Loading...
HomeMy WebLinkAboutSW8060608_Approved Plans_201801120 m Q m I W J E— ry ry Ld Q ry 0 V) Ld Ld v LiJ J F_ N! NOTE: POND ASBUILT DATA FROM SURVEY BY ESP ASSOCIATES, PA, DATED DUNE 29, 2017 N E NC GRID S 0 O ® 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THELOCATIONS OFIXISTING UNDERGROUND UTILMESARE SHOWN IN AN APPROXIMA TE WA Y OK YAND HA 1 /E NOT BEEN INDEPENDENTL Y VERIFIED BY TILE 0WNER OR II S REPRESENTATIVE. THECONM4CTORSHALLDETERMINE71-1E EXACTLOCA TION OFALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TOBERILL Y RESPONSIBLEFORANYAND ALL DAMAGES WHICHMIGHTBE OCCASIONED BY THE CONTRACTORS FAILURE TOEXACTLY LOCA TEAND PRESERVEANY ANDALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTIONSITESAFETYIS THESOLERESPONSIBILITYOF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TOASSUMEANYRESPONSIBILITYFOR SAFETYOF THE WORK OFPERSONSENGAGEDINTHEWORK OFANYNEARBY STRUCTURES, OR OFANYOTHERPERSONS. STORMWATER SUMMARY: 1.5" RUNOFF VOLUME REQUIRED: 42,494 c.f. SEPI Pre - Post 1-Yr, 24-hr RUNOFF REQUIRED: 96,943 cl ENGINEERING & CONSTRUCTION 1025 WADE AVENUE RALEIGH, NORTH CAROLINA 919.789.9977 11020 DAVID TAYLOR DRIVE, SUITE 115 CHARLOTTE, NORTH CAROLINA ASBUILT VOLE: 54704.714.4880 10 c.f. 5030 NEW CENTRE DR., SUITE B PROPOSED VOLUME: 42 647 c.f. WILMINGTON, NORTH CAROLINA 910.523.5715 (Functioning as Wet Detention Basin with No Infiltration) Www.sepiengineering.com RWM EXISTING RIGHT OF WAY MONUMENT W PROPOSED WATER LINE a ECM EXISTING CONCRETE MONUMENT — — - uge - — EXISTING UNDERGROUND ELECTRIC • OP EXISTING IRON PIPE — - C,,e - — EXISTING OVERHEAD ELECTRIC IPS IRON PIPE SET - - fo - EXISTING FIBER OPTIC a OR EXISTING IRON ROD — - - EXISTING TELEPHONE Q IRS REBAR SIT UC EXISTING UNDERGROUND CABLE -EPK EXISTING PK NAIL OC EXISTING OVERHEAD CABLE a PKS PK NAIL SET - g- EXISTING GAS EG M EXISTING GEODETIC MONUMENT SF PROPOSED SILT FENCE 0 CALCULATED PROPERTY CORNER EXISTING STORM PIPE N/F NOW OR FORMERLY PROPOSED STORM PIPE — - — NIGH WADER LINE • X . X • X • X • X . X . X • PROPOSED ABANDON DESIGNATION -- PROPERT( LINE v orb 1 EXISTING TREELIKE PROPERTf LINE NOT SURVEYED EXISTING FENCE — — — EXISTING 'EASEMENT �. EXISTING POWER POLE — 39- EXISTING MINOR CONTOUR EXISTING LIGHT POLE 40 EXISTING 'MAJOR CONTOUR EXISTING FIRE HYDRANT — 3g — PROPOSED MINOR CONTOUR, Lu L_ 0 U CAR�����'' Q�l = SEAL = 2 155 z FI N�- %0 OR4 'pG� w SEAL C-2197 N.0 COPYRIGHT© 2012 SEPI ENGINEERING & CONSTRUCTION, INC LU a n o o z O U LL 0 O 2 w F- U W O J co W CC ¢ O Z N 40 PROPOSED MAJOR CONTOUR Wv — --- — i , -1---- — EXISTING VALVE EXISTING EDGE OF PAVEMENT Wv C H PROPOSED LIMITS OF DISTURBANCE —w —--w — PROPOSED VALVE -M EXISTING FORCEMAIN EXISTING SANITARY MANHOLE z FM PROPOSED FORCEMAIN Q — - s, - - s- - — EXISTING GRAVITY SEINER EXISTING STORM MANHOLE SS � SS r: PROPOSCD GRAVITY SEWER Icv EXISTING IRRIGATION VALVE Z - W - EXISTING WATER LINE rP EXISTING TELEPHONE PEDESTAL W Cr iV EXISTING CABLE BOX r � 0 V N w O N Pi O H rT . w GRAPHIC S ALE � 20 0 10 20 40 0 a. F- W cn PROJECT MANAGER FIELD SURVEY DATE: GRT 8/17/2016 CHECKED BY: C%9T DRAWING DATE: 06/28/2017 ( IN FEET) 1 inch = 20 ft. Horz. DRAWN BY: JOB #: JR8 W6.015 SHEET C-2.1 1of2 1 0 m (10 m I w ry ry w Q ry O U) Y w w ry v w ry T! 0 U V) � 4M o w N 0 D STEEL POST SEE NOTE #5 WOVEN WIRE FENCING, 12" STAY SPACING AS REQUIRED TOP STRAND MIN. #10 GAUGE SILT FILTER FABRIC STAY AND LINE WIRES MIN. #12-1/2 GAUGE N Z 2 y 6" MIN. COMPACTED BOTTOM STRAND FILL OVER SKIRT* MIN. #10 GAUGE I N ANCHOR FABRIC SKIRT W/ MIN. 4" LONG WIRE STAPLES 0 12" O.C. * FOR REPAIR OF SILT FENCE FAILURES, USE #57 WASHED STONE IN LIEU OF COMPACTED FILL NOTES: 1. INSTALL NEW SILT FENCES AS SHOWN ON DRAWING AND AT LOCATIONS NECESSARY TO CONTROL SILTATION OF ADJACENT AREAS. 2. WHERE STEEL POSTS ARE USED, POSTS SHALL BE 5' IN LENGTH AND BE OF THE SELF FASTENER ANGLE TYPE. 3. WOVEN WIRE FENCING, WHERE REQUIRED, SHALL CONFORM TO ASTM A116 FOR CLASS 3 GALVANIZING. FABRIC SHALL BE A MINIMUM OF 32" WIDE AND HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. THE TOP AND BOTTOM WIRES SHALL BE 10 GAUGE AND INTERMEDIATE WIRES SHALL BE 12-1/2 GAUGE. WIRE FABRIC SHALL BE FASTENED TO POSTS. 4. FILTER FABRIC SHALL BE OF NYLON, POLYESTER, PROPYLENE OR ETHYLENE YARN WITH A MINIMUM STRENGTH OF 30 LB/UN. IN. AND A MINIMUM OF 85% FILTERING EFFICIENCY. FABRIC SHALL CONTAIN ULTRAVIOLET INHIBITORS AND STABILIZERS. 5. IF FABRIC FILTER IS USED WITH A STRENGTH OF 50 LB./LIN. IN. OR GREATER, & Q THE POST SPACING DOES NOT EXCEED 6', WOVEN WIRE FENCING IS NOT REQUIRED. OTHERWISE, WOVEN WIRE FENCING IS REQUIRED, AND POST SPACING SHALL NOT EXCEED 8'. TEMPORARY SILT FENCE 1 TOP OF BANK EL. 26.12 I= NTS BOTTOM OF SPILLWAY E. 23' LINE SPILLWAY WITH EXCELSIOR MATTING 16' • OF BANK 01 EL. 26.12 EL 26.12 - - - - EL. 25.60 3- 3 EMERGENCY SPILLWAY DETAIL, NTS 5' EMBANKMENT 21.5 100'x5'x 12" 1 FO R EBAY CLASS "B" RIP RAP 3 BOTTOM EL.18.00 CLEANOUT EL. 17.00 WET POND 1 B PERMITTED 1 /10/17 ASBUILT 6/22/17 PROPOSED 10/11 /2017 ELEVATION, PERMANENT POOL, FMSL: 22.91 22.75 22.75 ELEVATION, TEMPORARY POOL, FMSL: 25.40 25.52 25.00 AREA, PERM. POOL, ft2 17,497 153909 15,909 AREA, TEMP. POOL, ft2 24,093 23,386 21,866 VOLUME PROVIDED (TEMP. POOL), ft2 513780 54,423 423647 A L42" INV.OUT 21.01 'Z n`>�.) PROPOSED 2' LONG RECTANGULAR WEIR (01 2'-0" 6" 4'-0" 6, PLAN SITE N OTES 1. ANY DISCREPANCY IN THIS PLAN AND THE ACTUAL FIELD CONDITIONS SHALL BE REPORTED TO THE ENGINEER AS PRIOR TO START OF CONSTRUCTION. O THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL SETBACKS, EASEMENTS, AND DIMENSIONS SHOWN HEREON BEFORE BEGINNING CONSTRUCTION. `® 3 WORKING DAYS 2. THE CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS, UTILITIES, AND R/W'S (PUBLIC OR PRIVATE) PRIOR TO WORKING IN THESE AREAS. BEFORE YOU DIG 3. THE CONTRACTOR SHALL MAINTAIN THE SITE IN A MANNER SO THE WORKMEN AND PUBLIC SHALL BE PROTECTED FROM INJURY, AND THE ADJOINING FOR THE LOCATION OF PROPERTY PROTECTED FROM DAMAGE. UNDERGROUND FACILITIES Know what's below. 4. THE CONTRACTOR SHALL REMOVE ALL DEBRIS FROM THE SITE UPON COMPLETION OF THE PROJECT AND AT LEAST ONCE A WEEK DURING CONSTRUCTION. Call 5. THE CONTRACTOR SHALL KEEP THE AREA OUTSIDE THE "LIMITS OF CONSTRUCTION" BROOM CLEAN AT ALL TIMES. before you dig. 6. IF DEPARTURES FROM THE DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE TO THE OWNER FOR REVIEW. 7. ALL PERMITS RELATIVE TO THE PROJECT MUST BE OBTAINED PRIOR TO CONSTRUCTION. THE OWNER WILL PROVIDE NCDEQ STORMWATER PERMIT. 8. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH PERMITS ISSUED AND APPLICABLE STATE, TOWN AND LOCAL CODES. THELOCAPONSOFEUST/NGUNDERGROUND IMUTIESARE 9. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS, EQUIPMENT, ETC., THAT MAY BE REQUIRED. SHOWNINANAPPROXIMATEWAYONLYANDHAVENOTBEEN 10. THE ENGINEER/ARCHITECT/OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE PROJECT AS SETFORTH IN INDEPENDENTLYVERIFIED BYTHE OWNER ORITS THESE PLANS. REPRESENTATIVE THECONMACTORSHALLDETERMINETHE EXACTLOCA 77ON OFALL EXISTING U77LI77ESBEFORE COMMENCING WORD ANDAGREES TOBEFULLY RESPONS/BLEFORANYAND GENERAL GRADING NOTES ALLDAMCTUTSFAGES FAILURE TO CTLYLOCCASCA7ENED DP CONTRACTOR'SFAlLURE TOEXACTZY LOCATEAND PRESERVEANY 1. REASONABLE CARE HAS BEEN EXERCISED IN SHOWING THE LOCATION OF EXISTING UTILITIES ON THE PLANS. THE EXACT LOCATION OF SUCH UTILITIES IS ANDAU UNDERGROUND UTILITIES NOT KNOWN IN ALL CASES. THE CONTRACTOR SHALL EXPLORE THE AREA AHEAD OF THE DITCHING OPERATION BY OBSERVATIONS, ELECTRONIC DEVICES, HAND DIGGING, AND BY PERSONAL CONTACT WITH THE UTILITY COMPANIES IN ORDER TO LOCATE EXISTING UTILITIES IN ADVANCE OF THE TRENCHING NOTICE: OPERATIONS SO AS TO AVOID AND PREVENT DAMAGE TO THE EXISTING UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS RESULTING caysTRummsmEsAFETYIsTHEsaEREsPoNslex fTYoFTHE FROM ANY DAMAGE TO THE EXISTING UTILITY LINES INCLUDING, BUT NOT LIMITED TO REPAIRS AND LOSS OF SERVICE REVENUES. CONTRACTOR SHALL COMMACTORNEMHERTHEOWNERNORTHEENGINEERSHALLBE ARRANGE FOR TEMPORARY SUPPORT OF EXISTING UTILITIES, SUCH AS POLES, CONDUITS, FIBER OPTIC CABLES, TELEPHONE CABLES, WATER LINES, ETC.. �'ECTEDTOASSUMEANYRESPONSIBIL OF 7HE WORK, OFPERSONSENGAGEDlNTIfEWORK ORSAFET RK, OFANYNEARBYRBY 2. THE CONTRACTOR SHALL COMPLY WITH THE LATEST REVISIONS AND INTERPRETATIONS OF THE DEPARTMENT OF LABOR SAFETY AND HEALTH REGULATIONS STRUCTURES, OR OFAN Y 07HER PERSONS. FOR CONSTRUCTION PROMULGATED UNDER THE OCCUPATIONAL SAFETY AND HEALTH ACT. 3. THE CONTRACTOR SHALL PLAN AND CONSTRUCT WORK SO AS TO CAUSE MINIMUM INCONVENIENCE TO THE OWNER AND THE PUBLIC. THE CONTRACTOR SHALL PROVIDE, ERECT AND MAINTAIN AT ALL TIMES DURING THE PROGRESS OR TEMPORARY SUSPENSION OF WORK, SUITABLE BARRIERS, FENCES, SIGNS, OR OTHER ADEQUATE PROTECTION, INCLUDING FLAG MEN AND WATCHMEN AS NECESSARY TO INSURE THE SAFETY OF THE PUBLIC AS WELL AS THOSE ENGAGED IN THE CONSTRUCTION WORK. CONSTRUCTION SIGNING SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF "CONSTRUCTION AND MAINTENANCE OPERATIONS SUPPLEMENT TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" BY THE NCDOT. CONTRACTOR WILL BE RESPONSIBLE FOR ONSITE DUST CONTROL. 4. ALL MATERIAL CLEARED AND GRUBBED BY THE CONTRACTOR IN ORDER TO CONSTRUCT THE WORK, SUCH AS TREES, VEGETATION, FENCING, ETC... SHALL SEPI BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE PROPERLY DISPOSED OF OFF -SITE OR BURNED IF PROPER PERMITS ARE RECEIVED. EROSION CONTROL NOTES ENGINEERING & 1. ALL CONSTRUCTION ACTIVITIES SHALL BE PERFORMED IN COMPLIANCE WITH THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973. C 0 N S T R U C T 1 0 N 2. ALL LAND DISTURBING ACTIVITIES ARE TO BE PLANNED AND CONDUCTED TO LIMIT EXPOSURE TO THE SHORTEST FEASIBLE TIME. 1025 WADE AVENUE 3. ALL DISTURBED AREAS SHALL BE STABILIZED BY A PERMANENT GROUND COVER. RALEIGH, NORTH CAROLINA 4. AS SOON AS ALL AREAS ARE PERMANENTLY STABILIZED, ALL PERMANENT MEASURES HAVE BEEN INSTALLED, AND FINAL APPROVAL IS RECEIVED FROM 919 789 9977 THE OWNER, THE TEMPORARY MEASURES MAY BE REMOVED. 5. OVER THE LIFE OF THE PROJECT, THE OWNER SHALL MAKE PERIODIC INSPECTIONS TO EVALUATE THE CONTRACTORS EFFORTS AND SUCCESS IN 11020 DAVID TAYLOR DRIVE, SUITE 115 CONTROLLING EROSION OF SOILS TO OFF -SITE AREAS. IF AREAS ARE FOUND WHERE EROSION IS TAKING PLACE, THE CONTRACTOR SHALL TAKE THE CHARLOTTE, NORTH CAROLINA NECESSARY MEASURES TO REMEDY THE SITUATION. 704.714.4880 6. DRAWING NOTES THAT INDICATE THE INSTALLATION OF TURF REINFORCEMENT TO STABILIZE SOIL AND TO PROTECT SLOPES FROM EROSION REFER TO 5030 NEW CENTRE DR., SUITE B WESTERN EXCELSIOR CORPORATION TURF REINFORCEMENT MATS, "EXCEL PP5-10" OR APPROVED EQUIVALENT. WILMINGTON, NORTH CAROLINA 7. ANY SLOPES GREATER THAN 3:1 SHALL BE STABILIZED IMMEDIATELY WITH TURF REINFORCEMENT. 910.523.5715 www.sepiengineering.com CONSTRUCTION SEQUENCE NOTES: 1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ASSURE ALL SEDIMENT REMAINS ON SITE AND OUT OF SURROUNDING WETLAND AREAS. 2. MEANS AND METHODS OF EROSION CONTROL ARE THE RESPONSIBILITY OF THE CONTRACTOR. 3. MAINTAIN ALL TEMPORARY EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. CA EROSION CONTROL MAINTENANCE PLAN .�`�`\\�� �9 1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR THAT ALL EROSION CONTROL MEASURES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING ��� FESS/� EVERY RUNOFF PRODUCING RAINFALL EVENT, BUT IN NO CASE, LESS THAN ONCE EVERY WEEK AND WITHIN 24 HOURS OF EVERY HALF INCH RAINFALL. 2. DIVERSION DITCHES WILL BE CLEANED OUT IMMEDIATELY TO REMOVE SEDIMENT OR OBSTRUCTIONS FROM THE FLOW AREA. THE DIVERSION RIDGES WILL ALSO BE REPAIRED. SWALES AND DITCHES MUST BE TEMPORARILY STABILIZED WITHIN 21 CALENDAR DAYS OF CEASE OF ANY PHASE OF ACTIVITY 3. ASSOCIATED WITH A SWALE. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES FILLED. THE SEDIMENT FENCE = 1 Z HALF WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. STAKES MUST BE STEEL. STAKE SPACING WILL 6 FEET MAXIMUM WITH THE USE OF LL BE EXTRA STRENGTH FABRIC, �Nr; E�-� � 1 N WITHOUT WIRE BACKING. STAKE SPACING WILL BE 8 FEET MAXIMUM WHEN STANDARD STRENGTH FABRIC AND WIRE BACKING ARE USED. IF ROCKO�e\��� , FILTERS ARE DESIGNED AT LOW POINTS IN THE SEDIMENT FENCE THE ROCK MATERIAL WILL BE REPAIRED OR REPLACED IF IT BECOMES HALF FULL OF SEDIMENT, NO LONGER DRAINS AS DESIGNED OR IS DAMAGED. 4. ALL SEEDED AREAS WILL BE FERTILIZED, RE -SEEDED AS NECESSARY AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. ALL SLOPES WILL BE STABILIZED WITHIN 14 CALENDAR DAYS. ALL OTHER AREAS WILL BE STABILIZED WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS WHICHEVER IS SHORTER. co (3-NTY.) PROPOSED 2' LONG RECTANGULAR WEIR EXIST. TEMP. POOL 25.52 -, SEEDING SCHEDULE o P POSED TEMP. 2. _ 1':--.ALL DISTURBED AREAS DUE TO CONSTRUCTION AND ANY SEVERELY ERODED AREAS SHALL BE STABILIZED BY A PERMANENT GRASS COVER. THE SEED SPECIES SHALL BE SELECTED BASED ON THE TYPE SOIL PRESENT, SEASONAL CONDITIONS AND OTHER CONSIDERATIONS. AS AN ALTERNATIVE, THE CONTRACTOR MAY USE THE METHODS AND SCHEDULES SHOWN BELOW; HOWEVER, IT IS RECOMMENDED T A SPECIALIST BE CONSULTED WITH ATTENTION GIVEN TO SITE SPECIFIC CONDITIONS. 3" CR I FI C E a. CULTIVATE AREA TO A DEPTH OF 5 INCHES. PERMANENT POOL 22.75 b. APPLY AGRICULTURAL LIME UP TO 1 TON PER ACRE FOR SOIL DISTURBED LESS THAN fi", AND 2 TONS PER ACRE FOR SOILS DISTURBED GREATER THAN 6". c. APPLY 10-20-20 COMMERCIAL FERTILIZER AT THE RATE OF 500 LBS. PER ACRE. d. SOW GRASS SEEDS AT THE FOLLOWING RATES PER ACRE. 3 DRY SOILS (APRIL-SEPTEMBER) WET SOILS (APRIL-SEPTEMBER) BERMUDAGRASS ..................30 lbs. BERMUDAGRASS .................. 25 lbs. t CENTIPEDEGRASS...............10 lbs. BAHIAGRASS .......................... 25 lbs.' BAHIAGRASS ..........................30 lbs. CARPETGRASS ...................... 25 lbs. KOBE LESPEDEZA................20 lbs. ANNUAL RYEGRASS or ANNUAL RYEGRASS OR GERMAN MIL.LET.....................25 lbs. BOTTOM 17.00 GERMAN MILLET....................25 lbs. SECTION A - A e. MULCH WITH STRAW AT THE RATE OF 3250 TO 4350 LBS. PER ACRE SHOULD PROVIDE 75% COVER. COVER IN EXCESS OF 75% COULD REDUCE PROPER PLANT GROWTH AFTER SEED GERMINATION. ANCHOR STRAW WITH ASPHALT EMULSION TACK COAT APPLIED AT THE RATE OF 300 GALLONS PER ACRE. OUTLET STRUCTUIU"J1 2 WHERE IT IS NOT POSSIBLE TO ESTABLISH A PERMANENT GRASS COVER IN A REASONABLY PROPOSED TEMPORARY POOL EL. 25.00 EXISTING TEMPORARY POOL EL. 25.52 PERMANENT POOL EL. 22.75 21.5 1� 3 DE71"ENTION POND & FOIREBAY SECTION SHWT 23.41' MAIN POOL 1 3 BOTTOM EL. 17.0 CLEANDUT EL. 16.0 SHORT PERIOD OF TIME DUE TO SEASONAL CONSIDERATIONS, A TEMPORARY GRASS COVER SHALL BE ESTABLISHED. THE TEMPORARY SEED RATE PER ACRE SHALL BE: WI�SEPTEMBER-APRIL) SUMMER .(MAY -AUGUST) ANNUAL RYEGRASS....... 50 lbs. GERMAN MILLET .... 50 lbs. TALL FESCUE.................50 lbs. TEMPORARY COVERS SHALL NOT ELIMINATE THE REQUIREMENT FOR PERMANENT GRASS COVER. WHERE THE SEASON OR OTHER CONDITIONS ARE NOT SUITABLE FOR GROWING A TEMPORARY EROSION RESISTANT COVER, MULCH MAY BE APPLIED; HOWEVER, MULCH USED ALONE SHALL BE FOR THE SHORTEST TIME PRACTICAL. A TEMPORARY OR PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED AS SOON AS CONDITIONS ARE FAVORABLE. 3. TOPSOIL SHALL BE USED OVER ALL SOIL CONDITIONS FOR SUCCESSFUL ESTABLISHMENT OF VEGETATIVE COVER AT A DEPTH OF AT LEAST 4". TOPSOIL TO BE FROM APPROVED NC SOURCE. TOP OF BANK 4. IRRIGATE AS NECESSARY TO OPTIMIZE PLANT GROWTH. EL. 26.12 GROUND STABILIZATION CRITERIA SITE AREA STABILIZATION STABILIZATION 71MEFRAME DESCRIPTION TIMEFRAME EXCEPTIONS * Perimeter dikes, swales, ditches and 7 Days None slopes * High Quality Water (HQW) 7 Days None Zones If slopes are 10' or * Slopes Steeper 7 Days less in length and are not steeper than than 3.1 2:1. 14 days are allowed * Slopes 3:1 or 14 Days 7-days for slopes greater than 50 ft. in flatter length * All other areas None (except for with slopes flatter 14 Days perimeters & HQW than 4:1 Zones) NOT TO SCALE E CR4�F w SEAL C-2197 z N.0 COPYRIGHT© 2012 SEPI ENGINEERING & CONSTRUCTION, INC U j r O N a 0 0 U) z O w � U 0 0 U O W F_ U z CO O J � W J � ¢ o Z �- N z Q H z Q c� Z O W V F74 W Z W W w Q w C) PROJECT MANAGER FIELD SURVEY DATE: Off 8/17/2016 DRAWING DATE: Gff 06/28/209 k B JOB #: JR8 81016.015 SHEET 1 C-3.0 2of2 S' m m Lv J ry Iy Lv Q ry 0 Lx.I Ld U LEI f— ry E�- >', O Q0 I` a o Co N - \ .. Q 0 ry � r X i 1 POND ASBUILT DATA FROM SURVEYBY ESP I ASSOCIATES., Im S STORMWATER SUMMARY: 1.5" RUNOFF VOLUME I\�QU1RED: 42,494 c.f. Pre - Past 1-Yr, 24-hr RUNOFF REQUIRED: 96,943 c.f. ASBUILT VOLUME: 54,423 c.f. (Functioning as Wet Detention Basin with No Infiltration) ® 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what`s below. Call before you dig. ETHELOCATIONSOFEXISTING.UNDERGROUND UTILITIESARE SHOWN INANAPPROXIMATEWAYONLYANDHAVENOTBEEN INDEPENDENTLY VERIFIED BY rHE OWNER OR ITS REPRESENTATIVE. THECONTRACTORSHALL DETERMINE THE NC GRID EXACTLOCATIONOFALLEXIST/NGUTILITIESBEFORE COMMENCING WORK,ANDAGREES rOBEFULLYRESPONSIBLFFORANYAND ALL DAMAGES WHICHMIGHTBE OCCASIONED BY THE CONTRACTORSFAILURETOEkACTLY LOCATEAM7PRESERVEANY ANDALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTTONSITESAFETYIS TTIESOLERESPONSIBILITYOFTHE CONTRACTOR NEITHER THE OWNERNOR THEEKGINEER SHALL BE EXPECTED T'OASSUMEANYRESPONSIBILITYFOR SAFETYOF THE WORK OFPERSONSENGAGEDIN THE WORK, OFANYNEARBY STRUCTURES, OR OFAIVY07HER PERSONS. SEPI E N GIN E E R I N G& C o N S T R U C T 1© N 1025 WADE AVENUE RALEIGH, NORTH CAROLINA 919.789,9977 11020 DAVID TAYLOR DRIVE, SUITE 115 CHARLOTTE, NORTH CAROLINA 704.714.4880 5030 NEW CENTRE DR., SUITE B WILMINGTON, NORTH CAROLINA 910.523.5715 www.sepiengineering.com ,�,ttl!ltlfilll CAR \d Q� �.Ss /Q�� 9 , SEAL. l =� Ze G' F�Gi NSF' Q co �ttiltlt#111/!` v F � W SEAL a C-2197 z `rlliJllttt00``` COPYRIGHT 0 2012 SEPI ENGINEERING & CONSTRUCTION, INC i., LEGEND R RWM EXISTING RIGHT OF WAY MONUMENT W PROPOSED WATER LINE ECM EXISTING CONCRETE MONUMENT -- — EXISTING UNDERGROUND ELECTRIC 0 EIP EXISTING IRON PIPE -- _ _ _ - EXISTING OVERHEAD ELECTRIC fpsIRON PIPE SET --- — — EXISTING FIBER OPTIC w U`_ EIR EXISTING IRON ROD -_ - EXISTING TELEPHONE IRS REBAR SET — EXISTING UNDERGROUND CABLE EPK EXISTING PK NAIL EXISTING OVERHEAD CABLE PKS PK NAIL SET -- EXISTING GAS z EGM EXISTING GEODETIC MONUMENT SF PROPOSED SILT FENCE 6 CALCULATED PROPERTY CORNER m __ EXISTING STORM PIPE N jF NOW OR FORMERLY PROPOSED STORM PIPE O . — HIGH WATER LINE • X • X • X • X • X • x • X • PROPOSED DEMO DESIGNATION ---- PROPERTY LINE EXISTING TREELINE - - PROPERTY LINE NOT SURVEYED _ _-._-- - --- EXISTING FENCE _ EXISTING POWER POLE 39 EXISTING MINOR CONTOUR EXISTING LIGHT POLE 40 EXISTING MAJOR CONTOUR H ,y EXISTING FIRE HYDRANT PROPOSED MINOR CONTOUR 40 PROPOSED MAJOR CONTOUR EXISTING VALVE F� EXISTINGEDGE OF PAVEMENT Q WV PROPOSE} LIMITS OF DISTURBANCE ` —�—" _ PROPOSED VALVE Z I,� M EXISTING FORCEMAIN ti EXISTING SANITARY MANHOLE I••-{ H FM PROPOSED FORCEMAIN EXISTING GRAVITY SEWER v EXISTING STORM MANHOLE j•_•� SS SS PROPOSED GRAVITY SEWER EXISTING IRRIGATION VALVE '`' -- W-- — EXISTING WATER LINE _ EXISTING TELEPHONE PEDESTAL W F—^i 0 1 e/ EXISTING CABLE BOX F-4 "'.-I LLl J U F tt! f- GRAPHIC SCALE I 20' 0 10 20 40 PROJECT MANAGER FIELD SURVEY DATE: CRT 8/17/2016 IN FEET) CHECKED BY: DRAWING DATE: GRT 06/28/2W 1 inch 20 ft. Horz. DRAWN BY: JOB #: JRR SC16.Oi5 SHEET C-2.1 1 of 2 1 a m Q mI �i w J w Q O I- I LLd w w Cr 0 c* STEEL POST SEE NOTE #5 WOVEN WIRE FENCING, 12" STAY SPACING AS REQUIRED TOP STRAND MIN. #10 GAUGE SILT FILTER FABRIC STAY AND LINE WIRES MIN. #12-1/2 GAUGE I z C14 6" MIN. COMPACTED BOTTOM STRAND FILL OVER SKIRT MIN. #10 GAUGE �j C4 ANCHOR FABRIC SKIRT W/ MIN. 4 LONG WIRE STAPLES Q 12" O.C. � FOR REPAIR OF SILT FENCE FAILURES, USE #57 WASHED STONE IN LIEU OF COMPACTED FILL NOTES: 1. INSTALL NEW SILT FENCES AS SHOWN ON DRAWIN G AND AT LOCATIONS 0 S NECESSARY TO CO NTROL SILTATION F 0 ADJACENT ARE AS. 2. WHERE STEEL POSTS ARE USED, POSTS SHALL BE 5' IN LENGTH AND BE OF THE SELF FASTENER ANGLE TYPE. 3. WOVEN WIRE FENCING, WHERE REQUIRED, SHALL CONFORM TO ASTM A116 FOR CLASS 3 GALVANIZING. FABRIC SHALL BE A MINIMUM OF 32 WIDEAND A I F 6 HAVE MINIMUM 0 LINE WIRES WITH 12 STA Y SPACING. THE TOP AND BOTTOM WIRES SHALL BE ` 10 GAUGE AND INTERMEDIATE WIRES SHALL BE 12-1/2 GAUGE. WIRE FABRIC SHAH BE FASTENED TO POSTS. 4. FILTER FABRIC SHALL BE OF NYLON, POLYESTER, PROPYLENE OR ETHYLENE YARN WITH A MINIMUM STRENGTH OF 30 LB/LIN. IN. AND A MINIMUM OF 85% FILTERING EFFICIENCY. FABRIC SHALL CONTAIN ULTRAVIOLET INHIBITORS AND STABILIZERS. 5. IF FABRIC FILTER IS USED WITH A STRENGTH OF 50 LB./LIN. IN. OR GREATER, 9HU THE POST SPACING DOES NOT EXCEED 6, WOVEN WIRE FENCING IS NOT REQUIRED. OTHERWISE, WOVEN WIRE FENCING IS REQUIRED, AND POST SPACING SHALL NOT EXCEED 8. TEMPORARY SILT FENCE NTS 1I I 3 23' I BOTTOM OF 1� I TOP OF BANK SPILLWAY EL 25.60 3 EL. 26.12 LINE SPILLWAY WITH EXCELSIOR MATTING 16' EL. 26.12 25.60 3 3 EMERGENCY SPILLWAY DETAIL Ws WET POND 1B PERMITTED 1 / O/17 ASBUILT 6122117 ELEVATION, PERMANENT POOL, FM'SL. 22.91 22.75 ELEVATION, ION TEMPORARY POOL. FMSL . 254� 2 5.5 2 AREA, PERM. POOL, ft2 17,497 15,909 AREA TEMP. . POOL, ft2 245093 23,386 IKOLUME PROVIDED (TEMP. P 00L .), ft2 511780 80 4 42 5 3 A L42" EL. 26.12 i d- PLAN JIk-,/ I IU1\4 /_\ /-\ OUTUE T STRUC..91MYREE, 5' EMBANKMENT TEMPORARY POOL EL. 25.52 - - - - Q0 �- - - - PERMANENT POOL EL. 22.75 - 21.5 - - 21.5 100'x5'x 12 FOREBAY 1 CLASS »B» RIP RAP 3 MAIN POOL BOTTOM EL.18.00 1 CLEANOUT EL. 17.0 DETENTION POND & FOXREBAY SECTION WS SHWT 23.41' �1 3 BOTTOM EL. 17.0 CLEAN OUT EL. 16.0 SITE NOTES, - 1. ANY DISCREPANCY IN THIS PLAN AND THE ACTUAL FIELD CONDITIONS SHALL BE REPORTED TO THE ENGINEER AS PRIOR TO START OF CONSTRUCTION. O THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL SETBACKS, EASEMENTS, AND DIMENSIONS SHOWN HEREON BEFORE BEGINNING CONSTRUCTION. 0 3 WORKING DAYS 2. THE CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS, UTILITIES, AND R/W'S (PUBLIC OR PRIVATE) PRIOR TO WORKING IN THESE AREAS. " / BEFORE YOU DIG 3. THE CONTRACTOR SHALL MAINTAIN THE SITE IN A MANNER SO THE WORKMEN AND PUBLIC SHALL BE PROTECTED FROM INJURY AND THE ADJOININGFOR THE LOCATION OF PROPERTY PROTECTED FROM DAMAGE. Know whart's below.UNDERGROUND FACILITIES 4. THE CONTRACTOR SHAM- REMOVE ALL DEBRIS FROM THE SITE UPON COMPLETION OF THE PROJECT AND AT LEAST ONCE A WEEK DURING CONSTRUCTION. 5. THE CONTRACTOR SHALL KEEP THE AREA OUTSIDE THE "LIMITS OF CONSTRUCTION" BROOM CLEAN AT ALL TIMES. Cali before you dig. 6. IF DEPARTURES FROM THE DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE TO THE OWNER FOR REVIEW. 7. ALL PERMITS RELATIVE TO THE PROJECT MUST BE OBTAINED PRIOR TO CONSTRUCTION. THE OWNER WILL PROVIDE NCDEQ STORMWATER 'PERMIT. 8. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH PERMITS ISSUED AND APPLICABLE STATE, TOWNAND LOCAL CODES. 9. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTION THOWNINAI NSQFF;IMATE AYOftROUNQUTiLNOTH E S, CERTIFICATIONS, EQUIPMENT, ETC., THAT MAY BE REQUIRED. SHOWN/N;4NAPPROXiA4ATEW�#YONLYANQ/�fAfrENOTBEEN 10. THE ENGINEER/ARCHITECT/OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITHINQEPENQENTtYVERIFIEDBYIRE OWNER ORITS THESE PLANS. THE PROJECT AS SET FORTH 1N REPRESENTATIVE. THECONMCrORSHALL DETERMINE THE IXACTLOCATIONOFALLEX/SFiNGUTILITIESBEFORE COMM€NCENG WORK, ANDAGREES TO BEFULL Y RESPONSIBLEFORANYANQ /� GRADING /� ALL QAMAGESWHICHMIGHTBEOCCASIONED BYTHE GENERAL GRADING NOTES CONM41CTORSFAILURE TOEXACTLYLOCATEANQPRESERVEANY 1. REASONABLE CARE HAS BEEN EXERCISED IN SHOWING THE LOCATION OF EXISTING UTILITIES ON THE PLANS. THE EXACT LOCATION OF SUCH UTILITIES IS ANDALL UNDERGROUND UTILITIES. NOT KNOWN IN ALL CASES. THE CONTRACTOR SHALL EXPLORE THE AREA AHEAD OF THE DITCHING OPERATION BY OBSERVATIONS, ELECTRONIC DEVICES HAND DIGGING, AND BY PERSONAL CONTACT WITH THE UTILITY COMPANIES IN ORDER TO LOCATE EXISTING UTILITIES IN ADVANCE OF THE TRENCHING NOTICE: E OPERATIONS SO AS TO AVOID AND PREVENT DAMAGE TO THE EXISTING UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS RESULTING COSTR N UCTIDNSITESAFETY/STHESOLERESPONS/BlL/TYOFTHE FROM ANY DAMAGE' TO THE EXISTING UTIL ITY LINES.:: INCLUDING BUT NOT LIMITED T REPAIRS CONTRACT(JR NE/THERTHE wN 0 REPAI AND. LOSS OF SERVICE REVENUES. CONTRACTOR SHALL o ERNOR rnEENG/NEERSHALLBE ARRANGE EXPECTED T A RAN E FOR TEMPORARY O ssUMEANYRE P N ORAR SUPPORT S O StB1UTYFOR ETY F ORT OF :EXISTING UTILITIES, SUCH AS POLES, CONDUCTS, FIBER OPTIC CABLES, TELEPHONE CABLES WATER LINES, � ° TxE ES, ETC., WORK, OFPERSONSENGAGEDINTHFWORK OFANYNEARBY 2. THE CONTRACTOR SHALL COMPLY WITH THE LATEST REVISIONS AND INTERPRETATIONS OF THE DEPARTMENT OF LABOR SAFETY AND HEALTH REGULATIONS :STRUCTURES, oROFANYOTHERPERSONs FOR CONSTRUCTION PROMULGATED UNDER THE OCCUPATIONAL SAFETY AND HEALTH ACT. 3. THE CONTRACTOR SHALL PLAN AND CONSTRUCT WORK SO AS TO CAUSE MINIMUM INCONVENIENCE TO THE OWNER AND THE PUBLIC. THE CONTRACTOR SHALL PROVIDE, ERECT AND MAINTAIN AT ALL TIMES DURING THE PROGRESS OR TEMPORARY SUSPENSION OF WORK SUITABL E •.BARRIERS, FENCES, SIGNS,. OR OTHER ADEQUATE PROTECTION, INCLUDING FLAG MEN AND WATCHMEN AS NECESSARY TO INSURE THE SAFETY OF THE PUBLIC AS WELL AS THOSE ENGAGED IN THE CONSTRUCTION WORK. CONSTRUCTION SIGNING SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF "CONSTRUCTION AND MAINTENANCE OPERATIONS SUPPLEMENT TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" BY THE NCDOT. CONTRACTOR WILL BE RESPONSIBLE FOR ONSITE DUST CONTROL. 4. AL L MATERIAL CL EARED D AND GRUBBE D BY THE CONTRACTOR IN ORDE R TO CONS TRUCT E C THE WORK SUCH AS TREES, FENCING, VEGETA TION, ON , ETC... SHALL BECOME THE P OFF -SITE" PROPERTY OF THE CON TRACTOR R AND SHALL BE PROPERLY DISPOSED OF OFF SCTE OR BURNED IF PROPER PERMITS ARE RECEIVED. SEPI EROSION CONTROL NOTES ENGINEERING & 1. ALL CONSTRUCTION ACTIVITIES SHALL BE PERFORMED IN COMPLIANCE WITH THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973. C 0 N S T R U C T 1 0 N 2. ALL LAND DISTURBING ACTIVITIES ARE TO BE PLANNED AND CONDUCTED TO LIMIT EXPOSURE TO THE SHORT EST FEASIBLE TIME.. 1025 WADE AVENUE 3. ALL DISTURBED AREAS SHALL BE STABILIZED BY A PERMANENT GROUND COVER. � 4. AS SOON AS ALL AREAS ARE PERMANENTLY STABILIZED ALL PERMANENT RALEIGN, NORTH CAROLINA HAVE BEEN INSTALLED, AND FINAL APPROVAL IS RECEIVED FROM THE OWNER, THE TEMPORARY MEASURES' MAY BE REMOVED. 919.789.9977 5. OVER THE LIFE OF THE PROJECT, THE OWNER SHALL MAKE PERIODIC INSPECTIONS TO EVALUATE THE CONTRACTORS EFFORTS AND SUCCESS IN 11020 DAVID TAYLOR DRIVE, SUITE 115 CONTROLLING EROSION OF SOILS TO OFF -SITE AREAS. IF AREAS ARE FOUND WHERE EROSION IS TAKING PLACE, THE CONTRACTOR SHALL TAKE THE CHARLOTTE, NORTH CAROLINA NECESSARY MEASURES TO REMEDY THE SITUATION. 704.714.4880 6. DRAWING NOTES THAT INDICATE THE INSTALLATION OF TURF REINFORCEMENT TO STABILIZE SOIL AND TO PROTECT SLOPES FROM EROSION REFER TO 5030 NEW CENTRE DR., SUITE B WESTERN EXCELSIOR CORPORATION TURF REINFORCEMENT MATS, "EXCEL PP5-10" OR ' APPROVED EQUIVALENT. WILMI NGTON, NORTH CAROLINA 7. ANY SLOPES GREATER THAN 3:1 SHALL BE STABILIZED IMMEDIATELY WITH TURF REINFORCEMENT. 910.523.5715 www.sepiengineering.com CONSTRUCTION SEQUENCE NOTES; 1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ASSURE ALL SEDIMENT REMAINS ON SITE AND OUT OF SURROUNDING WETLAND AREAS. 2. MEANS AND METHODS OF EROSION CONTROL ARE THE RESPONSIBILITY OF THE CONTRACTOR. 3. MAINTAIN ALL TEMPORARY EROSION' CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. `�,ttttllrr,IL! EROSION CONTROL MAINTENANCE PLAN ,.,``� CARQ�'`'f,,, 1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR THAT ALL EROSION CONTROL MEASURES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING ASS/0 EVERY RUNOFF" PRODUCING RAINFALL EVENT, BUT IN NO CASE, LESS THAN ONCE EVERY WEEK AND WITHIN 24 HOURS OF EVERY HALF INCH RAINFALL. 