BY: EG CHECKED BY: ET Pond Report Hydraflow Hydrographs by Intellsoive Tuesday, Feb 13 2007. 10:30 AM Ponca No. 2 - Basin 1A-2 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage ! Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cult) 0.00 30.00 2,208 0 0 1.00 31.00 2,938 2,573 2,573 1.25 31.25 3.123 758 3,331 2.25 32.25 3,898 3,511 6,841 Culvert 1 Orifice Structures Weir Structures [A] [B] CC] [D] [A] [B] [Cl [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 15.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 31.25 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.38 0.00 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Real --- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No slope (%) = 0.00 0.00 0.00 0.00 N-Valus = .000 .000 .000 .000 4rIE Coeff. = 0.00 0.00 0.00 0.00 Multistage = Ala No No NO Exflltration = 0.520 Inlhr (Contour) Tailwater Elev. = 0.00 ft Stage (it) 3.00 2.00 1.00 000 Stage 1 Discharge Note: CelvetllOniice oWlom have been analyzed under Inlet and outlet control. Stage (ft) 3.00 2.00 C00 0 00 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 Total Q Discharge (oft) 13 1 DATE: PROJECT: PROJECT NO.: DESCRIPTION: April 20, 2007 Turtle Creek - Phase 1 041.05.043 Drainage Area Analysis - Basin 1A-3 DRAINAGE AREA DESIGN SHEET DRAINAGE AREA 1A-3 Post Development C A (fe) A (ac) 1 Dwellinq & Driveway ,, ... .. 2 Sidewalk tl"95s;; 664 3 Street & Gutter 0 Ja:, 1,697 4 Grass a2 ;','] r,'q.11 ;i•. 6 7 Weighted C 0.48 Total Area (acres) 7j0721 0.16 Impervious Area acres 2,361 1 0.05 Percent Impervious 33.4% Volume Runoff to be Controlled From 3 times a 1.5" Storm Rv=0.05+0.009(I) (Simple Method, Scheuler) 1= 334 Percent Impervious Rv= 0.35 Runoff Coefficient V=P*RV*Ad Drawdown Calculation P= 4.5 in Design Rainfall V= 0.021 ac ft Volume To Be Treated V= 929 fe Volume To Be Treated A= 1,085 a Area of Treatment Device D= 1.25 ft Pool Depth V= 1,757 ft3 Volume of Treatment 28.0 ft Seasonal High Water Table Elevation 30.0 ft Bottom of Treatment Device 31.3 ft Water Suface Elevation V= 929 ft3 Volume To Be Drawn Down A= 1,085 fe Area of Treatment Device k= 0.52 inthr Most Restrictive Infiltration Rate t= 29 hrs Drawdown Time t= 1.2 days RECEIVED APR 2 3 2007 DWQ PROJ # SHEET 3 OF 7 DESIGN BY: EG CHECKED BY: , ET Pond Report Hydraflow Hydrographs by Intelisohre Tuesday, Feb 13 2007, 10:30 AM Pond No. 3 - Basin 1A-3 Pond Data Ponca storage is based on known contour areas. Average end area method used. Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgfi) Incr. Storage (cuff) Total storage (tuft) 0.00 30.00 1,085 0 0 1.00 31.00 1.596 1.341 1,341 1.25 31.25 1,732 410 1,757 2.25 32.25 2,314 2,023 3,780 Culvert 1 Orifice Structures [A] [B] [C] [D] Rise (in) = 0.00 0.00 OAO 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft) = 0.00 0.00 0.00 0.00 Length (ft) 0.00 0.00 0.00 0.00 Slope (%) 0.00 0.00 0.00 0.00 N-value .000 .000 .000 .000 Orif. Coeff. = 0.00 0.00 0.00 0.00 Multl-Stage = n/a No No No Stage (ft) 3.00 2.00 1.00 0 nrt Weir Structures [A] [B] [C] [D] Crest Len (R) = 15.00 0.00 0.00 0.00 Crest El. (ft) m 31.25 0.00 0.00 0.00 Weir Coeff. = 3.33 0.00 0.00 0.00 Weir Type = Rect --- --- --- Multi-Stage = No No No No Exfiltration - 0.520 Inthr (Contour) Tailwater Elev. = 0.00 ft Note: CulvediNfi a oulfloava have been analyzed under inlet and outlet control. Stage 1 Discharge .. . ............ . ........... . ....... ... .... .... . . . . ....... IIIIIL_I�J ........... ... I..._.. i Stage (ft) 3.00 2.00 1.00 o n0 0.00 5.00 i0.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 Discharge (cfs) Total 0 i r7 DRAINAGE AREA DESIGN SHEET DATE: April 20, 2007 PROJECT: Turtle Creek - Phase 1 PROJECT NO.: 041.05.043 DESCRIPTION: Drainage Area Analysis -Basin 1 B DRAINAGE AREA 1 B Post Development C. A ftz A ac 1 Dwelling & Driveway ;a.:..:188,569 ;4.:33 !f;•>. 2 Sidewalk 37,613 lyl'rQ=$',!,•c_, 3 Street & Gutter 113,771 4 Grass �}'Gij' 5 g 7 iZIJ Weighted C 0.57 Total Area acres i` ,249 17.27 Impervious Area acres 339,9531 7.80 Percent Impervious 45.2% Volume Runoff to be Controlled From 1.5" Storm Rv=0.05+0.009(I) (Simple Method, Scheuler) 1= 45.2 Percent Impervious Rv= 0.46 Runoff Coefficient V=P*RV*Ad P= 1.5 in Design Rainfall V= 0.666 ac ft Volume To Be Treated V= 42;946 fe Volume To Be Treated A= 4,802 fe Area of Treatment Device D= 5.50 ft Pool Depth Drawdown Calculation V= 56,450 fts Volume of Treatment Okay Capacity 19.0 ft Seasonal High Water Table Elevation 21.0 ft Bottom of Treatment Device 26.5 It Water Suface Elevation V= 42,946 fts Volume To Be Drawn Down A= 4,802 fe Area of Treatment Device k= 3.96 inlhr Most Restrictive Infiltration Rate t= 17 hrs Drawdown Time t= 0.7 days RECEIVED APR Z 3 2007 DWQ PROD # SHEET 4 OF 7 DESIGN BY: EG CHECKED BY: ET Pond Report Hydratlow Hydrographe by Iritelisolve T Pond No. 4 - Basin 1 B Pond Data Pond storage is based on known contour areas. Average end area method used. Stage ! Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Stnrage {cult) Total storage (tuft) 0.00 21.00 4,802 0 0 1.00 22.00 6,615 6,669 5,659 2.00 23.00 8,457 7,486 13,145 3.00 24.00 10,590 9,624 22,668 4.00 25.00 12,925 11,758 34,426 5.00 26.00 15,331 14,128 48,564 5.50 28.50 18,252 7,896 56,449 Ann 27_nO 18.136 8.597 55.046 Culvert! Orifice Structures [A] [B] [C] [a] Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft) = 0.00 0.00 0.00 0.00 Length (ft) = 0.00 0.00 0.00 0.00 Slope (°%) = 0.00 0.00 0.00 0.00 N Value = .000 .000 .000 .000 Orif. Coeff. = 0.00 0.00 0.00 0.00 Multi -Stage = nla No No No Weir Structures [A] [B] [C] [D] Crest Len (ft) = 15.00 0.00 0.00 0.00 Crest El. (ft) = 26.50 0.00 0.00 0.00 Weir Coeff. = 3.33 0.00 0.00 0.00 Weir Type - Rect --- --- --- Muld-Stage = No No No No Ediltratlon = 3.960 inlhr (Contour) Tallwater Elev. = 0.00 R Notes CulvertlOrfte aWkws have been analMd under inlet and outlet control. Stage (ft) Stage 1 Discharge stage (ft) 6.00 6.00 4.00 3.00 2.00 1.00 0.00 0.00 2.00 4.00 6.00 Total Q 6.00 5.00 4.00 3.00 2.00 1.00 0.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 Discharge (cfs) DRAINAGE AREA DESIGN SHEET DATE: April 20, 2007 SHEET 5 OF 7 PROJECT: Turtle Creek - Phase 1 DESIGN BY: EG PROJECT NO.: 041.05.043 CHECKED BY: ET DESCRIPTION: Drainage Area Analysis - Basin 1C DRAINAGE AREA 1C Post Development C A A ac 1 Dwelling & Driveway r;;;;f 4: '; ' 84,875 :. -1; 9. ':r:." 2 Sidewalk 11,809 3 Street & Gutter 38,273 4 Grass 5 Pump Station a 95 d; 4,682 Weighted C 0.58 Total Area acres 283,381 6.51 Impervious Area acres 137,6391 3.16 Percent Impervious 48.6% Volume Runoff to be Controlled From 1.5" Storm Rv=0.05+0.009(I) (Simple Method, Scheuler) 1= 48.6 Percent Impervious Rv= 0.49 Runoff Coefficient V=P*Rv*Ad P= 1.5 in Design Rainfall V= 0.396 ac-ft Volume To Be Treated V= 17,256 fe Volume To Be Treated A= 9,377 ftz Area of Treatment Device D= 2.25 ft Pool Depth Drawdown Calculation V=F 