2. DIVERSION DITCHES WILL BE CLEANED OUT IMMEDIATELY TO REMOVE SEDIMENT OR OBSTRUCTIONS FROM THE FLOW AREA. THE DIVERSION RIDGES WILL - SEAL ALSO BE REPAIRED. SWALES AND DITCHES MUST BE TEMPORARILY STABILIZED WITHIN 21 CALENDAR DAYS OF CEASE OF ANY PHASE OF ACTIVITY = ASSOCIATED WITH A SWALE. = 21155 z 3. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES HALF FILLED. THE SEDIMENT FENCE WILL BE REPAIRED ASj�: NECESSARY TO MAINTAIN A BARRIER. STAKES MUST BE STEEL. STAKE SPACING WILL BE 6 FEET MAXIMUM WITH THE USE OF EXTRA STRENGTH FABRIC, 1 N E Q WITHOUT WIRE BACKING. STAKE SPACING WILL BE 8 FEET MAXIMUM WHEN STANDARD STRENGTH FABRIC AND WIRE BACKING ARE USED. IF ROCK FILTERS ARE DESIGNED AT LOW POINTS IN THE SEDIMENT FENCE THE ROCK MATERIAL WILL BE REPAIRED OR REPLACED IF IT BECOMES HALF FULL OF SEDIMENT, NO LONGER DRAINS AS DESIGNED OR IS DAMAGED. 4. ALL SEEDED AREAS WILL BE FERTILIZED, RE -SEEDED AS NECESSARY AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN ! A VIGOROUS, DENSE VEGETATIVE COVER. ALL SLOPES WILL BE STABILIZED WITHIN 14 CALENDAR` DAYS. ALL OTHER AREAS WILL BE STABILIZED WITHIN t t t t I I r I I I I 15 WORKING DAYS OR 90 CALENDAR DAYS WHICHEVER IS SHORTER. ,•`�G C o/vS OR4 LLJ SEAL S L� �E.Djj 1-'- ALL. DIS'TUR ' A � DUE TO CONSTRUCTION AND ANY SEVER ERODED AREAS SHALL BE STABILIZED BY A PERMANENT GRASS COVER. THE SEED SPECIES SHALL BE SELECTED BASED ON` THE TYPE SOIL PRESENT, SEASONAL CONDITIONS AND OTHER CONSIDERATIONS. AS AN ALTERNATIVE, THE CONTRACTOR MAY USE THE METHODS AND SCHEDULES SHOWN BELOW-, HOWEVER, IT IS RECOMMENDED THAT A SPECIALIST BE CONSULTED WITH ATTENTION GIVEN TO SITE SPECIFIC CONDITIONS. a. CULTIVATE AREA TO A DEPTH OF 5 INCHES. b. APPLY AGRICULTURAL LIME UP TO 1 TON' PER ACRE FOR SOIL DISTURBED LESS THAN 6", AND 2 TONS PER ACRE FOR SOILS DISTURBED GREATER THAN 6". c. APPLY 10-20-20 COMMERCIAL. FERTILIZER AT THE RATE OF 500 LBS. PER ACRE. d. SOW GRASS SEEDS AT THE FOLLOWING RATES PER ACRE. DRY SOILS WRIL-SEPTEMB WET SOILS (MRIL-S_EPTEM_ BER) BERMUDAGRASS ..................30 tbs. BERMUDAGRASS.................. 25 tbs. CENTIPEDEGRASS...............10 tbs. BAHIAGRASS .......................... 25 tbs. BAHIAGRASS ..........................30 tbs. CARPETGRASS ...................... 25 tbs. KOBE LESPEDEZA................20 Ibs. ANNUAL RYEGRASS or ANNUAL RYEGRASS OR GERMAN MILLET...................25 tbs. 1.00 GERMAN MILLET....................25 lbs. e. MULCH WITH STRAW AT THE RATE OF 3250 TO 4350 LBS. PER ACRE SHOULD PROVIDE 75% COVER. COVER IN EXCESS OF 75% COULD REDUCE PROPER PLANT GROWTH AFTER SEED GERMINATION. ANCHOR STRAW WITH ASPHALT EMULSION 'TACK COAT APPLIED AT THE RATE OF 300 GALLONS PER ACRE. 2. WHERE IT IS NOT POSSIBLE TO ESTABLISH A PERMANENT GRASS COVER IN A REASONABLY SHORT PERIOD OF TIME DUE TO SEASONAL_. CONSIDERATIONS, A TEMPORARY GRASS COVER SHALL BE ESTABLISHED. THE TEMPORARY SEED RATE PER ACRE SHALL BE WINTER SEPTEMBER-APRIL) SUMMER (MAY --AUGUST) ANNUAL RYEGRASS ....... 50 Ibs. GERMAN MILL ET. ... 50 Ibs. TALL FESCUE.................50 tbs. TEMPORARY COVERS SHALL NOT ELIMINATE THE REQUIREMENT FOR PERMANENT GRASS COVER. WHERE THE SEASON OR OTHER CONDITIONS ARE NOT SUITABLE FOR GROWING A TEMPORARY EROSION RESISTANT COVER, MULCH MAY BE APPLIED; HOWEVER, MULCH USED ALONE SHALL BE FOR THE SHORTEST TIME PRACTICAL. A TEMPORARY OR PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED AS SOON AS CONDITIONS ARE FAVORABLE. W J LL 0 a C C-2197 Al C . II/Itiltlt,,, COPYRIGHT © 2012 SEP! ENGINEERING & CONSTRUCTION, INC U o z o LD W n Of a 0 z 3. TOPSOIL SHALL BE USED OVER ALL SOIL CONDITIONS FOR SUCCESSFUL ESTABLISHMENT OF VEGETATIVE COVER AT A DEPTH OF AT LEAST 4". TOPSOIL TO BE FROM APPROVED NC Q TOP OF BANK 4. IRRIUGATE AS NECESSARY TO OPTIMIZE PLANT GROWTH. � I~ EL. 26.12 GROUND STABILIZATION CRITERIA SITE AREA STABILIZATION STABILIZATION DESCRIPTION TIMEFRAME TIMEFRAME EXCEPTIONS � Perimeter dikes, swales, ditches and 7 Days None slopes High Quality Water (HQW) 7 Days None Zones If slopes are 10' or Slopes Steeper than 3.1 7 Day less in length and are not steeper than 2:1, 14 days are allowed * Slopes 3:1 or flatter 14 Days 7-days for slopes greater than 50 ft. in length * All other areas None (except for with slopes flatter 14 Days perimeters & HQW than 4:1 1 Zones) J 0 �- GRAPRIC SCALE � cfit z ## O ## ## # a. Cf) PROJECT MANAGER FIELD SURVEY DATE: GRT 8/17/2016 ( IN FEET } CHECKED BY: DRAWING DATE: Gff 06/28/209 1 inch = ## ft. Harz. DRAWN BY: JOB #: JRS SC1 M5 SHEET C-3.0 2of2 0 1a 0 E NC GRID ST RMW R *- 1. " RUNOFF VOLUME REQUIRED: 42,995 c.f. Pre - Past 1-Yr, - RUNOFF I . .f. EXISTING VOLUME: 37,810 C f, (Functioningas Wet Detention Basin with No Infiltration) SBUILT VOLUME: , c.f. (Functioning as Wet Detention Basin with No Infiltration Note: Existing Infiltration Basin IB provided and was en-n tted for 56,451 c.f: However, with the variance in existing condition SHWT a significant amount of that treatment volume has been lost, Conversion to Wet Detention with additional excavation will allow the Basin tea function above the required 1..5" runoff volume requirements NOTE: ALTERNATIVE DESIGN PROVIDES EQUAL R BETTER T RMW TER CO TR L* EQUAL R BETTED PROTECTION F WATERS OF THE STATE, & RESULT IN NO INCREASED POTENTIAL CAR NUISANCE CONDITIONS COMPARED TO THAT F EXISTING IN' FILTRATION BASIN I B. LEGEND RWM EXISTING R GHT OF WAY MONUMENT W PROPOSED WATER LINE ECM EXISTING CONCRETE MONUMENT _ t 4 EXISTING UNDERGROUND ELECTRIC E!P EXISTING IRON PIPE _,; > _._ EXISTING OVERHEAD ELECTRIC n IRON PIPE SET jtb EXI.S71NG FIBER OPTIC ! EIR EXISTING IRON ROD —_,_._- EXISTING TELEPHONE IRS REBAR SET , _ EXISTING UNDERGROUND CABLE AEWEXISTING PIS NAIL EXISTING OVERHEAD CABLE APKS PK FAIL SET _ . � . � _. ,w�.. _— _ EXISTING GAS EXISTING GEODETIC MONUMENT SF PROPOSED SIFT FENCE 0 CALCULATED PROPERTY CORNER EXISTING STORM PIPE N f F NOW OR FORMERLY PROPOSED STORM PIPE HIGH WATER LINE • . X - X - X • X - X - X • PROPOSED DEMO DESIGNATION --- PROPERTY LINE " ` EXISTING TREEL,INE PROPERTY LIFE NOT SURVEYED --- ., — --- EXISTING FENCE if/.... *WOW iW b► UWW ,dew. WPM EXISTING EASEMENT r _ EXISTING POWER POLE Viz. _ __ EXISTING i -NOR CONTOUR 4v EXISTING LIGHT POLE _, <s 40 .. ..._ _, , .. EXISTING I TOR CONTOUR EXISTING FIRE HYDRANT PROPOSED MINOR CONTOUR ._...... PROPOSED MAJOR CONTOUR « S EXISTING VALVE ---- __ EXISTING EDGE OF PAVEMENT WV >. ,u — PROPOSED LIMITS OF DISTURBANCE --- -- — PROPOSED VALVE _ I-M EXISTING FORCEMAIN EXISTING SANITARY MANHOLE FM PROPOSED FORCEI AW <; EXISTING GRAVITY SEWER EXISTING STORM MANHOLE SS PROPOSED GRAVITY SEWER EXISTING IRRIGATION VALVE EXISTING WATER LINE � EXISTING TELEPHONE PEDESTAL. CAI 1 R' EXISTING CABLE BOX GRAPHIC SCALE 20 O 10 20 40 IN FEEr 1 inch = 20 ft. Horz. 0 0 Uj 0 0 3 WORDING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know. whars below. Call before you dig. CA 21 611 R. &C0 0 ` f SEAL C-2197 00 COPYRIGHT 0 2012 SEPI ENGINEERING 4 C"ONSTRUCTION, INC LU M FEEL POST SEE NOTE, WOVEN WIRE FENCING, 120 STAY SPACING AS REQUIRED TOP �� MIN. #10 GAUGE SILT FILTER FABRIC STAY AND LINE WIRES T MIN.._. 12-1 2 GAUGE ' ---'-- 6" MIN. COMPACTED FILL OVER'SKIRT BOTTOM STRAND MIN. #10 GAUGE ANCHOR FABRIC SKIRT W/ MIN. e LONG WIRE STAPLES 0 1 2" O.C. FOR REPAIR OF SILT !FENCE FAILURES, USE #57 WASHES STONE IN LIEU OF COMPACTED FILL NOTES., 1. INSTALL NEW SILT FENCES AS SHOWN ON DRAWING AND AT LOCATIONS NECESSARY TO CONTROL SILTATION OF ADJACENT AREAS. . WHERE STEEL POSTS ARE USED, POSTS SHALL BE 5' IN LENGTH AND BE OF THE SELF FASTENER ANGLE TYPE. i � 3. WOVENl WIRE FENCING WHERE REQUIRED SHALL CONFORM TO ASTM A11 fi FOR CLASS 3 GALVANIZING. FABRIC SHALL BE A MINIMUM OF 32" WIDE AND HAVE A MINIMUM OF fi LINE WIRES WITH 12" STAY SPACING. THE TOP AND BOTTOM WIRES SHALL BE 10 GAUGE AND INTERMEDIATE MIRES SHALL BE 12--1/2 GAUGE. WIRE FABRIC SHALL BE FASTENED TO POSTS. 4_ FILTER FABRIC SHALL BE OF ON POLYESTER PROPYLENE OR ETHYLENE YARN WITH A MINIMUM STRENGTH OF 30 LB IN. IN. AND A MINIMUM OF 85% FILTERING EFFICIENCY. FABRIC SHALL CONTAIN ULTRAVIOLET INHIBITORS AND STABILIZERS. 5. IF FABRIC FILTER IS USED WITH A STRENGTH OF 50 LB. JfiLIN. IN. OR GREATER, AK THE POST SPACING DOES NOT EXCEED �6% VEN f WIRE FENCING IS NOT REQUIRED. OTHERWISE, WOVEN WIRE FENCING IS REQUIRED, AND POST SPACING SHALL NOT EXCEED B'. TEMPORARY SILT FENCE NITS 0' SPILLWAY EL. LINE SPILLWAY WITH EXCELSIOR MATTING } EL. 26.20 EL. 25.80 1� 3 EMEIR-G`ENCT. SPILLWAY DET--A---IL r g 21.5 000, ? x 7 24 1 FOREBAY CLASS I; B RIP RAP BOTTOM EL. 17.00 CLEANOUT EL. 16.0 { WET POND 1B I ELEVATION, PERMANENT POOL, FMSL. EA, PERM. POOL, ft2 j VOLUME PROVIDED (TEMP POOL), ft2 M TT 41 -07 1 6 Ta P i:_A N ,. Yl =ar a i . . - • a i i M > is i. + . ny i. i BEFORE YOU DIG FOR THF LOCATION OF UNDERGROUND FACILMES °i t Know w. i r i r i• p • • i i Y lY. f li i i- r.M , i* Y., i A# Call before dig. ■Y y you i # im . ` + # '"'i !• / sr iR * * i i R Rri ! N iR s • Hi j( i i i s i W* r R i1 « H + i 14 c * c � + � i ` i.R.. � � � � � �� � w a rail 9 r i i64 A111MIi i' "' i i i i! 1 is i i •. it ' �! #' i MECJ '#FORMFMCF71C y M i 'M � _�.. 1� , i F i i �♦ a� + a r is y R + yf".. 1� s# i 1 7s• i. i �. i i •s i 1 M i!i i i' ii r r. i s- s j O s j � • ; i R , - � , s# #.s i i �s � i g � i. i � .r R a, �. it ff � i - iP • Y , i R � j s 1025 WADEAVENUE 919.7899977 CHARLOTTE, NORTH CAROLINA i i 'i i ! i i i ar # i t i! • i i 704.714.4880 ` ♦ # ` +.. , a r ' i' i ,`.r i. *. es i i # ri., si. i . ,... R 5030 -EW CENTRE DR w WILMINGTONNORTH i' t J� F iY s y a R * ■ R s; :S 10,5215715 www.sepiM e R0 - - gi 3 j if ff ffff f #f f f�f ' # i i '• it `i i i `i + # i i" ,. i !' '' i ! • �` *ff� � rr ! y y °' f° * # .. �.r s# i r y • f;#• •�#ff' rF:. °f s# - s - s r - s �� # r y R � y �. s �. a . � U'.. y S. .` � i' i � 6+ R` 1� a. t - R F: 3 � R9.� .. i a' . ar- « ,- s °'a 8"• 7� :..; � ar , �s *. � i . R . f y1F r ■ ' it f. � � a ® � a � i R.. r EL, 26.20 7 TOP OF BANG TEMP; FOOL 25.E SEEDING C 1. ALL DISTURSED'AREAS DUE TO CONSTRUCTION AND ANY I EI..Y ERODED AREAS SHALL BE s-' STABILIZED R ENT GRASS . THE SPECIES SHALL BE SELECTED BASED BY A PE G COVER E SEED EC ON THETYPESOIL PRESENT, SEASONAL CONDITIONS AND OTHER CONSIDERATIONS. AS AN ALTERNATIVE, THE CONTRACTOR MAY USE THE METHODS AND SCHEDULES SHOWN BELOW; HOWEVER, IT IS RECOMMENDED T A SPECIALIST' BE CONSULTED WITH ATT'ENTTON GIVEN TO SITE SPECIFIC CONDITIONS. }T HDPE a. CULTIVATE AREA TO A DEPTH OF 5 INCHES. b. APPLY AGRICULTURAL LIME UP TO 1 TON PER ACRE FOR SOIL DISTURBED LESS THAN PERMANENT ' I_ i 67, AND 2 TONS PER ACME FOR SOILS DISTURBED GREATER THAN 5'% c. APPLY 10-20--20 COMMERCIAL FERTILIZER AT THE RATE OF 500 LBS. PER ACME. INV . 2 1 3'} FI E d SOW GLASS SEEDS AT THE FOLLOWING DATES PER ACRE. DRY SQILS(MRIL—SEPTEMB WU $OILS WRIT SEI: IE B 4 •OT 1< 0 BERMUDAGRASS .....f*.... 30 tbs.BRU VRASS.................4 5 tbs. CENTIPEDEGRASS...............10 . IAGRASS..........................25 lbs. -. jjtb (y B 14\L S..........................30 tbs. CARE} I AS ...................... 25 Ibs. R KOBE LESPEDEZA.................20 tbs. ANNUAL RYEGRASS or ANNUAL RYEGRASS OR GERMAN MILLET....................25 tbs. BOTTOM 16.00 GERMAN MILLET....................25 tbs. SECTION A A ACRE e. MULCH WITH STRAW AT THE RATE OF 3250 TO 4350 LBS. PER SHOULD PROVIDE 75X COVER. COVER IN EXCESS OF 75X COULD REDUCE PROPER PLANT GROWTH AFTER SEED GERMINATION. ANCHOR STRAW WffH ASPHALT EMULSION TACK COAT APPLIED AT THE RATE OF 300 GALLONS PER ACRE. 0TJTL'E:jrjvL STRUCTURE 2. WHERE IT IS NOT POSSIBLE TO ESTABLISH A PERMANENT GRASS COVER , IN A REASONABLY SHORT PERIOD OF TIME DUE TO SEASONAL CONSIDERATIONS, A TEMPORARY GRASS 'COVER l" SHALL BE ESTABLISHED. THE TEMPORARY SEED RATE PER ACRE SMALL BE. WI (5EE1EM11E APRIL) SIMMER M&--AL U ANNUAL RYEGRASS....... 50 lbs. GERMAN MILLET ...50 tbs. TALL FESCUE.................50 tbs. TEMPORARY COMERS SHALL NOT ELIMINATE THE REQUIREMENT FOR PERMANENT GRASS COVER. WHERE THE SEASON OR OTHER CONDITIONS ARE NOT SUITABLE FOR GROWING A TEMPORARY EROSION RESISTANT COVER, MULCH MAY BE APPLIED, HOWEVER, MULCH USED ALONE SMALL BE FOR THE SHORTEST TIME PRACTICAL.. A TEMPORARY OR PERMANENT ` VEGETATIVE COVER SHALL BE ESTABLISHED AS SOON AS CONDITIONS ARE FAVORABLE. 3. TOPSOIL SHALE. BE USED OVER ALL SOIL CONDITIONS FOR SUCCESSFUL ESTABLISHMENT ' OF VEGETATIVE COVER AT A DEPTH OF AT LEAST 4". TOPSOIL TO BE FROM APPROVED NC SOURCE. TOP OF BANK 4. IRRIGATE AS NECESSARY TO OPTIMIZE PLANT GROWTH. TEMPORARY POOL EL. 25.E _ HWT 23.41 PERMANENT POOL EL. �22.75 . MAIN POOL 1� 3 3 BOTTOM EL. 16.0 CLEANOUT EL. 15.0 DETENTION POND & FOREBAY SE%f--',r.LrION NTS 0 LLJ N ROUND STABILIZATION CRITERIA SITE AREA STABILIZATION STABILIZATION TIMEFRAME DESCRIPTION TIMEFR+IE EXCEPTIONS Perimeter dikes, swot, ditches and 7 Days None slopes ' High Quality Water (HOW) 7 Days None Zones If slopes are 10' or ' Slopes Steeper 7 Days less in length and ore not steeper than than 3.1 21, 14 days are allowed Slopes 3.1 or 14 Days 7-days for slopes greater than 50 ft. in flatter length All ether areas None (except for with slopes flatter 14 Days perimeters & HQW than 4A Zones) SEAL to a —7 `s k C '" f���fiiltllt��� COPYRIGHTO 20,12 SEPI ENGINEERING & CONSTRUCTION, Uj oil ## 0 ## PROJECT MANAGER FIELD SURVEY DATE: 8/17/6 ( IN FEET CHECKED BY: DRAWING DATE: O6/28 1 inch = ## ft. Harz. DRAWN BY' JOB JRS E SC16.015 SHEET C-3.0 2 of STEEL POST SEE NOTE #5 12" STAY SPACING WOVEN WIRE FENCING, AS REQUIRED TOP ..STRAND MIN. #10 GAUGE SILT FILTER FABRIC STAY AND LINE WIRES MIN. 1.2-1 , 2 GAUGE N 6" MIN. COMPACTED BOTTOM STRAND FILL OVER SKIRT * MIN. #10 GAUGE N� ANCHOR FABRIC ABR C SKIRT Wf MIN. 4" LONG WIRE STAPLES 0 12" O.C. FOR REPAIR OF SILT. FENCE FAILURES, � LU ES, USE #57 WASHED STONE IN LIEU OF COMPACTED FILL NOTES: 1. INSTALL NEW SILT L FENCES AS SHOWN ON DRAWING AND AT LOCATION S NE CESSARY TO O C NTROL SILTATION. OF ADJACENT AREAS. 2. WHERE STEEL POSTS ARE USED, POSTS SHALL BE 5' IN LENGTH AND BE OF THE SELF FASTENER ANGLE TYPE. 3. WOVEN WIRE FENCING, WHERE REQUIRED, SHALL CONFORM TO ASTM A116 FOR CLASS 3 GALVANIZING. FABRIC SHALL BE A MINIMUM OF 32" WIDE AND A L HAVE MINIMUM OF 6 LINE WIRES WITH 12" STA Y SPA CING. THE TOP AND BOTTOM WIRES SHALL BE 10 GAUGE AND INTERMEDIATE WIRES SHALL BE 12-1 f 2 GAUGE. WIRE FABRIC SHALL BE FASTENED TO POSTS. 4. FILTER FABRIC SHALL BE OF NYLON POLYESTER PROPYLENE OR , ETHYLENE YARN WITH A MINIMUM STRENGTH OF 30 LBf LIN. IN. AND A MINIMUM OF 85% FILTERING EFFICIENCY. FABRIC SHALL CONTAIN ULTRAVIOLET INHIBITORS AND :STABILIZERS. 5. IF FABRIC FILTER IS USED WITH A STRENGTH OF 50 LB. f L.IN. IN. OR GREATER, &M THE POST SPACING DOES NOT EXCEED 6', WOVEN WIRE FENCING IS NOT REQUIRED. OTHERWISE WOVEN Q E FENCING G IS REQUIRED, AND POST SPACING SHALL NOT EXCEED 8'. TEMPORARY M ORARY SILT FENCE NTS TOP OF BANK M W ry rill Id Q O U) w w LU J rK I- a 6 4- v o cn v/ I f W I-- 1:3 X WET POND 1 B PERMITTED E ED 1-1017 / l AsBu ILT 5122117 ELEVATION, PERMANENT E NENT POOL, FMSL. 22.91 22.75 ELEVATION, TEMPORARY P F POOL, MSL. 25.40 2 . 5 52 AREA, PERM. POOL, ft2 17,497 15,909 2 AREA, TEMP.POOL ft 24 ,0 93 2 3, 385 VOLUME PR OVIDED R VIDE � D POOL), ft2 1 5 7 SO 54 42 3 A L42') 6„ 4!_01! 6$1 PLAN 23' EL. 2.12 3 TOP OF BAND 1 TE BOTTOM OF TOP OF BAN I'C SPILLWAY EL. 25 Q 3 EL. 26.12 LINE SPILLWAY WITH EXCELSIOR MATTING f I 42" HDPE I I 16' I - I EL. 26.12 I EL. 25.60 INV.OUT 21.01 3 3 SECTION A - A IM L 23.52 3" ORIFICE PERMANENT POOL 22.75 EMERGENCY SPILLWAY DETAILNTS OUTLET STRUCTURE NTS 5' EMBANKMENT T7 MPORARY POOL EL. 25.52 PERMANENT POOL EL. 22.75 21.5 1 00'x5'x 12 _ 21.5 1 CLASS „B" RIP RAP 1 I` O R E BAY I RnTrnnn Fi i sz nn I \ MAIN POOL 3 CLEAfJOUT EL 17.00 3 DE"IENTION POND & FON"'. - E7 B AY SECTION WS S HWT 23.41 ' BOTTOM 17.00 �1 3 BOTTOM EL. 17.0 CLEANOUT EL. 16.0 SITE NOTES 1. ANY DISCREPANCY IN THIS PLAN AND THE ACTUAL FIELD CONDITIONS SHALE. BE REPORTED TO THE ENGINEER AS PRIOR TO START OF CONSTRUCTION. O THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL SETBACKS, EASEMENTS, AND ` DIMENSIONS SHOWN HEREON BEFORE BEGINNING O CONSTRUCTION. ® 3wOR+ciNG DAYS 2. THE CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS, UTILITIES, AND R W'S PUBLIC OR PRIVATE PRIOR C } R OR TO WORKING IN THESE AREAS. � /'' BEFORE YOU DIG 3. THE CONTRACTOR SHALL MAINTAIN THE SITE IN AMANNE R E SO THE WORKMEN AND PUBLIC BE PROTECTED FROM INJURY, AND THE ADJOINING FOR SHE �ocaTio o� LOCATIONSHALL PROPERTY PROTECTED FROM DAMAGE. SHALL UNDERGROUND FACILITIES Know below. 4. THE CONTRACTOR REMOVE ALL DEBRIS FROM THE SITE UPON COMPLETION OF THE PROJECT AND AT LEAST ONCE A WEEK DURING CONSTRUCTION. what s 5. THE CONTRACTOR SHALL KEEP THE AREA OUTSIDE THE "LIMITS OF CONSTRUCTION" BROOM CLEAN AT ALL TIMES. Call before you dig. 6. IF DEPARTURES FROM THE DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE TO THE OWNER FOR REVIEW. 7. ALL PERMITS RELATIVE TO THE PROJECT MUST BE OBTAINED PRIOR TO CONSTRUCTION. THE OWNER WILL PROVIDE NCDEQ STORMWATER PERMIT. 8. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH PERMITS ISSUEDAND APPLICABLE STATE, TOWN AND LOCAL CODES. 9. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS, EQUIPMENT ETCT , . THAT MAY BE REQUIRED. THELOC4TIONS ©FEXIST1NC UNDERGROUND UTILMIESARE SHOWN INANAPPRDXIMATEWAYO/ULYANDHAifENOTBEEN 10. THEENGINEER`' AR H f C ITECT/OYYNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE E PROJECT AS SET FORTH IN /NDEPEN NTLY QE VERIFIED BYTHE OWNER ORITS THESE PLANS. REPRESENTATIVE FHECONTRACTORSHALL DETERMINE THE EXACTLOCATIONOFALL EXIST(NGUTILITIESBEFORE COMMENCING iNORKI ANDAGREES TOBEFULL Y RESPONSIBLE FOR ANYAND //��++ �+ GRADING GENERAL ,GRADING NOTES ALLDAMAGESWHICH MIGHTBEOCCASIONED 8YTHE CON TRACTOR SFAILURETOEXACTLYLOCATEAND PRESERVEANY 1. REASONABLE CARE HAS BEEN EXERCISED IN SHOWING THE LOCATION OF EXISTING UTILITIES ON THE PLANS. THE EXACT LOCATION OF SUCH UTILITIES IS ANDALt LtNDERGROUNO UTIL/TtES. NOT 'KNOWN IN ALL CASES. THE CONTRACTOR SHALL EXPLORE THE AREA AHEAD OF THE DITCHING OPERATION BY OBSERVATIONS ELECTRONICDEVICES, HAND DIGGING, AND BY PERSONAL CONTACT' WITH THE UTILITY COMPANIES IN ORDER TO .LOCATE EXISTING- UTILITIESNOTICE. IN ADVANCE OF THE TRENCHING OPERATIONS SO AS TO AVOID AND PREVENT DAMAGE TO THE EXISTING UTILITIES. THE CONTRACTOR SHALL BE RESPONSIB FO R OR ALL COSTS RESULTING CONSTRUCTtONSITESAFETYISTHESOLERESPQNSIB/L/TYOFTHE FROM ANY A D MAGE`TO THE EXISTI NG UTILITY LINES I ELIDING BUT NOT UM LIMITED TO REPAIRS AND EP LOSS OF SERVICE' REVENUES. CONTRACTOR SHALL CO NTRACTOR oNTRae oR N !" T E THERTHEOWNERNOR THEENGlNEE RSHALLaE ARRANGE FOR TEMPORARY SUPPORT OF `EXISTING 'UTILITIES, SUCH AS POLES, CONDUITS, FIBER OPTIC CABLES, TELEPHONE CABLES, WATER LINES ETC.. S WORK 2. � THE 'CONTRACTOR SHALL COMPLY WITH THE LATEST REVISIONS AND INTERPRETATIONS OF THE DEPARTMENT ' OF LABOR SAFETY AND HEALTH REGULATIONS ODTOASStIMEANGED[IVfTHsrBIL WORK YAfE4RFTHE WORK, OFFERSONSENGAGED /N THEWORK, OFANYNE4RBY OF STRUCTURES, OItOFAtJYOTHERPERSONS. FOR 'CONSTRUCTION PROMULGATED UNDER THE OCCUPATIONAL SAFETY AND HEALTH ACT. 3. THE CONTRACTOR SHALL PLAN AND CONSTRUCT WORK SO AS TO CAUSE MINIMUM INCONVENIENCE TO THE OWNER AND THE PUBLIC. THE CONTRACTOR SHALL PROVIDE, ERECT AND MAINTAIN AT ALL TIMES DURING- THE PROGRESS OR TEMPORARY SUSPENSION OF WORK SUIT ABLE ABLE BARRIERS, FENCES, .SIGNS, OR OTHER ADEQUATE PROTECTION, INCLUDING FLAG MEN AND WATCHMEN AS NECESSARY TO INSURE THE SAFETY OF THE PUBLIC AS WELL AS THOSE ENGAGED IN THE CONSTRUCTION WORK. CONSTRUCTION SIGNING SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF "CONSTRUCTION AND MAINTENANCE OPERATIONS SUPPLEMENT TO THE MANUAL " ON UNIFORM TRAFFIC CONTROL DEVICES BY THE NGDOT. CONTRACTOR WILL BE RESPONSIBLE FOR ONSITE DUST CONTROL. 4. ALL MATERIAL TE IAL CLEARED AND D GRUBBED BY THE N CO TRA T C OR ' IN ORDER ER TO CONSTRUCT sTRU CT THE. WORK SUCH AS TREES, VEGETATION, EG ET IONs C IN, FEN G ETC... SHALL. S,E I BECOME THEPROPERTY - RO ERTY OF THECONTRACTOR AND SHALL BE PROPERLY DISPOSED OF OFF SITE OR BURNED IF PROPER PERMITS ARE 'RECEIVED. EROSION CONTROL NOTES E N G I N E E R I N G& 1. ALL CONSTRUCTION ACTIVITIES SHALL BE PERFORMED IN COMPLIANCE WITH THE SEDIMENTATION POLLUTION : CONTROL ACT OF 1973. C 0 N S T R U C T 1 0 N 2. ALL LAND DISTURBING' ACTIVITIES ARE TO BE PLANNED AND CONDUCTED TO LIMIT T EXPOSURE4 THE SHORTEST FEASIBLE TIME. 3. ALL DISTURBED AREAS SHALL BE STABILIZED BY A PERMANENT GROUND COVER. 1 G WADE AVENUE 4. AS SOON AS ALL AREAS ARE PERMANENTLY STABILIZED' ALL PERMANENT MEASURES HAVE BEEN VE INSTALLED, AND FINAL APPROVAL IS RECEIVED FROM RALEIGH; NORTH CAROLINA THE OWNER, THE 'TEMPORARY MEASURES MAY BE REMOVED. 919.789.9977 5. OVER THE LIFE OF THE PROJECT, THE OWNER SHALL MAKE PERIODIC INSPECTIONS TO EVALUATE THE CONTRACTORS EFFORTS AND SUCCESS IN 11020 DAVID TAYLOR DRIVE, SUITE 115 CONTROLLING EROSION OF SOILS TO OFF -SITE AREAS. IF AREAS ARE FOUND WHERE EROSION IS TAKING PLACE, THE CONTRACTOR SHALL TAKE THE CHARLOTTE, NORTH CAROLINA NECESSARY MEASURES TO REMEDY THE SITUATION. 704.714.4880 6. DRAWING NOTES THAT INDICATE THE INSTALLATION OF TURF REINFORCEMENT TO STABILIZE SOIL AND TO PROTECT SLOPES FROM EROSION REFER TO 5030 NEW CENTRE DR., SUITE B WESTERN EXCELSIOR CORPORATION TURF" REINFORCEMENT MATS, "EXCEL PP5-10" OR APPROVED EQUIVALENT. WILMINGTON, NORTH CAROLINA 7. ANY SLOPES GREATER THAN 3:1 SHALL BE STABILIZED IMMEDIATELY WITH TURF REINFORCEMENT. 910.523.5715 CONSTRUCTION SEQUENCE NOTES: wwvv.sepiengineering.cAm 1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ASSURE ALL SEDIMENT REMAINS ON SITE AND OUT OF SURROUNDING WETLAND AREAS. 2. MEANS AND METHODS OF EROSION CONTROL ARE THE RESPONSIBILITY OF THE CONTRACTOR. 3. MAINTAIN ALL TEMPORARY EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. EROSION CONTROL MAINTENANCE PLANS Q��''',, 1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR THAT ALL EROSION CONTROL MEASURES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING �_SS /9 EVERY RUNOFF PRODUCING RAINFALL EVENT, BUT IN NO CASE, LESS THAN ONCE EVERY WEEK AND WITHIN 24 HOURS OF EVERY HALF INCH RAINFALL. Y� 2. DIVERSION DITCHES WILL BE CLEANED OUT IMMEDIATELY TO REMOVE SEDIMENT OR OBSTRUCTLONS FROM THE FLOW AREA. THE =DIVERSION ` RIDGES- WILL - SEAL ALSO BE REPAIRED. SWALES AND DITCHES MUST BE TEMPORARILY STABILIZED WITHIN 21 CALENDAR DAYS OF CEASE OF ANY PHASE OF ACTIVITY ASSOCIATED WITH A SWALE. _ 21155 0 3. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES HALF FILLED. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. STAKES MUST BE STEEL. STAKE SPACING WILL BE 6 FEET MAXIMUM WITH THE USE OF EXTRA STRENGTH FABRIC, N - Q WITHOUT WIRE BACKING. STAKE SPACING WILL BE 8 FEET MAXIMUM WHEN STANDARD STRENGTH FABRIC AND WIRE BACKING ARE USED. IF ROCK FILTERS ARE DESIGNED AT LOW POINTS IN THE SEDIMENT FENCE THE ROCK MATERIAL WILL BE REPAIRED OR REPLACED IF IT BECOMES HALF FULL OF ,, j R. SEDIMENT, NO LONGER DRAINS AS DESIGNED OR IS DAMAGED. _ 1 'l l of 4. ALL SEEDED AREAS WILL BE FERTILIZED, RE -SEEDED AS NECESSARY AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN ! A VIGOROUS, DENSE VEGETATIVE COVER. ALL SLOPES WILL BE STABILIZED WITHIN 14 CALENDAR DAYS. ALL OTHER AREAS WILL BE STABILIZED WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS WHICHEVER IS SHORTER. \\\\�``� � 8C CQ/vS gPOR4 -'-, 0A V I SEAL o a- C-2197 z /V C. SEEDING SCHEDULE `IltttEt�1���� 1. ALL DISTURBED AREAS DUE TO CONSTRUCTION AND ANY SEVERELY ERODED AREAS SHALL BE COPYRIGHT 0.2U12 STABILIZED BY A PERMANENT GRASS COVER. THE SEED SPECIES SHALL BE SELECTED BASED SEPI ENGINEERING & CONSTRUCTION, INC ON THE TYPE SOIL PRESENT, SEASOML CONDITIONS AND OTHER CONSIDERATIONS. AS AN ALTERNATIVE, THE CONTRACTOR MAY USE THE METHODS AND SCHEDULES SHOWN BELOW; HOWEVER, IT IS RECOMMENDED THAT A SPECIALIST BE CONSULTED WITH ATTENTION GIVEN TO SITE SPECIFIC CONDITIONS.' a. CULTIVATE AREA TO A DEPTH OF 5 INCHES. o b. APPLY AGRICULTURAL LIME UP TO 1PER E FOR SOIL DISTURBED LESS THAN 6", AND 2 TONS PER ACRE FOR SOILS DISTURBED GREATER THAN fi". c. APPLY 10-20-20 COMMERCIAL FERTILIZER AT THE RATE OF 500 LBS. PER ACRE. d. SOW GRASS SEEDS AT THE FOLLOWING RATES PER ACRE. DRY SOILS <(APRIL-SEPTEMEJEQ) WET SOILS (AERIL-SEPTEMEFR) ...30 Ibs. BERMUDAGRASS..:. BERMUDAGRASS............... .............25 lbs. CENTIPEDEGRASS...............10 lbs. BAHIAGRASS.......................... 25 'Ibs. n BAHIAGRASS ..........................30 Ibs. CARPETGRASS ...................... 25 Ibs. KOBE LESPEDEZA................20 Ibs. ANNUAL RYEGRASS or ANNUAL RYEGRASS OR GERMAN MILLET ....................25 lbs.' GERMAN MILLET....................25 Ibs. e. MULCH WITH STRAW AT THE RATE OF 3250 TO 4350 LBS. PER ACRE SHOULD z PROVIDE 75% COVER. COVER IN EXCESS OF 75% COULD REDUCE PROPER PLANT 0 t U GROWTH AFTER SEED GERMINATION. ANCHOR STRAW WITH ASPHALT EMULSION TACK > m COAT APPLIED AT THE RATE OF 300 GALLONS PER ACRE. Q 2. WHERE IT IS NOT POSSIBLE TO ESTABLISH A PERMANENT GRASS COVER IN A REASONABLY o SHORT' PERIOD OF TIME DUE TO SEASONAL CONSIDERATIONS, A TEMPORARY GRASS COVER z SHALL BE ESTABLISHED. THE TEMPORARY SEED RATE PER ACRE SHALL BE: WINTER (SEPTEMBER-APRIL) SUMMER (MAY -AUGUST ANNUAL RYEGRASS ....... 50 Ibs. GERMAN MILLET ,... 50 Ibs. TALL FESCUE.................50 Ibs. TEMPORARY COVERS SHALL NOT ELIMINATE THE REQUIREMENT FOR PERMANENT GRASS COVER. WHERE THE SEASON OR OTHER CONDITION'S ARE NOT SUITABLE FOR GROWING A TEMPORARY' EROSION RESISTANT COVER, MULCH MAY BE APPLIED; HOWEVER, MULCH USED ALONE SHALL BE FOR THE SHORTEST TIME PRACTICAL, A TEMPORARY OR PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED AS SOON AS CONDITIONS ARE FAVORABLE. 3. TOPSOIL SHALL BE USED OVER ALL SOIL CONDITIONS FOR SUCCESSFUL ESTABLISHMENT OF�-� VEGETATIVE COVER AT A DEPTH OF AT LEAST 4". TOPSOIL TO BE FROM APPROVED NC Q �h SOURCE. �_­! TOP OF BANK 4. IRRIGATE AS NECESSARY TO OPTIMIZE PLAT GROWTH. �--i EL. 26.12 I �T4 GROUND STABILIZATION CRITERIA SITE AREA STABILIZATION STABILIZATION DESCRIPTION TIMEFRAME TIMEFRAME EXCEPTIONS � Perimeter dikes,. swales, ditches and 7 Days None slopes ' High Quality Water ` (HQW) 7 Days None Zones If slopes are 10' or * Slopes Steeper 7 Days less in length and than 3:1 are not steeper than 2:1, 14 days are allowed * Slopes 3` 1 or flatten 14 Days 7--days for slopes greater than 50 ft. in length * All other areas None (except for with slopes flatter 14 Days perimeters & HQW than 4:1 Zones) JUL2017 i U � I w t- GRAPHIC �C_1LELU 0 ## ## ## PROJECT MANAGER FIELD SURVEY DATE: C%Crr 8IT7/2016 ( IN FEET } CHECKED BY: DRAWING DATE: C%RT 06/28/2017 1 inch = ## ft. Harz. DRAWN BY: JOB #: JRS SC16.015 SHEET C-3.0 2of2 E NC GRID STORMWATER SUMMARY: 1.5" RUNOFF VOLUMERj`�"QUIR-E---D: 42,494 cf. Pre - Post 1-Yr,, 24-hr RUNOFF REQUIRED: 96,943 c.f. ASBUILT VOLUME: 54,423 c.f. (Functioning as Wet Detention Basin with No Infiltration) 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know whaftbelow. Call before you dig. 7HELOCA TIONS OFEXISTING UNDERGROUND UTILInESARE SHOWN IN ANAPPROXIMA 7E WA Y OK YAAfD HA VE NO TBEFdV INDEPENVEV7Z Y VERIFIED BY THE OWNER OR ITS REPRESEKArIVE THECON7RACTORSHALLDEAERMINE 7HE EXACTLOCATIONOFALLEVS77NG U77LMES BEFORE COMMENCING WORK ANDAGASES rO BEFULL Y RESPONSIBLEFORANYAND ALL DAMAGES WHICHMIGHrOE OCCASIONED BY 7HE CONTRACrORS FAILURE TO Eyd4C77 Y LOCA 7EAA(D PRESERVEANY ANDALL UNDERGROUND UAL17ZES, NOTICE: CONSTRUC77ON SITE SAFE7YIS THESCLERESPONSIBILITY OF THE CONMACrOf NEMHER 7HE OWNERNOR 7HEENGINEER SHALL BE EVPECrED 70ASSUMEANYRESPONSIBIL17YFOR SAFE7Y OF 7HE WORK OFPFR5OhSF)V6A6E0 INTHE WORK, OFANYMEARBY S7RUCrbRES OROFANYOTHERPERSONS. SEIPI E N G I N E E R I N G & C 0 N S T R U C T 1 0 N 1025 WADE AVENUE RALEIGH, NORTH CAROLINA 919.789.9977 11020 DAVID TAYLOR DRIVE, SUITE 115 CHARLOTTE, NORTH CAROLINA 704.714.4880 5030 NEW CENTRE DR., SUITE B WILMINGTON, NORTH CAROLINA 910.523.5715 www.sepiengineering.com Uj U- C A �_Ss SEAL Z "6 N 0 co PO SEAL C-2197 /V. C. COPYRIGHT@ 2012 SEPI ENGINEERING & CONSTRUCTION, INC Uj C) co 71 0 Cn 5; ca W Cn Of C5 71, .......... 