26,859 fe Volume of Treatment Okay Capacity 10.00 ft Seasonal High Water Table Elevation 12.00 ft Bottom of Treatment Device 14.25 ft Water Suface Elevation V= 17,256 fe Volume To Be Drawn Down A= 9,377 ft2 Area of Treatment Device k= 2.99 inthr Most Restrictive Infiltration Rate t= 9 hrs Drawdown Time t= 0.4 days RECEIVED DWQ o� # Pond Report Hydreflow Hydrographs by Intelisolve Tuesday, Feb 13 2007, 10:30 AM Pond No. 5 - Basin 1 C Pond Data Pond storage is based on known contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (tuft) 0.00 12.00 9,377 0 0 1.00 13.00 11,459 10.418 10.418 2.00 14.00 14,194 12,827 23,245 2.25 14.25 14,725 3,615 26,859 2.75 14.75 15,796 7,630 34.490 3.75 15.75 17,980 16,688 51,378 Culvert IOrifice. Structures [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft) = 0.00 0.00 0.00 0.00 Length (ft) = 0.00 0.00 0.00 0.00 Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .000 .000 .000 .000 Orlf. Coeff. = 0.00 0.00 0.00 0.00 Multi -Stage = n/a No No No Stage (ft) 4.00 3.00 2.00 1.00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 15.00 0.00 0.00 0.00 Crest El. lift) = 14.75 0.00 0.00 0.00 Weir Coeff. = 3.33 0.00 0.00 0.00 Weir Type = Ract ... --- -- Multi-Stage = No No No No Exflltration = 2.990 inthr (Contour) Tallwater Elev. = 0.00 It Note: CulveNOriflce outibwe have been analyzed under Inlet and pullet control. Stage I Discharge Stagg (ft) 4.00 3.00 2.00 1.00 0.00 r 1 1 t °1 1 1 , 0.00 0.00 5.00 10.00 16.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 56.00 Total Q Discharge (cfs) 25 1 DATE: PROJECT: PROJECT NO.: DESCRIPTION: April 20, 2007 Turtle Creek - Phase 1 041.05.043 Drainage Area Analysis -Basin 1 D-1 DRAINAGE AREA DESIGN SHEET DRAINAGE AREA iD-1 Post Development C A (ftz) A ac 1 Dwellin & Drivewa ,... ::F;�p„;�'�:�°''; � 8,565.';�,�.. 2 Sidewalk0`ta : 3 Street &Gutter 9,648-. 4 Grasstr!0y::>K„iw';.+'"�Bi: Weighted C 0.65 Total Area acres 38,3011 0.88 Impervious Area(acres) 21,851 1 0.50 Percent Impervious 57.0% Volume Runoff to be Controlled From 3 times a 1.5" Storm Rv=0.05+0.009(I) (Simple Method, Scheuler) 1= 570 Percent Impervious Rv= 0.56 Runoff Coefficient V=P*RV*Ad P= 4.5 in Design Rainfall V= 0.186 ac-ft Volume To Be Treated V=F 8,093 ft? Volume To Be Treated A= 2,790 flz Area of Treatment Device D= 2.25 ft Pool Depth Drawdown Calculation V=F 9,450 f0 Volume of Treatment Okay Capacity 24.00 ft Seasonal High Water Table Elevation 27.00 ft Bottom of Treatment Device 29.25 Water Suface Elevation V= 8;093ii fe Volume To Be Drawn Down A= 2,790 it' Area of Treatment Device k= 2.55 in/hr Most Restrictive Infiltration Rate t= 11 hrs Drawdgwn Time t= 0.4 days RECEIVED APR 2 3 20€ 7 DWQ PROJ # SHEET 6 OF 7 DESIGN BY: EG CHECKED BY: ET Pond Report Hydraflow Hydrographs by Intelisolve Pond No. 6 - Basin 1 D-1 Pond Data Pond storage is based on known contour areas. Average and area method used. Stage ! Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuft) 0.00 27.00 2790 0 0 1.00 28.00 4,049 3,420 3,420 2.00 29.00 5.293 4,671 8,091 2.25 29.25 5,587 1,360 9.450 3.00 30.00 6,575 4,561 14,011 Culvert! Orifice Structures Weir Structures [A►] [B] [C] [D] [A] [B] IC] [D] Rise (in) = 24.00 0.00 0.00 0.00 Crest Len (ft) = 5.00 0.00 0.00 0.00 Span (in) = 24.00 0.00 0.00 0.00 Crest El. (tit) = 29.25 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert EL (ft) = 26.50 0.00 0.00 D.00 Weir Type = Riser --- -- --- Length (ft) = 50.00 0.00 O.DO D.00 Multi -Stage = Yes No No No Slope (%) = 1.00 0.00 0.00 0.00 N Value = .009 .000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multi -Stage = n/a No No No Exfiltration = 2.550 in/hr (Contour) Tallwater Elev. = 0.00 ft Stage (ft) 3.00 2.00 1.00 000 Note: GuhreriHhifies OUIllovls have been analyzed under Intel and culls' Stage 1 Discharge Stage (it) 3.00 2.00 KIM 0.00 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.OD 9.00 10.00 11.00 12.00 Total Q Discharge (cfs) 29 DRAINAGE AREA DESIGN SHEET DATE: April 20, 2007 SHEET 7 OF 7 PROJECT: Turtle Creek - Phase 1 DESIGN BY: EG PROJECT NO.: 041.05.043 CHECKED BY: ET DESCRIPTION: Drainage Area Analysis -Basin 1 D-2 DRAINAGE AREA 1 D-2 Post Development C A (fly) A (ac) 1 Dwelling & Driveway 2 Sidewalk 095 4;;885 b 11' 3 Street & Gutter 0 95; I 21' 997 4 Grass 5i �Illi!! Ili 7 Weighted C 0.65 Total Area (acres)Bb 686 1.85 Impervious Area (acres) 46,652 1 1.07 Percent Impervious 57.8% Volume Runoff to be Controlled From 3 times a 1.5" Storm Rv=0.05+0.009(I) (Simple Method, Scheuler) 1= 57.8 Percent Impervious Rv= 0.67 Runoff Coefficient V=P*Rv*Ad P= 4.5 in Design Rainfall V= 0.396 ao-ft Volume To Be Treated V= 17,258 fe Volume To Be Treated A= 6,534 fe Area of Treatment Device D= 2.05 ft Pool Depth Drawdown Calculation V= 17,335 fP Volume of Treatment Okay Capacity 23.70 ft Seasonal High Water Table Elevation 25.70 ft Bottom of Treatment Device 27.75 ft Water Suface Elevation V= 17,258 ft' Volume To Be Drawn Down A= 6,534 if Area of Treatment Device k= 2.55 in/hr Most Restrictive Infiltration Rate t= 10 hrs Drawdown Time t= 0.4 days RECEIVED APR 2 3 2007 BWQ PROD # Pond Report Hydraflow Hydrographs by Intelisolve Tuesday, Feb 13 2007,10:30 AM Pond No. 7 - Basin 1 D-2 Pond Data Pond storage is based on known contour areas. Average and area method used. Stage 1 Storage Table Stage (1t) Elevation (ft) Contour area (sgft) Incr. Storage (curt) Total storage (cuft) 0.00 25.70 6,534 0 0 0.30 26.00 7.077 2.042 2,042 1.30 27.00 8,964 8,021 10.082 1.55 27.25 9,451 2.302 12,364 1.80 27.60 9,941 2.424 14,788 2.05 27.75 10,434 2,547 17,335 3.05 28.75 12,443 11,439 26,774 CulvertI Orifice Structures [AJ [B] [C] [DI Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Inert El. (a) = 0.00 0.00 0.00 0.00 Length (ft) = 0.00 0.00 0.00 0.00 Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .000 .000 .000 .000 Orif. Coeff. = 0.00 0.00 0.00 0.00 Multi -Stage = n!a No No No Stage (ft) 4.00 3.00 2.00 1.00 0 lift Weir Structures [A] [B] [C] [©1 Crest Len (ft) = 15.00 0.00 0.00 0.00 Crest El. (ft) = 27.75 U0 0.00 0.00 Weir Coaff. = 3.33 0.00 0.00 0.00 Weir Type = Red --- -- --- Multi-Stage = No No No No Exflitratlon = 2.550 inlhr (Contour) Tallwater Elev. = 0.00 It Stage ! Discharge Note: CUWeNOdfioe ouMm have been aneWed under tried and outset cv" Stage (ft) 4.00 3.00 2.00 1.00 0.00 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 55.00 Discharge (ds) Total 0 33 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality April 19, 2007 J.B. Dilsheimer, Vice President DCNC North Carolina I, LLC 2528 Independence Boulevard, Suite 104 Wilmington, NC 28412 Subject: Request for Additional Information Stormwater Project No. SW8 060608 The Villages at Turtle Creek Phases 1 & 2 Onslow County Dear Mr. Dilshemer: The Wilmington Regional Office received a modified Stormwater Management Permit Application for The Villages at Turtle Creek Phases 1 & 2 on February 15, 2007. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please provide legible calculations. Unfortunately, some of the numbers had been highlighted on the original, which copied very dark and obscured the numbers. 2. For Basins 1-B, 1-C and 1 D-2, the drainage areas and built -upon areas reported on the application do not match up with the numbers used in the calculations. Please correct and revise the plans, supplements and calculations as needed. 3. The plan view detail of Basin 1 D-1 on sheet C.7.7 indicates that the emergency outlet elevation is 31.25. Should this be 30.25? 4. Please label the spillway elevation on the plan view detail of Basin 1 D-2 on sheet C.7.8 as 27.75. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to May 19, 2007, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Nam` Caro ' a �tura�� North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.ncwaterguality.org Fax (910) 350-2004 1-877-623-6748 An Equal OpportunRy/Affirmative Action Employer— 50°% Recycled110% Post Consumer Paper Mr. Dilsheimer April 19, 2007 Stormwater Application No. SW8 060608 Mod. Please reference the State assigned project number on all correspondence. Any original documents that need. to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7335. Sincerely, Linda Lewis Environmental Engineer ENB/arl: S:IWQSISTORMWATERIADDINF0120071060608mod. apr07 cc: Eric Tomczak, P.E., Cavanaugh & Associates Linda Lewis Page 2of2 Turtle Creek SW8 060608 Mod. 9 Subject: Turtle Creek SW8 060608 Mod. From: Linda Lewis <linda.lewis@ncmail.net> Date: Thu, 19 Apr 2007 17:40:18 -0400 To: Everett Gupton<everett.gupton@cavanaughsolutions.com> Everett: Attached please find my review comments regarding this application. Linda Content -Type: application/msword 060608mod. apr07. doc Content -Encoding: base64 __ _ i __ . ....... 1 of 1 4/19/2007 5:40 PM PIP'�tim���11k aMARV NN,*1XNIXON ■ i MMAIIAAAAAA)11 Of . -i ►�/f. ,°�< <',. `����� p�AAAAAAIt �)r�lill, Arr►7 Mr_ �� 1 F� zk lis 'I" POW 'Ro7vimi �2 40 NOW I f Ilm-Mm IIII(f r /j}I r lr��• �s� FOR DITCH MAIN INSTALL CONCRETE DRlVCWAY APRON FOR ACCESS M LODGEHALL. RD. AMID \1 �, 101 F PROPOSED PHASE 1 STORMWATER PLAN RAINAGE AREA 1D-1 DRAINAGE AR6ID-AIN AGE AREA ID-2 PHASE 1 DRAINAGE AREAS DRAINAGE AREA 1c DRAINAGE AREA AREA (ACRES) AREA 1A-1 0.69 AREA 1A-2 0.38 AREA 1A-3 0.16 AREA 1B 8.37 DRAINAGE AREA 1R AREA 1C 6.51 AREA 1D-1 0.88 AREA 1D-2 1.85 TOTAL PHASE 1 18.84 RAINAGE AREA 1A-2 DRAINAGE AREA RAINAGE AREA 1A-3 DRAINAGE AREA 1A- PHASE 1 SPECIFICATION JUNCTION BOXES (JB) 3 YARD INLETS (YI) 1 CURB INLETS CI) 25 5' X 7' BYPASS BOX 2 15" HDPE SDR 32.5 1,935 L.F. 18" HOPE SDR 32.5 454 L.F. 24' HOPE SDR 32.5 349 L.F- 30" HOPE SDR 32.5 351 L.F. 36" HOPE SDR 32.5 508 L.F. 42" HOPE SDR 32.5 250 L.F. INFILTRATION BASINS 7 RIP RAP APRONS 15 LEVEL SPREADERS 9 004ERAI NOTED (1) TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND ASSOCIATES, P.LSf L-2981. INFORMATION PROVIDED _ - - (9) LATERAL SEPARAT10H OF SEWERS OR WATER MAINS WATER MAINS SHALL BE LAD AT LEAST TEN (12) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" SEPARATION FROM BOTTOM OF STORMWATER PIPE AND TOP OF FOR ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RF.COROATON. (10) FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR SEWER PIPE (2) BUFFLR NFORIEATOH AND SETBACI(S HAVE BEEN BARRIERS PREVENT A TEN (10) FOOT LATERAL SEPARATION - IN WHICH CASE: (13) ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS TO 13E DIRECTED TO RIGHT-OF-WAY, OR TO YARD NLET (OR OTHER STORMWATER ON (A) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE E EVARON ON THE BOTTOM OF COLLECTION DEVICES) FOR EVENTUAL DISCHARGE TO INFILTRATION BASIN. I�MLAND TiE WATER MAIN AT LEAST EIGHTEEN ITS) INCHES ABOVE THE 7CP OF SEVIER. OR (14) FOR MA)MAIM ALLOWABLE SULT-UPON AREA PER LOT SEE TABLE S7 ON SHEET 5A AND TABLE 5,5 ON SHEET 65.. (3) 7RAl:TOR TO FELD VERff1' ALL FDDSTNG UTLHIIES BEFORE (B) THE WATER MAIN IS LAD IN THE SAME TRENCH AS THE SEWER MTH THE WATER MAIN (13) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS DOES NOT INCLUDE ANY RUNOFF FROM NPERVIOUS SURFACE COMMENCING OONS7RUC710N. LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED AND WITH THE ELEVATION OF FUTURE COMMERCIAL AREA, A PERMIT MODIFICATION WLL BE NECESSARY PRIOR TO CONSTRUCTING ANY (4) IS FOR ALL WASTE 11-E WnDM OF WATER LEAST (EARTH, INCHES ABOVE THE TOP OF SEWER. ADDITIONAL IMPERVIOUS SURFACE MMATERIALS GENERTRACTOR ATED DEMLE OLITION AND GRUBBING (10) CROSSING A WATER MAINS OVER AMAIN SEWER? WHF?EVER NECESa) SARY FOR AA WATER MAIN TO CROSS (10) THE STORMWATER MANAGEMENT PLAN DEMTEO ON THESE SHEETS SHALL BE CON37RU070 IN ACCORDANCE WITH THE SEDMENT ACTIM71ES SHOWN. OVER A SEWER, THE WATER MAIN SHALT. BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF @ EROSION CONTROL PLAN APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. 5 SEDIMENT FENCING TO ( BE AT THE LIMIT OF pSNRBAIICE FOR THIS CONSTRUCTION THE E WATER MAIN IS AT LEAST SICN7FFN 18 INCHES ABOVE ( ) THE TOP OF THE SEWER, UNLESS LOCAL 7 ACCORDING TO THE SEDIMENTATION POLLUTION (» TON CONTROL ACT OF 1973 (NORTH CAROUNA GENERAL STATUTE 51-00) SECT IS SUBJECT TO APPROVED EROSION SITE, AT LEAST ONE FOOT (7') FROM WETLANDS CONDITIONSHEAT BARRIERS PREVENT AN EIGHTEEN (18) INCH SEPARATION -- IN MUCH CASE, BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND AND CONTROL PLAN. THE CONTRACTOR PULL ADHERE TO ALL SHALL O A OF 'THE CONDITIONS SET FORTH IN THE APPROVED PLAN. O APPROVED BY A COPY OF THE APPROVED (11 CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 1. INTERVALS ALONG SEDIMENT FENCING WITH JOINTS THAT ARE EQUIVALENT TO WATER MAN STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE CROSSING. IS APRESCRIBED T SEDIMENTATION AID EROSION CONTROL PLAN SHALL BE DISPLAYED AT THE JOB S1E AT ALL TIMES B STE (18) ALL FITTINGS TO BE MJ DIP MTH THRUST BLOCKING UNLESS OTHERWISE NOTED ON PLANS (7) ALL DISTURBED AREAS TO BE SEEDED. FER711JZED, AND MULCHED (it) CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER MAIN TO (19) EXCELSIOR MATTING AND SEEDING TO BE USED ON SLOPES STEEPER T{AN 2.1. SOD SHALL BE USED FOR ALL SLOPES FLATTER WITHIN 13 CALENDAR DAYS OF GRADING ACTIVITIES (8) WATER, SEWER, AND S70RMWATM PIPES TO BE INSTALLED IN CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE CONSTRUC70 OF FERROUS MATERIALS AND WITH JOINTS EQLNVALE14T TO WATER MAIN STANDARDS FOR A DISTANCE THAN 2.1. (20) FINISHED FLOOR ELEVATION (FFE) DEN71FIED ON THE PLAN IS INDICATIVE OF COMPACTED PAD GRADE TO WHICH 2'-4' OF TOP TRENCHES ACCORDING TO STANDARD SPECIFICATIONS AND DETAILS OF TEN (10) FEET ON EACH SIDE OF THE POINT(S) OF CROSSING. A SECTION OF WATER MAIN SOIL WILL BE ADDED. SEE DETAIL 5/C.7.11. ET EET C.7.10. SHE PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. (21) CONTRACTOR SHALL IMPLEMENT TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH M.U.T.C.D. V= Q Z� a