1 111-1111- — C/-� S M FIVI PROPOSED FORCEMAIN R", . .. .. EXISTING STORM MANHOLE EXISTING GRAVITY SEWER Z SS SS PROPOSED GRAVITY SEWER g EXISTING IRRIGATION VALVE 2'� m -W- EXISTING WATER LINE . .... EXISTING TELEPHONE PEDESTAL r-r m EXISTING CABLE BOX L ma Ld I eee �4 ry ry LLJ ry 0 1-- It= mvff E jUL 2 0 2017 BY., Cn Ld Ld ry GRAPHIC ',��.CAI-,E 0 Ld 1 0-1 CL 1- (y 20 0 10 20 40 I PROJECT MANAGER FIELD SURVEY DATE: mmmlg--- GIRT 8/17/2016 IN FEET CHECKED BY: DRAWING DATE: 0 CRT 06/28/209 (6 1 inch 20 ft. Horz. DRAWN BY: JOB -+-� I- 4- JR8 SC16.015 0 0""', 0 co SHEET 0 oryc"4 C-2.1 N LiJ 1 of 2 r�- ::D X EY3 CD I W l €— LiI 0 Ld ( f [ f ry 0 LLJ I- Iz I- lix C�.l N S E NC GRID STORMWATER SUMMARY: 1.5" RUNOFF VOLUME REQUIRED: 42,995 c.f. Pre Post 1 Yr, 24 hr RUNOFF REQUIRED. 931848 c.f. EXISTING VOLUME: 3 7, 810 C.f. (Functioning as Wet Detention Basin with No Infiltration) ASBUILT VOLUME: 52,493 c.f. (Functioning as Wet Detention Basin with No Infiltration) Note: Existing Infiltration Basin 1B provided and was permitted for 56,451 c. However, with the variance in existing condition SHWT a significant amount of that treatment volume has been lost. Conversion to Wet Detention with additional excavation will allow the Basin to function above the required. 1.5" runoff volume requirement. NOTE: ALTERNATIVE DESIGN PROVIDES EQUAL OR BETTER STOR:MWATER CONTROL, EQUAL OR BETTER PROTECTION OF WATERS OF THE STATE, & RESULT IN NO INCREASED POTENTIAL FOR NUISANCE CONDITIONS COMPARED TO THAT OF EXISTING INFILTRATION BASIN I B. LEGEND Q R1MM EXISTING RIGI-T OF WAY MONUMENT W PROPOSED WATER LINE ECM EXISTING CON -,BETE MONUMENT — - _ urge - — EXISTING UNDERGROUND ELECTRIC a• SIP EXISTING IRON PIPE — - - - ohe - — EXISTING OVERHEAD ELECTRIC ® 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know. what's below. Call before you dig. WELOCA77 NSOFEXIVINGUNDERGROUNDUTILrnESARE SHOWN INANAPPROX/MATE WAYONL YAND HAVENOT BEEN NDEPENDENTLYVERIFED8YTHE OWNER ORITS > ?EPRESENTATIVE THE CONTRi4GTORSM L DETERMINE THE : (AMOCATIONOFALL EYI&TINGURXLTRESBEFORE COMMENCIM NI ANDAGREES TOBEFLILLY RESPONSISLEFORANYAND ' UL DAM4C7851+H1CHM1GHTBE`OCCASIONEDBYTHE :ON7P4CTORSFAILURE70EXAC7LY LOCATEANDPRESERVEANY WDALL UNDERGROUND U77LITIES. gOTICE: ;ONSTRUCHONSITESAFETYIS THESOLERESPONSIBILITYOFTHE O IPS IRON PIPE SET LLJ - - - EXISTING FIBER OPTIC LJ EIR EXISTING IRON ROD t - EXISTING TELEPHONE @Q IRS REBAR SET _ _ EXISTING UNDERGROUND CABLE A&M EXISTING PK BAIL -- -- --_- EXISTING OVERHEAD CABLE PKS PK NAIL SET ` EXISTING GAS A EGM EXISTING GEODETIC MONUMENT SF PROPOSED SILT FENCE Q CALCULATED FROPERTY CORNER EXISTING STORM PIPE N f F NOW OR FORKERLY PROPOSED STORM PIPE . — HIGH WATER ENE • X . X . X . X . X . X . X • PROPOSED DEMO DESIGNATION �-�-- ---- PROPERTY LINE EXISTING TREELINE ~- - PROPERTY LINE NOT SURVEYED EXISTING FENCE EXISTING EASEMENT SE P1 ENGINEERING C 0 N S T R U C T 1 0 N 1025 WADE AVENUE RALEIGH, NORTH CAROLINA 919.789.9977 11020 DAVID TAYLOR DRIVE, SUITE 115 CHARLOTTE, :NORTH CAROLINA 704.714.4880 5030 NEW CENTRE DR., SUITE B WILMINGTON,'NORTH CAROLINA 910.523.5715 www.sepiengineering.com ��>it4liilft/Itt1 -CA �Ss/o y EAL 7f 111ii� CQ�,%,, OR4 z SEAL _LU C-2197 N.0 lll�f#iili��� COPYRIGHT@ 2012 SEPI ENGINEERING & CONSTRUCTION. INC LU Q � 0 z 0 J L > m w cn a r _z EXISTING POWER POLE EXISTING MINC3 CONTOUR �� EXISTING LIGHT POLE EXISTING MAJ(R CONTOUR 0 EXISTING FIRE HYDRANT 39 PROPOSED MINOR CONTOUR ---- 4 PROPOSED MAJOR CONTOUR � V; EXISTING VALVE --� _- _ EXISTING EDGE OF PAVEMENT WV C ---- PROPOSED VALVE C!3 1. PROPOSED LINTS OF DISTURBANCE — w Lv --- r-+ z FM EXISTING F=EMAIN ���; � Z EXISTING SANITARY MANHOLE FM PROPOSED FCRCEMAIN EXISTING GRAVITY SEWER EXISTING STORM `MANHOLE �:�. � � �•-•� SS � SS PROPOSED GFAVITY SEWER /CV C/) Zj-- 'XI EXISTING IRRIGATION VALVE - W - - - EXISTING WATER LINE Q 011 EXISTING, TELEPHONE PEDESTAL � � � �•••{ CATt ! EXISTING CABLE BOX —t ECII Uj Uj W ._i GRAPHIC SCALE CO 20 0 10 20 40 PROJECT MANAGER FIELD SURVEY DATE. Cif 8I17f 2016 IN FEET CHECKED BY: DRAWING DATE; off 06/28/209 1 inch - 20 ft. Horz. DRAM BY. JOB* JFiS ��1Gi.415' SHEET C-2.1 1 of 2 STEEL POST ----- SEE NOTE #5 12" STAY SPACING WOVEN WIRE FENCING, AS REQUIRED TOP STRAND MIN, #1`0 GAUGE SILT FILTER FABRIC STAY AND LINE WIRES XT MIN. 12 1 2 GAUGE a 1 Z v C14 . ------ 6" MIN. COMPACTED L IRT„ K BOTTOM STRAND FILOVER S MIN 1 0 GAUGE 0 z ANCHOR FABRIC SKIRT W MIN. 4 LONG WIRE STAPLES 0 12s O.G. FOR REPAIR OF SILT C F * FENCE ALLURES, USE #57 WASHED STONE IN LIEU OF COMPACTED FILL NOTES. 1. I SILT S AS SHOWN ON DRAWING D AT LOCATIONS INSTALL NEWS FENCE. S AN N NE CESSARY ECESSARY TO CONTROL SIL TATION OF ADJACENT AREAS. 2. WHERE STEEL POSTS ARE USED, POSTS SHALL BE 5' IN LENGTH AND BE OF THE SELF FASTENER ANGLE TYPE. WIRE N REQUIRED, SHALL CONFORM TO 3. WOVEN RE FENCING, WHERE E O Al Q 16 FOR CUSS 3 GALVANIZING. FABRIC SHALL BE A MINIMUM " s � F 6 LINE WIRES WITH 12 STAY OF 32 WIDE AND HAVE A MINIMUM O E E AY D SPACING. THE TOP AND BOTTO M WIRESSHALL BE 10 GAUGE B 12-1 2 GAUGE, WIRE FABRIC AND INTERMEDIATE WIRES SHALL E SH ALL HALL BE FASTENED TO POSTS. ON POLYESTER PROPYLENE OR 4. FILTER FABRIC SHALL BE OF NYLON, , ETHYLENE YARN WITH A MINIMUM STRENGTH OF 30 LB LIN: 1N. AND F A MINIMUM OF 85% FILTERING EFFICIENCY. ABRIC SHALL CONTAIN ULTRAVIOLET INHIBITORS AND STABILIZERS. 5. IF FABRIC FILTER IS USED WITH A STRENGTH OF 50 L.B. L#N. IN. OR GREATER THE POST SPACING DOES NOT EXCEED 6' WOVEN f ,8� : WIRE FENCING IS NOT REQUIRED. OTHERWISE WOVEN WIRE FENCING IS REQUIRED AND POST SPACING SHALL NOT EXCEED 8". TEMPORARY SILT �? FENCE NTS TOP OF BAND EL. 26.12 co J ry ry W Q V) Lti W Cy v W E- Iz D I.- NJ 0 I� 0 -Q U(C) C I\ :D x WET POND 1 PERMITTED 1 1 17 1 O/ AB S UILT 2 17 G1 2� ELEVATION, PERMANENT P/{`{�.`{jj POOL, �� { g 22.91 �}//\) �///�)7 ■s ali i ELEVATION, TEMPORARY POOL =L. 25.4 O 25.40 2 AREA, i E1 r��. ����g Et PERM. 17 4 g7 16,509 6g50 AREA, p EA TEMP. P g I ��� g �2 24 g 098 23,108 OO g ftz VOLUME PROVIDED TEMP. POOL), 51,780 O 2g 4 93 A L42 HDP 6„ 4,_0„ 6„ PLAN 2O' EL, 26.12 TOP OF BANG 1­,7710 0 - TC P O F BANS' SPILDWAY EL. EL. 26,12 LINE SPILLWAY WITH EXCELSIOR MATTING 42" HOPE Cis EL. 26.12 --y ------ EL. 25.40 EMEIDU%ENCY SPILLWAY DETAIL, WS 5' EMBANKMENT /k . INV.OUT 20. TEMP. POOL 25.4 z" n��cEr�c SECTION A - A OUTLET Sy"I"'R U NTS TEMPORARY POOL EL. 25.4 SHTWT23.41'-- - PERMANENT POOL EL. 22.75 21.5 s ,21.5 1 OO x5 x12 - EOREBAY CLASS "�_, RAP RAP. 1 3 MAIN POOL 1 BOTTOM EL.19.00 1 CLEANOUT EL. 18.00 5 BOTTOM EL. 18.0 11 # ii�piiil� I I MIN NMI GLEANOUT EL. 17.0 SITE NOTES 1. ANY DISCREPANCY IN THIS PLAN AND THE ACTUAL FIELD CONDITIONS SHALL BE REPORTED TO THE ENGINEER AS PRIOR TO START OF CONSTRUCTION. O THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL SETBACKS, EASEMENTS, AND DIMENSIONS SHOWN HEREON' BEFORE BEGINNING` CONSTRUCTION. 0 3 WORKING LAYS THE E CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS, UTILITIES, AND R S PUBLIC OR PRIVATE PRIOR TO WORKING 1N THESE AREAS.` } BEFORE YQi1 DIG 3. THE CONTRACTOR SHALL MAINTAIN THE SITE IN A MANNER SO THE WORKMEN' AND PUBLIC SHALL BE PROTECTED:. ` FROM INJURY, 'AND THE ADJOINING �Oc OF DE PROPERTY PROTECTED FROM DAMAGE. GR UNDERGROUND FACILITIES FACT Know wh 4, THE CONTRACTOR S� REMOVE ALL DEERS FROM THE SITE UPON COMPLETION OF THE 'PROJECT AND AT LEAST ONCE A' WEEK DURING CONSTRUCTION./�{ *LIMITS at sbelow. 5. THE CONTRACTOR SHALL KEEP ;THE AREA OUTSIDE THE " OF CONSTRUCTION BROOM CLEAN AT ALL TIMES. Call before i(■ A e yQI� dig. V 6. IF DEPARTURES FROM THE DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE TO THE OWNER FOR :REVIEW. 7. ALL PERMITS RELATIVE TO THE PROJECT MUST' BE OBTAINED PRIOR TO CONSTRUCTION. THE OWNER WILL PROVIDE NCD EQ STORMWATER PERMIT: 8. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH PERMITS ISSUED AND APPLICABLE STATE TOWN AND LOCAL CODES. 9. THE CONTRACTOR SHALL OBTAIN BTI .NAND PAY FOR ALL ' INSPECTIONS, E ONS CERTIFICATIONS, `E EQUIPMENT, ETC. THAT MAY B : Q s s E REQUIRED. TtfELDCAflONS OF UNDERGROUND UTfUTfES.4RF SHOWN /NAFPRDX/MATEW/fiYDNLYANL7HAVE"NDTBEEN 10 THE ENGINEER ENGINEER/ARCHITECT/OWNER OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN INDEPEN Y vE DEN7L ftfFtEL?BYTHEDWNERORIT s THESE PLANS. REPRESENTAflVE THECONTMCTORSMUDETERM/NETHE EXAcrL0CAWNOFAUEXIS7JNGUTIL MES, 6EFORE COMMENCING WORI( ANDAGREES TOBEFULLY RESMVSfSLEFOR MYMD GENERAL GRADING NOTES ALLD MACESWfICHMIGHTBEDCa4SIONEDBYTHE WVM40TDRWSFAILURETOEMC7LYLDCATEMDPRESERVEAW 1. REASONABLE CARE HAS BEEN EXERCISED IN SHOWING THE LOCATION OF EXISTING UTILITIES ON THE PLANS. THE EXACT C LQCAT#t3N OF SUCH UTILITIES IS ANLIALL UNDER n `TI GROUND u u ES, NOT KNOWN IN N ALL CASES: THE CONTRACTOR SHALL. EXPLORE THE AREA AHEAD OF THE DITCHING OPERATION BY .OBSERVATIONS ELEC ONIC TR DEVICES HAND DIGGING,P .AND `BY PERSONAL CO CONTACT WITH THE UTILITY _ COMPANIES IN ORDER TO LOCATE EXISTING UTILITIES IN ADVANCE 'QF THE TRENCHING NOTICE: OPERATIONS SO AS TO AVOID AND PREVENT DAMAGE TO THE EXISTING UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS RESULTINGc�vsTRucTraNsfTEsaFErYfs:TxESDLFREsf�nfsfBiL 1TYDFTHE FROM ANY DAMAGE T` E O THE. EXISTING'.:. UTi N LITY LINES INCLUDING, LUD G BUT NOT LIMITED T O REPAIRS AND LOSS OF SERVICE REVENUES. CONTRACTOR :SHALL T` CONTROL oR NEftffH ER7xfEDtMVERN R o THEEN6rN R EE SiIALLBE` ARRANGE FOR TEMPORARY SUPPORT F O EXISTING UTILITIES,SUCH AS POLES, CONDUITS, R , CTS FIRE OPTIC CABLES, TELEPHONE CABLES, WATER'; LINES, ETC.. EXPECTED TDASSUMEANYRESF DNS/B1LiTf'FDRSAFETYt1F E TH 2. THE CONTRACTORSHALL COMPLY WITH THE LATEST REVISIONS' AND INTERPRETATIONS NTER RETATION S OF THE DEPARTMENT OF LABOR SAFETY AND HEALTH REGULATIONS WORK, aF�RS(1NSENGAGEvNTFfEwoRK, OFANYNEARBY sTRUCUREs 0R0FAnYDrRERPERSON S. FOR CONSTRUCTION PROMULGATED UNDER THE OCCUPATIONAL SAFETY AND HEALTH ACT: 3. THE CONTRACTOR SHALL PLAN AND CONSTRUCT WORK SO AS To CAUSE MINIMUM INCONVENIENCE TO THE OWNER AND THE PUBLIC. THE CONTRACTOR SHALL- PROVIDE ERECT AND NT IN MAI T A A ALL TIMES' DURING THE PROGRESS OR TEMPORARY SUSPEN SION NS#ON OF WORK SUITABLE LE BARRIERS, FENCES SIGNS OR OTHER ADEQUATE PROTECTION, INCLUDING FLAG MEN AND WATCHMEN AS NECESSARY TO INSURE THE SAFETY OF THE PUBLIC AS WELL AS THOSE ENGAGED IN THE CONSTRUCTION WORK. CONSTRUCTION SIGNING SHALL BE IN ACCORDANCE WITH " RDANC THE LATEST EDITION OF CONSTRUCTION AND MAINTENANCE OPERATIONS ERATI S SUPPLEMENT TO THE MANUAL ON UNIFORM TRAFFIC C C CONTROL DEVICES" BY .THE NCDOT. CONTRACTOR WILL BE °RESPONSIBLE FOR ONSITE DUST CONTROL 4. ALL MATERIAL TE C AND D R G UBBED BY THECONTRACTOR IN ORDER DER TO CONSTRUCT THE WORK, SUCH U AS TREES VEGETATION FENCING, FE C NG ETC... SHALL SIEPI BECOME ME THE PROPERTY OF - THE CONTRACTOR 0 AND SHALL BE "P PROPERLY ERLY DISPOSED OF OFF SITE- OR BURNED IF PROPER PERMITS ARE RECEIVED: EROSION CONTROL NOTES. E& NGINEERIN G; 1. ALL CONSTRUCTION ACTIVITIES SHALL BE .PERFORMED IN COMPLIANCE WITH THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973. C0NSTRU"CT1O N" ' 2. ALL LAND DISTURBING ACTIVITIES ARE TO BE PLANNED AND CONDUCTED TO LIMIT EXPOSURE TO THE SHORTEST l PEAS BLE TIME. 1025 WAD AVENUE UE 3. ALL DISTURBED AREAS SHALL BE STABILIZED BY A PERMANENT GROUND COVER. 4. AS SOON AS All AREAS ARE PERMANENTLY STABILIZED, ALL PERMANENT MEASURES HAVE BEEN INSTALLED, AND FINAL APPROVAL IS RECEIVED FROM RALEIGH , NORTH CAROLINA THEW OWNER, THE TEMPORARY MEASURES .::MAY BE "REMOVED. 919.789.9977 5, OVER .THE .LIFE OF THE PROJECT THE OWNER SHALL MAKE PERIODIC INSPECTIONS TO EVALUATE THE CONTRACTORS EFFORTS AND SUCCESS IN T 11 020 C}AV 1D A YLUR DRIVE, SUITE 115 CONTROLLING EROSION OF SOILS TO OFF -SITE AREAS. IF AREAS' ARE FOUND WHERE EROSION IS TAKING PLACE," THE CONTRACTOR SHALL TAKE THE CHARLOTTE, NORTH CAROLINA NECESSARY` MEASURES TO :REMEDY THE SITUATION. 704.7144880 6. DRAWING NOTES.THAT::. INDICATE .THE INSTALLATION O AL.LA F TURF REINFORCEMENT. TO STABILIZE SOIL AND TO PROTECT SLOPES FROM EROSION 'REFER TO 5030 NEW CENTRE DR., SUITE B WESTERN EXCELSIOR CORPORATION TURF REINFORCEMENT MATS, "EXCEL PP5--10" OR APPROVED EQUIVALENT. WILMINGTON, NORTH CAROLINA 7. ANY SLOPES GREATER THAN 31 SHALL BE STABILIZED IMMEDIATELY WITH TURF REINFORCEMENT. 910.523.5715 CONSTRUCTION SEQUENCE NOTES: wvvw.sepiengineering.com 1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ;ASSURE ALL SEDIMENT REMAINS ON SITE AND OUT OF SURROUNDING WETLAND AREAS. 2. MEANS' AND METHODS OF, EROSION CONTROL ARE THE RESPONSIBILITY OF THE CONTRACTOR. 3. MAINTAIN ALL TEMPORARY EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. EROSION CONTROL MAINTENANCE PLAN 1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR THAT ALL EROSION CONTROL MEASURES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING iASS / 9 EVERY RUNOFF PRODUCING RAINFALL ` EVENT, BUT IN NO CASE, LESS THAN ONCE EVERY WEEK AND WITHIN 24 HOURS OF EVERY HALF INCH RAINFALL, Q' 2. DIVERSION DITCHES WILL BE CLEANED OUT IMMEDIATELY TO REMOVE SEDIMENT OR OBSTRUCTIONS FROM THE FLOW AREA. THE DIVERSION RIDGES WILL `` AL ALSO BE REPAIRED. SWAL.ES AND DITCHES MUST BE TEMPORARILY STABILIZED WITHIN 21 CALENDAR DAYS OF CEASE OF ANY PHASE OF ACTIVITY ASSOCIATED WITH A SWAL.E. 3. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES HALF FILLED. THE SEDIMENT FENCE WILL BE REPAIRED ' AS NECESSARY' TO MAINTAIN A BARRIER. STAKES MUST BE STEEL STAKE SPACING WILL BE 6 FEET MAXIMUM WITH THE USE OF STRENGTH FABRIC fG� �G'1� EXTRA WITHOUT STAKE ;WILL ' N WIRE BACKING. SPACING BE 8 FEET MAXIMUM WHEN STANDARD STRENGTH FABRIC AND WIRE BACKING ARE USED. IF ROCK FILTERS ARE DESIGNED AT LOW POINTS IN THE SEDIMENT FENCE THE ROCK WILL BE REPAIRED OR HALF �!ff -�'\A MATERIAL REPLACED IF' IT BECOMES FULL OF' f �. SEDIMENT, NO LONGER DRAINS AS DESIGNED ORAS, DAMAGED. 4. ALL SEEDED AREAS WILL BE FERTILIZED, RE --SEEDED AS NECESSARY AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE, COVER, ALL SLOPES WILL BE STABILIZED WITHIN 14 CALENDAR` DAYS. ALL OTHER AREAS WILL BE STABILIZED WITHIN° , 15 WORKING DAYS OR 90 CALENDAR DAYS WHICHEVER IS SHORTER. � ��$C CO w SEAL C-2197 ` v , C SEEDING SCI-IEDULEia��11, 1\��,� 1 ALL DISTURBED AREAS DUE TO C ON U N STR CTIO AND ANY SEVERELY EVE ELY ERODED` AREAS SHALL 'BE ' COPYRIGHi@ 2032 STABILIZED BY A PERMANENT GRASS COVER. THE SEED SPECIES SHALL BE SELECTED BASED SEPI ENGINEERING & CONSTRUCTION, INC ON THE TYPE SOIL PRESENT, SEASONAL CONDITIONS AND OTHER CONSIDERATIONS. AS AN ALTERNATIVE, THE CONTRACTOR MAY USE THE METHODS AND SCHEDULES SHOWN BELOW; HOWEVER, IT IS RECOMMENDED THAT A SPECIALIST BE CONSULTED WITH ATTENTION GIVEN TO SITE SPECIFIC` CON < a. CULTIVATE AREA TO A DEPTH OF 5 INCHES, o b. APPLY AGRICULTURAL LIME UP TO 1 TON PER ACRE FOR; SOIL DISTURBED LESS THAN 6 AND 2 TONS PER ; ACRE FOR SOILS DISTURBED GREATER THAN 6", c. APPLY 10-20-20 COMMERCIAL. 'FERTILIZER AT THE RATE OF 500 LBS. PER ACRE. d. SOW GRASS SEEDS AT THE FOLLOWING RATES PER ACRE. DRY SQIU (A RIL SEPTET WET SOILS WRIL--SEPTEMBER BERMUDAGRASS ..................30 lbs. BERMUDAGRASS.................. 25 lbs. -' CENTIPEDEGRASS...............10 lbs. BAHIAGRASS.............. ...........25 lbs. c� BAHIAGRASS ..........................30 lbs. CARPETGRASS ...................... 25 lbs. c.� KOBE LESPEDEZA.............20 lbs. ANNUAL ` RYEGRASS or ANNUAL RYEGRASS OR GERMAN MILLET..; ILL.ETr....................25 lbs. GERMAN MILLET ....................25 lbs. e. MULCH WITH STRAW AT THE RATE OF 3250 TO 4350 L.BS. PER ACRE SHOULDco PROVIDE 75% COVER. COVER IN EXCESS OF 75X COULD REDUCE PROPER PLANT 0 LD _' GROWTH AFTER SEED GERMINATION. ANCHOR STRAW WITH ASPHALT EMULSION TACK COAT APPLIED AT THE RATE OF 300 GALLONS PER ACRE. Uj CD 2. WHERE IT IS NOT POSSIBLE TO ESTABLISH A PERMANENT GRASS COVER IN A REASONABLY r SHORT PERIOD OF TIME DUE TO SEASONAL CONSIDERATIONS, A TEMPORARY GRASS COVER SHALL BE ESTABLISHED. THE TEMPORARY SEED RATE PER ACRE SHALL BE: WINTER (SEPTMER-6ERI SUPER; (MAY AUGU$ ANNUAL ` RYEGRASS....... 50 lbs. GERMAN MILLET....50 lbs. TALI FESCUE.................50 lbs. TEMPORARY COVERS SHALL NOT ELIMINATE THE REQUIREMENT FOR PERMANENT GRASS COVER. WHERE THE SEASON OR OTHER CONDITIONS ARE NOT SUITABLE FOR GROWING A TEMPORARY EROSION RESISTANT COVER, MULCH MAY BE APPLIED; HOWEVER, MULCH USED ALONE `'SHALL BE FOR THE SHORTEST 71ME PRACTICAL A TEMPORARY OR PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED AS SOON AS CONDITIONS ARE FAVORABLE. 3. TOPSOIL SHALL BE USED OVER ALL SOIL CONDITIONS FOR SUCCESSFUL ESTABLISHMENT OF VEGETATIVE COVER AT A DEPTH OF AT LEAST 4". TOPSOIL TO BE FROM APPROVED NC SOURCE. C t•---� TOP O I- RANK 4. IRRIGATE AS NECESSARY To OPTIMIZE PLANT GROWTH. F--# EL. 26.12 GROUND -STABILIZATION CRITERIA SITE AREA STABIUZA11ON STABILIZATION TIMEFRAME DESCRIPTION 11MEFRAME EXCEPTIONS * Perimeter dikes, swarles. ditches and 7 Days None slopes * High Quality Water (HQW) 7 Days None Zones If slopes are 10' or * Slopes Steeper than 3.1 7 Days less in length and are not steeper than 2:1, 14 days are allowed * Slopes 3:1 or 14 Days 7-days for slopes greater than 50 ft. in flatter length All other areas None (except for with slopes flatter 14 Days perimeters & HQW than 4:1 Zones) Z ECEIVE U Y® Uj Uj GRAPHIC �C AL co PROJECT MANAGER MELD SURVEY DATE: C'f 8%17/2016 IN FEET CHECKED BY: DRAWING DATE: Gff 06/28/2("7 1 inch ## ft. Horz DRAWN BY: JOB M JRS sm.a15 SHEET C-320 2af2 C� D m co QI v m ;ry of W oF-D AS —BUILT SURVEY INFORMATION PROVIDED Ry qi=pi ENGINEERINGPRELIMINACON9 RY —NOT FOR _ 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. 7HE L OCA TIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMA TE WA Y ONL Y AND HA VE NO T BEEN INDEPENDEN71 Y VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CON77?4CTOR SHALL DETERMINE THE E%ACTLOCATIONOFALL EXISTING UTILITIES BEFORE COMMENCING WORD ANDAGREES TOBEFULLY RESPONSIBLEFORANYAND ALL DAMAGES WHICHMIGHTBE OCCASIONED BY THE CONTRACTORS FAILURE TOEXACTLY LOCATEANDPRESERVEANY ANDALL UNDERGROUND UTILITIES NOTICE: CONSTRUCTIONS/TESAFETYIS 7HESOLERESPONSIBIL17YOF7HE CONTRACTOR NEITHER 7HEOWNERNORTHEENGINEERSHALL BE EXPECTED TOASSUMEANYRESPONSIBIL/TYFORSAFETYOF THE WORK, OFPERSONS ENGAGED IN THE WORK, OFANYNEARBY STRUCTURES, OR OFAN Y 0 7HER PERSONS. SEPI ENGINEERING & C O N S T R U C T 1 0 N 1025 WADE AVENUE RALEIGH, NORTH CAROLINA 919.789.9977 11020 DAVID TAYLOR DRIVE, SUITE 115 CHARLOTTE, NORTH CAROLINA 704.714.4880 5030 NEW CENTRE DR., SUITE B WILMINGTON, NORTH CAROLINA 910.523.5715 www.sepiengineedng.com w U- 0 ca \,,i�tiCA �lrrtrtli QF�-ss �y ' AL - 12 _= V C 0/v �p OR41,- w SEAL o- C-2197 z \ N•c flii!l111�i>` COPYRIGHT © 2012 SEPI ENGINEERING & CONSTRUCTION, INC w I-- 0 0 z INFILTRATION BASIN 1 B ALTERNATIVE DESIGN RETROFIT WET POND CONVERSION I ® 3 WORKING DAYS ,r BEFORE YOU DIG f FOR THE LOCATION OF UNDERGROUND FACILITIES Know whafs below. Call before you dig. ETHE LOCATIONSOFEXI3TINGUNDERGROUND UTIL177ESARE SHOWN INANAPPROXIMATEWAYOKYANDI AVENOTBEEN INDEPENDENTL Y VERIFIED 8Y THE OWNER OR I I S REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE NAD 83 NG GRID EXACFLOCATIONOFALLEXISTING UTILITIES BEFORE COMMENCING WORK ANDAGREES TOBEFULLY RESPONSIBLEFORANYAND ALL DAMAGES WHICH MIGHTBE OCCASIONED BY THE "i Sk�W � CONJRAETORS FAILURE TO EXACTLY LOCATEAND PRESERVEANY AIJDALL UNDERGROUND UTILITIES. a s a NOTICE: CONSTRUCT/ONStTESAFETYfSTHESOLERESPONS/B1UTY0FTHE `x C0N7R4CT0R NEITHER THEOWNERNOR THEENGINEER SHALL BE EXPECTED TOASSUMEANYRESPONSIBtLITYFORSAFETYOFTHE WORK CJFPERSONSENGAGEDIN THEWORK OFANYNEARBY STRLICTURES, OROFANYOTHERPERSONS. STORMWATER SUMMARY: 1.511 RUNOFF VOLUME REQUIRED: 42,995 c.f. Pre Post 1-Yr. 24-hr RUNOFF REQUIRED: 93,848 c.f. EXISTING VOLUME: 37,810 C f. (Functioning as Wet Detention Basin with No Infiltration) PROPOSED VOLUME: 51,780 c.f. (Functioning as Wet Detention Basin with No Infiltration) Note: Existing Infiltration Basin IB provided and was permitted for 56,451 c.f. However, with the variance in existing condition SHWT a significant amount of that treatment volume has been lost. Conversion to Wet Detention with additional excavation will allow the Basin to function above the required 1.5" runoff volume requirement. NOTE: ALTERNATIVE DESIGN PROVIDES EQUAL OR BETTER STORIMIWATER CONTROL, EQUAL OR BETTER PROTECTION OF WATERS OF THE STATE, & RESULT IN NO INCREASED POTENTIAL FOR NUISANCE CONDITIONS COMPARED TO THAT OF EXISTING INFILTRATION BASIN 1B. 0 RWM EXISTING RIGHT OF NAY MONUMENT PROPOSED WATER LINE ECM EXISTING CONCRETE MONUMENT ___ _ - J _ ___ EXISTING UNDERGROUND ELECTRIC 0 EIP EXISTING RON PIPE 1 _ EXISTING OVERHEAD ELECTRIC IPS IRON PIPE SET _ Tr` _ w__._ _ EXISTING FIBER OPTIC ©R EXISTING IRON ROD - _--- -_ -- EXISTING TELEPHONE IRS REBAR SET EXISTING UNDERGROUND CABLE AEPK EXISTING PK NAIL , _-M EXISTING OVERHEAD CABLE A PKS PK NAIL SET __ - C' - - - EXISTING GAS T EGM EXISTING GEODETIC MONUMENT SF PROPOSED SILT FENCE 0 CALCULATED PROPERTY CORNER ; 4110Y 1 EXISTING STORM PIPE N/F NOW OR FORMERLY PROPOSED STORM PIPE -- — HIGH WATER LINE • X - X . X . X . X - X - X PROPOSED DJEMO DESIGNATION ENG IN EERI N G& C 0 N S T R U C T 1 0 N 1025 WADE AVENUE RALEIGH, NORTH CAROLINA 919.789.9977 11020 DAVID TAYLOR DRIVE, SUITE 115 CHARLOTTE, NORTH CAROLINA 704.714.4880 5030 NEW CENTRE DR., SUITE B WILMINGTON, NORTH CAROLINA 910.523.5715 www.sepiengineedng.com LU Q �F�_SSIp�1i AL Q4 -� �? SEAL z o C-2197 N. C rIf1111lIltl�}`'� COPYRIGHT© 2012 SEPI ENGINEERING & CONSTRUCTION; INC a 1" ---- PROPERTY LINE EXISTING TREELIKE PROPERTI LINE NOT SURVEYED EXISTING FENCE — — ! EXISTING EASEMENT EXISTING POWER POLE EXISTING MINOR CONTOUR° ; EXISTING LIGHT POLE EXISTING 'MAJOR CONTOUR EXISTING FIRE �'0 PROPOSED MINOR CONTOUR HYDRANT -- 40 PROPOSED MAJOR CONTOUR EXISTING VALVE --_._ -- - - — --- - EXISTING "EDGE OF PAVEMENT WIV PROPOSES LIMITS OF DISTURBANCE— w _ PROPOSED VALVE EXISTING FORCEMAIN EXISTING SANITARY MANHOLE �--� w FM PROPOSE} FORCEMAIN� EXISTING GRAVITY SEWER = J; EXISTING STORM MANHOLE r T1 � SS SS i! PROPOSED GRAVITY SEWER r, Av , EXISTING IRRIGATION VALVE - ---. EXIST#NGINATER LINE -� EXISTING TELEPHONE PEDESTAL EXISTING CABLE BOX f-+-•I ,.✓ /" i'��'1 � z FICEIVE 2016 Yo LU GRAPHIC SCALD 0 Uj 20 0 10 20 40 PROJECT MANAGER FIELD SURVEY DATE: EAS 8IT7/2= IN FEET) CHECKED BY: DRAWING DATE: JRS 10/24/2016 1 inch = 20 ft. Horz. DRAWN BY: JOB #- EAS SM.M5.00 SHEET PRELIMINARY C-2.0 2of3 3 STEEL POST SEE NOTE #5 WOVEN WIRE FENCING, 12" STAY SPACING AS REQUIRED TOP STRAND MIN. # 10 GAUGE SILT FILTER FABRIC STAY AND LINE WIRES a Q MIN, 12_.l O 1 2 GAUGE � N ., Iz y 6" MIN. COMPACTED BOTTOM STRAND FILL OVER SKIRT oz MIN. #10 GAUGE I - tV � ANCHOR FABRIC SKIRT W MIN. 4" LONG WIRE STAPLES 0 12" O.C. FOR REPAIR OF SILT FENCE FAILURES, USE #57 WASHED STONE IN LIEU OF COMPACTED FILL NOTES: 1. INSTALL NEW SILT FENCES AS SHOWN ON DRAWING AND AT LOCATIONS NECESSARY TO CONTROL SILTATION OF ADJACENT AREAS. 2. WHERE STEEL POSTS ARE USED, POSTS SHALL BE 5' IN LENGTH AND BE OF THE SELF FASTENER ANGLE TYPE. 3. WOVEN WIRE FENCING WHERE REQUIRED, SHALL CONFORM TO ASTM A116 FOR CLASS 3 GALVANIZING. FABRIC SHALT. BE A MINIMUM „ " OF 32 WIDE AND HAVE A MINIMUM OF 6 LINE WIRES WITH 12 STAY SPACING. THE TOP AND BOTTOM WIRES SHALL BE 10 GAUGE AND INTERMEDIATE WIRES SHALL BE 12-1 j2 GAUGE, WIRE FABRIC SHALL BE FASTENED TO POSTS. PROPYLENE L1N. IN. AND PRO -NE OR ETHYLENE YARN WITH A ,MINIMUM STRENGTH OF 30 LB 4. FILTER FABRIC SHALL BE OF NYLON, POLYESTER, / A MINIMUM OF 85% FILTERING EFFICIENCY, FABRIC SHALL CONTAIN ULTRAVIOLET INHIBITORS- AND STABILIZERS. WOVEN IN. POST SPACING DOES NOT EXCEED 6 WO 5. IF FABRIC FILTER IS USED WITH A STRENGTH OF 50 LB. LIN. OR GREATER, . THE P E , I CI POST SPACING S NOT EXCEED 8 FENCING IS NOT REQUIRED. OTHERWIS WOVEN WIRE. FENCING IS REQUIRED, AND OST C HALL WIRE FE � Y SILT FENCE TEMPORARY S NTS B 10M 1 I� EL 3 LINE SPILLWAY WITI- EXCELSIOR MATTING 6$ TOP OF BANK EL. 26.20 I I EL. 26.20 - - - - EL. 25.80 3 3 EMEIRGENCY SPILLWAY DETAIL NTS TOP OF BANK EL. 26.20 0 m d � (_0 1-0 o °° N l 4- J N I- Ir \o W o�� 5' EMBANKMENT A L42" 622 4,_0„ 6„ PLAN SITE NOTES 1. ANY DISCREPANCY IN THIS PLAN AND THE ACTUAL FIELD CONDITIONS SHALL BE REPORTED TO THE ENGINEER AS PRIOR TO START OF CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL SETBACKS, EASEMENTS, AND DIMENSIONS SHOWN HEREON BEFORE BEGINNING CONSTRUCTION. 3 WORKING DAYS 2. THE CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS, UTILITIES, AND R f W'S (PUBLIC OR PRIVATE) PRIOR TO WORKING IN THESE AREAS. 1� BEFORE YOU DIG 3. THE CONTRACTOR SHALL MAINTAIN THE SITE IN A MANNER SO THE WORKMEN AND PUBLIC SHALL BE PROTECTED FROM INJURY, AND THE ADJOINING FOR THE acaT�ari of UNDERGROUND FACILITIES4. PROPERTY PROTECTED FROM DAMAGE. . Know. what`s THE CONTRACTOR SHALL REMOVE ALL DEBRIS FROM THE SITE UPON COMPLETION OF THE PROJECT AND AT LEAST' ONCE A `WEEK DURING CONSTRUCTION. �1i� 5. THE CONTRACTOR SHALL KEEP THE AREA OUTSIDE THE "LIMITS OF CONSTRUCTION* BROOM CLEAN AT ALL TIMES. ore you dig. before yo 6. IF DEPARTURES FROM THE DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND 'REASONS THEREOF SHAM BE TO THE OWNER FOR REVIEW. 7. ALL PERMITS' RELATIVE TO THE PROJECT MUST BE OBTAINED PRIOR TO CONSTRUCTION. THE OWNER WILL PROVIDE NCDEQ STORMWATER PERMIT. 8. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH PERMITS ISSUED AND APPLICABLE STATE, TOWN AND LOCAL CODES. THE LOCATONS OFEXISTINGUNDERGROUND UTILITIES ARE 9. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS, EQUIPMENT, ETC., THAT MAY BE `REQUIRED. SHOWN /NANAPPROXIMATE WA Y OK YAND HA VE NO TBEEN 10. THE ENGINEER/ARCHITECT/OWNER DISCLAIM" ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN / lNIIEPENDENTLYVERIFIED BYTHEOWNER OR ITS REPRESBVTAT/VE THECONTRACTOR SHALL DETERMINE THE THESE PLANS. FXACTLOCATIONOFALLEXIS71NGU71LIT/ESBEFORE COMMENCING WORD ANDAGREES TOBEFULLY RESPONSIBLEFORANYAND ALL DAMAGESWHICHMIGHTSE OCCASIONED BY THE p /� GENERAL GRADING NOTES CONTRACTOR'SFAILURETOEXACTLYLOCATEANDPRESERVEANY 1. REASONABLE CARE HAS BEEN EXERCISED IN ,SHOWING THE LOCATION OF EXISTING UTILITIES ON THE PLANS. THE EXACT LOCATION OF SUCH UTILITIES IS- ANDALL UNDERGROUND UTILITIES. NOT KNOWN IN ALL CASES. THE CONTRACTOR SHALL EXPLORE THE AREA AHEAD OF THE DITCHING OPERATION BY OBSERVATIONS, ELECTRONIC DEVICES, HAND DIGGING, AND BY PERSONAL CONTACT WITH THE UTILITY COMPANIES IN ORDER TO LOCATE EXISTING UTILITIES IN ADVANCE OF THE TRENCHING NOTICE: OPERATIONS S0 AS TO AVOID AND PREVENT DAMAGE TO THE EXISTING UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS RESULTING CONSTRUCT/ONSffESAFETYIS THESOLERESPl1N5/81L TYOFTHE SERVICE R FROM ANY DAMAGE TO THE EXISTING UTILITY LINES INCLUDING, BUT NOT LIMITED TO REPAIRS AND LOSS OF SE CE REVENUES. S. CONTRACTOR SHALL : CONTRACTOR NEITHER THE OWNERNOR THEENGINEERSHALL BE EXPECTED TOASSUMEANYRESPONS/B/LITYFORSAFETYOFTHE ARRANGE FOR TEMPORARY SUPPORT OF EXISTING UTILITIES, SUCH AS POLES, CONDUITS, FIBER OPTIC CABLES, TELEPHONE CABLES, WATER LINES, ETC.. WORK, OFPERSONSENGAGED INTHE WORK , OFANYNEARBY 2. THE CONTRACTOR SHALL COMPLY WITH THE LATEST REVISIONS AND INTERPRETATIONS OF THE DEPARTMENT OF LABOR SAFETY AND HEALTH REGULATIONS STRUCTURES, OR OFANY OTHER PERSONS. FOR CONSTRUCTION PROMULGATED UNDER THE OCCUPATIONAL SAFETY AND HEALTH ACT. 3. THE CONTRACTOR SHALL PLAN AND CONSTRUCT WORK SO AS TO CAUSE MINIMUM INCONVENIENCE TO THE OWNER AND THE PUBLIC. THE CONTRACTOR SHALL PROVIDE, ERECT AND MAINTAIN` AT ALL TIMES DURING THE PROGRESS OR TEMPORARY SUSPENSION OF WORK, SUITABLE BARRIERS, FENCES, SIGNS, OR OTHER ADEQUATE PROTECTION, INCLUDING FLAG MEN AND WATCHMEN AS NECESSARY TO INSURE THE SAFETY OF THE PUBLIC AS WELL AS THOSE ENGAGED IN THE CONSTRUCTION WORK. CONSTRUCTION SIGNING SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF "CONSTRUCTION AND MAINTENANCE OPERATIONS SUPPLEMENT TO ' THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" BY THE NCDOT. CONTRACTOR WILL BE RESPONSIBLE FOR ONSITE DUST CONTROL. 4. ALL MATERIAL CLEARED AND GRUBBED BY THE CONTRACTOR IN ORDER TO CONSTRUCT THE WORK, SUCH AS TREES, VEGETATION, FENCING, ETC... SHALL SIEPI P OFF -SITE R R IF PROP PERMITS ARE RECEIVED. BECOME THE PROPERTY OF THE CONTRACTOR AND .SHALL BE PROPERLY DISPOSED OF 0 ITE 0 BURNED ER ER EROSION CONTROL NOTES ENGINEERING & 1. ALL CONSTRUCTION ACTIVITIES SHALL BE PERFORMED IN COMPLIANCE WITH THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973. CONSTRUCTION LAN DISTURBING ACTIVITIES ARE 'TO BE PLANNED AND CONDUCTED TO LIMIT EXPOSURE TO THE SHORTEST FEASIBLE TIME. 2. ALL D D E EX 1025 WADE AVENUE 3. ALL DISTURBED AREAS SHALL BE STABILIZED BY A PERMANENT GROUND COVER. RALEIG H, NORTH C AROLINA ARE PERMANENTLYSTABILIZED,ALL ` PERMAN NT 'M R HAVE BEEN I AN FINAL APPROVAL IS RECEIVED FROM 4. AS SOON AS ALL AREAS E ERMANENTI E MEASURES tiA E INSTALLED, D 919.789.997I THE OWNER, THE TEMPORARY MEASURES MAY BE REMOVED. , 11 DAVID TAYLOR DRIVE SUITE 415 020 W R MAKE PERIODIC INSPECTIONS EVALUATE THE CONTRACTORS EFFORTS AND SUCCESS IN 5. OVER THE LIFE OF THE THE OWNER SHALL SECTIONS TO EV C PROJECT, ' CONTROLLING EROSION OF SOILS TO OFF -SITE AREAS. IF AREAS ARE FOUND WHERE EROSION IS TAKING PLACE, THE CONTRACTOR SHALL TAKE THE HA NORTH CARULINA CHARLOTTE, E, NECESSARY MEASURES TO REMEDY THE SITUATION, 1 744.74.4880 6. DRAWING NOTES THAT INDICATE THE INSTALLATION OF TURF REINFORCEMENT TO STABILIZE SOIL AND TO PROTECT SLOPES FROM EROSION REFER TO 5030 NEW CENTRE DR., SUITE B WESTERN EXCELSIOR CORPORATION TURF REINFORCEMENT MATS, `EXCEL PP5-10" OR APPROVED EQUIVALENT. WILMINGTON, NORTH CAROLINA 7. ANY SLOPES GREATER THAN 3:1 SHALL BE STABILIZED IMMEDIATELY WITH TURF REINFORCEMENT. 910.523.5715 www.sepiengineedng.com CONSTRUCTION SEQUENCE NOTES: 1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ASSURE ALL SEDIMENT REMAINS ON SITE AND OUT OF SURROUNDING WETLAND AREAS. 2. MEANS AND METHODS OF EROSION CONTROL ARE THE RESPONSIBILITY OF THE CONTRACTOR. 3. MAINTAIN ALL TEMPORARY EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. EROSION CONTROL MAINTENANCE PLAN ,��it4itiltlll� ,��```�ARo��'`%,, 1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR THAT ALL EROSION CONTROL MEASURES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING �-SS / pyq y EVERY RUNOFF PRODUCING 'RAINFALL EVENT, BUT IN NO CASE, LESS THAN ONCE EVERY WEEK AND WITHIN 24 HOURS OF EVERY HALF INCH RAINFALL. r �� l 2. DIVERSION DITCHES WILL BE CLEANED OUT IMMEDIATELY TO REMOVE SEDIMENT OR OBSTRUCTIONS FROM THE FLOW AREA. THE DIVERSION RIDGES WILL _ Q S ALSO BE REPAIRED. SWALES AND DITCHES MUST BE TEMPORARILY STABILIZED WITHIN 21 CALENDAR DAYS OF CEASE OF ANY PHASE OF ACTIVITY = _ ASSOCIATED WITH A SWALE. 04 27 - Q0 3. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES HALF FILLED. ' THE SEDIMENT FENCE WILL BE REPAIRED AS TO BARRIER. MUST BE STEEL WILL MAXIMUM WITH USE OF NECESSARY MAINTAIN A STAKES STAKE SPACING BE 6 FEET THE EXTRA STRENGTH FABRIC, WITHOUT WIRE BACKING. STAKE SPACING WILL BE 8 FEET` MAXIMUM' WHEN STANDARD STRENGTH FABRIC AND WIRE BACKING ARE USED. IF ROCK ���� Ol�,�\��` o FILTERS ARE DESIGNED AT LOW POINTS IN THE SEDIMENT FENCE THE ROCK MATERIAL WILL BE REPAIRED OR REPLACED IF IT BECOMES HALF FULL OF DAMAGED �/� S,���`�`%3��► I SEDIMENT NO LONGER DRAINS AS DESIGNED OR IS 4. ALL SEEDED AREAS WILL BE FERTILIZED, RE -SEEDED AS NECESSARY AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. ALL SLOPES WILL BE STABILIZED WITHIN 14 CALENDAR DAYS. ALL OTHER AREAS WILL BE STABILIZED WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS WHICHEVER IS SHORTER. ,`�����`""'rrll,,���/ • cC co _ \ o- EL. 26.20 3 TOP OF BANK 1- TEMP. POOL 25.4 I I 42» HDPE I I PERMANENT POOL 22.91 INV. 22.41 3» ORIFICE I 3 INV.OUT 20.90 V 1 6" 4'-0» 6" SECTION A - A BOTTOM 16.00 OUTLET STRUCTURE NTS TEMPORARY POOL EL. 25.4 PERMANENT POOL EL. 22.91 ". 21.5 1I \ 3 DETENTION POND & FOIREBAY SECTION.- SHWT 23.41J-- -- MAIN POOL 3 BOTTOM EL 16.0 CLEANOUT EL. 15.0 TOP OF BANK EL. 26.20 W SEAL � - - C-2197 = - s - At.0 - SEEDING SCHEDULE 'fIlrr►,,t�t,,� 1. ALL DISTUR13M AREAS DUE TO CONSTRUCTION AND ANY SEVERELY ERODED AREAS SHALL BE COPYRIGHT© 2012 STABILIZED BY A PERMANENT GRASS COVER. THE SEED SPECIES SHALL BE SELECTED BASED SEPI ENGINEERING & CONSTRUCTION, INC ON THE TYPE SOIL PRESENT, SEASONAL CONDITIONS AND OTHER CONSIDERATIONS. AS AN ALTERNATIVE, THE CONTRACTOR MAY USE THE METHODS AND SCHEDULES SHOWN BELOW; HOWEVER, IT IS RECOMMENDED THAT A SPECIALIST BE CONSULTED WITH ATTENTION GIVEN TO SITE ` SPECIFIC CONDITIONS. o a. CULTIVATE AREA TO A DEPTH OF 5 b. APPLY AGRICULTURAL LIME UP M 1 TON PER ACRE FOR SOIL DISTURBED 6", AND 2 TOMS PER ACRE FOR SOILS DISTU EO GREATER THAN 6". c. APPLY 10-20-20 COMMERCIAL FERTILIZER AT THE RATE OF 500 LBS. PER ACRE. d. SOW` GRASS SEEDS AT THE FOLLOWING RATES PER ACRE. DRY SOILS (APRIL-SEPTEMBER) WET SOILS (APRIL-SEPTEM BERMUDAGRASS..................30 lbs. BERMUDAGRASS.................. 25 lbs. LLI -' CENTIPEDEGRASS...............10 lbs. BAHIAGRASS .......................... 25 lbs. BAHIAGRASS ..........................30 lbs. CARPETGRASS ...................... 25 lbs. c� KOBE LESPEDEZA................20 lbs. ANNUAL RYEGRASS or ANNUAL RYEGRASS OR GERMAN iMILLET .....................25 lbs. GERMAN MILLET....................25 lbs. e. MULCH WITH STRAW AT THE RATE OF 3250 TO 4350 LBS. PER ACRE SHOULD PROVIDE 75% COVER. COVER IN EXCESS OF 75% COULD REDUCE PROPER PLANT 0 GROWTH AFTER SEED GERMINATION. ANCHOR STRAW WITH ASPHALT EMULSION TACK , COAT APPLIED AT THE RATE OF 300 GALLONS PER ACRE. 2. WHERE IT IS NOT POSSIBLE TO ESTABLISH A PERMANENT GRASS COVER IN A REASONABLY SHORT PERIOD OF TIME DUE TO SEASONAL CONSIDERATIONS, A TEMPORARY GRASS COVER z SHALL BE ESTABLISHED. THE TEMPORARY SEED RATE PER ACRE SHALL BE: WINTER (SEPTEMBER- RIL) SUMMER, Y-AUGUST ANNUAL RYEGRASS ....... 50 lbs. GERMAN MILLET .... 50 lbs. TALL FESCUE.................50 lbs. TEMPORARY COVERS SHALL NOT EUMINATE THE REQUIREMENT FOR PERMANENT GRASS COVER. WHERE THE 'SEASON OR OTHER CONDITIONS ARE NOT SUITABLE FOR GROWING A TEMPORARY EROSION RESISTANT COVER, MULCH MAY BE APPLIED; HOWEVER, MULCH USED ALONE SHALL BE FOR THE SHORTEST TIME PRACTICAL. A TEMPORARY OR PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED AS SOON AS CONDITIONS ARE FAVORABLE. 3. TOPSOIL SHALL BE USED OVER ALL SOIL CONDITIONS FOR SUCCESSFUL ESTABLISHMENT OF VEGETATIVE COVER AT A DEPTH OF AT LEAST 4". TOPSOIL TO BE FROM APPROVED NC �-- SOURCE. 4. IRRIGATE AS NECESSARY TO OPTIMIZE PLANT GROWTH. Z GROUND STABILIZATION CRITERIA SITE AREA STABILIZATION STABILIZATIONTIMEFRAME DESCRIPTION TIMEFRAME EPPTIONS EXCEPTIONS * Perimeter dikes, swales, ditches and 7 Days None slopes * High Quality Water (HOW) 7 Days None Zones If slopes are 10' or * Slopes Steeper 7 Days less in length and are not steeper than than 3:1 2:1, 14 days are allowed * Slopes 3:1 or 14 Days 7-days for slopes greater than 50 ft. in flatter length * All other areas None (except for with slopes flatter 14 Days perimeters & HOW than 4:1 Zones) W � I- V � H ,P a GRAPHIC SCALE Uj BY: Uj 0 a CD PROJECT MANAGER FIELD SURVEY DATE: EAS 8/17/2016 IN FEEL , CHECKED BY: JRS DRAWING DATE: 10/24/2016 1 inch = ## ft. Harz. DRAWN BY: JOB #: EAS u%16.015.00 SHEET PRELIMINARY NOT FOR CONSTRUCTION � C-3.0 ,,, Johnson, Kelly From: Johnson, Kelly Sent: Thursday, May 18, 2017 9:33 AM To: Nick Garner (nick@ccrgnc.com) Subject: FW: Trash Racks I just pulled the plans for Turtle Creek, and you are correct. It does not specify dimensions for the trash rack, and I missed it during the review. I will leave this email and a copy of applicable page of the SCM Manual stapled to the plan to establish that we talked today and decided to go with 5.5in spacing. Thanks for catching that. KJ From: Johnson, Kelly Sent: Thursday, May 18, 2017 9:14 AM To: Nick Garner (nick@ccrgnc.com) <nick@ccrgnc.com> Subject: Trash Racks Nick, I got your voicemail. The new regulations requires a trash rack, but it doesn't specify details. Here is the guidance in the SCM Manual, https1(ncdenr.s3.amazonaws.com/s3fs- public/Enerev%20Mineral%20and%20Land%20Resources/Stormwater/BM P%20Manual/A- 4%20%20Common%20Structures%20and%20Materials.pdf (page 18). 1 think that if it is an existing, permitted site that you just go by what the existing plans say though. If you have questions, please let me know. Kelly 1CeL Lt i0hws0vt, Kelly Johnson Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910.796.7331 E-mail correspondence to and from this address may be subject to the !North Carolina Public Records Law and may be disclosed to third parties. Ic 113�J���n:; i J. NCDEQ Stormwater Manual " " principal -emergency outlet may be considered. A combined principal -emergency outlet is a single outlet structure that conveys both low flows (e.g., stormwater management functions) and extreme flows. A primary design consideration for a combined principal -emergency outlet, particularly when in the form of drop inlet structures, is protection against clogging. Trash racks should be"designed as described below. When a combined principal- emergency outlet is proposed, then the emergency outlet portion should be designed as if no additional storage is available and as if all normally operating weirs, ports and/or orifices are inoperative or clogged. Trash Racks Most outlets are subject to some degree of trash and debris from incoming flows, and certain outlets are more susceptible to clogging than others. Before a debris control structure is designed, the anticipated debris problem should be analyzed. The type and quantity of debris are determined primarily by upstream land use, soil erodibility, watershed size, and the type of stormwater management facility. Trash racks to serve drop inlets should be designed to provide positive protection against clogging of the outlet under any operating level. The.average velocity of flow through a clean trash rack should not exceed 2.5 fps during peak design flow. Velocity can be computed on the basis of the net area of opening through that part of the rack receiving the flow. The same criteria should apply to ports or openings along the side of a riser structure. The clear distance between bars generally should not be less than 2 inches; however, one exception to this may be near the apex of the trash rack. Bar spacing should be no greater than one-half of the minimum conduit dimension in the drop inlet, with an absolute maximum of 5.5 inches to discourage child access. An alternative to a typical peaked trash rack for the top of risers includes having a weir opening with a concrete slab and manhole for access (see Fig. 8 below). In some cases, debris -control devices may be required for low-level intakes at the basin bottom. In these situations, debris control structures such as those discussed in the FHWA publication "Debris Control Structures" (HEC 9) (USDOT, 1971) should be considered where appropriate. A-4. Common SCM Structures & Materials 18 Revised: 3-8-2017 LEGEND ANN EXISTif�G PROPOSED FUTURE 4 T1 IV) — -- -- ROW LINE/PROPERTY LINE — — SANITARY SEWER —ss —ss —ssAM S)7T VVA —---_ CM------ SEWER FORCE MAIN—�—�+—�— ,,., ----- WATER LINE w --- �T �f?AIIT 5— _: _:: ___- _ � CULVERT/ STORM PIPE — — -- — STREAM/DITCH SEDIMENT FENCE � SEWER MANHOLE O TOWN OF SURF no*=[ CITY UTILITY EASEMENT PLUG VALVE/GATE VALVE N UNTY NCJRTH FAROLINA BL°W_°FF oPENDER CO, FIRE HYDRANT ASSEMBLY OWNER OtIF EXITING IRON PIPE O Ehc: EXISTING MAGNETIC NAIL DCNC NORTH CAROLINA I, LLC � SUITE 104 CiEPK EXISTING PARKER—KALON NAIL 2528 INDEPENDENCE BLVD., � '� 0 EXISTING PROPERTY CORNER WILMINGTON, NORTH CAROLINA 28412 ,Z* LIMITS OF DISTURBANCE (910) 790-9880/(910) 79O-8759 (fax) —�—�—�— JUNCTION BOX (JB) YARD INLET (YI) Yl BYPASS BOX (BP) BP ENGINEERCATCH BASIN/CURB INLET (CI) O CAVANAUG"n AND ASSOCIATES, P.A. i.J , 60X CULVERT � • _ _�,� 130 NORTH FRONT STREET, SUITE 202 � EXISTING MAJOR CONTOURS -- -- 10— — m.4M r EXISTING MINOR CONTOURS WILMINGTON, NORTH CAROLINA 28401 --- --- — ---- --- _,_____ll___: 910) 392-4462/(910) 392-461-2 (fax� � -- PROPOSED MAJOR coNTouRs ,o )SED MINOR CONTOURS •- --- RIP RAP — INFILTRATION BASIN (TREATMENT AREA) SURVEYOR 77771 WETLANDS CHARLES F. RIGGS & ASSOCIATES, P.A. VEGETATIVE FILTER 202 WARLICK STREET BIO—RETEMIvN AREA MONITORING WELL P.O. BOX 1570 FINISHED FLOOR ELEVATION FFE JACKSONVILLE, NC 28541-1570 �,� � DRAINAGE AREA BOUNDARY--------- (910) 455-0877 P SHEET INDEX PLANNER ' , C.3.1 OVERALL SITE PLAN"` C.5.0 PHASE 1 & 2 OVE�I�faLL STORMW.AT�R PLAN �� HADENSTANZIALE C.5.1 PHASE 1 OVERAL_ `TORMWATER PLAN yAWIg ovERA�� C.5.2 PHASE 1 STORMS"�f� i � R PLAN DRAINAGE AREA 1 B � ET �SI 3807 WRIGHTSVILLE AVE. SITE - C.5.3 PHASE 1 STORM'vi,; i LC- PLAN DRAINAGE AREA 1 C �OL ° � C.5.4 PHASE 1 STORMWATER PLAN DRAINAGE AREAS 1A AND 1D� SUITE 24 �-, ,,-� � � Q ATKINSON LOOP C. PHASE 2 OVERA��_ STORMWATER PLAN WILMINGTON, NC 28403 l�_ PHASE 2 PHASE-1 ROAD C.7.7 PHASE 1 STORRMWATER INFILTRATION BASINS 1A-1, 1A-2, (910) 791-8383 1 A — 3, & 1 D —1 PENDER COUNTY C.7.8 INFILTRATION BA3lNS 113, 1 C, 8c 1 D-2 DETAILS NORTH CAROLINA C.7.9 STORMWATER GFNERAL DETAILS 1 , NC HIGHWAY 210 C.7.10 STORMWATER GENERAL DETAILS 2 ' C.7.11 STORMWATER GEN ERAL DETAILS 3 VICINITY MAP c.7.1 2 STORMWATER G�:��i�RAL DETAILS 4 C.7.13 STORMWATER GENERAL DETAILS PHASE. 1 8c 2 SPECt�-'CATIONS FINAL DESIGN NOT TO SCALE RELEASED FOR BEFORE YOU DIG ! CONSTRUCTION CALL 1-800-632-4949 DISTURBANCE ACREAGE 36.84 �.,t""""""""". � N.C. ONE -CALL CENTER PROPOSED LOT COUNT �NVIS � � IT'S THE t.,sw ! SINGLE FAMILY 71 Q EA - ° 2 � - Solutions through integrity ar�d partnership ''��, S• TO�G�P tl� �U�l �� � ,., � DATE: OCTOBER 31, 2007 PROJ. NO.: 041.05.043 gWS�O�) yM � $p R • s opt s�oy Al • �B 5 Q� 99) \ Za9R��L���lj� 74 R A 3 SSA 1�' NOW OR FO MERLY NOW OR FORMERLY NELUE M ORE GLORIA J. DEARMAS & D.B. 456, 216 cq NORMAN E. SHEPPARD NOW OR FORMERLY GFA �0 R! D.B. 997, P. 140 GLORIA J. DEARMAS & 4-1 p NORMAN E. SHEPPARD TT^� C�. D.B. 997, P. 140 %\ yA NOW OR FORMERLY SALLIE BRAGG BATTS D.S. 214, P. 96 M.B. 5, P. 17 -400 p �So 1�1 �ICG31 lip ;Ij Will , 111M a NOW OR FORMERLY EMMETT SNIFF D.B. 810, P. 125 M.B. 4, P. 55 PHASE 2 (28 SINGLE FAMILY LOTS) LU I LL(jLNU A - DAVID WILSON JUSTICE, SR. - D.B. 152Z P. 118 M.B. 32, P. 132 B - STEPHEN ROSS JUSTICE, JR. & WE, -- D.B. 2347, P. 72 PAULA DENISE JUSTICE M.B. 32. P. 132 C - JOHN MARK BALDRIDGE -- D.B. 2368, P. 145 M.B. 4. P. 55 D - MYRA T.ROCHELLE & HUSBAND, -- D.B. 747, P. 166 JAMES L. ROCHELE, JR. M.B. 25, P. 58 E - OSTON G. HARDISON & WIFE, JAQEUNE D. HARDISON - O.B. 754, P. 755 F - OSTON G HARDISON do WIFE, JA=NE D. HARDISON -- D.B. 724. P. 61 G - OSii)N G HARDISON do WIFE, JAOELINE D. HARDISON d D.B. 724. P. 61 H - OSTON G. HARDISON do WIFE, JAMNE DENISE HARDISON -- D.B. 913, P. 192 1 - GLORIA J. DEARMAS - D.B. 677, P. 48 0 �1 �r6 SOT , � A 90 O� F� pR jy 3 R 90�'2 7?�igGRy7 3� AAp7SOH Y 404 WETLANDS 44WETLANDS 1 diB SOT , 90 f 1 v� O�v0 NOW OR FORMERLY PR N C. KING, III & WIFE JOYCE RENEE KING B. 1492, P. 287 E g. PHASE 4 (48 SINGLE FAMILY LOTS) �kl j C� NOW OR FORMERLY WOODY L. ATKINSON D.B. 661. P. 238 NOW OR FORMERLY PZOplj SHEILA ATKINSON SLATER eO4,e „ D.B. 730. P. 31 1-,M.B. 22. P. 35 LINE TABLE 0 �1 �r6 SOT , � A 90 O� F� pR jy 3 R 90�'2 7?�igGRy7 3� AAp7SOH Y 404 WETLANDS 44WETLANDS 1 diB SOT , 90 f 1 v� O�v0 NOW OR FORMERLY PR N C. KING, III & WIFE JOYCE RENEE KING B. 1492, P. 287 E g. PHASE 4 (48 SINGLE FAMILY LOTS) �kl j C� NOW OR FORMERLY WOODY L. ATKINSON D.B. 661. P. 238 NOW OR FORMERLY PZOplj SHEILA ATKINSON SLATER eO4,e „ D.B. 730. P. 31 1-,M.B. 22. P. 35 LINE TABLE LINE LENGTH L1 182.79 L2 1512.41 L3 568.02 L4 316.70 L5 92.23 L6 85.98 L7 153.11 L8 108.14 L9 159.23 L10 192.24 L11 126.20 L12 177.53 L13 339.50 L14 360.00 L15 337.35 L16 135.83 L17 125.75 L18 69.34 L19 114.82 L20 81.51 L21 92.63 L22 41.10 L23 52.64 L24 31.86 L25 93.33 L26 � , 78.04 L27 60.18 L28 53.83 L29 32.79 L30 7119 L31 77.81 L32 32.42 L33 114.58 L34 43.85 L35 49.36 L36 96.02 L37 FORMERLY ATKINSON SHEILA . PHASE FAMILY(53 SINGLE • J. NOTE:• BUILDING FOOTPRINT RESTRICTION r r PHASE t1111►A'IMk1rAA'NA1A� i - E Fipp- �,WOODY L. ATKINSON POND ..► .r #j ,� yjw=r AM/►A;�►/t,�►I►AA� /M1t1P G MiMM�1►r/ • Y �o o O ,.„ �.. � •"'�� .•sir'' o� f ri o U LAO I LIN ,C HW. 210 101.37 LINE TABLE LINE LENGTH L38 10$.06 L39 51.61 L40 98.66 L41 52.08 L42 76.26 L43 25.20 L44 69.24 L45 44.93 L46 39.65 L47 132.30 L48 298.01 L49 238.87 L50 500.95 L51 393.64 L52 53.03 L53 231.25 L54 2886.38 L55 100.57 L56 1105.91 L57 210.60 L58 758.66 L59 89.55 L60 192.09 L61 216.37 L62 229.97 L63 372.90 L64 906.62 L65 100.00 L66 100.00 L67 129.40 L68 200.00 L69 123.31 L70 129.71 � L71 790.52 I L72 503.60 L73 128.14 cuRv!!-4 __.ABLE CURVE I LE►v TH RADIUS C1 265.70 430.01 C2 254.97 473.73 SCALE: 1" =300' 300 0 300 Wr .00' SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. 8P6.•10.00• -NOTE: TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND ASSOCIATES, P.L.S.# L-2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. cO Lr O 7 c tti co C 04 U z O HW. 210 101.37 LINE TABLE LINE LENGTH L38 10$.06 L39 51.61 L40 98.66 L41 52.08 L42 76.26 L43 25.20 L44 69.24 L45 44.93 L46 39.65 L47 132.30 L48 298.01 L49 238.87 L50 500.95 L51 393.64 L52 53.03 L53 231.25 L54 2886.38 L55 100.57 L56 1105.91 L57 210.60 L58 758.66 L59 89.55 L60 192.09 L61 216.37 L62 229.97 L63 372.90 L64 906.62 L65 100.00 L66 100.00 L67 129.40 L68 200.00 L69 123.31 L70 129.71 � L71 790.52 I L72 503.60 L73 128.14 cuRv!!-4 __.ABLE CURVE I LE►v TH RADIUS C1 265.70 430.01 C2 254.97 473.73 SCALE: 1" =300' 300 0 300 Wr .00' SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. 8P6.•10.00• -NOTE: TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND ASSOCIATES, P.L.S.# L-2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. cO Lr O 7 c tti co C 04 U z O cuRv!!-4 __.ABLE CURVE I LE►v TH RADIUS C1 265.70 430.01 C2 254.97 473.73 SCALE: 1" =300' 300 0 300 Wr .00' SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. 8P6.•10.00• -NOTE: TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND ASSOCIATES, P.L.S.# L-2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. cO Lr O 7 c tti co C 04 U z O cis JL. N ...... �rnrn to O o LL o to z O r- O T -1 1a �+ r U O Q J` J3J U LL J Ld L.L.1 Imo""""` cr- li w LL L1 O v 0:� C� w Uz C)V J a. ®Or z W d W � o 4W. CL p_ Q. tN N7 u) SHEET NO. C. 3. 1 h N n O LO O oc © �. zoo ►,. ,........6,�•, 'd Gl <,t cV • Z • i .4•' • Ag- �! 1S 054 eq.tt, 0.34 acres 48 5."M sq.ft.-- PHASE 2 SEE SHEET C. 5.5 (ALL RUNOFF FROM PHASE 2 TO BE DIRECTED TO BASIN B) { �. r .•- j %�%MR �''2 {' rr .:✓ .+tee .r.. INFILTRATTN SEE SHEET C.5.4 NFI�tTRAT 1.31 SEE SHEET C.5.4 5' WALKING PATH ,v ' b :t ♦ � • i,� c•' Ea *,.}. r,;n+-:..n ..w.r� , .:�\ � �\ _ n` wt/s .:.a-na�.;.•_"sria{` ��',; �,�ra.,• '�� �•�� XNI 4 . 44 , ,', r .,. � z., • c}r�ad ^�..q :;, \\ , � °� .::. ��_;,;,�c�:3ssc.• c , ,�- ' ��„ � • e � .. • � , � tic: s !� s � f � �� tiS �l � ``, .a' j '- ♦ e♦�o♦ �'�',r}}Y%/ =jay t� a �jjj �� '- ♦♦000♦ t � f� ./��� � �14 � Kii'-tI/y�'" 3 .:� 1 .� a�,~i..i:'•VIM �.J..-. � � � � ,tip `( 4 4 t f1 rlm�[ fit. �1t `r ♦ \ ? Y !.'y<ti� �� rti; a 4 ♦ , ♦ 1 irOOAI s -Will jai '; � r . a , ,.:(( �� .�� .• •%'' ��+ � • ':rc� ♦♦e f . r � + is � r � a a �! } �i ��, �• ,• 7, ar`r;;• %/ ��i ��9`, ` � �'�/ .�:.lt'�" � \` �' ♦ ♦Y♦O C • � � * . �'y + t3<•'r'� � a ♦ � 4 �� Sl ty 1 f \"k�j *�� � i i �, ♦ ,achy/ / Ett � ., ,t � c�` � � �•.°., ♦ � ;'� � •' ��� '� // i r , a r r to � ��ar ././'..e� ..• *���� / � � )1 §!� ''3p• � � ` � � f ; iy :; -•fit';` s s.:"°`'�•�, � ��` ' (� i e MIAMI' t - • ► . bra , . i,VFW a • • i >•M1L L< \ r ;%�.ice..•, � ` - `� \ � r r ( a � a , ` .. 10 -MIN- m� milli wWwopw, TEMPORARY CONSTRUCTION `� a � : • • a ��`' Alt. ENTRANCE .,.ram"'i�..t%_a�'M4?TuE'•N•YYSR•�zs.,{ *', �;5 ����- .rY low tF w.a .• !art RFR • N RA NOTES: (1) TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND ASSOCIATES, P.L.�S.# L-2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION, (2) ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN FIELD APPROVED BY THE ARMY CORPS OF ENGINEERS ON NOVEMBER 23, 2005 (FINAL APPROVAL PENDING). (3) CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES BEFORE COMMENCING CONSTRUCTION. (4) CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS GENERATED THROUGH DEMOLITION AND GRUBBING ACTIVITIES SHOWN. (5) SEDIMENT FENCING TO BE AT THE LIMIT OF DISTURBANCE FOR THIS CONSTRUCTION SITE, AT LEAST ONE FOOT (1.) FROM WETLANDS (6) CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. INTERVALS ALONG SEDIMENT FENCING. (7) ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 CALENDAR MAYS OF GRADING ACTIVITIES. (8) WATER, SEWER, AND STORMWATER PIPES TO BE INSTALLED IN TRENCHES ACCORDING TO STANDARD SPECIFICATIONS AND DETAILS ON SHEET C.7.10. (9) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS SHALL BE LAID AT LEAST TEN (10) FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A TEN (10) FOOT LATERAL SEPARATION --- IN WHICH CASE: (A) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION ON THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER; OR (B) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION OF THE BOTTOM OF THE WATER FAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER. (10) CROSSING A WATER MAIN OVER A SEWER. WHENEVER NECESSARY FOR A WATER MAIN TO CROSS OVER A SEWER, THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST EIGHTEEN (18) _ INCHES ABOVE THE TOP OF THE SEWER, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT AN EIGHTEEN (18) INCH SEPARATION -- IN WHICH CASE, BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE CROSSING. (11) CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE POINT(S) OF CROSSING. A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. e (12) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" SEPARATION FROA BOTTOM OF STORMWATER PIPE AND TOP OF SEWER PIPE. (13) ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS TO BE DIRECTED TO RIGHT--OF-VAY, OR TO YARD INLET (OR OTHER STORMWATER COLLECTION DEVICES) FOR EVENTUAL DI=CHARGE TO INFILTRATION BASIN. (14) FOR MAXIMUM ALLOWABLE BUILT --UPON AREA PER LOT SEE TABLE 5.1 ON SHEET 5.1. AND TABLE 5.5 ON SHHET 5.5. (15) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS DOES NOT INCLUDE ANY RUNOFF FROM IMPERVIOUS SURFACE ASSOCIATED WITH THE FUTURE COMAERCIAL AREA. A PERMIT MODIFICATION WILL BE NECESSARY PRIOR TO CONSTRUCTING ANY ADDITIONAL IMPERVIOUS SURFACE. (16) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SEDIMENT & EROSION CONTROL PLAN APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. (17) ACCORDING TO THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973 (NORTH CAROLINA GENERAL STATUTE 113A 51-66) THIS PROJECT IS SUBJECT TO AN APPROVED SEDIMENTATION AND EROSION CONTROL PLAN. THE CONTRACTOR SHALL ADHERE TO ALL OF THE CONDITIONS SET FORTH IN THE APPROVED PLAN, AS PRESCRIBED BY NCDENR. A COPY OF THE APPROVED SEDIMENTATION AND EROSION CONTROL PLAN SHALL BE DISPLAYED AT THE JOB SITE AT ALL TIMES, (18) ALL FITTINGS TO BE MJ DIP WITH THRUST BLOCKING UNLESS OTHERWISE NOTED ON PLANS. (19) EXCELSIOR MATTING AND SEEDING TO BE USED ON SLOPES STEEPER THAN 2:1. SOD SHALL BE USED FOR ALL SLOPES FLATTER THAN 2:1. (20) FINISHED FLOOR ELEVATION (FFE) IDENTIFIED ON THE PLAN IS INDICATIVE OF COMPACTED PAD GRADE TO WHICH 2"--4" OF TOP SOIL WILL BE ADDED. SEE DETAIL 5/c.7.11. (21) CONTRACTOR SHALL IMPLEMENT TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH M.U.T.C,D. P-RAINAGE AREA AREA 1 A--1 AREA 1A--2 AREA 1 A- 5 AREA 1 B AREA 1 C AREA 1 D---1 AREA 1D--2 TrITAL PHASE 1 & 2 DRAINAGE AREA AREA, i �,AQR,-l­JL 0.69 0.38 0.16 17.27 6.51 0.89 2.07 27.97 1 Pld-ASE 1 & 2 DRAINAGE AREAS CONSTRUCTION SEQU_'_N��L 1 • PERFORM CONSTRUCTION STAKE OUT. 2. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE. 3. CLEAR SITE, BUT DO NOT GRUB. 4. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES. 5. GRUB SITE. 6. CONSTRUCT SEDIMENT BASINS. 7. COMMENCE ROUGH GRADING OF THE SITE. 8. INSTALL STORMWATER MANAGEMENT DEVICES. 9. CONSTRUCT SEWER COLLECTION SYSTEM. 10. CONSTRUCT WATER SYSTEM, 11. ROUGH GRADE THE SITE. 12. SHAPE SHOULDERS AND CUT AND FILL SLOPES. 13. SCARIFY, SEED, FERTILIZE AND MULCH ALL DISTURBED AREAS. 14.INSTALL DRY UTILITIES (ELECTRICAL, FIBER --OPTIC, CABLE, PHONE, ETC). 15. RE -SCARIFY, RE --SEED, RE --FERTILIZE AND MULCH ALL DISTURBED AREA, 16. CONSTRUCT ROADBED BASE COURSE AND INTERMEDIATE ASPHALT COURSE. 17. APPLY FINAL ASPHALT COURSE. 18. AFTER DISTURBED AREAS ARE STABILIZED WITH VEGETATION, THE CONTRACTOR SHALL RETURN TO THE SITE AND REMOVE ALL TEMPORARY EROSION CONTROL MEASURES. 0 rn N iw Q/ c o T rn CL � 0 04 z c C cc o ci N EJ0) cz 0 4-0 � cl) 2 U. o Z 0 0 " a N o 00 06 .G U LLJ __j cl- Cr- Z. z ,_ Ltj Q z � C) FZ �•- O N w O Q ce [l 61 O w ® z p N 4 w Q W W Q. tY N SHEET NO. C. 5.0 O N � m W w W 4 CL .♦ • �� ,• V c� w -.• tom : 0 ? t� <i / • •w .� �. Lr S •..� V ) Q� Z W ZU u-ty0 END PHASE 1 - PAVEMENT AND SIDEWALK FFE 32.00 o0of CI-AA1 '00� GRT 30.50 INV OUT 27.73 24" HDPE EQUALIZATION SEE DETAIL PIPE @ ELEV, 27.00 0% SLOPE {TYP)/ 1� 2 INSTALL 15' FFE SPILLWAY 0 29-25' 32.50 ( Id 1005; INSTALL APPROX. 26 LF 15- HDPE DR .,,.BERM EL. 30.50 13 32.5 0 0.50% INV OUT 27.60 INSTALL APPROX. 29 LF 15" 1 _X HDPE DR 32.5 00.25% CI-21 GRT 31.07PROPOSED F.E.S. PROPOSED INFILTRATION INV OUT. 25.70' INV OUT 27.04 BASIN 1 D--1 FFE SEE DETAIL 4 32.50 CI-22 GRT 31.04 ;' _ .\ ; :"�, AMENITY INV. IN 26.97- INV OUT 26.97"' AREA INSTALL APPROX. 33 —PROPOSED RIP RAP W/ J INSTALL APPROX. LF 15" HDPE LEVEL SPREADER (TYP.) LF 15" HDPE 32.5 0 0.48.,.• SEE DETAIL 32*5 0 0*52% INV OUT 27.60 31 35, FFE FFE .7.10 DRAINAGE AREA BERM 32.5 31.75 1D-2 BOUNDARY 0 Z�1' LANDSCAPED EL 0 28.75' ISLAND 'f / CI-AA5 INSTALL APPROX. 132 LF 15";, _N GRT 28.00 HDPE DR 32.5 0 0.70%; INV IN 25.81 2 _IC 31.35", INV OUT 25.81 C 30 85' (TYP.) SEE DETAIL \,C.7.12 C.7.12 2' CONCRETE CURB AND GUTTER• INSTALL APPROX. 26 LF 15" (TYP) HDPE DR 32.5 0 0.50% SEE DETAI 6 CI-AA2 I GRT 30.55 r GRT 30.75 a \C.7.1 0 INV IN 27.73 /\�_ FFE INV IN 26.05, INSTALL APPROX. INV OUT 27.73 INV OUT 26.04 15 LF 15" __1c I Nu HDPE DR 32.5 CI-AA3 00.47% GRT 30.60 INV OUT 25.61 INV OUT 27.89 5' SIDEWALK (TYP.)- (TYP.) 29.50' i 4 SEE DETA . I '/ 4 SEE DETAIL( 2 INSTALL 15' SPILLWAY ® 27.75' FFE INSTALL APPROX,134 5.25' CI-AA6 31 0 LF 15" HDPE DR JB-4. 32.5 0 0.25% GRT 28.00 < GRT '1-71 INV IN 25.68 R INV IN 6 LANDSCAPED CI �0, CIRCLE 2 /jINV OUT 25.68 op) INV OUT 26.00 28.5y- 26' ASPHALT ROAD (RADIUS 65.0 (LOGGERHEAD BLVD ONLY.) TIL SEE DETAIL AND WA Y_ / 2VALLEY CURB X PROPOSED INFILTRATION SEE DETAIL BASIN 1D-2 FFE SEE DETAIL 3 31.50 C.7.8 INSTALL APPROX. 63-,-,(.% ZZ ASPHALT LF 15" HDPE DR ROAD QFY::�� CI-AA4 32.5 @ 0.49% 50'DETAIL-__11 i_" SCALE SEE - GRT 29.00 Co 50 5 INV OUT 26.12 50 0 C.7.9 (TYP SCALE OF MAP MAY VARY E AREA 1D DUE TO METHODS OF REPRODUCTION. DRAINAG- INFILTRATION DAQI PROPOSED14 1 r_% I r'A A ell K 1 4 A ri PROPOSED INFILTRATION BASIN PROPOSED INFILTRATION 1 rN 1_1 PROPOSED INFILTRATION BASIN 1D-1 N I' . -I L I n PROPOSED I t-IL AIIUN 1:51A A r_1 50 j V�4­ -7 A_ p. . . . . . 20' RESTRICTIVE ACCESS EASEMENT FOR POND MAINTENANCE -qP 404 WETLANDS _c cl) 0 cz PROPOSED INFILTRATION BASIN 1A-2 PROPOSED 49.5 LF ALUMINUM TTOMLESS CULVERT TO MATCH SEE DETAIL a2- c: 'XISTING BOTTOM ELEVATIONS. C.7.7 SEE DETAIL � % CO-3 2 INV 31.50 V06 FUTURE COMMERCIAL AREA INSTALL 15' 1% SEE GENERAL NOTE 15 C - �79 SPILLWAY 0 31.25' / jf 34 c CIV 0) Ll :3 33 TOP OF BERM 0 PROPOSED ELEVATED L CONCRETE SIDEWALK BRIDGE (5 LF) cf) INSTALL APPROX. 