Q Q� C v 3 2 2 0 Table5.1 MAXIMUM IMPERVIOUS SURFACE AREAS FOR PHASE i RESIDENTIAL LOTS LOT NUMBER MAXIMUM IMPERVIOUS SURFACE AREA 0,FT. LOT NUMBER MAXIMUM IMPERVIOUS SURFACEAREA (SO. FT. 1 4,152 24 4182 2 4152 25 3 4152 26 4 4,152 27 31681 5 1 4,300 28 3672 8 4,186 29 3.669 7 3 6fi8 30 3,864 83,603 31 3,659 9 3,607 32 3.633 10 3,607 33 3,602 11 3,517 34 3.801 12 4158 35 31599 13 3.692 36 4,151 14 3,776 37 4,480 15 3.891 38 3.849 18 3.731 39 3.828 17 3,695 40 A022 18 3,676 41 4,255 19 4,211 42 4,087 2D 211 4269 -4,350 43 SA29 44 4,128 22 1 4.161 45 4,425 29 4165 NOTE 1: AVG SO. Fr. PER LOT IS 3,923 SO. FT. 068 669 SO. FT. / 43 LOTS = 3.923 SQ. FT.) NOTE 2: TOTAL B'UA FOR EACH LOT INCLUDES 56 X 59 BUILDING ENVELOPE, PLUS 1S' WIDE DRIVEWAY (VARYING LENGTHS), PLUS SECTION OF DRIVEWAY WITHIN ROW (124 tD 180 SF, DEPENDING ON LOCATION IN PHASE 1), UNLESS OTHERWISE NOTED. SIDEWALKS AND CURB ARE NOT INCLUDED IN BUA. CONSTRUCTION SEQUENCE 1. PERFORM CONSTRUCTION STAKE OUT. 2. INSTALL TEMPORARY GRAVE CCNSTRUCTNN ENTRANCE 3. CLEAR SITE, BUT DO NOT GRUB. 4. 'NSTALL ALL EROSION AND SEDRGEiI7 CONTROL MEASLW_S S GRUB SITE 6. CONSTRUCT SEDIMENT BASINS 7. COMMENCE ROUGH GRADING OF THE SITE e, INSTALL STORMWATER MANAGEMENT DEVICES. 0. CONSTRUCT SEW'Fn COLLECTION SYSTEM. I O.CONSTRUCT WATER SYSTEM. 11. ROUGH GRADE THE SITE, 12.SHAPE SHOULDERS AND CUT AND FILL SLOPES. 13.SCARIFY, SEED„ FERTILIZE AND MULCH ALL DISTURBED AREAS. 14.INSTALL DRY UTILITIES (ELECTRICAL, FIBER-OPTIC, CABLE, PHONE ETC), 15.RE-SCARIFY, RE -SEED, RE-FERTFUZE AND MULCH ALL DISTURBED AREA. 18.CONSTRUCT ROADBED BASE COURSE AND INTERMEDIATE ASPHALT COURSE 17.APPLY FINAL ASPHALT COURSE 1B.AFTER DISTURBED AREAS ARE STABILIZED WITH VEGETATION, THE CONTRACTOR SHALL RETURN TO THE SITE AND REMOVE ALL TEMPORARY EROSION CONTROL MEASURES SHEET NO. C,.5.1 P -� � W U Z LLillU .s P. 01 TRANSACTION REPORT MAR-16-2007 FRI 02:03 PM :K FOR: NCDENR 9103502004 SEND :K DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP MAR-16 02:02 PM 93284132 1'28" 7 FAX TX OK 285 :K TOTAL : 1M 28S PAGES: 7 State OfNot& Ce OHM Deparbnent of Envir+o=ent and Natural Resources Wihmt%non Regional Office A ichael F. Frey, Govemor William Or. Ross Yr., Secretary FAX COVR SHEET Date: /��° 7 No. Of Pages: (esdw bg ter) To: ely/i..s r.0 '.v s From :�ro C9s' rrw e,e-- CO:CO: NC DENR FAX #:io FAX#: 9Ia-350-a004 121 Cordleel Drive Enmeleo, fie, NX_ 2$405aM Tckphme pj% 7q&7W Fs (910) 391,VU An ZqW OPMWdW Al nuMi a Aefin Emp o w. CAVANAU G H Solutions through integrity and partnership February 13, 2007 U( )(, Ms. Linda Lewis Environmental Engineer North Carolina Department of Environment and Natural Resources Division of Water Quality r 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Re: The Villages at Turtle Creek - SW8 060608 Dear Ms. Lewis: \/ Cavanaugh & Associates, P.A. (CA) on behalf of DCNC North Carolina I, LLC, hereby submits the following application to the NCDENR Division of Water Quality for review of the modification of Stormwater Permit SW8 060608. This permit was issued for the subject development identified as `The Villages of Turtle Creek,' which is located in the Town of Surf City, Pender County, North Carolina. The current stormwater permit (SW8 060608) consists of Phases 1 and 2 of the development. Phase 2 is directly adjacent to Phase 1 and utilizes some of the same engineered stormwater controls as Phase 1. CA is applying for the modification of the permit to