76 L.F. X c {TYP) i /; /11 1 i . SEE DETAIL co-i e, 0' 30" RCP AT 0.25% 0 INV 31.00 _P: 31.90*--` 0 PROPOSED INFILTRATION N v-r.,, f CO-4 BBASIN1A I HP: , INV 30.00 PROPOSED INFILTRATION SEE DETAI (JA BASIN 1A-3 C.7.7 EXISTING 24" ROP CULVERT SEE DETAIL 3 C. CO-2 A :3-'TOP OFBERM INV 31.00 "' \ EL. 0 32.75' NC ( ENTRANCE SIGN TOP OF BERM , INSTALL 15'_�--l- (16 SF) Ap'qWr 21, EL. @ 32.25' VA. fCow ) MATC!f MATCH SPILLWAY 0 31.75' 31.75' EXISTING yEXISTING 362' PROPOSED RIP RAP W/ PROPOSED YARD INLET LEVEL SPREADER (TYP.) 3145 GRATE 29.87 SEE DETAIL 36 6� 5 INV. 25.88 30.95' SEE DETAIL 30.45'�_ (TYP.) 30.25'--- INSTALL 15' TC 31 . ................ SPILLWAY @ 31.25' py G 30.82' 30.62' INSTALL APPROX. 115 L.F. ENTRANCE' OF 30" HDPE AT 0.25% k�_ (16 SF) (TYP.) INSTALL APPROX. 197 L.F. OF 36" HDPE AT 0.25% (TYP.) PROPOSED ELEVATED -C 31.76' CONCRETE SIDEWALK BRIDGE (5 LF) (TYP) HP PROPOSED CURB 11��ET G 31.26' GRATE 30.40'�­ I SEE DETAIL INV. 25.63' sr SCALE: 1 ')U PROPOSED CURB SEE DETAIL GRAIL, 30 50' 0 50 (TYP.) ( 2 '_ ' _' I '­ _­___ -, �_ PROPOSED YARD IN 1, INV. 21�1 GRATE 29.30 W5 INV. 24.97 �fv 30.2.5' SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. nR A INI ArF ARE A 1 A_ Iq DRAINAGE AREA 1A-1 DATA TOTAL AREA 0,69 ACRES IMPERVIOUS AREA G25 ACRES PERCENT IMPERVIOUS 37% VOLUME 4.5" RAINFALL 4,283 CU.FT. BASIN VOLUME 4,879 CU.FT. DRAINAGE AREA 1A-2 DATA TOTAL AREA 0.38 ACRES IMPERVIOUS AREA 0.16 ACRES PERCENT IMPERVIOUS 42% VOLUME 4.5" RAINFALL 2,629 CU.FT. BASIN VOLUME 3,331 CU.FT. DRAINAGE AREA 1A-3 FDATA TOTAL AREA 0.16 ACRES IMPERVIOUS AREA 0.05 ACRES PERCENT IMPERVIOUS ; 4% VOLUME 4.5" RAINFALL 929 CU.FT. BASIN VOLUME 1,757 CU.FT. DRAINAGE AREA 1D-1 DATA TOTAL AREA 0.89 ACRES IMPERVIOUS AREA 0.48 ACRES PERCENT IMPERVIOUS 53% VOLUME 4.5" RAINFALL 7,739 CU.FT. BASIN VOLUME 7,887 CU.FT. DRAINAGE AREA 1D-2 DATA TOTAL AREA 2.07 ACRES IMPERVIOUS AREA 0.98 ACRES PERCENT IMPERVIOUS 47% VOLUME 4.5" RAINFALL 16,142 CU.FT. BASIN VOLUME 17,335 CU.FT. GENEBAL (1) NOTES: TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND H TE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS ASSOCIATES, P.L.S.# L-2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN SHALL BE CONSTRUCTED IN ACCORDANCE NTH THE SEDIMENT & PURPOSE ONLY. NOT FOR RECORDATION. EROSION CONTROL PLAN APPROVED BY THE NORTH CAROLINA (2) ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN FIELD APPROVED BY DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. THE ARMY CORPS OF ENGINEERS ON NOVEMBER 23, 2005 (FINAL APPROVAL f ACCORDING TO THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973 PENDING). (NORTH CAROLiNA GENERAL STATUTE 113A 51-66) THIS PROJECT IS (3) CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES BEFORE COMMENCING SUBJECT TO AN APPROVED SEDIMENTATION AND EROSION CONTROL CONSTRUCTION. PLAN. THE CONTRACTOR SHALL ADHERE TO ALL OF THE CONDITIONS (4) CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS GENERATED SET FORTH IN THE APPROVED PLAN, AS PRESCRIBED BY NCDENR. A THROUGH DEMOLITION AND GRUBBING ACTIVITIES SHOWN. COPY OF THE APPROVED SEDIMENTATION AND EROSION CONTROL PLAN (5) SEDIMENT FENCING TO BE AT THE LIMIT OF DISTURBANCE FOR THIS CONSTRUCTION SHALL BE DISPLAYED AT THE JOB SITE AT ALL TIMES. SITE, AT LEAST ONE FOOT (1') FROM WETLANDS 8) ALL FITTINGS TO BE MJ DIP WITH THRUST BLOCKING UNLESS OTHERWISE (6) CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. INTERVALS ALONG NOTED ON PLANS. EXCELSIOR MATTING AND SEEDING TO BE USED ON SLOPES STEEPER SEDIMENT FENCING. THAN 2:1. SOD SHALL BE USED FOR ALL SLOPES FLATTER THAN 2:1. (7) ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 `2-1` FINISHED FLOOR ELEVATION (FFE) IDENTIFIED ON THE PLAN IS (8) CALENDAR DAYS OF GRADING ACTIVITIES. WATER, SEWER, AND STORMWATER PIPES TO BE INSTALLED IN TRENCHES ACCORDING INDICATIVE OF COMPACTED PAD GRADE TO WHICH 2"-4" OF TOP TO STANDARD SPECIFICATIONS AND DETAILS ON SHEETS C.7.1, C.7.6 AND C.7.10. SOIL WILL BE ADDED. SEE DETAIL 5/C.7.11. (9) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS SHALL BE LAID 21 CONTRACTOR SHALL IMPLEMENT TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH M.U.T.C.D. AT LEAST TEN k I ) FEET I LATERALLY FROM VIVI EXISTING OR PROPOSED SEWERS, Vfil_r_,>S LOCAL CONDITIONS OR BARRIERS PREVENT A TEN (10) FOOT LATERAL SEPARATION -- IN WHICH CASE: (A) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION ON THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE (.�01 STRUCTION EU EIN CE_ TOP OF SEWER; OR (B) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE PERFORM CONSTR.UCTION STAKE OUT. WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE. EIGHTEEN(18) INCHES ABOVE THE TOP OF SEWER. 3. CLEAR SITE, BUT DO NOT GRUB. (10) CROSSING A WATER MAIN OVER A SEWER. WHENEVER NECESSARY FOR A WATER 4. INSTALL ALL EROSION AND SEDIMENT CONTROL MAIN TO CROSS OVER A SEWER, THE WATER MAIN SHALL BE LAID AT SUCH AN MEASURES. ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST EIGHTEEN (18) 5. GRUB SITE. INCHES ABOVE THE TOP OF THE SEWER, UNLESS LOCAL CONDITIONS OR BARRIERS 6. CONSTRUCT SEDIMENT BASINS. PREVENT AN EIGHTEEN (18) INCH SEPARATION -- IN WHICH CASE, BOTH THE COMMENCE ROUGH GRADING OF THE SITE. WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND 8. INSTALL STORMWATER MANAGEMENT DEVICES. WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE 9. CONSTRUCT SEWER COLLECTION SYSTEM. OF TEN (10) FEET ON EACH SIDE OF THE CROSSING. 10. CONSTRUCT WATER SYSTEM. (11) CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FOR A I1. ROUGH GRADE THE SITE. WATER MAIN TO CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE SEWER SHAPE SHOULDERS AND CUT AND FILL SLOPES. SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO 13.SCARIFY, SEED, FERTILIZE AND MULCH ALL DISTURBED WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE AREAS. POINT(S) OF CROSSING. A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT 14.INSTALL DRY UTILITIES (ELECTRICAL, FIBER-OPTIC, CABLE, THE POINT OF CROSSING. PHONEETC (12) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24- SEPARATION FROM ,). BOTTOM OF STORMWATER PIPE AND TOP OF SEWER PIPE. 15.RE-SCARIFY, RE -SEED, RE -FERTILIZE AND MULCH ALL DISTURBED cl- C) 0 cr_ C) cr_ � w � -<c C) LLJ Z (f) ul ui 9 n. QC to (10 SHEET NO. O NC) C) c,-w 0 Z Q__ to W t�- C) W W •~ _40 � W U CL 4 (13) ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS T BE DIRECTED TO RI HT -OF -WA mrxr-m. z Of z OR TO YARD INLET OR OTHER STORMWATER COLLECTION DEVICES) FOR EVENTUAL 16.CONSTRUCT ROADBED BASE COURSE AND INTERMEDIATE 0 0 0 0% i-"- U- F- *0 DISCHARGE TO INFILTRATION BASIN. ASPHALT COURSE. (n f 0 �.) Z. 0 1-7 ui 0 (14) FOR MAXIMUM ALLOWABLE BUILT-UPONTABLEA AREA VLN LOT btt TABLE 3.1 ON SHEET 3.1 I. APPLY MKIA1 ASPHALT _r COURSE. ow U) AND TABLE 5.5 ON SHEET 5.5. 18. AFTER DISTURBED AREAS ARE STABILIZED N_j<TH < LJLJ (15) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS DOES NOT VEGETATION, THE CONTRACTOR SHALL RETURN TO THE zz _j z INCLUDE ANY RUNOFF FROM IMPERVIOUS SURFACE ASSOCIATED WITH THE FUTURE SITE AND REMOVE ALL TEMPORARY EROSION CONTROL u_wo COMMERCIAL AREA. A PERMIT MODIFICATION WILL BE NECESSARY PRIOR TO MEASURES. cr_ 0 CONSTRUCTING ANY ADDITIONAL IMPERVIOUS SURFACE. PHASE 2 SPECIFICATIONS YARD INLETS (YI) 2 JUNCTION BOXES (JB) 3 CURB INLETS (CI) 15 12" HDPE DR 32.5 50 L. F. 15" HDPE DR 32.5 113 L. F. 18" HDPE DR 32.5 981 L. F. 24" HDPE DR 32.5 59 L. F. 30 HDPE DR 32.5 297 L. F. 36 L HDPE DR 32.5 919 L. F. woo 404 WETLANDS O FFE 31.50 LP: 30.20 CI-41 - 48 FFE 31.5vkcb INSTALL APPROX. 25 LF 15 HDPE DR 32.5 @ 0.24% -w-l" ................ ;;;�� S� \ 404 WETLANDS SCALE: 1 50' 50' 0 50 SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. \\FFE,--- 32.50v�D HP:-i'l.37 JOHN MARK BALDRIDGE DB 2368, Pg. 145 PIN: 4225-79-6001-0000 OFF N/S 210 PL 4/55 J3 10' DRAINAGE EASEMENT (TYP.) (CENTERED ON PIPE) v--LP:30.21 CI-39 Cl 8 ti FFE FFE�A�D (31.50 32.5 \111� INSTALL YARD INLET CI-40 JYP.) SEE DETAIL 4 I i C.7.1 E dL VD 0 CI--2 SEE SHEET C.5.2 0 Rf INSTALL APPROX. 59 LF 24" HDPE DR 32.5 @. 0.50% cm INSTALL CONCRETE co "--DRIVEWAY APRON FOR c� ACCESS TO 0) LODGEHALL RD. 22' ASPHALT ROAD (TYP.) c cl) SEE DETAIL CO _0 a) (3) c HP: 32.28 z C 5' SIDEWALK (TYP.) co SEE DETAIL ci 0) cm (D 4-4 2' VALLEY CURB (TYP.) c N SEE DETAIL c� ri 0 2 U- EXISTING DRAINAGE 0 DITCH (TO BE ABANDONED cl) z AND FILLED) c cf) 0 V_ INSTALL APPROX. 364 0- LF 36" HDPE @ 0.29% 0 0 0 ca CI-28 INSTALL APPROX. 127 LF 18' INSTALL APPROX. 208 LF 36 LP: 30.99 HDPE DR 32.5 @ 0.25% YI--3 HDPE DR 32.5 @ 0.25% ss YI-2 CI-31 low INSTALL APPROX. 26 LF 36 77T 7IT APPROX. 297 LF 30' INSTALL 8 INSTALL. APPROX. 209 LF 18 HDPE DR 32.5 @ 0.25% HDPE DR 32.5 @ 0.25% A FFE x� 1 (79 - FFE I % FFE FFE FFE 51.50 (42.50 FFE 11. 50 2.5� TFE 31.50 1.50 -ALL APPROX. 114 LF 18 FFE 32.50 INSI 32.50 INSTALL APPROX. 115 LF 18 _H')PE DR 32.5 @ 0.25% HDPE DR 32.5 @ 0.25% CI-33 HP: 3 - CI-37 1.34 Tlevc _0 eA LP: 30.19to s qvr ffT BEFORE YOU DIG 1 CALL 1-800-632-4949 N.C. ONE -CALL CENTER IT'S THE LAW 1 HP: 31.36 ALL ROA INSTALL 18" PRE -CAST F.E.S. (TYP) JB-6 INV = 26.64 ---------- CENTERED ON EXISTING JB--5 DRAINAGE DITCH CENTERED ON EXISTING DRAINAGE DITCH INV. IN 27.34 CONNECT TO CULVERT AS SHOWN INV. OUT 27.34 INV. IN 26.64 INV. OUT 26.64 STEPHEN ROSS JUSTICE, Jr. INSTALL APPROX, 140 DB 2347, Pg. 072 INSTALL 18 PRE -CAST FES LF 18" HDPE DR 32.5 PIN: 4225-78-6767-0000 INV. IN = 27.34 @ 0. 5_10% LOT A PB 32, Pg. 132 APPROX, LOCATION INSTALL CURB INLET EXISTING DRAINAGE DITCH (TYP.) SEE DETAIL rl r2 r2 �7"3 DAVID WILSON JUSTICE, Sr. DB 1522, Pg. 118 INSTALL APPROX. 140 LF PIN: 4225-78-7489-0000 18" HDPE DR 32.5 @ 0.507, LOT B - PB 32, Pg. 132 JB-7 INSTALL APPROX. 25 LF 12" CENTERED ON EXISTING EXISTING DRAINAGE HDPE DR 32.5 @ 1.0% DRAINAGE DITCH DITCH (TO REMAIN IN PLACE) INV. IN = 28.04 /-LP- 30.21 INV. OUT = 28.04 '' HP: 31.42 18" PRE -CAST F.E.S. (TYP) INV = 28.04 ss INSTALL APPROX. 41 LF 36 wn[DF np 7�0 r-1 nrl A CI-35 CI-314 INSTALL APPROX. 136 LF 18"' CI-30 CI-27 INSTALL APPROX. 25 LF 12' HDPE DR 32.5 @ 0.25% INSTALL APPROX. 280 LF 36 HDPE DR 32.5 @ 0.25% HDPE DR 32.5 @ 0.24% 66 FFE FFE u CROSSWALK 68 'C31.50 FFE @9 (TYP.) (32.56 FFE FFE8 S1.50 FFE' SEE DETAIL r8 �31.5q 32.5 (32.50.'VC-7-15 IHP:31.31� HP: li 0 CI-36 CI-32 PHASE 2-PROPOSED IMPERVIOUS AREA V .............. - - - - - PHASE 2 DRAINAGE AREA DATA TOTAL DRAINAGE AREA 8.90 ACRES IMPERVIOUS AREA 4.53 ACRES PERCENT IMPERVIOUS 51.0% VOLUME 1.5" RAINFALL 24,615 CU. FT. INFILTRATION BASIN _113 DATA VOLUME PHASE 1 1.5" RAINFALL 18,323 CU. FT. VOLUME PHASE 2 1.5" RAINFALL 24,623 CU. FT. TOTAL VOLUME 1.5" RAINFALL 42,946 CU. FT. (PHASE 1 AND 2) VOLUME INFILTRATION BASIN 1B 56,449 CU. FT. *NOTE: ALL STORMWATER RUNOFF GENERATED FROM PHASE 2 WILL BE COLLECTED IN THE ABOVE SHOWN STORMWATER COLLECTION SYSTEM AND DIRECTED TO INFILTRATION BASIN 113. SEE SHEETS C.5.2 AND C.7.8. HDPE DR 32.5 @ 0.24% FFE FFE "31.50 FFE FFE FFE 1.50 31.50 31.50 31.50 ............. .. INLET DATA (IN FEET) INLET RIM INV IN INV OUT CI-27 30.50 24.62 24.62 CI-28 30.50 24.36 24.36 CI-29 30.00 - 26.89 CI-30 30.00 25.29 25.29 CI-31 30-00 25.39 (YI-3) 26.51 (CI-29) 25.39 CI-32' 30.00 - 27.31 CI-33 30.00 27.09 27.09 CI-34 30.00 27.08 27.08 CI-35 30.00 - 27.33 CI-36 30.00 - 27.75 CI-37 30.00 27.69 27.69 CI-38 30.00 27.64 27.64 CI-39 30.00 - 27.70 CI-40 30.00 27.17 27.17 CI-41 30.00 - 27.23 YI-3 29.90 26.81 (CI-33) 26.74 (CI-34) 25.91 (Y 1-2) 25.91 YI-2 29.90 27.40 (CI-37) 27.32 (CI-38) 26.65 (CI-40) 26.65 CI-2 30.30 26.91 (CI-1) 23.32 (CI-28), 23.32 014 LP: 30-1 95�� INSTALL APPROX. 25 LF 15 / HDPE DR 32.5 @ 0.88% A� I FFE 2.50 32 HP: 32.35 / �� CI-29 CROSSWALK Y LP: 30.3 SEE DETAILrB C.7.1 FFE 32.50 INSTALL APPROX. 38 LF 15 HDPE DR 32.5 @ 1.0% 404 WETLANDS HDPE DR 32.5 @ 1.00% i�ble 5.5 MAXIMUM IMPERVIOUS SURFACE AREAS FOR PHASE 2 RESIDENTIAL LOTS MAXIMUM IMPERVIOUS IMPERVIOUS J SURFACE LOT SURFACE AREA INvi [3 R I AREA (S Q F T -NUMBER (S Q. FT.) 4,176 60 4,189 47 61 4,187 /48 4,149 62 4,189 4)226 63 4,187 4,1145 64 4,195 50 4,152 65 4,187 5 5 2 4,15-1, 66 4,187 4,151 67 4,187 68 4,187 54 4,15 1 4,147 69 4,183 4,166 70 4,186 57 71 4,186 58 4,213 '72 4232 4,25-3 4,289 AVGSQ. FT.PER L01"IS4,185SO. F'r. (117,181 SO- FT, /28 LOTS = 4,185 SQ. FT F_� 2" -1-0 [AL BUA FOR EACH 1-0-1- INCLUDES 551 X BUILDING ENVELOPE, PLUS 18' WIDE DRIVEWAY L.EflG_FHS), PLUS SECTION OF DRIVEWAY �li,!IIIIN RaVv' (126 to 164 SF, DEPFNDIN(.' ON L_ UNLESS OTHERWISE )CATION Ill PHASE 2), AND CURB ARE NOT If L) _-D.SlI_FWALKS lN'(3LUDED IN BUA GENERAL NOTES: (1) TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS (11) CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS AND ASSOCIATES, P.L.S.# L-2981. INFORMATION PROVIDED FOR NECESSARY FOR A WATER MAIN TO CROSS UNDER A SEWER, BOTH ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. THE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED OF (2) ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN FIELD FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN APPROVED BY THE ARMY CORPS OF ENGINEERS ON NOVEMBER '93, STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF CONSTRUCTION SEQUENCE 2005 (FINAL APPROVAL PENDING). THE POINT(S) OF CROSSING. A SECTION OF WATER MAIN PIPE SHALL (3) CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES BEFORE BE CENTERED AT THE POINT OF CROSSING. 1. PERFORM CONSTRUCTION STAK'L' OUT. COMMENCING CONSTRUCTION. (12) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24- 2. INSTALL TEMPORARY GRAVEL C,,,)NSTRUCTION (4) CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE SEPARATION FROM BOTTOM OF STORMWATER PIPE AND TOP OF ENTRANCE. MATERIALS GENERATED THROUGH DEMOLITION AND GRUBBING SEWER PIPE. 3. CLEAR SITE, BUT DO NOT GRUB. ACTIVITIES SHOWN. (13) ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS TO BE DIRECTED TO 4. INSTALL ALL EROSION AND SEDIMENT CONTROL (5) SEDIMENT FENCING TO BE AT THE LIMIT OF DISTURBANCE FOR THIS RIGHT-OF-WAY, OR TO YARD INLET (OR OTHER STORMWATER MEASURES. CONSTRUCTION SITE, AT LEAST ONE FOOT (1') FROM WETLANDS COLLECTION DEVICES) FOR EVENTUAL DISCHARGE TO INFILTRATION 5. GRUB SITE. (6) CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. BASIN. 6. CONSTRUCT SEDIMENT BASINS, INTERVALS ALONG SEDIMENT FENCING. (14) FOR MAXIMUM ALLOWABLE BUILT -UPON AREA PER LOT SEE TABLE 7. COMMENCE ROUGH GRADING O'F THE SITE. (7) ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHE) 5.5 ON SHEET 5.5. 8. INSTALL STORMWATER MANAGEMENT DEVICES. WITHIN 15 CALENDAR DAYS OF GRADING ACTIVITIES. (15) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS (8) WATER, SEWER, AND STORMWATER PIPES TO BE INSTALLED IN DOES NOT INCLUDE ANY RUNOFF FROM IMPERVIOUS SURFACE 9. CONSTRUCT SEWER COLLEC-n0Nf SYSTEM. TRENCHES ACCORDING TO STANDARD SPECIFICATIONS AND DETALS ASSOCIATED WITH THE FUTURE COMMERCIAL AREA. A PERMIT 10.CONSTRUCT WATER SYSTEM. ON SHEETS C.7.1 AND C.7.6. MODIFICATION WILL BE NECESSARY PRIOR TO CONSTRUCTING ANY 11. ROUGH GRADE THE SITE. (9) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS ADDITIONAL IMPERVIOUS SURFACE. 12. SHAPE SHOULDERS AND CUT AND FILL SLOPES. SHALL BE LAID AT LEAST TEN (10) FEET LATERALLY FROM EXISTING (16) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS 13.SCARIFY, SEED, FERTILIZE AND MULCH ALL OR PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR BARRIER SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SEDIMENT & DISTURBED AREAS. PREVENT A TEN (10) FOOT LATERAL SEPARATION -- IN WHICHCASE: EROSION CONTROL PLAN APPROVED BY THE NORTH CAROLINA 14ANSTALL DRY UTILITIES (ELECI[R!CAL, (A) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH TIE DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. FIBER-OPTIC, CABLE, PHONE, ETC.). ELEVATION ON THE BOTTOM OF THE WATER MAIN AT LEAS (17) ACCORDING TO THE SEDIMENTATION POLLUTION CONTROL ACT OF 15.RE-SCARIFY, RE -SEED, RP---FFRTIL-IZE AND EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER; OR 1973 (NORTH CAROLINA GENERAL STATUTE 113A 51-66) THIS MULCH ALL DISTURBED AREA. (B) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER PROJECT IS SUBJECT TO AN APPROVED SEDIMENTATION AND EROSION CONTROL PLAN. THE CONTRACTOR SHALL ADHERE TO ALL OF THE 16.CONSTRUCT ROADBED BASE COURSE AND WITH THE WATER MAIN LOCATED AT ONE SIDE ON A BENCi OF CONDITIONS SET FORTH IN THE APPROVED PLAN, AS PRESCRIBED BY INTERMEDIATE ASPHALT COURSE-.. UNDISTURBED EARTH, AND WITH THE ELEVATION OF THE BOTTOM NCDENR. A COPY OF THE APPROVED SEDIMENTATION AND EROSION 17.APPLY FINAL ASPHALT COURSE. OF THE WATER MAIN AT LEAST EIGHTEEN(18) INCHES ABODE THE CONTROL PLAN SHALL BE DISPLAYED AT THE JOB SITE AT ALL TIMES. 18. AFTER DISTURBED AREAS ARE STABILIZED WITH TOP OF SEWER. (18) ALL FITTINGS TO BE MJ DIP WITH THRUST BLOCKING UNLESS VEGETATION, THE CONTRACTOR SHALL RETURN (10) CROSSING A WATER MAIN OVER A SEWER. WHENEVER NECESSARY FOR OTHERWISE NOTED ON PLANS. TO THE SITE AND REMOVE At' REMOVE TEMPORARY A WATER MAIN TO CROSS OVER A SEWER, THE WATER MAIN SHALL BE (19) EXCELSIOR MATTING AND SEEDING TO BE USED ON SLOPES STEEPER . .1-1. EROSION CONTROL MEASURE's. LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATR MAIN THAN 2:1. SOD SHALL BE USED FOR ALL SLOPES FLATTER THAN 2:1. IS AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF THE <EWER, (20) FINISHED FLOOR ELEVATION (FIFE) IDENTIFIED ON THE PLAN IS UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT AN EIGHTEEN (18) INDICATIVE OF COMPACTED PAD GRADE TO WHICH 2"-4" OF TOP INCH SEPARATION -- IN WHICH CASE, BOTH THE WATER MAIM AND SOIL WILL BE ADDED. SEE DETAIL 5/C.7.11. SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FCR A (21) CONTRACTOR SHALL IMPLEMENT TRAFFIC CONTROL MEASURES IN DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE CROSSING ACCORDANCE WITH M.U.T.C.D. z cl- Q) Or Z) L.Lj LL- 0z c) 0Q) C) C (0 cl z ell i ix SHEET NO. C.5.5 CN L6 C) � `� o Q m W W C~3 i; U li j Ct. p V t 21 RIP RAP W/ LEVEL SPREADER SEE DETAIL 5/C.7.10 t-%l Inn f'%[ I-r SPILLWAY EL. 31.75 3:1 SLOPE MAX. 100 YR STORM EL. = 31.27 APPROXIMATE SEASONAL HIGH WATER TABLE ELEVATION = 29.00 , I I III- '1 112 INFIL. BASIN 1A-1 BOTTOM: 31.00 SECTION Al —Al INFILTRATION BASIN 1A-1 DETAIL DETAIL -, SCALE: NOT TO SCALE C. 77 APPROX. 33' APPROX. 837 BOTTOM EL. 30.00 100 YR. STORM EL. 30-17 ---32 RIP RAP CURB CUT �blm EL. 32.25 cl) co 9 SCALE: 1" =30' 30' 0 30' A mv =---M m mn SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. FREVISION 6 EL ;6A - REVISED INFILTRATION BASIN 1D- D RA I k*, 8&-* SCALE: 1" = 30' 300 30' SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. PLAN SPILLWAY EL. 31-25 3:1 SLOPE MAX. 100 YR STORM EL. = 30.17 21 'APPROXIMATE SEASONAL HIGH WATER TABLE ELEVATION 28.00 - INFIL. BASIN 1A-3 BOTTOM: 30.00 SECTION A3—A3, INFILTRATION BASIN 1A-3 DETAIL DETAIL r7� -1 SCALE: NOT TO SCALE C.7.7j BOTTOM 100 YR. STORM lfffmrl�., CURB CUT - L j 1 1 2 n.#ll_1#lvkjwxvmmvAr#rw ze 0 c cv c� rn co Qa cm 0 c- c� 0 co 6 QD c: m 0 co I c CL cm 0 z c SCALE: 1 30' cri 30 0 30O ci (D cm SCALE OF MAP MAY VARY 0 :0 DUE TO METHODS OF REPRODUCTION. •c: co PLAN SPILDVAY EL. 31.25 3:1 SLOPE MAX. 100 YR STORM EL. = 30.41 - — --------- �7__ -A APPROXIMATE SEASONAL HIGH WAiER TABLE ELEVATION = 28.00 ---- - --------- INFIL. BASIN 1A-2 BOTTOM: 30.00 .SECTION A2—A2 INFILTRATION BASIN 1A-21 DETAIL DETAIL 2 �, . SCALE: NOT TO SCALE CC. 7, 3:1 SLOPE MAX. FG: 30.75 100 YR STORM EL. = 27.82 �'� I SCALE: 1" =30' 0 30 SCALE OF MAP MAY VARY TO METHODS UT UuL_ UUJ OF REPRODUCTION. 15' SPILLWAY 0 EL. 30-25 ]_�APPROXIMATE SEASONAL HIGH WATER TABLE ELEVATION = 24.00 INFIL. BASIN 1D-1 RIP RAP BOTTOM: 27.00 SEE DETAIL 5/C.7.10 SECTION Dl—Dl INFILTRATION BASIN 1D-1 DETAIL DETAIL SCALE: NOT TO SCALE kC.7.71 ri 0 0 2 LL oc t: 0 c 0 z 0 cr) c- o C6 0 V) (1) 06 43 Ld __j (J Q LLJ cn C/) cr LL. O n" V) z LL- C/� _o �^.. C) V) Llj p LLi QD LQLj <c CN z Lj CL LLJ Q) 0 .0 0 C, LZU `� o Q L,j o ce Lo SHEET NO. C. 7.7 BOTTOM EL. 21.00 100 YR. STORM EL. 26.05 I SCALE: 1" = 20' 20' o' 20' SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. FROM COLLECTION -----..- SYSTEM BERM EL. 27.50 INV OUT (BYPASS) PLAN VIEW 15' SPILLWAY @ EL. 26.50 APPROX. 220' APPROX. 115' 1� BERM EL. 27.50 3:1 SLOPE MAX. 100 YR STORM EL. = 26.05 — I- - 2----- — APPROXIMATE SEASONAL HIGH WATER TABLE ELEVATION = 19.0 �77 RIP RAP W/ INFIL BASIN 113 LEVEL SPREADER BOTTOM: 21.00 42" FLARED SEE DETAIL 5/CJ.10 END SECTION INV OUT 21.00 sECTioINI B—B INFILTRATION BASIN 1 B DETAIL DETAIL SCALE: NOT TO SCALE ABOVE GROUND INFILTRATION BASIN MAINTENANCE AGREEMENT 1. STORMWATER MANAGEMENT FACILITIES SHALL BE REGULARLY MAINTAINED TO ENSURE THEY FUNCTION AT DESIGN CAPACITY AND TO PREVENT HEALTH HAZARDS ASSOCIATED WITH DEBRIS BUILDUP AND STAGNANT WATER. THE: PRIVATELY OWNED PORTION OF THE SYSTEM MUST BE PRIVATELY MAINTAINED. 2. RESPONSIBILITY FOR OPERATION AND MAINTENANCE OF STORMWATER FACILITIES, INCLUDING PERIODIC REMOVAL AND DISPOSAL OF ACCUMULATED PARTICULATE MATERIAL AND DEBRIS, BUT NOT LIMITED TO THE FOLLOWING: VISUAL INSPECTION OF ALL SYSTEM COMPONENTS AT LEAST TWICE EACH YEAR; VACUUMING OF ALL STORM SEWER INLETS ONCE EVERY SIX MONTHS (FREQUENCY OF VACUUMING MAY BE ADJUSTED TO ONCE A YEAR IF FIRST YEAR MAINTENANCE RECORDS INDICATE THAT SEDIMENT AND DEBRIS ACCUMULATION IS INSIGNIFICANT); REVERSE FLUSHING AND VACUUMING IF SYSTEM INSPECTIONS INDICATE SIGNIFICANT ACCUMULATION OF SEDIMENT IN THE PIPES; AND PERIODIC REMOVAL AND DISPOSAL OF OTHER MATERIAL AND DEBRIS, SHALL REMAIN WITH THE OWNER OR OWNERS OF THE PROPERTY, WITH PERMANENT ARRANGEMENTS THAT SHALL PASS TO ANY SUCCESSIVE OWNER, UNLESS ASSUMED BY A GOVERNMENTAL AGENCY. 3. IN THE EVENT THAT THE FACILITY BECOMES A DANGER TO PUBLIC SAFETY OR PUBLIC HEALTH, OR IF IT IS IN NEED OF MAINTENANCE, THE OWNER SHALL EFFECT SUCH MAINTENANCE AND REPAIR OF THE FACILITY IN A MANNER THAT IS APPROVED BY THE TOWNSHIP ENGINEER OR HIS DESIGNEE. IF THE OWNER FAILS OR REFUSES TO PERFORM SUCH MAINTENANCE AND REPAIR, THE MUNICIPALITY MAY IMMEDIATELY PROCEED TO DO SO IN ACCORDANCE WITH THE MAINTENANCE BOND. ABOVE GROUND INFILTRATION BASIN MAINTENANCE AGREEMENT DETAIL r4, SCALE: NOT TO SCALE C.7.81 BOTTOM EL. 12.00 100 YR. STORM EL. 13.65 15' SPILLWAY @ EL. 14.75 X"- p SCALE. 1" = 20' g 2a o,20 SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. ------------ .AS APPROX. 240' PLAN VIEW U 3:1 SLOPE MAX. BERM EL. 15.25 100 YR STORM EL. = 13.65 ----------- FROM COLLECTI�O..N SYSTEM ' APPROXIMATE SEASONAL HIGH I WATER I TABLE ELEVATION 10.0 77 RIP RAP INFIL. BASIN 1 C INV OUT 30" FLARED SEE' DETAIL 5/C.7.10 BOTTOM: 12.00 (BYPASS) END SECTION SECTION C-C INV OUT 12.00 INFILTRATION BASIN 1C DETAIL. SCALE: 1 0 20 SCALE O MAP k VARY CUE TO METHODS OF REPRODUCTION. r DETAIL REVISION� 2 6A -REVISED INFILTRATION BASIN 1D-1 SCALE: NOT TO SCALE & g DRAINAGE AREA APPROX. 242' BOTTOM EL. 25.70 100 YR. STORM EL 26.47 CURB INLETS @ 28.00 PLAN VIEW � 3:1 �! OPE MAX. 15' SPILLWAY C�? EL 27.75 SZ 100 YR STORM EL. = 26.47 -I — 2APPROXIMATE SEASONAL HIGH WATER TABLE ELEVATION = 23.70 M coINFIL BASIN ?D -2 BOTTOM: 25.70 A SECTION D2-0 a INFILTRATION BASIN 1 D 2 DETAIL DETAIL - r3 SCALE: NOT TO SCALE C.7.8 ®�® W co U N r N O t� O rn CV co O L.. O c r- O cs 0 CL cm c g cis 0) o N .c 0) (n 0 2 U. Jc 4-0 V) c z O 0 r 0 CO 0 U) 06 W � J J I~ Lu -1 � 0 U � co N UZ LL_ � V) �/ �- q J C) o W W ......J n.. CL r-- E,--- .N�. to h a O a C) L a o t� CL cc 0CL ce ") 14- L0 cfl SKEET NO. f z , Z C' 0 0 LL V)LLJ 0 awe= ivy► V) •cn Qw� ✓�•i �w0 ar o �•,_ti • -.14114e, s. 24 12" PARKING STRIP (FINISH GRADE) 1 DROP PROPOSED ROAD SURFACE o � � \ � Q� Tl> 9 7» p o o D D o\ /� /�\/�\/�\/�\/�\/�\/�\/�\/�\ \ \ \ \ 6" OF SELECT FILL // // // / EXISTING SUBGRADE //\//� /� GENERAL NOTES 1.) CONTROL JOINTS SHALL BE PLACED @ 10' INTERVALS UNLESS OTHERWISE SPECIFIED BY ENGINEER, PLANS, OR SPECIFICATIONS. 2.) ALL CONTROL JOINTS SHALL BE FILLED WITH JOINT SEALER. 3.) EXPANSION /CONTRACTION JOINTS SHALL BE AT 90 FOOT INTERVALS, AND ADJACENT TO ALL RIGID OBJECTS. 4.) ALL JOINTS SHALL MATCH LOCATIONS WITH JOINT IN ABUTTING SIDEWALK. 5.) CONCRETE SHALL ACHIEVE A MINIMUM 28 DAY YIELD STRENGTH AT 3,000 PSI. VALLEY CURB DETAIL DETAIL rT� SCALE: NOT TO SCALE V _. �_7_ 9 SLOPE VARIES 3:1 MAX EXISTING SUBGRADE ALUMINUM BOTTOMLESS CULVERT W/ WING WALL (WING WALL SHALL BE DESIGNED BY AND BARE THE SEAL OF P.E. LICENSED IN NORTH CAROLINA) 1.5' MIN. DVI WWI UF F-A101. STREAM (UNDISTURBED) ROW VARIES ROW VARIES 24.00 19.00 15.00 13.00 2.00% FT - BOS FT - EOS FT - BOC FT - EOP SLOPE, low SLOPE VARIES 3:1 MAX SLOPE VARIES 3:1 MAX ROW 17.00 FT 13.00 FT 11.00 FT 2.00% 7777xt i VARIES Y_ - EOS - BOC - EOP SLOPE ROW VAPItElc-3 22.00 FT BOS 19.00 FT EOS 17.00 Fj' EOS 13.00 FT; BOC 11.00 F EOP 2.001% SLOPE 15.00 FT BOC 13.00 FT - EOP 2.00% SLOPE 5-0" CONCRETE SIDEWALK 5-0" CONCRETE SIDEWALK AT 2%, SEE DETAIL 4/C.7.11 AT 2%, SEE DETAIL 4/C.7.11 TYPICAL VALLEY CURB TYPICAL ROAD SECTION SEE DETAIL 1/C.7.9 SEE DETAIL 3/C.7.9 NOTE: TYPICAL ROADWAY SECTION TO BE APPLIED TO LOGGERHEAD BLVD. BEGINNING AT THE INTERSECTION OF STOCKTON PLACE AND LOGGERHEAD BLVD. MOVING NORTH. r1l v I- . (1) EOP = EDGE OF PAVEMENT (2) BOC = BACK OF CURB (3) EOS = EDGE OF SIDEWALK (4) BOS BACK OF SIDEWALK TYPICAL ROADWAY SECTION - - (5) ROW = RIGHT OF WAY PRIMARY SUBDIVISION ROADS/BOULEVARDS DETAIL n SCALE: NOT TO SCALE C.7.9/ r-lkllrflt-M ^r*jAr%r- Ham, ICRETE FOOTING Z MANUFACTURER'S --CIFICATIONS (MIN. 4,000 PSI CONCRETE) SLOPE VARIES 3:1 MAX EXISTING 1, A SUBGRADE Z5'-O" CONCRETE SIDEWALK 5-0" CONCRETE SIDEWALK AT 2%, SEE DETAIL 4/C.7.11 AT 2%, SEE DETAIL 4/C.7.11 TYPICAL VALLEY CURB TYPICAL ROAD SECTION SEE DETAIL 1/C.7.9 SEE DETAIL 3/C.7.9 NOTES: (1) EOP = EDGE OF PAVEMENT (2) BOC = BACK OF CURB TYPICAL ROADWAY SECTION (3) EOS EDGE OF SIDEWALK (4) BOS BACK OF SIDEWALK SECONDARY SUBDIVISION ROADS (5) ROW = RIGHT OF WAY DETAIL r5�\ SCALE: NOT TO SCALE C. 7.9j SLOPE VARIES - 3:1 MAX VARIES - EOS 15.00 FT - BOC 14.25 FT - EOP 2.00% SLOPE ROW VARIES VARIES - EOS 15.00 FT - B( 14.25 FT - E( 2.00% SLOPE SLOPE VARIES 3:1 MAX - EXISTING EXISTING SUBGRADE SUBGRADE 5-0" CONCRETE SIDEWALK 5'-0" CONCRETE SIDEWALK AT 2%, SEE DETAIL 4/C.7.11 TYPICAL 8" UPRIGHT CURB TYPICAL ROAD SECTION AT 2%, SEE DETAIL 4/C.7.11 SEE DETAIL 8/C.7.9 SEE [DETAIL 3/C.7.9 NOTES: NOTE: 1) TYPICAL ROADWAY SECTION VARIES WITH CENTER LANDSCAPE ISLAND. SEE PLAN VIEW FOR DIMENSIONS. 2) TYPICAL ROADWAY SECTION TO BE APPLIED TO LOGGERHEAD BLVD. FROM NC 210 ENTRANCE TO INTERSECTION OF STOCKTON PLACE (1) EOP = EDGE OF PAVEMENT (2) BOC = BACK OF CURB (3) EOS = EDGE OF SIDEWALK (4) BOS = BACK OF SIDEWALK (5) ROW = RIGHT OF WAY TYPICAL ROADWAY SECTION - . PRIMARY SUBDIVISION ROADS210 ENTRANCE DETAIL SCALE: NOT TO SCALE 1" SF 9.5A SURFACE COURSE 2 1/2" 1 19.0 B 6" AGGREGATE BASE COURSE (ABC) OF 95% STANDARD PROCTOR HE FILL -MAXIMUM 8" LIFTS AS REQUIRED MAXIMUM DRY DENSITY \/���/�j\/�\\/��\/� \/�j� THIS SECTION REPRESENTS THE MOST � �\/�\ �\ RESTRICTIVE PAVEMENT DESIGN SYSTEM. FINAL PAVEMENT DESIGN SYSTEM TO BE DETERMINED IN THE FIELD BASED ON FIELD CONDITIONS. MATERIALS SHALL MEET THE REQUIRED SECTIONS OF THE NCDOT STANDARD SPECIFICATION FOR ROADS AND STRUCTURES. LIGHT -DUTY ASPHALT PAVEMENT DETAIL 3 SCALE: NOT TO SCALE ROW VARIES ROW VARIES _j L_ 0 22.00 FT __BOQ_ 0 � ly- 5 17.00 FT EOS ui 0 I- - Z LL_ 12.00 FT F-W'." 12.00 FT BOC bj < SLOPE VARIES 10.00 FT . D__ 10.00 FI EOP 3:1 MAX \�\\\\\\{\\\\���;������������� 2.00% SLOPE , �, . r::.. _ . 2.00% SLOPE REVERSE PAN VALLEY CURB TYPICAL ROAD SECTION SEE DETAIL 3/C.7.9 ,TYPICAL ROADWAY SECTION ONE-WAY TRAFFIC CIRCLES DETAIL 6 SCALE: NOT TO SCALE Ll- 0 Lij I 0 (Y- Q EE �3_ Ld �_ 0 Q SLOPE VARIES XW3:1 MA X I 5'-0" CONCRETE SIDEWALK AT 2%, SEE DETAIL 4/C.7.11 -TYPICAL VALLEY CURB SEE DETAIL 1/C.7.9 NOTES: (1) EOP = EDGE OF PAVEMENT (2) BOC BACK OF CURB (3) EOS EDGE OF SIDEWALK (4) BOS = BACK OF SIDEWALK (5) ROW = RIGHT OF WAY R -3/4 2" JOINT R�/4)j SEALER /� " PAVEMENT SURFACE PROPOSED 2" GRADE ' /� /� 5. /� //� 3,OOD PSI \ . CONCRETE\/ r° , y 1/2" PREFORMED X BITUMINOUS JOINT FILLER NOTES: 1. 1/2" PREFORMED EXPANSION JOINT FILLER, BITUMINOUS TYPE, TO BE INSTALLED BETWEEN THE CURB AND ASPHALT PAVEMENT. DEPTH OF FILLER STRIP EQUALS PAVEMENT THICKNESS LESS 1/2 2. TRANSVERSE JOINTS 1/2" WIDE SHALL BE INSTALLED IN THE CURB 20 FEET APART AND SHALL BE FILLED WITH PREFORMED BITUMINOUS -IMPREGNATED FIBER JOINT RECESSED 1/4" IN FROM FRONT FACE AND TOP OF CURB. 3. EXPANSION JOINTS THRU AND ADJACENT TO THE CURB SHALL BE INCLUDED IN THE UNIT PRICE BID FOR CURB. MOUNTABLE CURB DETAIL -_ _ SCALE: NOT TO SCALE C.7.91 ®f L9 :3 CD c 0 Q_ -0 c CTS c Jc 0) :3 0 L_ Jc 4-1 c 0 4-J :3 0 W 04 z c 0 c 0c\I c\I ILL z 0 z 0 cr) a: 0 06 Q LLJ � __j 0 �'" L 0 LL 4<c LLJ Zi c) O U) O LLJ LLJ LLJ CL C\4- O w w v oc a Lu cl: CN co Oc Q: ce N SHEET NO. N �' � V_ 'q. C) J C. Q � w 000 zwz V) il- P woo 0 uj 0 (n X < < T- w cn Z-JZ 4: 1 SCOPE VARIES TO TIE TO 1 S�OpE. VARIES TO TIE TO FINISH GRADE NOTE: (1) USE PENSACOLA BERMUDAGRASS AS VEGETATED COVER (2) USE WOVEN PAPER NET AS CHANNEL LINER VEGETATIVE FILTER DETAIL SCALE: NOT TO SCALE �,C.7.10 2$_0" INVERT LIGHT DUTY INLET GRATE NOTES: (1) ALL CONCRETE TO BE 3,000 P.S.I. (2) ALL CATCH BASINS MORE THAN 3'-6" IN DEPTH SHALL HAVE STEPS 12" ON CENTERS. (3) ALL PIPE IN STORM DRAIN STRUCTURE SHALL BE STRUCK EVEN WITH THE INSIDE WALL, GROUTED, AND BRUSHED SMOOTH. (4) 4'-0° BOX TO USED FOR STORMWATER PIPES 12"-24" AND 5'-0" BOX TO BE USED FOR STORMWATER PIPES GREATER 24" IN DIAMETER. STANDARD.- STORMWATER YARD INLET (YI) DETAIL C� SCALE: NOT TO SCALE C.7.1 FINISH GRADE F_ w_ w w o Q H 3'-0" EXIST. GRADE MIN. I I �j Ell Li - I I 6" LAYERS OF HAND PLACED COMPACTED BACKFILL SEE SPECIFICATIONS PROVIDE UNIFORM AND CONTINUOUS SUPPORT OF PIPE BARREL BETWEEN BELL HOLES 2'-0" MIN. 3,_0„ FINISHED GRADE MIN. EXIST. GRADE TRENCH WALLS \ MAY BE SLOPED CONDUCTIVE TRACER TAPE �, 0 VARIES #57 WASHED STONE TO 1 /6TH DIAMETER OF PIPE O.D. HDPE MINIMUM OF 4" OF NO. 57 WASHED STONE TO BRING TO GRADE NOTES: 1. SOIL FROM TRENCH SHALL BE PLACED TO ENSURE RUNOFF WILL RETURN 70 THE TRENCH. 2. GROUND COVER ABOVE TOP OF PROPOSED WATERLINE SHALL BE A MINIMUM OF 3'. BEDDING FOR CLASS "C" HDPE PIPE DETAIL n SCALE: NOT TO SCALE HUB END ON C END SEC SPIGOT El INLET END SE( x L_ STEEL BA PLAN NATURAL GRADE VARIES RP RAP _ AL _AL 2 2 00 . LAYER OF FILTER FABRIC NOTE: MINIMUM H = 2/3 PIPE SECTION B-B GENERAL NOTES: 1. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER. 2. SIDEWALLS SHALL EXTEND UP AS SHOWN ON THE PLANS BUT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER. 3. THERE SHALL BE NO OVERFALL FROM THE END OF THE APRON TO THE: SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIP RAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE . SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE APRON SHALL HAVE A CUTOFF' OR TOE WALL AT THE DOWNSTREAM END. 4. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. 5. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. 6. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED. LEVEL SPREADER RP RAP APRON REQUIREMENTS OUTLET # CLASS L I W THICKNESS Dw/WEIGHT Co--1 1 8' 6' 24" 5-200 LB. CO-2 A 401 6' 12" 2"—Cs CO-3 B 6' m 6' 18" 5„_15p, CO--4 A 4' 6' 12" 211_6„ 1 B BASIN 2 10':> 10.5' 36" 25--250 LB. 113 BYPASS 1 8' 10.5' 24" 5-200 LB. 1 C (BASIN & BYPASS) B 6' 7.5' 18" 5"-15" 1 C SWALE A 8' 10' 12 2"--6" 1 D—CC A 4' 6' 12)121?-6>, 1D--2 A 4' 4' 12" 2„_6►l RIP RAP APRON FOR FLARED END SECTION DETAIL n SCALE: NOT TO SCALE C.7.1 Qj BY --PASS LINE a. Q '4 BY—PASS LINE 0 INFILTRATION r) A C%1 A 1 FROM DRAINAGE AREA IIIlRiiTit� V COVER M w SEWER NOTES: (1) THICKNESS OF CONCRETE TO BE 6" UNLESS OTHERWISE STATED INSTALL SOLID MANHOLE COVER MARKED 'STORM SEWER' RIM: A BYPASS WEIR: B INV. IN: C � INV. OUT: D BYPASS LINE INV. OUT: E INFILTRATION BASIN _ SUMP: F � 12" WASHED A.B.C.. BASIN INVERT ELEVATIONS — ----- A --, --- 1B 28.00 26.50 21.81 23.22 21.81 21.00 19.50 1 C 16.00 14.25 12.11 12.00 12..11 11.00 9.50 i i • SCALE: NOT TO SCALE In 3"_ OR I GENERAL NOTES: 1. 1 1 /2" OF 1-2 AND 4" OF A.B.C. TO BE USED IN PARKING AREAS. 2. 1 1 /2" OF I-2 AND 6" OF A.B.C. TO BE USED FOR PRIVATE DRIVES. 3. ALL CONCRETE TO BE 3600 P.S.I. 18" VERTICAL CUR DETAIL 6 SCALE: NOT TO SCALE 0 U 1 33. co •� N 0 � N o c rn 1 0 CL U z � c co 0 o N L3� Tip m :3 .. 0 2 LL a (J) z o V_ Q r Q � co 'v m Q rn C c� U 41 U `d J cr- zi w � �z �d t� p 0 Q caLLJ W W C� CL W ® N N w v � U Q c� or tk 4 W Q p N � N � SHEET NO. C. 7. 10 N Q �o V) m cr_ Z o y....... 7 4 t�► V? o • N Ld /� • �- uJ a ..ti••.............••��,.= 4" CONCRETE SIDEWALK dd '• ti 4 4 d A 4 CONCRETE SUPPORT a BLOCK AFFIXED TO CONC. CHANNEL WITH TYPE 'S' MORTAR (3Y2"X6"X5') 4" GRAVEL NOTE: ALL CONCRETE SHALL ACHIEVE MINIMUM 28--DAY, YIELD STRENGTH OF 3,000 PSI #4 REBAR @ i e)" n (' 3,500 PSI CONC. 5' 12" ( TYP. ) a a d 4. a 2„ Q,a 4 4 04. O o 4 d- 2" MIN. (TYP.) #4 REBAR @ 12" O.C. HORIZ. SECTION A -A CONCRETE SIDEWALK BRIDGE DETAIL r7� SCALE: NOT TO SCALE �C..11 F EXPANSION/CONTRACTION JOINT E A --- - OPTIONAL MANHOLE it , E r` GENERAL NOTES: Now CHAMFER ALL EXPOSED CORNERS 1 " . USE CLASS "B" C •NCRETE THROUGHOUT. , Q {ylT/ _ pw+-)li ` OPTIONAL CONSTRUCTIt3N--MONULITHIC POUR, 2" KEYVV Y, OR ____---- f #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER, ., , USE FORMS TO CONSTRUCT THE BOTTOM SLAB. cn - CONCRETE IS T SLAB OF BOX Lu IF REINFORCED C0 t: ETE PIPE SE IN BASE 0 , FLL ADD TO BASE AS SHOWN ON STANDARD NO. 840.00 . CL PROVIDE ALL. JUNCTION BOXES OVER 3-6" IN DEPTH WITH STEPS 12" ON CENTERS IN ACCORDANCE WITH STD. NO. 640. 66 , C) O Ln 0 6 j 3" 3,, - } _. ..._._ ADJUST THE STEEL, CONCRETE AND BRICK MASONRY QUANTITIES C; TO INCLUDE THE ADDITION OF THE MANHOLE (I.E. DIAGONAL BARS ' SEE STANDARD 840.54 SHORTENED AROUND OPENING IN TOP SLAB, ADDITIONAL VARIABLE FOR MANHOLE COVER & FRAME "r4_13ARS "A" HEIGHT BRICK MASONRY, OPENING IN TOP SLAB.) PLAN _ OPTIONAL � SPACED 6" C. TO C. MAX. DEPTH OF THIS STRUCTURE FROM TOP OF BOTTOM SLAB TO TOP BRICK MAY BE USED ELEVATION IS 12 FEET. /-TO ADJUST FRAME & B" �F COVER TO SURFACE ELEVATION MAX, 1#4 BAR 1/ 0 t OUTLET PIPE a 6ff PIPE/ ,�: .. _ .. SECTION INLET - -------- _..., " C OR D - D __D0WE.1L SECTION X_ tf X 61 EXP. JOINT SEE MUTE '_.3-w- DOWEL,, SECTION -_Y f 2 11 (V V0) imp Oil rr)nn% W 199;1 RQTTPR SECTIQNA-A PAVEMENT P.C.C. CURB TYPE 8° UPRIGHT CONCRETE CURB DETAIL � SCALE: NOT TO SCALE DIMENSIONS AND QUANTITIES FOR CONCRETE JUNCTION BOXES DIMENSIONS OF BOX AND PIPE TUFF SLAG TOTAL REIN ORCEMENT CUBIC YARDS �iUAf�TITIES DEDUCTIONS FOR ONE DIMENSIONS BOX A PIPE SSPAN'I[THHEIGiT3As "A" IN BOXAND SEAR RIPE GU.YDS, f� TOPF B0TT0�9 � WALL t.6S . �'i�.} , YDS p R.C. D A I B H NO. : LENGTH E F SLAB ,LAB IFT. OFF HIT. { REINF MIN. ,HT 12 2�-0f 2r_OPf 20-312 2` 9" 3'-O,t 3'-0 0.167 F 0.167 0.185 22 0.750 � 0,015 0.024 t f , 2 r •' � {f � 2 r -3" 3 ` ( 2 P - 6 F* # 12 } 3, _ 0!' � f - � re 3 -3 0.196 0.1196 1 0.204 24 0.902 0.023 0.036 18'' 2-6" I 2 ` - 6 . f 2' 9 . 14 3'- 3't I 3,F 3' 6 f ` 0.227 1 0.227 € 0.222 30 1.065 10.033 0.049 _........ ._._ M.. _ 24" 31-O'' 3'_0r' 3' 3f E 16 1 3'-9}f 4`_0f' 4°-00,296 t 0.296 0.259 40 1.434 0.059 0.085 . f 30; _ +._ Q.092 C.1270,3`6318 I 4-344376 0,375 .1,860 36 f� 41- O,f 41- Or! 4' - 3 20 `. 5' 0,f 5 0.463 € 0.463 0.333 64 2.341 .132 0.178 _ _..._ ! rq t 61 i 1 6 f 8 P! 42 t {a - ! 4 9 22 51- 3 f' 5' S' • 6" 0.560 t 0'-5 60 0,370 77 2,878 0,180 0.243 48" 5'-4' I 51- $' ;Y3ff 6t�4,d 6'-4" 0.743 0.743 0,407 111 3.623 0.235 0.317 5 _ 3 or 28 54" 51.100, j 5`-101' 5..928 � £` 7" 1 6' 1 Of. W 10,r 0.865 0.865 � 0.444 126 4.283 0.297 0.401 6D" 6` . 6�' �.. 61 6rr ► � „ 30 7` 3 ` I 7f B" 7 6" 1.042 € 1.042 0.481 145 5.090 0.367 0.495 ,f f „ rr " '- ,210 , r f� 4 _._.. 21 O _ 0.518169 5.917 0,444 ♦ 8�9 66 - s 1 - ?A t-its_ CONCRETE JUNCTION BOX (JB) DETAIL. SCALE: NOT TO SCALE C:7•11 1 11)11IWIIM 11)1113M)) FRONT VIEY! STANDARD CURB CUT DETAIL SCALE: NOT TO SCALE �C�7,11 FINISHED GRADE TO BE FLUSH 4'd''H WALKWAY VARIES 5' PER PLAN 3 SLOPE 1 /4 PER C5 FT. FROM R.O.W. a C ti °V d C pp 3 MIN. APPROVED COMPACTED 4" SELECT FILL COMPACTED TO SUBGRADE 95% OF STANDARD PROCTOR SECTION 4" AIR ENTRAINED CONC. 3,000 P. S.I. @ 28 DAYS NOTE: TRANSVERSE EXPANSION JOINTS 1 /2" WIDE SHALL BE PROVIDED AT INTERVALS OF NOT MORE THAN 20 FEET AND FILLED WITH PREFORMED BITUMINOUS CELLULAR TYPE JOINT FILLER. CONTRACTION JOINTS SHALL BE PLACED ON 5 FEET INTERVALS. LONGITUDINAL JOINTS 1/4" WIDE SHALL BE PROVIDED BETWEEN CURBS ABUTTING SIDEWALKS, AND SHALL BE FILLED WITH PREFORMED BITUMINOUS TYPE JOINT FILLER. THE TOP OF ALL JOINT FILLER SHALL BE 1 /4" BELOW THE TOP OF THE SIDEWALK. SIDEWALK DET DrITAIL rT`IIIIIIIIIIIIIIIII`� SCALE: NOT TO SCALE C.7.11 RESPREAD 4" TOPSOIL AND STABILIZE FINISHED FLOOR ELEVATION (TYPICAL ALL DISTURBED AREAS) CONCRETE DRIVEWAY 24" CONCRETE VALLEY CURB -1 HOT MIX PAVEMENT FINISHED FLOOR ELEVATION - COMPACTED PAD GRADE PAD GRADING DETAIL DETAIL r5 SCALE: NOT TO SCALE CJ.11, A SCALE: NOT TO SCALE 6" (+/-- 1/2 $2) SWALE NOTE: CONTRACTOR TO MAINTAIN POSITIVE DRAINAGE IN HOUSE PAD AREAS AND THROUGHOUT PROJECT AT ALL TIMES. '�•� 0 .7 l � 1 N r 0 1 cm M O r• N c W •- � o� 1 r 0 cz ^ CL U Z c c .2 0 0)A� 0 W N r rrrr y/ U) .� 0 0 LL 0 Z C 0 M 4-0 :3 oa 0 CD m u 0 a 06 rn as U Ld Lid LLJ -_.f C v Cr --.. v�LIJ C QLLJ v) LL- V © C) L.v o C W W Q o LZLJ �LjLj -- j CL, S: LLJ to N N Q. N N w 4 W W Z 0 o Cl, p � N � w SHEET NO. C.7.11 BACK or CURB . ..... ISO- x ft A _-h PLAN X SECTION Y-Y RISER HT. 3 VAR I ES k, oh P - 6" WHERE 30" TO 36" PIPE IS USED RISER HT. VARIES A WHERE 42'! TO 54" PIPE IS USED DETAIL SHOWING METHOD OF RISER G0NST_RUCTI'.O,N 4 r 3 PLAN FRAME , GRATE , & HOOD ASS'Y ERAS �E,_ GRATE AND HOOD SEE TOP ELEVATION 7T" 3f B 6 61" SEE NOTE SECTION X-X SECTION AA 3 rr i 3/4 /4 )�tr =� ,�f({}(/yj/��,rr 1 4.•.�n- . Q <i XCC i _27 6 it 31411 W1 31/2 SECTION KK GENERAL NOTES: USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL CATCH BASINS OVER 3-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. MO. 840. 00, USE TYPE "Ell , "F"AND "G"GRATES UNLESS OTHERWISE INDICATED, FOR W-O" IN HEIGHT OR LESS USE 6" WALLS AND BOTTOM SLAB. OVER 8'-0"' TO 16'.0" IN HEIGHT USE 8" WALLS AND BOTTOM SLAB. ADJUST QUANTITIES ACCORDINGLY. CONSTRUCT WITH PIPE CROWNS MATCHING. CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. FRAME,, GRATE AND HOOD ­b S .03 STD. N 0 SEE STD. . 84d N.O. 840.66 V-01f TOP ELEVATION I_ LT .� 1j, wt E SEE NOTE SECTION J-J WHERE 30" 70 36" PIPE IS USED NOTE: USE TYPE "Err Y "Fr' AKD IV' GRATE UNLESS OTHERWISE NOIED, ALIGN FRAME WITH INSI)E EDGE OF WALL TO ALL OVA FOR VERTICAL ADJUSTME4T-­­ wALL SECTION SECTI04 - BB TO.P.. ELEVATION STEPS STD. NO, 840.66 .... ...... L ..... . . . --- A E SECTION M-M WHERE 42 TO 54" PIPE IS USED 111 2 I/h I _. Vim., rr SECTION LL SECTION PP z co X, rRill 2-0 3 .Olt _c\1 K L M K-_ L M FRAW PLAN 31 - It It n 0 L6 21. 13z '114 0-A 3 /4 --------- u 2' - 11 rt _F1OOD EUNATION 6tl-- ------- E 6 6" It #4 BARS V @ EQUAL SPACES' 3 W LU R R -- --- ------- U- < Im Rt C3 :4 w LIJ cr) s PLAN OF TOP SLAB SECTION S-S 6 E #8 "W" BARS #4 BARS V V I F 6' tdUAL 8PAct8' L #4 BARS "U" tr 11/2 _S ECT_T­0_.NR_-.R_ #4 BAR 6" EXPANSION JOINTS 41-611 41 6'r STD. 840.03 FRAME, GRATE & HOOD 6 f_ol PLAN CURBAND GUTTER WITH CATCH BASIN ON STEEP GRADES TOP 6 ELEV.­`,. USE ON FLAT EXPANSION JOINT GRADES2% AND UNDER 3r^'r+ ; _-- _-_` ___ 3.1 -_O1'fDEPRESSED GUTTER LINE EXPANSION JOINT co ELEVATION NORMAL CURB AND GUTTER ON LIGHT GRADES NORMAL GUTTER LINE EXPANSION JOINT 8tt TOP E L E V USE ON GRADES VER 2% DEPRESSED GUTTER LINE loft VIAX 6 r 011 EXPANSION JOINT ELEVATION NORMAL CURB AND GUTTER ON STEEP GRADES MINIMUM DIMENSIONS AND QUANTITIES FOR CONCRETE CATCH BASIN(BASED ON MIN. HEIGHT, H, WITH NO RISER) DIMENSIONS OF BOX AND PIPE COVER CU. YDS. CONG. IN BOX DEDUCTIONS ONE PIPE PIPE 1 SPAN !WIDTH WIDTH SPAN I;MIN. HEIGHT DIMENSION E F BARS-U NO. 1ENGTH BARS-V NO. LENGTH I BARS-W NO. LENGTH TOTAL LBS, TOP 80770M JOT. CONC. �FOR MINIWAI SLAB SLAB 'HEIGHT, H A f! B C G D H R.C. 1211 31-01 21- 2 2 0.235 0.772 0.015 i 0.026 15" 3'-0' 2-2 3 -oil 0,235 0.829 0.023 0.036 18 3'-0" 2'- 2 0.235 0.887 . .... 0.033 10.049 .... ...... ...... .. 24' 3f -O?f 21- 2 0.235 1,001 0.059 �0.085 - -------- ---- 30" 3,-0" 2'-2r' 3 r - 4 4 11-2?l 4$ Otj 4 11-511 2 3 3 3 r-911 39 0.123 *:0.321 1.433 0.092 0.127 36' 31 -Olt 2(-2f' 31-10?1 4 -9 41 0'? e 4 3 3 3 31-911 43 --- --- -- ----- 0.161 ;0.358 1.714 0.132 ]0.178 42" $1-011 1; 21- 2 4T-51' 1 5 11-511 W-21? 4 11-8` 2 2le11 rr3 2'- 1 l" 32 0,112 0.318 i 1.738 0.180 0.243 48' I 31-0to t 2 .2 5 0!1 21-01, 4 21 - 3 3 2 3 2'- 11 lr 35 ... f 0.145 0.352 2. -5 .. ..... 0.235 �0.317 .... .. ... ..... 54 3'- 0 2- 2 51- 7 6 _3r 2- 7 ?1 1 3-2 4 2- 10 5 2� lit? ...... ... .... 2 . 41 0.180 0.386 2. 0.297 0,401 CONCRETE CATCH BASIN DETAIL 1 SCALE: NOT TO SCALE - �71 3/4 cn P p 17 21/13 N N SECTION MM DETAIL SHOWING TYPES OF GRATES USE ACCORDING TO WATER FLOW. 4 it :3? f7! .- co 4' 1 col c\j ATE FLOW SAG WATER FLOW UT j------ LO ilm7r .4 uil 134 TYPE "Flt TYPE "E" TYPE 6 t= 3,4 RAISED FiLOW ARROW 23/4 it 1/16"t HIGH­­ c* 71? 1tr 1/2 (D SECTION JJ 55/s 7 N" 3 R 131A 21-113/4 7 11/2 1 Y2 12 fir 13 /4 SECTION A -A _A/8 ITYPE F I SECTION - RR FRAME, GRATES, AND HOOD FOR USE- ON STANDARD CATCH BASIN), DETAIL 2 SCALE: NOT TO SCALE C. 7.1 2j * RISER HAS .228 CUBIC YARDS OF CONCRETE PER FOOT HEIGHT 2 I_10,4ff 1/2 J 21/4, i SECTION A -A TYPE - E it RAISED FLOW ARROW 23, 4 1 HIGH 6 \A1 IX 7-8 jj 13rr X4 tt - - -------- 2 _113/ fill 11/2 -1 7 7-7) T T8 TYPE G SECTION A -A co c: cz c: cz cn Jc 0) :3 0 4-0 cl) c 0 4-0 :3 0 0 Ld LIJ cl� (J LLJ cr_ 0 LL_ LL d Ld LLj C) Lu CL (0 N 'C1\4 CN c* Z Z c c Z US, CL u k SHEET NO. C. 7.12 01cM t N , i }!✓ xi t 404 WETLANDS w. f r � lrJ1" J �► r 2' VALLEY CURB 'rs r SEE DETAIL,i CROSSWALK -�" (TYP.) �--� SEE DETAIL $ C.7.1.. _4 5' SIDEWALK TYP.) SEE DETAIL 4 C.7.11 Ell I It PROPOSED 5' WALKING PATH r r W&w,: :%7v- •. ► CRT s OUT • • • FFE INSTALL APPROX. 191 LF 18 rrr ! HDPE DR 32.5 0 • ii SEE DETAIL 2 • i ! ' s� • ! it t:► • �' � i •• INSTALL APPROX. w r r• ` �0 �` ���► ��r►� •----" i err► � f .• 1\ i At I NO NO IF !44 • a ,� � ' � Via, /' '�I 0 p� FFI_ = 29.50 CRT 21.95 BF#, = 20.50 INV IN (CI-16) 19.26 y' j` PROPOSED F.E.S. INV OUT 13.12 INV IN (C#-17) 18.98 = INV OUT 18.98 ..., ' SEE DETAIL (TYP. 2 ' - INSTALL APPROX. 112 C.7.12 c.7.12 c.7.13 C.7.13 ...---..>-H D P E D R 32.5 0.25 ..Kw ._. . 404 WETLANDS I-FE = 30.00 PUMP STATION DRIVE PROPOSED RIP RIM: 16.00 _r BFE = 21.00 _._ _ / 12 GRAVEL ACCESS ROAD .: RAP W/ LEVEL . - 12.11 # 19 SPREADER (TYP.) WEIR ELEV: 14.25 1 /' .F... ,- k, AN#TARY SEWER �' _ F,A _..._Fa..,. __ INV. OUT (BY-PASS): 13.40 r F PROPOSED S INSTALL 15 INSTALL APPROX. INV. OUT (BASIN): 12.11 J f PUMP STATION SPILLWAY AT r .j , 24 LF 30" HDPE SUMP: 11.Ofi FG =16.50 ELEV. 14.75 BERM EL. 15.75t -. µ. DR 32.5 @ 0.46% E (TYP.) 3 J ,- .INV OUT 12.00 SEE DETAIL (T SCALE: 1 " - 50' 50' 0 50' - DRAINAGE AREA 1 C fi SCALE OF MAP MAY VARY Z DUE TO METHODS OF REPRODUCTION. f'1 i" f A. t K i A f' t- A Mr- A DRAINAGE AREA 1C__DATA TOTAL AREA 6.51 ACRES IMPERVIOUS AREA 3.16 ACRES PERCENT IMPERVIOUS 49% VOLUME 1.5" RAINFALL 17256 CU.FT, BASIN VOLUME 26,859 CU.FT. PROPOSED INFILTRATION BASIN 1 C GENERAL NOTES; (1) TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND ASSOCIATES, P.L.S.# L-2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. (2) ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN FIELD APPROVED BY THE ARMY CORPS OF ENGINEERS ON NOVEMBER 23, 2005 (FINAL APPROVAL PENDING). (3) CONTRACTOR TO FIELD VERIFY ALA. EXISTING UTILITIES BEFORE COMMENCING CONSTRUCTION. (4) CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS GENERATED THROUGH DEMOLITION AND GRUBBING ACTIVITIES SHOWN. (5) SEDIMENT FENCING TO BE AT THE LIMIT OF DISTURBANCE FOR THIS CONSTRUCTION SITE, AT LEAST ONE FOOT (1') FROM WETLANDS (6) CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. INTERVALS ALONG SEDIMENT FENCING. (7) ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 CALENDAR DAYS OF GRADING ACTIVITIES. (8) WATER, SEWER, AND STORMWATER PIPES TO BE INSTALLED IN TRENCHES ACCORDING TO STANDARD SPECIFICATIONS AND DETAILS ON SHEET C.7.10. (9) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS SHALL BE LAID AT LEAST TEN (10) FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A TEN (10) FOOT LATERAL SEPARATION --- IN WHICH CASE: (A) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION ON THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER- OR (B) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN(18) INCHES ABOVE THE TOP OF SEWER. (10) CROSSING A WATER MAIN OVER A SEWER. WHENEVER NECESSARY FOR A WATER MAIN TO CROSS OVER A SEWER, THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF THE SEWER, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT AN EIGHTEEN (18) INCH SEPARATION --• IN WHICH CASE, BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE CROSSING. (11) CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE POINT(S) OF CROSSING. A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. (12) SEWER AND STORMWATER PIPS � HAVE A MINIMUM OF 24" SEPARATION FROM BOTTOM OF STORMWATER PIPE AND TOP OF SEWER PIPE. (13) ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS TO BE DIRECTED TO RIGHT--OF--WAY, OR TO YARD INLET (OR OTHER STORM WA' . 7R COLLECTION DEVICES) FOR EVENTUAL DISCHARGE TO INFILTRATION BASIN. (14) FOR MAXIMUM ALLOWABLE BUILT--w'. PON AREA PER LOT SEE TABLE 5.1 ON SHEET 5.1 AND TABLE 5.5 ON SHEET 5.5. (15) THE STORMWATER MANAGEMEN-f PAN DEPICTED ON THESE SHEETS DOES NOT INCLUDE ANY RUNOFF FROM IMPERVIOUS S3Rr _!_It' ASSOCIATED WITH THE FUTURE COMMERCIAL AREA. A PERMIT MODIFICATION WILL BE NECESSARY PRIOR TO CONSTRUCTING ANY ADDITIONAL IMPERVIOUS SURFACE. (16) THE STORMWATER MANAGEMENT ' -_AN DEPICTED ON THESE SLEETS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SE1 .gV1f'NT & EROSION CONTROL PLAN APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. (17) ACCORDING TO THE SEDIMEENTATIC, I POLLUTION CONTROL ACT OF 1973 (NORTH CAROLINA GENERAL STATUTE 113A 51---6) ''HIS PROJECT IS SUBJECT TO AN APPROVED SEDIMENTATION AND EROSION CCU ) ROL PLAN. THE CONTRACTOR SHALL ADHERE TO ALL OF THE CONDITIONS SET FORTH I l THE APPROVED PLAN, AS PRESCRIBED BY NCDENR. A COPY OF THE APPROVED SEDIMENTATION AND EROSION CONTROL PLAN SHALL BE DISPLAYED AT THE JOB SITE AT ALL TIMES. (18) ALL FITTINGS TO BE MJ DIP W#T;r-, THRUST BLOCKING UNLESS OTHERWISE NOTED ON PLANS. (19) EXCELSIOR MATTING AND SEEDINI? TO BE USED ON SLOPES STEEPER THAN 2:1. SOD SHALL BE USED FOR ALL SLOPES FLA =1-ER THAN 2:1. (20) FINISHED FLOOR ELEVATION (FFE f IDENTIFIED ON THE PLAN IS INDICATIVE OF COMPACTED PAD GRADE TO WI :11 2"-4" OF TOP SOIL WILL. BE ADDED. SEE DETAIL 5/C.7.11. (21) CONTRACTOR SHALL IMPLEMENT TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH M.U.T.C.D. CONSTRUCTION c\_.[__�.'__"uENCE 1. PERFORM CONSTRUCTION STAKE OUT. 2. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANC LE. 3. CLEAR SITE, BUT DO NOT GRUB. 4. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES. 5. GRUB SITE. 6. CONSTRUCT SEDIMENT BASINS. 7. COMMENCE ROUGH GRADING OF THE SITE. 8. INSTALL STORMWATER MANAGEMENT DEVICES, 9. CONSTRUCT SEWER COLLECTION SYSTEM. 10.CONSTRUCT WATER SYSTEM. 11. ROUGH GRADE THE SITE. 12. SHAPE SHOULDERS AND CUT AND FILL SLOPES. 13. SCARIFY, SEED, FERTILIZE, AND MULCH ALL DISTURBED AREAS. 14.INSTALL DRY UTILITIES (ELECTRICAL, FIBER-OPTIC, CABLE, PHONE, ETC). 15. RE --SCARIFY, RE -SEED, RE ---FERTILIZE, AND MULCH ALL DISTURBED AREA. M CONSTRUCT ROADBED BASE COURSE AND INTERMEDIATE ASPHALT COURSE, 17. APPLY FINAL ASPHALT COURSE. 18. AFTER DISTURBED AREAS ARE STABILIZED WITH VEGETATION, THE CONTRACTOR SHALL RETURN TO THE SITE AND REMOVE ALL TEMPORARY EROSION CONTROL. MEASURES. E 8 ut c O O U cm r N 2 0 a� cm �. co co r r 0 t� 8 CL U .� z c 0 CCU m L N i .... ) m 0 0 LL o z c0M .0 Q.}d a 0 � 0 O Q rn c U Q cl- >- � Imo-- <C Z LLJ p u - .. . wc) I-LLJ Z Q CL <c � o tl ms.. I N � N � o f^" c� t�3 a w o U) W © z q o N 5 W CL CC N r'7 SHEET NO. C.5.3 N d' Z � 0 o 0 W V C.) W 0 CL d V •,,,� 14%.� ,moo • ��0000 .,% cn U . .A ©®D" :(a QN :0�"s < F- Q V) Z w O �`-wU GENERAL NOTES: I (1) TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND ASSOCIATES, P.L.S.# L-2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. (2) ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN FIELD APPROVED BY THE ARMY CORPS OF ENGINEERS ON NOVEMBER 23, 2005 (FINAL APPROVAL PENDING). (3) CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES BEFORE COMMENCING CONSTRUCTION. (4) CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS GENERATED THROUGH DEMOLITION AND GRUBBING ACTIVITIES SHOWN. (5) SEDIMENT FENCING TO BE AT THE LIMIT OF DISTURBANCE FOR THIS CONSTRUCTION SITE, AT LEAST IMAT -n AkInQ ONE FOOT POMA VJ17 . .......................... ...... . . . .............. `� �" C(6) CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. INTERVALS ALONG SEDIMENT CI-1 3 AMENITY AREA FENCING. GIRT 30.00 (7) ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 CALENDAR DAYS OF 00 INV IN 27.32 - 11 - ) N GRADING ACTIVITIES. co It ... .. (8) WATER, SEWER, AND STORMWATER PIPES TO BE INSTALLED IN TRENCHES ACCORDING TO STANDARD INV OUT 27.32 7, r �"l - ­ �­__ 10 FFE a SPECIFICATIONS AND DETAILS ON SHEET C.7.10. < (TYP.) 1 2 32.50 SEE DETAIL INSTALL APPROX. 164 LF 15 (9) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS SHALL BE LAID AT LEAST TEN C.7.12 C.7.12 13) C.7.13 OR PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR m HDPE DR 32.5 @ 1.05% (10) FEET LATERALLY FROM EXISTING k I BARRIERS PREVENT A TEN (10) FOOT LATERAL SEPARATION -- IN WHICH CASE: p ----------INSTALL APPROX. 56 LF 15 LANDSCAPED CIRCLE ">I/ (A) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION ON THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER; OR HDPE DR 32.5 @ 0.5% (RADIUS 65.00') INSTALL 15' SPILLWAY @ EXISTING POND (B) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN SCALE 1 50' 1 LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION OF 50' ® 50' EL. 27.75 -PROPOSED 5` WALKING PATH THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN(18) INCHES ABOVE THE TOP OF FFE SEWER. CI-1 2 (10) CROSSING A WATER MAIN OVER A SEWER. WHENEVER NECESSARY FOR A WATER MAIN TO CROSS c1_1 4 ELEVATION GRT 27.90 OVER A SEWER, THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVA, ON THAT. THE BOTTOM OF SCALE OF MAP MAY VARY GRT 30.40 INV IN 25.60 THE WATER MAIN IS AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF THE SEWER, UNLESS DUE TO METHODS OF REPRODUCTION. ► INV OUT 27.60 N INV OUT 25.60fi LOCAL CONDITIONS OR BARRIERS PREVENT AN EIGHTEEN (18) INCH SEPARATION -- IN WHICH CASE, BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND INSTALL APPROX. 33 LF 15 CI 15 WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) 20' ONE WAY HDPE DR 32.5 @ 0.48% FEET ON EACH SIDE OF THE CROSSING. TRAFFIC CIRCLE GRT 25.38 (11) CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER MAIN TO SEE DETAIL -10) 23.03. 6 INV IN (CI -HE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED OF 22' ASPHALT ROAD (TYP) CROSS UNDER A SEWER, BOTH 1 (CI-11) 23.03 FFE INSTALL APPROX. 230 LF 18'­�_: INV IN 3.03 FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE C.7.9 1.50 INV OUT 23.03 SEE DETAIL 5 E OF THE POINT(S) OF CROSSING. A SECTION OF WATER MAIN HDPE DR 32.5 @ 1.05% OF TEN (10) FEET ON EACH SIDE R B9 C.7.9 PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. cl 10 I ( CI-14 (FFE Ti (12) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" SEPARATION FROM BOTTOM OF GRT 30.40 GRT 25.52 27.00 STORMWATER PIPE AND TOP OF SEWER PIPE. TIAL LOTS TO BE DIRECTED TO RIGHT-OF-WAY, OR TO YARD INV OUT 23.10' (13) ROOFTOP RUNOFF FOR ALL RESIDEN INV OUT 27.60 ass (FFE 26' ASPHALT ROAD 6.00 FFE - INLET (OR OTHER STORMWATER COLLECTION DEVICES) FOR EVENTUAL DISCHARGE TO INFILTRATION co 26.00 BASIN. LOGGERHEAD BLVD. 24-50 -UPON AREA PER LOT SEE TABLE 5.1 ON SHEET 5.1 AND TABLE SEE DETAIL 4 CROSSWALK (14) FOR MAXIMUM ALLOWABLE BUILT C 7 9 FF VA r. (TYP.) 5.5 ON SHEET 5.5. RUNOFF FROM IMPERVIOUS SURFACE ASSOCIATED WITH THE FUTURE COMMERCIAL AREA. A PERMIT SEE DETAIL (15) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS DOES NOT INCLUDE ANY 31.50 r8 39 INSTALL APPROX. 28 LF 15 ' .7.151 MODIFICATION WILL BE NECESSARY PRIOR TO CONSTRUCTING ANY ADDITIONAL IMPERVIOUS HDPE DR 32.5 @ 0.25% SURFACE. INSTALL APPROX. 37 LF 15 (16) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS SHALL BE CONSTRUCTED IN FFE _J HDPE DR 32.5 @ 0.49% ACCORDANCE WITH THE SEDIMEN' EROSION CONTROL PLAN APPROVED BY THE NORTH CAROLING 28.50 wAm- DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. POLLUTION CONTROL ACT OF 1973 (NORTH CAROLING GENERAL 2' VALLEY CURB (TYP), INSTALL APPROX. 142 LF 15 FFE C1_11 Ad J (17) ACCORDING TO THE SEDIMENTATION SEE DETAIL HuPt- DR 32.5 @ 1.39% 28.50 GIRT 28.06 INSTALL APPROX. 189 LF ?4"" STATUTE 11 3A 51-66) THIS PRO II CT IS SUBJECT TO AN APPROVED SEDIMENTATION AND EROSION 1 1 HDPE DR 32.5 @ 0.25% CONTROL PLAN. THE CONTRACTOR SHALL ADHERE TO ALL OF THE CONDITIONS SET FORTH IN THE I N V IN (CI-9) 25.44 APPROVED PLAN, AS PRESCRIBED BY NCDENR. A COPY OF THE APPROVED SEDIMENTATION AND FFE FFE - V FFE INV IN (CI-12) 25.44 28.00 2700 EROSION CONTROL PLAN SHALL IBE DISPLAYED AT THE JOB SITE AT ALL TIMES. - 10' DRAINAGE EASEMENT (TYP.) DRAINAGE AREA 1 32.00 INV OUT 25.44 "ju (CENTERED ON PIPE) (18) ALL FITTINGS TO BE MJ DIP WITH THRUST BLOCKING UNLESS OTHERWISE NOTED ON PLANS. (19) EXCELSIOR MATTING AN $' D SEEDING TO BE USED ON SLOPES STEEPER THAN 2:1. SOD SHALL BE 1B BOUNDARY CI-9 USED FOR ALL SLOPES FLATTER THAN 2: 1. GRT 29.80 INSTALL APPROX. 20 LF 24FFE 7.5 (20) FINISHED FLOOR ELEVATION (FFE) IDENTIFIED ON THE PLAN IS INDICATIVE OF COMPACTED PAD <1 INV IN 27.42 HDPE DR 32.5 @ 0.25% FFE BFE 18.50 GRADE TO WHICH 2"-4" OF TOP SOIL WILL BE ADDED. SEE DETAIL 5/C.7.11. INV OUT 27.42 PROPOSED YI-1 2-6.50 t/ V (21) CONTRACTOR SHALL IMPLEMENT TRAFFIC CONTROL MEASURES IN ACCORDANCE NTH M.U.T.C.D. ART 27. RIGHT OF WAY SEE DETAIL 1 2 1 2 JB-2 INV IN 22.56 C.7 -\C I f% -7 1 5' SIDEWALK TYP C.7.12 .1 2f .7. RIM 29.00 INV Oj 22.56", ULU INV IN 22.51 SEE DP"T 51L FFE = 28.50 SEE DETAIL 4 10 FFE.:. INV OUT 22.51 BFE = 19.50 C.7.11 33.50 JB-1 20 ' RESTRICTIVE ACCESS EASEMENTRIM 29.00 INV IN 22.35 FOR DITCH MAINTENANCE INV OUT 22.35 CI-3 1 INSTALL APPR �_66 LF 24" 22' ASPHALT ROAD (TYP) GIRT 30.30 ►(TYP.) SEE DETAIL 3 H u I—, t- DR 32.5 G. 2 5 % SEE DETAIL INV OUT 27.00 (-a• R'0: S W A L K 1, �C. 7. J11. 5 Di-"AINAGE AREA C.7.9 c1_1 8 1B BOUNDARY SE1_ DETAIL CI - 5 F GIRT 30.30 1 C.7.15 GRT 28.70 29.00 Y A : /,/, // . / FFE =29.50 INV OUT 27.00 INV 26.50 FFE INSTALL APPROX. 74 LF 24 BFE 20.50 FFE - FFE I- HDPE DR 32.5 0 0.25% 1/00 SD JB-5 32.50 31 00 30.00 v L/ CENTERED ON EXISTING FFE DRAINAGE DITCH 31.50 INV. IN = 26-64 t 6) CI-7 8 0, INV. OUT 26.64 �NSTALL APPROX. 25 LF 15 GRT 27.67 C - GRT 27.67 INV IN 22.17 FFE =30.00 HDPE DR 32.5 @ 0.25% INV IN (CI-6) 2) 2. 11 Si INSTALL APPROX. 59 LF INV OUT 22.17.,-, BFE 21.00 24" HDPE DR 32.5 @ 0.50% INV IN (CI-7) 22.11 INV OUT 22.11 FFE 30.00 BFE 21.00 M I TOCKTC S PLACE EAST INSTALL APPROX. Ld Li STOCKTON PLACE EST LF 4 2 " HDPE PROPOSED F.E.S. D R 32 .5 Q 5% INV: 26.50 t7_77 PROPOSED F.E.S. INV. 26.20 INSTALL APPROX. 35 LF 15 " I i : k' HDPE DR 32.5 @ 0.25% CI-2 GIRT 30.30 Al I INV IN (CI-1) 26.91 INV IN (CI-28) 23.32 INV OUT 23.32 INSTALL APPROX. 49 LF 36 I. HDPE DR 32.5 @ 0.25% 1 INSTALL APPROX. 39 LF 15 HDPE DR 32.5 @ 0.25% 28.5' ASPHALT ROAD (TYP) LOGGERHEAD BLVD. ONLY SEE DETAIL 7 C.7.9 FFE � �J / / 32.50 50' VEGETATED INSTALL PROPOSED FILTER. SEE DETAIL APPROX. 25 INSTALL APPROX. 289 LF 36 FFE LF 36" HDPE C.7.10 29.00 HDPE DR 32.5 @ 0.25% DR 32.5 @ BFE FFE 0.25% PROPOSED RIP 00 .FFE 32.50 32RAP W/ FFE . 