include changes that have been made to Phases 1 and 2. This modification will demonstrate sufficient capacity in the storm' water management system to accommodate the limited changes to Phases 1 and 2. The modifications addressed in this submission include a revised entrance from NC 210 into Phase 1 of the property, as well as a detailed site plan for the amenity area. Also, subdivision road widths within the property have been reduced, creating a net reduction in the total impervious surface located in Phases 1 and 2. The changes in the entrance, amenity area, and road widths have caused the total built -upon area (BUA) for the phases to be revised as well. Please note, the BUA tables for Phases 1 and 2 have been updated to include only the proposed maximum allowable house footprint and its associated driveway (both on the lot and the right- of-way fronting the lot). In the original permit, all sidewalk within the right-of-way was also included in the calculations for the BUA tables. Per an email discussion with you on October 11, 2006, the sidewalk has been removed from the BUA table. To facilitate your review of the enclosed documentation, the following is a list of the items constituting the application: 1. A check made payable to NC DENR in the amount of $420.00 to satisfy the review fee for this application. 2. One (1) original copy of the executed 'Stormwater Management Permit Application Form.' 3. One (1) copy of the executed `Infiltration Basin Supplement' for Phase 1 Basin 1A-1. 4. One (1) copy of the executed 'Infiltration Basin Supplement' for Phase 1 Basin 1A-2. 5. One (1) copy of the executed 'Infiltration Basin Supplement' for Phase 1 Basin 1A-3. 6. One (1) copy of the executed 'Infiltration Basin Supplement' for Phase 1 Basin 1 B. 7. One (1) copy of the executed 'Infiltration Basin Supplement' for Phase 1 Basin 1 C. 8. One (1) copy of the executed 'Infiltration Basin Supplement' for Phase 1 Basin 1 D-1. The Villages of Turtle Creek 02/13/07 041.05.043 Page 2 of 2 9. One (1) copy of the executed 'Infiltration Basin Supplement' for Phase 1 Basin 1 D-2. 10. Two (2) copies of the 'Stormwater Management Plans,' including sheets C.3.1, C.5.0, C.5.1, C.5.2, C.5.3, C.5.4, C.5.5, C.7.7, C.7.8, C.7.9, C.7.10, and C.7.11. 11. Two (2) copies of the `Stormwater Management High Density Permit Application Supplemental Report.' 12. One (1) copy of the deed for the subject property of which Phases 1 and 2 are a portion. 13. One (1) copy of the Deed Restrictions and Protective Covenants for high density residential subdivisions. 14. One (1) copy of the agent authorization letter. Please note that Phase 1 of the project was issued a Stormwater Management Permit on July 20, 2006, and an Erosion and Sedimentation Control Permit on June 13, 2006, through the express program. An Express Erosion and Sedimentation Control Permit was also issued for Phase 2 on July 13, 2006. Please note, the Phase 1 Stormwater Management Permit had been approved previously on November 30, 2006, for a modification to include Phase 2, which you personally reviewed and approved. Please do not hesitate to contact our office should you have any questions, comments, or require any additional information. Regards, CAVANAUGH & ASSOCIATES, P.A. Everett Gupton, E.I. Cc: Tom Miner, DCNC North Carolina I, LLC 041.05.043 Turtle Creek\Dots\Permits\Stormwater\Phasei\Phasei Modification for 210 Entrance Re-alignmentTermitModCover Letter.doc