0 A-D > LEVEL SPREADER 29-00 L N SEE DETAIL CI-6 FFE 30.00 r5 31.00 U-i GRT 28.70 P. IN\/ IN (CI-4) 22.48 10' DRAINAGE EASEMENT C.7.10 INV IN (CI - 5) 26.44 (CENTERED ON PIPE) ui M INV OUT 22.48 cr01 (TYP.) SEE DETAIL 1 2 C.7.12 C.7.13 2 INSTALL APPROX. 58 LF 42" �HDPE DR 32.5 @ 0.25% ;j- - G"'�� f INSTALL APPROX. 57 LF 42 A INSTALL APPROX. 145 LF 36 HDPE DR 32.5 @ 1.21%----Wk , %� / / ;, HDPE DR 32.5 @ 0.25% BP RIM: 28.00 20' RESTRICTIVE ACCESS EASEMENT INV. IN: 21.81 WEIR EL: 26.50 FOR POND MAINTENANCE I /INV OUT (BY-PASS): 23.22' INV OUT (BASIN): 21.81 cl-4 GIRT 30.30 SUMP: 21.00 3 0 INV IN (CI-3) 26.90 INV IN (CI-2) 23.20 SEE DETAIL 3 I've, INV OUT 23.20 PROPOSED F.E.S. C.7.10 1'j INV 21.00 ",PROPOSED RIP RAP W .......... IV LEVEL SPREADER �BERM EL. 27.50 A APPROX. LOCATION OF INFILTRATION BASIN 1 B -UNNAMED JURISDICTIONAL INSTALL 15' SPILLWAY @ 'SEE DETAIL EL. 26.50 EXISTING 24" CULVERT STREAM TO BECKY'S CREEK C.7.8 X NOTE: INFILTRATIOiN FASIN 1 B SIZED TO ACCOMODATE UP TO DRAINAGE AREA 1 B 381126 CU. FT, FLOW FROM FUTURE PHASE 2 AREA. GE AREA ASE 1 ONLY) DRAINAGE AREA 1B DATA TOTAL AREA 17.27 ACRES IMPERVIOUS AREA 7.80 ACRES PERCENT IMPERVIOUS 45% VOLUME 1.5" RAINFALL 42,946 CU.FT. PHASE 1 VOLUME 18,323 CU.FT. PHASE 2 VOLUME 24,623 CU.FT. BASIN VOLUME 56,449 CU.FT. DPOSED INFILTRATION BASIN 1B K , I CONSTRUCTIOiN SEQUENCE � w 1. PERFORM CONSTRUCTION STAKE OUT. 2. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE. 3. CLEAR SITE, BUT DO NOT GRUB. 4. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES. 5. GRUB SITE. 6. CONSTRUCT SEDIMENT BASINS. 7. COMMENCE ROUGH GRADING OF THE SITE. 8. INSTALL STORMWATER MANAGEMENT DEVICES. 9. CONSTRUCT SEWER COLLECTION SYSTEM. 10. CONSTRUCT WATER SYSTEM. 11. ROUGH GRADE THE SIM 12. SHAPE SHOULDERS AND CUT AND FILL SLOPES. 13. SCARIFY, SEED, FERTILIZE, AND MULCH ALL DISTURBED AREAS. 14. INSTALL DRY UTILITIES (ELECTRICAL, FIBER-OPTIC, CABLE, PHONE, ETC). 15. RE -SCARIFY, RE -SEED, RE -FERTILIZE, AND MULCH ALL DISTURBED AREA. 16. CONSTRUCT ROADBED BASE COURSE AND INTERMEDIATE ASPHALT COURSE. 17. APPLY FINAL ASPHALT COURSE. 18. AFTER DISTURBED AREAS ARE STABILIZED WITH VEGETATION, THE CONTRACTOR SHALL RETURN TO THE SITE AND REMOVE ALL TEMPORARY EROSION CONTROL MEASURES. co 4_0 0) a) c 1-i T_ o I c\1 0 z c 20 0) c ci 0) i 0 L. LL V_ 0 z 0 ct) a: 0 ca 0 cd iV Ld U CL Go 0 cr_ ct� >_ j0 � Q (10 � LLJ u ct LLJ L CL 0 �h. N N W U W O CL c\j SHEET NO. C. 5.2 C) N C) L6 C) U115 •, o Lo m Q CL W p V tun limmommminumma- 11110108*114. % v • 0S 4� �j t� � � ,}� , ',y,C �.....++r."_ '��..� , :ems.•"* �� � r 'j{ - ii im III C � __"'� '�;�. E�"'^"'_- i •'�'•;ntt��•.taVSC4••-.. � �Z ��:n:^� / .,I� 'tom r"j /. / A � �!r"v. O .1 _ NJA *1 10 Ali- 1 -4 T_ DtY o 74 VAA Ed 1, 0, OWN_ g �wl N I Of R, I ir � �� �..�. r �� , s* r a r i i ,� 'WIN m 1WAS NMI DRAINAGE AR 1101.1111112F.-I PHASE 1 SPECIFICATIONS JUNCTION BOXES (JB) 3 YARD INLETS (YI) 1 CURB INLETS (CI) 31 5' X 7' BYPASS BOX 2 15" HDPE SDR 32.5 11998 L.F. 18" HDPE SDR 32.5 454 L.F. 24" HDPE SDR 32.5 349 L.F. 30 )) HDPE SDR 32.5 351 L.F. 36" HDPE SDR 32.5 508 L.F. 423' HDPE SDR 32.5 250 L.F. INFILTRATION BASINS 7 RIP RAP APRONS 16 LEVEL SPREADERS 9 PROPOSED PHASE 1 STORMWATER PLAN GENERAL NOTES: (1) TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. (9) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS SHALL BE LAID AT LEAST TEN (12) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24- SEPARATION FROM BOTTOM OF STORMWATER PIPE AND TOP OF RIGGS AND ASSOCIATES, P.L.S.# L-2981. INFORMATION PROVIDED (10) FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR SEWER PIPE. FOR ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. BARRIERS PREVENT A TEN (10) FOOT LATERAL SEPARATION -- IN WHICH CASE: (13) ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOPS TO BE DIRECTED TO RIGHT-OF-WAY, OR TO YARD INLET (OR OTHER STORMWATER (2) ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN (A) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION ON THE BOTTOM OF COLLECTION DEVICES} FOR EVENTUAL DISCHARGE TO INFILTRATION BASIN, FIELD APPROVED BY THE ARMY CORPS OF ENGINEERS ON THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER; OR (14) FOR MAXIMUM ALLOWABLE BUILT -UPON AREA PER LOT SEE TABLE 5.1 ON SHEET 5.1 AND TABLE 5.5 ON SHEET 5.5.. NOVEMBER 23, 2005 (FINAL APPROVAL PENDING). (B) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN (15) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS DOES NOT INCLUDE ANY RUNOFF FROM IMPERVIOUS SURFACE (3) CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES BEFORE LOCATED AT ONE SID. ON A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION OF ASSOCIATED WITH THE FUTURE COMMERCIAL AREA. A PERMIT MODIFICATION WILL BE NECESSARY PRIOR TO CONSTRUCTING ANY COMMENCING CONSTRUCTION. THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN(18) INCHES ABOVE THE TOP OF SEWER. ADDITIONAL IMPERVIOUS SURFACE. (4) CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE (10) CROSSING A WATER MAIN OVER A SEWER. WHENEVER NECESSARY FOR A WATER MAIN TO CROSS (16) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SEDIMENT MATERIALS GENERATED THROUGH DEMOLITION AND GRUBBING OVER A SEWER, THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF & EROSION CONTROL PLAN APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. ACTIVITIES SHOWN. (17) ACCORDING TO THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973 (NORTH CAROLINA GENERAL STATUTE 113A 51-66) THIS (5) SEDIMENT FENCING TO BE AT THE LIMIT OF DISTURBANCE FOR THE WATER MAIN IS AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF THE SEWER, UNLESS PROJECT IS SUBJECT TO AN APPROVED SEDIMENTATION AND EROSION CONTROL PLAN. THE CONTRACTOR SHALL ADHERE TO ALL THIS CONSTRUCTION SITE, AT LEAST ONE FOOT (1') FROM LOCAL CONDITIONS OR BARRIERS PREVENT AN EIGHTEEN (18) INCH SEPARATION -- IN WHICH OF THE CONDITIONS SET FORTH IN THE APPROVED PLAN, AS PRESCRIBED BY NCDENR. A COPY OF THE APPROVED WETLANDS CASE, BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND SEDIMENTATION AND EROSION CONTROL PLAN SHALL BE DISPLAYED AT THE JOB SITE AT ALL TIMES. (6) CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) (18) ALL FITTINGS TO BE MJ DIP WITH THRUST BLOCKING UNLESS OTHERWISE NOTED ON PLANS. INTERVALS ALONG SEDIMENT FENCING. FEET ON EACH SIDE OF TIECROSSING. (19) EXCELSIOR MATTING AND SEEDING TO BE USED ON SLOPES STEEPER THAN 2:1. SOD SHALL BE USED FOR ALL SLOPES FLATTER (7) ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHED (11) CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER MAIN TO THAN 2: 1. WITHIN 15 CALENDAR DAYS OF GRADING ACTIVITIES. CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED OF (20) FINISHED FLOOR ELEVATION (FIFE) IDENTIFIED ON THE PLAN IS INDICATIVE OF COMPACTED PAD GRADE TO WHICH 2"-4" OF TOP (8) WATER, SEWER, AND STORMWATER PIPES TO BE INSTALLED IN FERROUS MATERIALS AND KITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCESOIL WILL BE ADDED. SEE DETAIL 5/C.7.11 OF TEN (10) FEET ON EACH SIDE OF THE POINT(S) OF CROSSING. A SECTION OF WATER MAIN TRENCHES ACCORDING TO STANDARD SPECIFICATIONS AND DETAILS (21) CONTRACTOR SHALL IMPLEMENT TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH M.U.T.C.D, ON SHEET C.7.10. SHALL BE CENTERED AT THE POINT OF CROSSING. 1A-3 PHASE 1 DRAINAGE AREAS DRAINAGE AREA AREA (ACRES) AREA 1 A-1 0.69 AREA 1 A-2 0.38 AREA 1A-3 0.16 AREA 1 B 8.37 AREA 1 C 6.51 AREA 1 D--1 0.89 AREA 1D-2 2.07 TOTAL PHASE 1 19.07 DRAINAGE AREA Table 5.1 MAXIMUM IMPERVIOUS SURFACE AREAS FOR PHASE 1 RESIDENTIAL LOTS MAXIMUM IMPERVIOUS MAXIMUM IMPERVIOUS LOT SURFACE AREA LOT SURFACE AREA NUMBER (SQ. FT.) NUMBER (SQ, FT.) 1 4,152 24 4,162 4,152 25 3 4,152 26 - - -- - -- --- 4 4,152 27 3,681 4,300 28 3,672 4,186 29 3,668 7 308 30 31664 1 33608 31 3,659 3,607 3 607 32 33 3,633 3,602 31 517 34 3,601 45156 35 3,599 3,692 36 4,151 31776 37 4,480 3,691 38 3)849 .1 3,131 39 3,828 3$695 40 4,022 3,676 41 4,255 4211 42 4,087 20 4,269 43 3,829 21 4)350 44 4,128 21,3 41161 4165 45 4,425 NO I E 1 AVG SQ. FT. PER LOT IS 3,923 SQ, FT, (168,669 SO. FT. / 43 LOTS - 3,923 SQ. FT.) NO! E 2- TOTAL BUA FOR EACH LOT INCLUDES 55'X 55' BUILDING V ENELV ELOPE, PLUS 18' WIDE DRIVEWAY (VARYING LENGTHS), PLUS SECTION OF DRIVEWAY WITHIN ROW (124 to 180 SF, DEPENDING ON LOCATION IN PHASE 1), UNLESS OTHERWISE NOTED. SIDEWALKS AND CURB ARE NOT INCLUDED IN BUA. C 0SEQUENCE- 1, PERFORM CONSTRUCTION STAKE OUT. 2. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE. 3. CLEAR SITE, BUT DO NOT GRUB. 4. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES. 5. GRUB SITE. 6. CONSTRUCT SEDIMENT BASINS. 7. COMMENCE ROUGH GRADING OF THE SITE. 8. INSTALL STORMWATER MANAGEMENT DEVICES. 9. CONSTRUCT SEWER COLLECTION SYSTEM. 10.CONSTRUCT WATER SYSTEM. 11.ROUGH GRADE THE SITE. 12.SHAPE SHOULDERS AND CUT AND FILL SLOPES, 13.SCARIFY, SEED, FERTILIZE AND MULCH ALL DISTURBED AREAS. 14.INSTALL DRY UTILITIES (ELECTRICAL, FIBER-OPTIC, CABLE, PHONE, ETC). 15. RE -SCARIFY, RE -SEED, RE -FERTILIZE AND MULCH ALL DISTURBED AREA. 16.CONSTRUCT ROADBED BASE COURSE AND INTERMEDIATE ASPHALT COURSE. 17.APPLY FINAL ASPHALT COURSE. 18. AFTER DISTURBED AREAS ARE STABILIZED WITH VEGETATION, THE CONTRACTOR SHALL RETURN TO THE SITE AND REMOVE ALL TEMPORARY EROSION CONTROL MEASURES. 1, Nil c� co c cz co -c 0) cl) c 0 4-0 :3 0 W z O 0) .c: S ci 0 c\j 0 LL 0 z 0 cf) 13: W 0 as c al Ld 0 Q� cj� Q) LL_ r 6E - 0 Lj_j Cf) aC LL- C.� w(j) _'j 6" c) Q j n� CL C:) LLJ 00 MAWS= N c uj CC oc CN to SHEET NO. C. 5.1 N C) N � L6 � °: o c; Q cz Gil kCL Q W U \� � EXISTING \ \ DRAINAGE DITCH \ \ 20' RESTRICTIVE ACCESS EASEMENT \ \ FOR DITCH MAINTENANCE \ INSTALL CONCRETE \\ DRIVEWAY APRON \� FOR ACCESS TO \� LODGEHALL RD. INFILTRATION BASIN 1C 'SEE SHEET C.5.3 �L- SANITARY SEWER J PUMP STATIONIN I DRAINAGE AREA 1 D- DRAINAGE AREA 1 A - RAINAGE AREA 1 D-1 r-DRAINAGE AREA 1 D-2 CHASE 1 DRAINAGE AREAS �S DRAINAGE AREA AREA (ACRES) DRAINAGE AREA 1C AREA 1 A-1 0.69 AREA 1 A-2 0.38 AREA 1 A-3 0.16 AREA 18 8.37 AREA 1 C 6.51 AREA 1 D-1 0.89 AREA 1 D-2 2.07 TOTAL PHASE 1 19.07 RAINAGE AREA-4a,-2. _ _ DRAINAGE AREA DRAINAGE AREA 1A-3 PHASE 1 SPECIFICATIONS JUNCTION BOXES (JB) 3 YARD INLETS (YI) 1 CURB INLETS (CI) 31 5' X 7' BYPASS BOX 2 15" HDPE SDR 32.5 11998 L.F. 18" HDPE SDR 32.5 454 L.F. 24" HDPE SDR 32.5 349 L.F. 30" HDPE SDR 32.5 351 L.F. 36" HDPE SDR 32.5 508 L.F. 42" HDPE SDR 32.5 250 L.F. INFILTRATION BASINS 7 RIP RAP APRONS 16 LEVEL SPREADERS 9 EXISTING DIRT PATH` ` � ENTRANCEY CONSTRUCTION UNNAMED JURISDICTIONAL „�' i \\ top'�. STREAM TO BECKY S CREEK INFILTRATION BASIN,` INFILTRATION BASIN 1 A-3 AREA 1 A-1 SEE SHEET C.5.4,. SEE SHEET C.5.41,�, NC HWY 210 _3-•---.. --- �w....._�n,, a (APPROX. 60' ROW) " �---►�.�mug . Tf 01 \� SCALE: 1 " =100' 100 0 100 SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. PROPOSED PHASE 1 STORMWATER PLAN GENERAL NOTES:. (1) TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. (9) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS SHALL BE LAID AT LEAST TEN (12) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" SEPARATION FROM BOTTOM OF STORMWATER PIPE AND. TOP OF RIGGS AND ASSOCIATES, P.L.S. L-2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. (10) FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR SEWER PIPE. (2) ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN BARRIERS PREVENT A TEN (10) FOOT LATERAL SEPARATION -- IN WHICH CASE: (13) ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS TO BE DIRECTED TO RIGHT-OF-WAY, OR TO YARD INLET (OR OTHER STORMWATER FIELD APPROVED BY THE ARMY CORPS OF ENGINEERS ON (A) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION ON THE BOTTOM OF COLLECTION DEVICES) FOR EVENTUAL DISCHARGE TO INFILTRATION BASIN. NOVEMBER 23, 2005 (FINAL APPROVAL PENDING). THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER; OR (14) FOR MAXIMUM ALLOWABLE BUILT -UPON AREA PER LOT SEE TABLE 5.1 ON SHEET 5.1 AND TABLE 5.5 ON SHEET 5.5.. (3) CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES BEFORE (B) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN (15) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS DOES NOT INCLUDE ANY RUNOFF FROM IMPERVIOUS SURFACE COMMENCING CONSTRUCTION. LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION OF ASSOCIATED WITH THE FUTURE COMMERCIAL AREA. A PERMIT MODIFICATION WILL BE NECESSARY PRIOR TO CONSTRUCTING ANY (4) CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE THE BOTTOM OF THE (WATER MAIN AT LEAST EIGHTEEN(18) INCHES ABOVE THE TOP OF SEWER. ADDITIONAL IMPERVIOUS SURFACE. MATERIALS GENERATED THROUGH DEMOLITION AND GRUBBING (10) CROSSING A WATER MAIN OVER A SEWER. WHENEVER NECESSARY FOR A WATER MAIN TO CROSS (16) THE STORMWATER MANAGEMENT PLAN DEPICTED; ON THESE SHEETS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SEDIMENT ACTIVITIES SHOWN. OVER A SEWER, THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF & EROSION CONTROL PLAN APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, (5) SEDIMENT FENCING TO BE AT THE LIMIT OF DISTURBANCE FOR THE WATER MAIN IS AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF THE SEWER, UNLESS (17) ACCORDING TO THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973 (NORTH CAROLINA GENERAL STATUTE 113A 51-66) THIS THIS CONSTRUCTION SITE, AT LEAST ONE FOOT (1') FROM LOCAL CONDITIONS OR BARRIERS PREVENT AN EIGHTEEN (18) INCH SEPARATION -- IN WHICH PROJECT IS SUBJECT TO AN APPROVED SEDIMENTATION AND EROSION CONTROL PLAN. THE CONTRACTOR SHALL ADHERE TO ALL WETLANDS CASE, BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND OF THE CONDITIONS SET FORTH IN THE APPROVED PLAN, AS PRESCRIBED BY NCDENR. A COPY OF THE APPROVED (6) CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) SEDIMENTATION AND EROSION CONTROL PLAN STALL BE DISPLAYED AT THE JOB SITE AT ALL TIMES. INTERVALS ALONG SEDIMENT FENCING. FEET ON EACH SIDE OF THE CROSSING. (18) ALL FITTINGS TO BE MJ DIP WITH THRUST BLOCKING UNLESS OTHERWISE NOTED ON PLANS. (7) ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHED (11) CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER MAIN TO (19) EXCELSIOR MATTING AND SEEDING TO BE USED ON SLOPES STEEPER THAN 2:1. SOD SHALL BE USED FOR ALL SLOPES FLATTER WITHIN 15 CALENDAR DAYS OF GRADING ACTIVITIES CROSS UNDER A SEWER BOTH THE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED OF THAN 2: 1. (8) WATER, SEWER, AND STORMWATER PIPES TO BE INSTALLED IN FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE (20) FINISHED FLOOR ELEVATION (FEE) IDENTIFIED ON THE PLAN IS INDICATIVE OF COMPACTED PAD GRADE TO WHICH 2"-4" OF TOP TRENCHES ACCORDING TO STANDARD SPECIFICATIONS AND DETAILS OF TEN (10) FEET ON EACH SIDE OF THE POINT(S) OF CROSSING. A SECTION OF WATER MAIN SOIL WILL BE ADDED. SEE DETAIL 5/C.7.11. ON SHEET C.7.10. PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. (21) CONTRACTOR SHALL IMPLEMENT TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH M.U.T.C.D. a Table 5.1 MAXIMUM IMPERVIOUS SURFACE AREAS FOR PHASE 1 RESIDENTIAL LOTS LOT NUMBER MAXIMUM IMPERVIOUS SURFACE AREA SQ. FT, LOT NUMBER MAXIMUM IMPERVIOUS SURFACE AREA SQ. FT. 1 4,152 24 4,162 2 4,152 25 3 4,152 26 4 41152 27 5 4,300 28 3,672 6 4,186 29 41268 7 31668 30 31664 8 3,608 31 3,659 9 ` 3,607 32 31633 10- 3,607 33 3,602 11 3,517 34 3,601 12 4,156 35 31599 13 31692 36 31551 14 3,776 37 41480 15 31691 38 3,849 16 3,731 39 3,828 17 31695 40 4,022 18 31676 41 41255 19 43211 42 41087 20 4,269 43 3,829 21 4,350 44 41128 22 4,161 45 4,425 23 4,165 NOTE 1: AVG SQ. FT. PER LOT IS 3,923 SQ. FT. (168,669 SQ. FT. / 43 LOTS = 3,923 SQ. FT.) NOTE 2: TOTAL BUA FOR EACH LOT INCLUDES 55' X 55' BUILDING ENVELOPE, PLUS 18' WIDE DRIVEWAY (VARYING LENGTHS), PLUS SECTION OF DRIVEWAY WITH I N ROW (124 to 180 SF, DEPEN DI NG ON LOCATION IN PHASE 1), UNLESS OTHERWISE NOTED. SIDEWALKS AND CURB ARE NOT INCLUDED IN BUA. CONSTRUCTION SEQUENCE- 1. PERFORM CONSTRUCTION STAKE OUT. 2. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE. 3. CLEAR SITE, BUT DO NOT GRUB. 4. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES. 5. GRUB SITE. 6. CONSTRUCT SEDIMENT BASINS. A- Pie R Gluffic 7. COMMENCE ROUGH GRADING OF THE SITE. 0 ITICARRU A SWION( TAI 8. INSTALL STORMWATER MANAGEMENT DEVICES. PvIA�$tCOS CIS MIN 9, CONSTRUCT SEWER COLLECTION SYSTEM. 10.CONSTRUCT WATER SYSTEM. DIVISION OF IYNATIERQU U `1 11. ROUGH GRADE THE SITES 6 7 12. SHAPE SHOULDERS AND CUT AND FILL SLOPES. 13. SCARIFY, SEED, FERTILIZE AND MULCH ALL DISTURBED AREAS. 14.INSTALL DRY UTIL111ES (ELECTRICAL, FIBER-OPTIC, CABLE, PHONE, ETC). 15. RE -SCARIFY, RE -SEED, RE -FERTILIZE AND MULCH ALL DISTURBED AREA. 16. CONSTRUCT ROADBED BASE COURSE AND INTERMEDIATE ASPHALT COURSE. 17. APPLY FINAL ASPHALT COURSE. 18. AFTER DISTURBED AREAS ARE STABILIZED WITH VEGETATION, THE CONTRACTOR SHALL RETURN TO THE SITE AND REMOVE ALL TEMPORARY EROSION CONTROL MEASURES. 0 N T A s� N ca t33 � O c c � e N s 0 U. c o 7 o O cor 0 c 0 a s U LLJ � aC a- F- ct� >_ v W I-- � CC LLJ Q �C C) a C "L -J -JCL j co C4 g lit � e W o 0 Wv~) vi W 4 tY W SHEET NO. C.5.1 w w • U z � •: o Q I w Q h• t'i, Q p U to �- 4` �,'•• F-- ••,ch ca s �+� n own cn s i • • O - i ' .J Q s (% • Li 0 PHASE 3 FUTURE DEVELOPMENT 404 WETLANDS I� EXISTING POND 18 w 14r034 sq.ft. L, W.acros 17 A9 j 2 ft. s aq. y F COMMUNITY POOL AREA 19 �= 0 a 10,863 sq.ft. ' � _ 45 � 24 aces GENERAL NOTES. _ ATION PROVIDED BY CHARLES F. RIGGS r i8.537 �•�• �' _ , � ,'bus• (1) TOPOGRAPHICAL SURVEY` INFORM 0.42 �y 22 ASPHALT ROAD AND ASSOCIATES, P.L.S.# L-•-2981. INFORMATION PROVIDED FOR y ' 'o28 ,93• U 1 � /N..n.�..#SEE DETAIL 5 2p ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. 5 19 a ' WALKING PATH C.7.s ,gals cm ill, �._. . as} aces ,� LEYLAND WAY t, INFORMATION AND SETBACKS HAVE BEEN FIELD COMMUNITY CLUBHOUSE �z {2} ALL WETLAND BU FFER ��� APPROVED BY THE ARMY CORPS OF ENGINEERS ON NOVEMBER 23, 2005 t6�3t3 �•'� � W A o.37 MENiT 21 / {FINAL APPROVAL PENDING). AREA 15.552 ocof o G� 14.173 � cm D VERIFY ALL EXISTING UTILITIES BEFORE' • (3) CONTRACTOR TO FIEL \ 43`� s 22 COMMENCING CONSTRUCTION. ,3,888 ,�,, 6" CURB 8c GU TER �23 -; ' 0.637 �.ft 14 I• 0.3, a C TYP) 6 24 24 aria s 77 ft \ 8 s.7M sq ft sq. 4 CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS .7.1 'S 7,M aq,�, °•� ° G6 °� %.�. (} OLITION AND GRUBBING ACTIVITIES SHOWN. 26 ASPHALT ROAD �``� tr 0.18 Gans F13 GENERATED THROUGH DEM 1 /TYPI 4 � .� /'� 12 , \tip \ ) 42 i ,8, sgAL FOR THIS SEE DETAIL c 7.9 O (5) SEDIMENT' FENCING TO BE AT THE LIMIT OF DISTURBANCE,.�aagft � , C16 �'"� � °�� a� ONE FOOT 1 FROM WETLANDS. \ /r A D WA i CONSTRUCTION SITE, AT .LEAST 0 { ) �E�"AN � �ryk ,2.1 sq.ft. A PUMP STATION DRIVE 6 CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. (} G RHEAD.'"""� INTERVALS ALONG SEDIMENT FENCING. / a _ 1 BL 18,520 sq ft. f. , / ,Oaq.ft ; , 40 024 0.,V acros j ED FERTILIZED AND MULCHED WITHIN n TRAFFIC 14.022 sq.f. 31 20 acres (7) ALL DISTURBED AREAS TO BE SEED , s 20' ASPHALT ONE --WAY 14 CIRCLE U.020111%& GRADING ACTIVITIES. 0.32 acxss DAYS OF TRAFFIC CIRCLE � • � . t3,904 sgft °g28) � 29 30 S 15 CALENDAR DA 1I SEE DETAIL / INSTALLED !N TRENCHES s 4o 0 27 R AND STORMWATER PIPES TO BE INSTA (8} WATER, SEWS: 8 C.7.9 a sq.ft � �� SPECIFICATIONS AND DETAILS ON SHEETS .24 a tt6 ACCORDING TO STANDARD � � HANDICAP PARKING t 1 / C.7.6, & C.7.10. HANDICAP ACCESSIBLE + \ SEE DETAILS 1 2 3 CROSSWALK (9) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER .MAINS ' (TYP) e 39 38 7.1 .7.1 .7.1 s',s T LATERALLY FROM EXISTING OR 0.26 aq.ft 4 so j SHALL BE LAID AT LEAST TEN (10) FEE SEE DETAIL ,7,1 $ 0.2g acne ' „. � PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A . TEN 10 FOOT LATERAL SEPARATION --- IN WHICH CASE: VALLEY CURB j j TRAFFIC ONE-WAY E 32 710 { ) NCH WITH THE TRAFFIC CIRCLE , 9i�' 22 ASPHALT ROAD (A) THE WATER MAIN IS LAID IN A SEPARATE THE (TYPI 1 SEE DETAIL ss6 w•ro SEE DETAIL 5 ELEVATION ON THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN SEE DETAIL C.7.9 s Q+ 0.2o a • � 37 � C.7.9 33 � ' �' �// 0 7 C.7.9 r 18 INCHES ABOVE THE TOP OF SEWER, OR \ (B) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH \ 0.28 ac t2'o�'q' ' 20' RESTRICTIVE ACCESS EASEMENT •- a27 G . THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF PHASE 2 „9• 34 / + , ,492 ' PROPOSED 10' UNDISTURBED EARTH, AND WITH THE ELEVATION OF THE BOTTOM OF FOR DITCH MAINTENANCE „9 "r �,.ft /' •24 a UTILITY EASEMENT T EIGHTEEN 18 INCHES ABOVE THE TOP 35 : ' MID) THE WATER MAIN AT LEAS C } �� Q G. OF 'SEWER. . 36 a �iL ,054 VOL 0.23 acres (10 CROSSING A WATER MAIN OVER A SEWER. WHENEVER NECESSARYFOR', A ` \ . ,4.002i, aq.ft C ) n .02a aq.ft S OVER A SEWER, E WA 10AIN PI� j-� /�IN` M20 acroa WATER MAIN TO CROSS TT T1E. `AT'EI MYAlN IS AT \ T SUCH AN ELEVATION THAT., E B0 � GE A S ' AS ALT ROAD ' �� i o.�a K �' � TE ICI iB AaVE `THE TOP OF THE SEWER, UNLESS 26 PH +�,• / 'tp�J ' T (TYP} 4 404 BARRIERS PREVENT AN EIGHTEEN (18) INCH �\ ` �0 \ LOCAL" CONDITIONS ORB SEE DETAIL SEPAR ATION IN WHICH CASE, BOTH THE WATER MAIN AND SEWER c.7.s Ste, 'off°; Oct. WETLAND CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THAT \ BOUNDARY SHALL BE CON '� 2 MAIN STANDARDS FOR A DISTANCE OF TEN . \ 'ate; ' ARE EQUIVALENT TO WATER \ �► . , 10 FEET ON EACH SIDE OF THE CROSSING. ( ) %A. alu Q CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY ,0.79s sq.ft 0.24 aam_ (11 } \ MAIN TO CROSS UNDER A SEWER, BOTH THE WATER MAIN fl� FOR A WATER \ AND THE SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND \ /� /''� \ `y STOP SIGN " o 20 ACCESS EASEMENT RESTRICTIVE ASEM I TS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE WITH JOINTS _ o N Q SEE DETAIL 2 FOR POND MAINTENANCE OF TEN 10 FEET ON EACH SIDE OF THE POINT(S) OF CROSSING. A ( } _ OF , \ o .7.1 SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT CROSSING. PROPOSED 49.5 LF ALUMINUM 12 SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" SEPARATION BOTTOMLESS CULVERT TO MATCH ( FROM BOTTOM OF STORMWATER PIPE AND TOP OF SEWER PIPE. EXISTING BOTTOM ELEVATIONS 2 SEE DETAIL �' (13) ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS TO BE DIRECTED TO 'P Z RIGHT -OF -•WAY, OR TO YARD INLET (OR OTHER STORMWATER COLLECTION �, �� 7 FOR EVENTUAL DISCHARGE TO INFILTRATION BASIN. Q '� O A O DEVICES} ON 1 . (14) FOR MAXIMUM ALLOWABLE BUILT -UPON AREA PER LOT SEE TABLE 5�� �} �p --r1 SHEET 5.1 AND TABLE 5.5 ON SHEET 5.5. k� tp 0 O 7 15 THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS DOES J ( ) NOT INCLUDE ANY RUNOFF FROM IMPERVIOUS SURFACE ASSOCIATED WITH E FUTURE COMMERCIAL AREA. A PERMIT MODIFICATION WILL BE 2 ?- THE �'" \ NECESSARY PRIOR TO CONSTRUCTING ANY ADDITIONAL IMPERVIOUS 0 A C� SURFACE. <S` 16 THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS 03 G) a { ) SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SEDIMENT & EROSION �.- 7 _)o y --A CONTROL PLAN APPROVED BY THE NORTH CAROLINA DEPARTMENT OF --A _ r -0 ENVIRONMENT AND NATURAL RESOURCES. ,'4 U (17) ACCORDING TO THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973 (y `0 R,Oy (NORTH CAROLINA GENERAL STATUTE 113A 51--66) THIS PROJECT IS SUBJECT TO AN APPROVED SEDIMENTATION AND EROSION CONTROL PLAN. �Q cp THE CONTRACTOR SHALL ADHERE TO ALL OF THE CONDITIONS SET FORTH co IN THE APPROVED PLAN, AS PRESCRIBED BY NCDENR. A COPY OF THE Ra APPROVED SEDIMENTATION AND EROSION CONTROL PLAN SHALL BE DISPLAYED AT THE JOB SITE AT ALL TIMES. (18) ALL FITTINGS TO BE MJ DIP WITH THRUST BLOCKING UNLESS OTHERWISE NOTED' ON PLANS �rI BECKY'S CREEK ROAD 19 EXCELSIOR MATTING AND SEEDING TO BE USED ON SLOPES STEEPER (UNIMPROVED) THAN 2:1. SOD SHALL BE USED FOR ALL SLOPES FLATTER THAN 2:1. x•`~" (20) FINISHED FLOOR ELEVATION (FFE) IDENTIFIED ON THE PLAN IS INDICATIVE - OF COMPACTED PAD GRADE TO WHICH 2 4��OF TOP SOIL WILL BEP ADDED. SEE DETAIL 5/C.7.11. (21) CONTRACTOR SHALL IMPLEMENT TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH M.U.T.C.D. `UNNAMED JURISDICTIONAL STREAM TO BECKY'S CREEK FUTURE COMMERCIAL 28.5' ASPHALT ROAD AREA r(Typ) e 7' PLANTED MEDIAN PROPOSED 10' DOT RIGHT OF WAY EASEMENT NCHWY210 ROW NCDOT PLANS SEE SHEETS C.3.3 & C.3.4 ��CSINGLE FAMILY HOME MAX. S.F.= 3,080 MAX. BEDROOMS= 4 I 20' ASPHALT ONE --WAY TRAFFIC CIRCLE 6 SEE DETAIL k,C. 7 9 PROPOSED 10' UTILITY EASEMENT (TY') 0�3 o0 o A� Q' a p ROW ROW M ROW PROPOSED 10' DOT RIGHT OF WAY EASEMENT LOT LEGEND LINE TABLE LINE LENGTH L1 168.73 L2 52.06 L3 4.58 L4 18.59 L5 419.71 L6 210.32 L7 389.41 L8 108.57 L9 243.11 CURVE TABLE CURVE LENGTH RADIUS Cl 259.92 495.00 C2 71.36 495.00 C3 106.24 1285.00 C4 294.17 220.00 C5 189.62 118.00 C6 387.05 628.98 C7 218.17 77.00 C8 265.64 77.00 C9 76.26 112.95 C10 179.82 230.00 C11 68.33 293.89 C12 70.62 302.83 C13 169.51 199.61 C14 94.45 239.39 C15 137.02 77.00 C16 188.21 77.00 Cl 71 158.571 77.00 SCALE: 1" =100' 100' 0 100' Mmm_9 - - - m ____ - i SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. AUG 10 2007 DWQ P OJ A - DAVID OLSON JUSTICE, SR. - D.B. 1522, P. 118 M.B. 32, P. 132 B - STEPHEN ROSS JUSTICE, JR. & WIFE, - D.B. 2347, P. 72 PALLA DENISE JUSTICE M.B. 32, P. 132 C - JOHN MARK" BALDRIDGE - D.B. 2368, P. 145 M.B. 4, P. 55 D - MYRA T. ROCHELLE & HUSBAND, - D.B. 747, P. 166 JAMES L. ROCHELE, JR. M.B. 25, P.. 58 E - OSTON G. HARDISON & WIFE, JAQUELINE D. HARDISON - D.B. 754, P. 755 F - OSTON G. HARDISON & WIFE, JAQUELINE D. HARDISON - D.B. 724, P. 61 G - OSTON G. HARDISON & WIFE, JAQUELINE D. HARDISON - D.B. 724, P. 61 H - OSTON G. HARDISON & WIFE, JAQUELINE DENISE HARDISON - D.B. 913, P. 192 I - GLORIA J. DEARMAS - D.B. 677, P. 48 <C z 0- L J cr U (� Q) p w LL J � Q L.� o Q Q a Z LLJ Z CIL Lij N o0 N O z cr. � w � Z t1 N Q 4 ac Ix SHEET NO. C. 3.2 co N o w cn crq•... m Qo w v w Q 4i Q � W Y,. i•f < , c I hereby certify that I have reviewed the plan and the plan meets or exceeds the regulations and ordinances of the Town of Surf City. ,41 Public Works Director Building Inspector - •�` : '� ` `t•t , A V •'+ . /� + , ` Chief Fire Marshall Police - •- { - '9 �,}� Town Manner < •i • E9 c� �l w� r r W VALLEY CURB _; < (TYP) SEE DETAIL <=< °' / as CL c`7'9 PROPOSED STORMWATER r POND 1 D -1 / Z3 n45 ��� ``• SCALE: 1" - 20' t0 34TBACK ' S 20' 0 20' GENERAL 'NOTES.. / (1) TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS hg / -2981. INFORMATION PROVIDED FOR L AND ASSOCIATES,. P.L.S.# L ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. �- ,.��; /. `. `. / / / 4 SCALE OF MAP MAY VARY +D ' <• : , DUE TO METHODS OF REPRODUCTION. •� (2) ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN F : _ 1' : `` : ` .'` : ` ,,•, '~:' ;< POOL HOUSE <' ,• �:...:'•.'. K.� ., �. � APPROVED BY THE ARMY CORPS OF ENGINEERS ON NOVEMBER 23, 2005 N:• '.� <':''�< - ''` : < / ,. • • COMMUNITY POOL AREA PENDING (850 S.F.} FINAL APPROVAL ). - : ; ' <. , ` . ,.'.<� < <•': 0 OPEN SPACE ' • .. , .F ,.�. - ~ �., :t : " � •'.: ; � �<''.. 0 BEFORE � `d•� '.,. - ".�.�7�-.,�.'',,;.,;-.<•;i..`�•`:. �• ` °•`� NG UTILITIES '- - �'� ' .� ' ��' ..�- : <.' .; <•-�� ��:�' EXISTING CONTRACTOR TO FIELD VERIFY ALL •,'.. ; ;'' •�.: <<::• :.. � .,., : < :. , { : s: / COMMENCING CONSTRUCTION. « e • ' •: i d . '< , ` . - ,� - �, ••-� fir• , ' . •� �,,,, " < : << x ,<. ! a,! `, '< '': , . t .. C '.' q <• / a. • :'< ` t', .4 ` • / . , .« <, A ,W''.'"°-'A,��„'H°"""'.`•' ,• ,' t t ' ,'```� <✓r" ,�-^"z'`- ',,.."' " ,s ,. , •,.1 :�y5 �' c r .4 :< • < / `. ; •<.. 4)) CONTRACTOR IS RESPONSIBLE FOR DISPOSAL ALL WASTE MATERIALS• j'.' KIDDIE POOL DEMOLITION AND GRUBBING ACTIVITIES SHOWN. GENERATED THROUGH(224 S.F.)� < o f ' 3 . < yr .--^a y •<: ! { `, ..'. <• w. ' .� �d•cp, . w� -- ....� ""~ jr.°" •' ` r, •. t ... .`. < •. s : c` • <' .' •� , < • r t /� 4 .: < ,.a"vtl"µ�„un^" r•• ' y,.a .w �,G... «A.„.a^" .r �,.. . * t •, . ,c .. ,.' •,� • :. "<t i ,• `% STURBANCE FOR THIS `� < BE AlHE LIMIT OF DI �.,. ; �,j•:.s_�-••'�....� • R,� . �.• , < -� ;, �r.�' . - .� ' - ..,. �' �n' ��<'�: •• .' SEDIMENT FENCING TO 1 .P"" .•,"�, ..�"i••~ �' . <. _ •t ++' �,,, � , �" tt,�,.u„"'""•� "' �� � ^ ,,,.�"••~��,rF'� �,:>v , ti. {.. ,'t • c � t{, r '<. f ` i . �' < • < �/ / C 5 I , •• .. 41 ' ..* , L l < , •. n+• ` , ,.a""' ..,,-v'-"-�sw"' Ate. ' LL.:� . °''3 ,g,-*°'G r ._,.,."`' ' ' , �,"�` ors` • < ' YE `. ' ' . re ' t , :1 !! I CONSTRUCTION SITE, AT LEAST ONE FOOT (1) FROM WETLANDS. - :4 • • ` ' Y' a�` ' - ' - .. / • •1�. • � .,..... . •"` • fd•. ate,' r., ` t - , o„♦•+- �a-•r""ry r"" �,,,: , *� �"„n-"'' �,,:.* • , ,»+*s • .�,r ' �, ' ' .,,. •t ' ,.,, t,• t �.. ' •. • < �� _ '°. ,�"in'"' .s.•A'• < .4 t • 't ' ' ,<�'j0 �"".'x' �,e�„.+ . aw,�'a • y+".m+ •�<...,"�`�,. �� ' � . �'�.�,rv'"• .+ �p ,•e�`'� a�,.,�"" t ' <. 4 <: ' :< < { (6) CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. / �� ` : ` _� ';, :< -'` .• NOTE: REFERENCE ARCHITECTUAL °~'t='::�::•�': _Y`.<<' S ALONG SEDIMENT FENCING. ':::" •, INTERVAL `` ` PLANS FOR EXACT - �' •: < ,;'F::`�<<. LOCATION OF ITEMS WITHIN 7 ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN ;;:: '' "' , -'< ':,..'�.::? :'':: �'. ;:. AMENITY AREA, INCLUSIVE 15 CALENDAR DAYS OF GRADING ACTIVITIES. OF THE POOL AREA. ' e♦ ` . •r ,'� i .".<: {,; c•<•, K � � [ ` •': ` :; , - '" � ��< : ••cf ,.ic• ..f .+�< -�,.•' ' "`� »pA' • " `' ! .-`..��'�r `y ' f' { 14, ' <<c. ,S•. .•k •, ,o a' , •.. ,<.'• t, ,• '<�••,, , 'c.•r<4, ••'` ,<'•a.. •ttr<< ,•{r i,' �,r %.4. ,; .x `+'' y-r'"`�' °`� "o ��'� �.--"`'� c.,�•_•,�� AND STORMWATER PIPES TO BE INSTALLED IN TRENCHES • .. �-` 8 WATER SEWER, AILS ON SHEETS / <<:.�. • ,- < - 0 STANDARD SPECIFICATIONS AND DETAILS .a " F •' a : ` i `' t: < ' ACCORDING T .... < `1 • } - � t !'c,'r . - s ' <• •..i < � -,;• • u•` t'.- :' , �; is • a• ' t • � ' C.7.19 • ! < do-• # [t' •s, i < r , "� • a .t<' •� . '`< .•< << . ,. ' r, ,. •<. ' : ,f. < s } • .• '� : •'` aeo.'�+•r„�y • < ,y':<. • mom.' - .rea' "•" r^"` �», `•`.- r i � 4� ..i f � � <�• 1 •• �< • � t. fr.. � `�:f . , . ,Qe ., .� , •.1. d... �• ' •� „ro•.°""s a,,,n6`'' �� < t ,<: � � •• .< • ,:C� ,':_'• ' : •,:.• er t, ' <,{• : t < � . , WATER MAINS / 9 LATERAL SEPARATION OF SEWERS OR WATER MAINS. ,�, •+ ", "' F '• C }„ FROM EXISTING OR < ' ' / 10 FEET LATERALLY F �-= : `:� :.. • � : ' .� `���� � ` :,� , � . :, <••'<<: SHALL BE LAID AT LEAST TEN( ) d 9 •. e' ` 't `{ : - :. •<• CAL CONDITIONS OR BARRIERS PREVENT A SEWERS, UNLESS LOCAL PROPOSED SE ..` '.'e'. ,��.•�• ,�.�^`� .,,+•�.-�`y.,� �-� ,;< :,...,�_ � :.r< / ,, 1 ` '« 1� , .^•"".r^°',,.�'". .ram' , ,.a` +,,,.-•"°'0�4,°" ,,..•d''w., ,'<,R `,�. • <. {•' r ,, - t'' l f< . " I • 1 10 FOOT LATERAL SEPARATION -- IN WHICH CASE: � < S WALKING PATH /?•1 .e a .•� • •:r .d< • : •a' '`` ,...".'`�,6,,,.•`°',aw ' � . � .....°"�"`.' E" � � � p-••"� �,.. c �t<.• •• -. <` •�cri •''` , TEN THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE . TTON ON THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN° " a _r (18) INCHES ABOVE THE TOP OF SEWER, OR / IN THE SAME TRENCH AS THE SEWER WITH < ' . �- •' / - a of - r�r�" <�, ' �'�`� .,,..'`s•' rA"��# ..�`""""�„,•* '"-•A'.dx,• �..�'° B THE WATER MAIN IS LAID O LOCATED AT ONE SIDE ON A BENCH OF "� I' .:J: .�_ o ` � �� � �.- ��.....•' .. THE WATER MAIN LO ` •VAR �� / UNDISTURBED EARTH, AND WITH THE ELEVATION OF THE BOTTOM OF ,. AM EN I TY COMMUNITY CLUBHOUSE LEAST EIGHTEEN 18 INCHES ABOVE THE TOP ; :a . ' • AREA h :F :•� THE WATER MAIN AT C ) (4,400 S. 5' SIDEWALK •. k OF SEWER / Y A ' • „�"`���•E' ' pr ' .rf"" . '"' y.,,.`•""��a."'. 9 ~ c ,°•' , ✓!'��` •a• - 11s�< ! „ < G A WATER MAIN OVER A SE WHENEVER NCCES < 10 CROSSING / • THE WATER MAIN, "` ♦ � - "- _ -F �</ PROPOSED OTRM ATE POND WATER MAIN TO CROSS OVER A SEWER, E B€TT� , E CATER MAIN AT SUCH AN ELEVATION THAT THE -� - �•� - • . UNLESS SEWER U _..- . � - •-a ram'" � �.•- � .��� • BOVE THE TOP OF THE <- C EAST EI�HE� ._ 18 INCH BARRIERS PREVENT AN EIGHTEEN( } p�� ,• j ` ..�" .� < �°' ''�� °�' �„„� � "`' ..ter' �,� -.• :. ; • "'. < - _ LOCAL "CONDITIONS OR } E WATER MAIN AND SEWER --- IN WHICH CASE, BOTH THE -. `` � � �.r �'� `�* ' M ✓.- �� � �� �• ♦ :� ' SEPARATION JOINTS THAT MATERIALS AND WITH FERROUS M SHALL BE CONSTRUCTED OFF R A DISTANCE OF TEN O WATER MAIN STANDARDS FOR ARE EQUIVALENT / f (10) FEET ON EACH SIDE OF THE CROSSING. �: � _ ''' '� . -�` '-�'` .�"" •, •_. / 11 CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY () " WATER MAIN •::: r- - . - ` ` CROSS UNDER A SEWER, BOTH THE / FOR A WATER MAIN TO C • " - •° • . - • `�< '.. FERROUS MATERIALS AND THE SEWER SHALL BE CONSTRUCTED OFF NTABLE CURB e AND �, :" _ /! . JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE ` WITH SEE DETAIL . ;'. 6 CORc GUTTER F CROSSING. A . .. / ._ OF TEN (10) FEET ON EACH SIDE OF THE POINTS) 0 :°:: • = °: SHALL BE CENTERED AT THE POINT OF -`a c.a.9 f SECTION' OF WATER MAIN PIPE •' " a ' ':4 ` '' / ,/ CROSSING. y• - �•' + � - .�.� R PIPES TO HAVE A MINIMUM OF 24" SEPARATION 14 r N z 0 G 0 N m C 0 uL f 0 0 tM a .0 U 0 0 N N N Z� I Uj (12) SEWER AND ST FROM BOTTOM OF STORMWATER PIPE AND TOP OF SEWER PIPE. S TO BE DIRECTED TO ` 26' ASPHALT ROAD W F FOR ALL RESIDENTIAL LOT 13 ROOFTOP RUNOFF TYP C } COLLECTION ( 4 � 'SETBACK •' •: � .:-- < , .. a ,.. •; ::'•• v W � 3 RIGHT-OF-WAY, OR TO YARD INLET (OR OTHER STORMWATER COL DETAIL 70 / SEE DEVICES) -UPON AREA PER LOT SEE TABLE 5.1 ON FOR EVENTUAL DISCHARGE TO INFILTRATION BASIN. c.7s •.. v+''''"• /y fi R MAXIMUM ALLOWABLE BUILT ` h • , SHEET 5.1 AND TABLE 5.5 ON SHEET 5.5. ` :,•; • . 18 y DEPICTED ON THESE SHEETS DOES 15 THE STORMWATER MANAGEMENT PLAN DE • 'a... Ix C ) ANY RUNOFF FROM IMPERVIOUS SURFACE ASSOCIATED WITH NOT INCLUDE • '�: 9 54 •F TION WILL BE ' - .:�- ' • : • .. .. ..,. • THE FUTURE COMMERCIAL AREA. A PERMIT MODIFICA 66' OW ` ' ' ` • _ .' :. �... l SHEET NO. PRIOR TO CONSTRUCTING ANY ADDITIONAL IMPERVIOUS``'` -- NECESSARY " SURFACE. (16) THE ST ORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS ~''<: ': :e'. •: °' =:b'�. ' 63' ti :��•y; SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SEDIMENT & EROSION ,t DEPARTMENT OF APPROVED BY THE NORTH CA DEPAR } CONTROL PLAN APPR C� CON �. .MAW NATURAL RESOURCES. C MENT AND 6 < N CURB &GUTTER 7 CN o ENVIRONMENT e_ 6 CU .--•-''"- ' --.._ HANDICAP ACCESSIBLE 9' <..• s � ` . �•..: ' .'.`<:'."{ NTA11ON POLLUTION CONTROL ACT OF 1973 Y ING TO THE SEDIME SEE DETAIL � � �' S' SIDEWALK �, CROSSWALK -- � o (17} ACCORD ' NORTH CAROLINA GENERAL STATUTE 113A 51-66) THIS PROJECT IS ( .�. (TYP.) (TYP) ` ON AND EROSION CONTROL PLAN." ` APPROVED SEDIMENTATION 4 SEE DETAIL fi3' �':: ` : :.' ., SUBJECT TO AN A .• .: .. • .'• 4, .«,• a -a.: •` '•••i • f 1 THE CONTRACTOR SHALL ADHERE TO ALL OF THE CONDITIONS SET FORTH:: •7• �.% Y NCDENR. A COPY OF THE d,e• ` •7tr IN THE APPROVED PLAN, AS PRESCRIBED B <.. - , : • • d SHALL BE a CONCA TROL PLAN �k'• ' .•``- ... -•'• �•-.::..- .�' APPROVED SEDIMENTATION AND EROSION `...�'..'. , ' , i ALL TIMES. DISPLAPED AT THE JOB SITE AT .,: ,' .. ' . • .' ' •:.:.`:' °.- �':..:'..---- . , q W G UNLESS OTHERWISE ` ' UST BLOCKING •"t .4-•x , :''. ; - - . -. . 4,• �"-� - -.- •_ .._-•-- L5_ .._..--- E MJ DIP WITH THR.•..- '~ ' - (18) ALL FITTTNGS TO B HANDICAP PARKING �• • NOTED ON PLANS. ' .` � e .. --a • ..'. • - •, . .., .. (TYP) W _ f USED ON SLOPES STEEPER � <` i SEE DETAILS . (19) EXCELSIOR MATTING AND SEEDING TO BE U �:: ---'` •7.1 .7.1 •7.1 • ALL BE USED FOR ALL SLOPES FLATTER THAN 2:1. LOGGERHEAD BLVD. THAN 2:1. SOD SHALL TRAFFIC CIRCLE _ ----- - , '.;. <� �,t a' ' .• .<'.`: _ „ .<'• <<! Z 20 FINISHED FLOOR ELEVATION (FFE) IDENTIFIED ON THE PLAN IS INDICATIVE �, �' j -•'"'"" <BO PAD GRADE TO WHICH 2 4 OF TOP SOIL WILL .....-- OF COMPACTED '.. •t j ` < in ADDED. SEE DETAIL 5/C.7.11 VALLEY CURB < f _ 22 ASPHALT ROAD <... r - ^� //,{y� Q �' z < ,4, � ] t TYP. • . '• 8 v z_ ..., S IN ' (TYP-) (TYP.) . �. • . . '•.' ::1., t; ,.', .. o TRAFFIC CONTROL MEASURE < CEMENT TRAF ,. < • w 21 CONTRACTOR SHALL IMP SEE DETAIL -'i'' SEE DETAIL .< :.• r ;• : 4 : - Li °C v C } ACCORDANCE WITH M.U.T.C.D. `J -u / 4 C� •�Arm 404 WETLANDS Aj 7 �• . f l p f t r : ` r e( •/j(� � 7- X, i�;. y`. rn?ls�frar�;;' ti� � /!� 1 r . ! ! r .��`ifi �l � 1; , ��� -/, Pik;:�,, .�1 �`� •� ' ; �� �.. �` �"^:�..,M ;•mil. '7t^•! f� \ r��• ti • r LIMLiMm of i �•, ,.� •-ern ♦s* .►s♦ ♦p r i •� i S i Ri? �•`�,r, ! - r r , P :fit '\� \ --� y�, _ /���`y • \\\\ on A Ri� • a ® �� � ids-�;::�-� i ,fit.' -.i•�-..sc :�. 1 • i00000♦o♦o ♦,moo♦ mom , • �s _ _-- - r' • .�� ,rra�>.,a•as r - 1 SCALE: in =100' 100' 0 100' SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. = ci.wl It I mAlm'.6,1111 Hill WE COT FM - z�.so , LOT #12 �f� .r;► ! � � IS L er � •��T i' ff♦./ice♦♦�,;!� �/�' y P r r . r FA HAWN, �� i f Y • � r P pt i • a 1r � •� .f :� ;x i i • rW11111MI, W, �. wig♦ ♦A.®.,� �,�` A r„// . � / >/ ! - •� �,,�� ter..• ®, �- r r l 1 l�i , . r•ri ! • 1 / , ♦:♦:oo+f t ���� ! 1� r ♦0000000� ���� �` J '='•`sw;eay we '1se..(•'q. f:�.� / {� ' � t•t� � rrP r i:. ��'.�•r•=-_ � � �' _ ..wri/.riii ...�,Sr�i_si::s:�a __ _ I'` _ -- - - - - -- - - - -- - - _-�IN l r r P• i, WETLANDL2 OF SEDIMENT FENCE AT LEAST ONE (1) FOOT OFF OF L EMERGENCY BOUNDARY . DETAILSPILLWAY (TYP) LNC HWY. SEE ! DETAII_r-,-� SEDIMENT DEVICE DESCRIPTIONS BOTTOM ELEV. BOTTOM AREA SPILLWAY ELEV. SPILLWAY AREA SEDIMENT TRAP 1 A--1 31' 69025 S.F. 31.75' 6,985 S.F. SEDIMENT TRAP 1 A--2 30' 2,208 S.F. 31.25' 3,123 S.F. SEDIMENT TRAP 1A-3 30' 1,085 S.F. 31.25' 1,732 S.F. SEDIMENT BASIN 1 B 21' 4,802 S.F. 26.50' 16,252 S.F. SEDIMENT BASIN 1 C 12 9,377 S.F. 14.75' 15,796 S.F. SEDIMENT TRAP 1D--1 27' 2,790 S.F. 29.25' 5,587 S.F. SEDIMENT TRAP 1D--2 25.70' 6,534 S.F. 27.75' 10,434 S.F. NOTE: DISTURBANCE AREA 1 A TO BE COMPLETED WITH VEGETATIVE COVER PRIOR TO ANY LAND DISTURBANCE ACTIVITIES IN DISTURBANCE AREA 1 B. PURSUANT TO APPROVED LAND QUALITY SOIL EROSION AND SEDIMENT CONTROL PERMIT, NO MORE THAN 20 ACRES SHALL BE EXPOSED/DISTURBED AT ANY GIVEN TIME, DUE TO THE HQW: SA WATERSHED CLASSIFICATION. CONSTRUCTION SEQUENCE 1. PERFORM CONSTRUCTION STAKE OUT 2. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE. 3. CLEAR SITE, BUT DO NOT GRUB. 4. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES 5. GRUB SITE. 6. CONSTRUCT SEDIMENT BASINS. 7. COMMENCE ROUGH GRADING OF THE SITE. 8. INSTALL STORMWATER MANAGEMENT DEVICES. 9. CONSTRUCT SEWER COLLECTION SYSTEM. 10. CONSTRUCT WATER SYSTEM. 11. ROUGH GRADE THE SITE. 12. SHAPE SHOULDERS AND CUT AND FILL SLOPES. 13. SCARIFY, SEED, FERTILIZE AND MULCH ALL DISTURBED AREAS. 14. INSTALL DRY UTILITIES (ELECTRICAL, FIBER-OPTIC, CABLE, PHONE, ETC). 15. RE -SCARIFY, RE -SEED, RE -FERTILIZE AND MULCH ALL DISTURBED AREA. 16. CONSTRUCT ROADBED BASE COURSE AND INTERMEDIATE ASPHALT COURSE. 17. APPLY FINAL ASPHALT COURSE. 18. AFTER DISTURBED AREAS ARE STABILIZED WITH VEGETATION, THE CONTRACTOR SHALL RETURN TO THE SITE AND REMOVE ALL TEMPORARY EROSION CONTROL MEASURES. GENERAL NOTES: (1) TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARGES F. RIGGS AND PHASE I NDTES ASSOCIATES, P.L.S.# L-2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. (1) PHASE I SEDIMENT POND DRAINAGE AREA: 18.84 ACRES (2) ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN FIELD APPROVED BY THE ARMY CORPS OF ENGINEERS ON NOVEMBER 23, 2005 (2) LIMIT OF DISTURBANCE: 26.3 ACRES (FINAL APPROVAL PENDING). (3) IMPERVIOUS AREA: 8.36 ACRES (3) CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES BEFORE COMMENCING CONSTRUCTION. (4) PERCENT IMPERVIOUS: 44.4% (4) CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS (5) SEDIMENT FENCE LENGTH: 7,894 LINEAR FEET GENERATED THROUGH DEMOLITION AND GRUBBING ACTIVITIES SHOWN. (APPROXIMATE) (5) SEDIMENT FENCINGTOLIMIT DISTURBANCE EROSION CONTROL CONSTRUCTION ATLAS ONE FOOTS (1*) ROMWETLANDS�'S MAINTENANCE PLAN (6) CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. r CL U z -a o co � •� N N .c to 76 41) 0 0 LL }' O 0 0 4-0 �J 0 m �U O Q U INTERVALS ALONG SEDIMENT FENCING. O 7 ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, .AND MULCHED WITHIN 15 (1) CONTRACTOR SHALL CHECK ALL EROSION AND SEDIMENT CALENDAR DAYS ACTIVITIES. CONTROL PRACTICES FOR INTEGRITY FOLLOWING EVERY OF GRADINGRUNOFF PRODUCING RAINFALL EVENT, OR AT A MINIMUM, C� O 8 WATER SEWER AND STORMWATER PIPES TO BE INSTALLED IN TRENCHES ONCE A WEEK. ANY REPAIRS WILL BE MADE ACCORDING TO STANDARD SPECIFICATIONS AND DETAILS ON SHEETS C.7.1, IMMEDIATELY TO MAINTAIN THE FUNCTION OF THE DESIGN Q Q C.7.6, & C.7.10. MEASURES. Z V) CI_ --.-J O O (9) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS SHALL (2) CONTRACTOR SHALL REMOVE ALL SEDIMENT FROM THE �...._, � or,-__! SEDIMENT FENCE WHEN IT BECOMES ABOUT A HALF OF A BE LAID AT LEAST TEN (10) FEET LATERALLY FROM EXISTING OR PROPOSED FOOT DEEP AT THE FENCE BASE. THE SEDIMENT FENCE v U Q SEWERS, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A TEN (10) WILL BE REPAIRED AS NECESSARY TO MAINTAIN }-:-- FOOT LATERAL SEPARATION IN WHICH CASE: FUNCTION AS A BARRIER. tl� O (A) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION � L.Li ON THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES (3) THE SEDIMENT FENCING AREA AND COLLECTED �`' � U) � Q ABOVE THE TOP OF SEWER; OR SEDIMENTS WILL BE REMOVED AND BROUGHT TO GRADE �C o ; U (B) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH AFTER THE CONTRIBUTING AREA HAS BEEN PROPERLY Z j Z C) THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED STABILIZED. U! 1 0 �C I_, EARTH, AND WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN w p V AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER. irk ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO p (10) CROSSING A WATER MAIN OVER A SEWER. WHENEVER NECESSARY FOR A SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A WATER MAIN TO CROSS OVER A SEWER, THE WATER MAIN SHALL BE LAID VIGOROUS, DENSE VEGETATIVE COVER. __j CL 'J AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT S L LEAST EIGHTEEN (18) INCHES ABOVE THE TOP- OF THE SEWER, UNLESS (5) CONTRACTOR TO WEEP AND KEEP CLEAN OF SEDIMENT Lu LOCAL CONDITIONS OR BARRIERS PREVENT AN EIGHTEEN (18) INCH THE ROADWAY ADJACENT TO THE PROJECT SITE AS SEPARATION -- IN WHICH CASE, BOTH THE WATER MAIN ANDSEWER NECESSARY. SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) (6) AT NO POINT IN TIME MAY EXPOSED DISTURBANCE �-- FEET ON EACH SIDE OF THE CROSSING. EXCEED 20 ACRES. O O O (11) CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY SEEDING SCHEDULE Q N FOR A WATER MAIN TO CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN SEEDING MIXTURE w W 3 (10) FEET ON EACH SIDE OF THE POINT(S) OF CROSSING. A SECTION OF SPECIES RATE (LB/ACRE) DATES p v WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. "' z W TALL FESCUE 50 SEPT 1 — APRIL 1 ar PENSACOLA BAHIAGRASS 25 SEPT 1 -- APRIL 1 W z (12) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" SEPARATION KOBE LESPEDEZA 50 SEPT 1 — APRIL 1 o FROM BOTTOM OF STORMWATER PIPE AND TOP OF SEWER PIPE. o SEEDING MIXTURE p N (13) ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS TO BE DIRECTED TO w LOE RIGHT--OF—WAY, OR TO YARD INLET (OR OTHER STORMWATER COLLECTION SPECIES RATE (LB/ACRE) DATES a cL TALL FESCUE 50 APRIL 1 — SEPT 1 DEVICES) FOR EVENTUAL DISCHARGE TO INFILTRATION BASIN. BROWNTOP MILLET 25 APRIL 1 — SEPT 1 KOBE LESPEDEZA 50 APRIL 1 — SEPT 1 4�i �- N (14) FOR MAXIMUM ALLOWABLE BUILT —UPON AREA PER LOT SEE TABLE 5.1 ON Qc SHEET 5.1 AND TABLE 5.5 ON SHEET 5.5. SOIL AMENDMENTS SHEET NO. (15) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS DOES APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR NOT INCLUDE ANY RUNOFF FROM IMPERVIOUS' SURFACE ASSOCIATED WITH APPLY 3,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE THE FUTURE COMMERCIAL AREA. A PERMIT MODIFICATION WILL BE AND 1,000 LB/ACRE 10-10-10 FERTILIZER. C.4. 1 NECESSARY PRIOR TO CONSTRUCTING ANY ADDITIONAL IMPERVIOUS SURFACE, MULCH (16) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS SHALL APPLY 4,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER ►,� BE CONSTRUCTED IN ACCORDANCE WITH THE SEDIMENT & EROSION CONTROL OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACKING o o PLAN APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT WITH ASPHALT, NETTING, ROVING, OR BY CRIMPING WITH A N p AND NATURAL RESOURCES. MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY to STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. ti (17) ACCORDING TO THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973 •• o Q (NORTH CAROLINA GENERAL STATUTE 113A 51-66) THIS PROJECT IS MAINTENANCE w Z SUBJECT TO AN APPROVED SEDIMENTATION AND EROSION CONTROL PLAN. IF GROWTH IS LESS THAN FULLY ADEQUATE, REFERTILIZE IN 0 THE CONTRACTOR SHALL ADHERE TO ALL OF THE CONDITIONS SET FORTH IN THE SECOND YEAR ACCORDING TO SOIL TESTS OR TOPDRESS U W THE APPROVED PLAN, AS PRESCRIBED BY NCDENR. A COPY OF THE WITH 500 LB/ACRES 10-10-10 FERTILIZER. RESEED, APPROVED SEDIMENTATION AND EROSION CONTROL PLAN SHALL BE FERTILIZE, AND MULCH DAMAGED AREA IMMEDIATELY. o 4 DISPLAYED AT THE JOB SITE AT ALL TIMES. (18) ALL FITTINGS TO BE MJ DIP WITH THRUST BLOCKING UNLESS OTHERWISE NOTED ON PLANS. (19) EXCELSIOR MATTING AND SEEDING TO BE USED ON SLOPES STEEPER THAN c� �,� •• �, •.. 2:1. SOD SHALL BE USED FOR ALL SLOPES FLATTER THAN 2:1. cn w o (20) FINISHED FLOOR ELEVATION (FFE) IDENTIFIED ON THE PLAN IS INDICATIVE n w = i cv • 0 OF COMPACTED PAD GRADE TO WHICH 2"-4" OF TOP SOIL WILL BE ADDED. • t � SEE DETAIL 5/C.7.11. z q zwo •. (21) CONTRACTOR SHALL IMPLEMENT TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH M.U.T.C,D. F7��'I,�IT.��n1 AENIT AREA INFILTRATION BASIN 1D-1 SEE SHEET C.5.4 INFILTRATION BASIN 1 D-2 SEE SHEET C.5.4 �EYLAND 5' WALKING PATH •1 � . r•w. J FM r2&00 WE r 16.00 6� �s'I Bm - M000�'s FFE r28.00 t =i�\;� 1 X BFE - 16.00 I v •`t53,T iata , l � � ;� ►d i 1 sr �_j }- s`4 �• >�,�� sir f ` ' Ir o •f :-�►ooA : f o*moo ?-� j'�' �;' Ia�T .i;r>♦/ ,' PUMP STATION Pr _ tar`' � �� � % � `• -rl�� ��` EvIv fir" j �` • tRty 1!iit����t,-1.�� �f f l ✓ rY:C � - tr ,J/�-GSA/' �..�� i"max,.. "'�• � �� r��� 1 - -t 404 i. a WETLANDS Lx NO m-num. rit 0 Em IF w w \i\a �, � R Ili ►4 �.. _ � � _.••�ir..�..a *e ' '* i ,mm' "' w- :• i 1S `. �/C..i`/������� a7- _„u1 • � �.:.•-.►.•"�/ t,.- rw.•! 7.�.sv r'G"�•Irc�a�o�sa_� i r, � • r PiOPOSED PHASE 1 STORMWATER -PLAN Roy( � SCALE: 1" =100' 100' 0 100' SCALE OF MAP MAY VARY DUE TO METHODS OF REP ODUCTION. DRAINAGE A DRAIN PHASE 1 SPECIFICATIONS 3 JUNCTION BOXES (JB) 3 YARD INLETS (YI) 1 CURB INLETS (CI) 31 5' X 7 BYPASS BOX 2 15" HDPE SDR 32.5 1,998 L.F. 18" HDPE SDR 32.5 454 L.F. 24" HDPE SDR 32.5 349 L.F. 30" HDPE SDR 32.5 351 L.F. 36" HDPE SDR 32.5 508 L.F. 42" HDPE SDR 32.5 250 L.F. INFILTRATION BASINS 7 RIP RAP APRONS 16 LEVEL SPREADERS 9 SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24w SEPARATION FROM BOTTOM OF STORMWATER PIPE AND TOP OF GENERAL (1) NOTES:_ TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. (9) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS SHALL BE LAID AT LEAST TEN (12) RIGGS AND ASSOCIATES, P.L.S.# L-2981. INFORMATION PROVIDED DESIGN PURPOSE ONLY. NOT FOR RECORDATION. (10) FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR 13 ( ) SEWER PIPE, ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS T� BE DIRECTED TO RIGHT-OF-WAY, OR TO YARD INLET (OR OTHER STORMWATER ( 2) FOR ENGINEERING ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN BARRIERS PREVENT A TEN (10) FOOT LATERAL SEPARATION - IN WHICH CASE. (A) THE WATER MAIN IS ' LAID IN A SEPARATE TRENCH, WITH THE ELEVATION , ON THE BOTTOM OF COLLECTION DEVICES) FOR EVENTUAL DISCHARGE TO INFILTRATION BASIN. TABLE 5.5 5.5.. FIELD APPROVED BY THE ARMY CORPS OF ENGINEERS ON THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER; OR (14) FOR MAXIMUM ALLOWABLE BUILT -UPON AREA PER LOT SEE TABLE 5.1 ON SHEET 5,1 AND ON SHEET NOVEMBER 23, 2005 (FINAL APPROVAL PENDING). BEFORE (B) THE WATER MAIN IS LAID IN THE SAME TENNIS AS THE S EWER WITH THE WATER MAIN (15) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS DOES NOT INCLUDE ANY RUNOFF FROM IMPERVIOUS SURFACE ASSOCIATED WITH THE FUTURE COMMERCIAL AREA. A PERMIT MODIFICATION WILL BE NECESSARY PRIOR TO CONSTRUCTING ANY (3) CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED 'EARTH, AND WITH. THE ELEVATION OF ADDITIONAL IMPERVIOUS SURFACE. {4) COMMENCING CONSTRUCTION. RESPONSIBLE FOR DISPOSAL OF ALL WASTE CONTRACTOR IS R THE BOTTOM OF THE :WATER MAIN AT LEAST EIGHTEEN(18) INCHES ABOVE THE TOP OF SEWER. FOR A WATER MAIN TO CROSS (16) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SEDIMENT MATERIAL S GENERATED THROUGH DEMOLITION AND GRUBBING 10 ( ) CROSSING A WATER MAIN OVER A SEWER. WHENEVER NECESSARY SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF & EROSION CONTROL PLAN APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. ACTIVITIES SHOWN. FOR OVER A SEA, THE WATER MAIN THE WATER MAIN IS AT LEAST EIGHTEEN {18) INCHES ABOVE THE TOP OF THE SEWER, UNLESS (17) ACCORDING TO THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973 (NORTH CAR NA GENERAL STATUTE 113A 51-66) THIS PROJECT IS SUBJECT TO AN APPROVED SEDIMENTATION AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL ADHERE TO ALL {5) SEDIMENT FENCING TO BE AT THE LIMIT OF DISTURBANCE SITE AT LEAST ONE FOOT 1 FROM O A CONDITIONS OR BARRIERS PREVENT. AN EIGHTEEN (18) INCH SEPARATION -- IN WHICH LOCAL COND OF THE CONDITIONS SET FORTH IN THE APPROVED PLAN, AS PRESCRIBED BY NCDENR. A COPY OF THE APPROVED THIS CONSTRUCTION CASE, BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND SEDIMENTATION AND EROSION CONTROL PLAN SHALL BE DISPLAYED AT THE JOB SITE AT ALL TIMES, 6 () WETLANDS CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. CO WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) (18) ALL FITTINGS TO BE MJ DIP WITH THRUST BLOCKING UNLESS OTHERWISE NOTED ON PLANS. INTERVALS ALONG SEDIMENT FENCING. FEET ON EACH SIDE OF THE CROSSING. A SEWER. WHENEVER IT IS NECESSARY FOR A WATER MAIN TO (19) EXCELSIOR MATTING AND SEEDING TO BE USED ON SLOPES STEEPER THAN 2:1. SOD SHALL BE USED FOR ALL SLOPES FLATTER 7 () ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHED (11) CROSSING A WATER MAIN UNDER _ CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED OF {20) THAN 2.1. FINISHED FLOOR ELEVATION {FFE) IDENTIFIED ON THE PLAN IS INDICATIVE OF COMPACTED PAD GRADE TO WHICH 2r-4" OF TOP DAYS OF GRADING ACTIVITIES. WITHIN 15 CALENDAR D PIPES TO BE INSTALLED IN FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE SOIL WILL BE ADDED. SEE DETAIL 5/C.7.11. (8) WATER, SEWER, AND STORMWATER TRENCHES ACCORDING TO STANDARD SPECIFICATIONS AND DETAIL S OF TEN (10) FEET ON EACH SIDE OF THE POINT(S) OF CROSSING. A SECTION OF WATER MAIN OF CROSSING. (21) CONTRACTOR SHALL IMPLEMENT TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH M.U.T.C.D. PIPE SHALL BE CENTERED AT THE POINT • ON SHEET C.7.10. J PHASE 1 DRAINAGE AREAS DRAINAGE AREA AREA 1A--1 AREA 1 A-2 AREA 1A-3 AREA 1B AREA 1 C AREA 1 D-1 AREA 1D-2 TOTAL PHASE 1 DRAINAGE AREA AREA (ACRES) 0.69 0.38 0.16 8.37 6.51 0.89 2.07 Table 5.1 MAXIMUM IMPERVIOUS SURFACE AREAS FOR PHASE 1 RESIDENTIAL LOTS LOT NUMBED MAXIMUM IMPERVIOUS SURFACE AREA (SQ. FT.) LOT NUMBER MAXIMUM IMPERVIOUS SURFACE AREA (SQ. FT. 1 4,152 24 4,162 2 4,152 25 3 4,152 26 4 4,152 27 3,681 5 41300 28 3,672 6 4,186 29 3,668 7 3,668 30 3,664 8 3,608 31 3,659 9 3,607 32 3,633 10 3,607 33 3, 602 11 3,517 34 3,601 12 4,156 35 3,599 13 3,692 36 4,151 14 3,776 37 4,480 15 3,691 38 3,849 16 3,731 39 3,828 17 3,695 40 4,022 18 3,676 41 4,255 19 41211 42 4,087 20 4,269 43 3,829 21 4,350 44 4,128 22 4,161 45 4,425 23 4,165 NOTE 1: AVG SQ. FT. PER LOT IS 31923 SQ. FT. (168,669 SQ. FT. 143 LOTS - 3,923 SQ. FT.) NOTE 2: TOTAL BUA FOR EACH LOT INCLUDES 55' X 55' BUILDING ENVELOPE, PLUS 18' WIDE DRIVEWAY (VARYING LENGTHS), PLUS SECTION OF DRIVEWAY WITHIN ROW (124 to 180 SF, DEPENDING ON LOCATION IN PHASE 1), UNLESS OTHERWISE NOTED. SIDEWALKS AND CURB ARE NOT INCLUDED IN BUA. CONSTRUCTION SEQUENCE 1. PERFORM CONSTRUCTION STAKE OUT. 2. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE. 3. CLEAR SITE, BUT DO NOT GRUB. 4. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES. 5. GRUB SITE. 6. CONSTRUCT SEDIMENT BASINS. 7. COMMENCE ROUGH GRADING OF THE SITE. 8. INSTALL. STORMWATER MANAGEMENT DEVICES. 9. CONSTRUCT SEWER COLLECTION SYSTEM. 10.CONSTRUCT WATER SYSTEM. 11. ROUGH GRADE THE SITE. 12.SHAPE SHOULDERS AND CUT AND FILL SLOPES. 13. SCARIFY, SEED, FERTILIZE AND MULCH ALL DISTURBED AREAS. 14.INSTALI DRY UTILITIES (ELECTRICAL, FIBER-OPTIC, CABLE, PHONE, ETC). 15.RE-SCARIFY, RE -SEED, RE -FERTILIZE AND MULCH ALL DISTURBED AREA. 16.CONSTRUCT ROADBED BASE COURSE AND INTERMEDIATE ASPHALT COURSE 17. APPLY FINAL ASPHALT COURSE. 18. AFTER DISTURBED AREAS ARE STABILIZED WITH VEGETATION, THE CONTRACTOR SHALL RETURN TO THE SITE AND REMOVE ALL TEMPORARY EROSION CONTROL MEASURES. r cm rrr a� c co U Z c 0 0 N .c 49 V} ._ 0 2 }' U- O {%} O_ Z O "' � d O 0 m -U Q CB c'6 U L L L Lid U J CL cr Lid Or LLJ �"'-- � v j Q CL UOV QD L J J �C 6C) <C 0 Z to o Q N N W U U w q W S 9Q w p p N Q o s ^w W n d- SHEET NO. C. 5.1 END PHASE 1 PAVEMENT AND SIDEWALK \. � TYPE 'B' INLET 32,00\ GRT 30.50 � ... INV OUT 27.73 24„HDPE EQUALIZATION\ SEE DETAIL PIPE 0 ELEV. 27.00 (TYP } 1 2 0% SLOPE N FFE _ 32..5�0j 1 INSTALL APPROX. 26 LF 15" HDPE DR 13 32.5 0 0.50% INV OUT 27.60 `INSTALL APPROX. 29 LF 15" HDPE DR 32.5 0 0.25% TYPE 'B' INLET �: GRT 31.07 / INV OUT 27.04 FFE 32.50 TYPE IV INLET !jf GRT 31.04 Q INV OUT 26.97 INSTALL APPROX. 25 \ \ LF 15" HDPE DR , \ \ 32.5 0 0.50% t INV OUT 27.60 DRAINAGE AREA FFE 1D-2 BOUNDARY L11� { INSTALL APPROX. 132 LF 15" { 1 HDPE DR 32.5 0 0.70% 1 2' CONCRETE 1 ( CURB AND GUTTER ,4 I I (TYP) . . To ON ! r " 30- PROPOSED 49.5 LF ALUMINUM! \`TMIN ESS ON VFRT_14LMATCH / PROPOSED INFILTRATION'-, • 4•:. Y i7 F.:7 BASIN 1 D-1 t:- t SEE DETAIL 4'" .t ��:+rns'�c t{•pit' aiijf a,. AMENITY AREA INSTALL APPROX. 33 LF 15" HDPE OR Y :: 32.5 0 0.50% 31.35' FFE a LANDSCAPED ISLAND (y{ TC 31.35' 31.50' lop GRT 30.55 'Kill•UT 27.73 GRT 30.75 INV IN �- i • •" •Lm • • �e .. 1 j 5' SIDEWALK (TYP.) { (1 SEE DETA I 4 o C.7.11 FFE = I 31.50 v q I ' ;•# % 1 26' ASPHALT ROAD I { (LOGGERHEAD BLVD ONLY.) - SEE DETAIL �{ I 4 C.7.9 o I 1 FFE _ I ; { 31.50 SCALE: 1 = 50 50' 0 50' y; r SCALE'' OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. TYPE 'B' INLET GRT 30.60 / INV OUT 27.89 C SEE (TYP.) 29.50 i ETAL�C.7.12 C.7:12 • -r INSTALL APPROX. 34 '= LF 15" HDPE DR JB- 4 .r 32.5 0 0.257, GRT 30.75 LANDSCAPED CIRCLE INV IN 26.00' INV OUT 00 (RADIUS = 65.00') 26.�'- . > AND wA PROPOSED INFILTRATION ' BASIN 1 D-2 ```-- SEE DETAIL 3 t C.7.8 22' ASPHALT f m" ROAD (TYP-) TYPE `B' INLET SEE DETAIL GRT 29.00 5 INV OUT 26.12 r~ C.7.9 (TYP.) rRAI1*'\4AGE AREA 1 D_ INV OUT: 25.70' :XISTING BOTTOM ELEVATIONS. �; CO-3 3 C.7.7 SEE DETAIL {`, INV ` 31.50�- FUTURE COMMERCIAL AREA 31 INSTALL 15 SEE GENERAL NOTE 15 C.7.9 1 I «= SPILLWAY 0 31.25 I \N PROPOSED RIP RAP W/ LEVEL SPREADER (TYP.) SEE DETAIL I ' �. ;, ---• TOP OF BERM LA / N 5 -�~' PROPOSED ELEVATED o I I `�'" N�. EL. 032.25 '�- CONCRETE SIDEWALK \ TOP OF BERM - C.7.10 BRIDGE (5 LF) + EL 028.75 rn' :.r, z �' ` INSTALL APPROX. 76 L.F. \ � SEE 1 J 1 I ���� r CO-1 OF 30 RCP AT 0.257 C.7.11 I I INV 31.00 r: LP:31.90' "'' (TYP.) TYPE 'B' INLET I { GRT 28.00 I 3 •..,.. ; �� W INV OUT 25.81 2 (TYP.) SEE DETAIL 1 , PROPOSED INFILTRATION C.7.12 C.7.12 ! :1:. I 1 BASIN 1A-1 :�:.._,f, HP: CO--4 APPROX. 26 LF 15" SEE DETAI 1 W .f„` INV 30.00 PROPOSED INFILTRATION INSTALL HDPE DR 32.5 0 0.50% i I C.7 7 -� ;ry. `, BASIN 1A IL f - � w' SEE DETAIL 3 V �--% EXISTING 24" RCP CULVERT 1 " ` `CO-2 INSTALL APPROX. / TOP OF BERM 115 LF 15" EL. 0 32.75' 2 IN 00 HDPE DR 32.5 ---... > ENTRANCE SIGN 14 TOP OF BERM 0 0.50 p ., _ ..wd. .� . NC HWy . • INSTALL 15' (16 SF) 210 �� ' : EL. 0 32.25' INV OUT 25.61 (A FrhU- ; ` t � f SPILLWAY 0 31.75' 31.75 , \ ! NG EXlST1NG ... �. EXiST4NG 'r.``�.► /'� 3 Tc 3�.32' .t PROPOSED RIP RAP W/ • G 30.82 u INSTALL i 5 -_ ""�- _PROPOSED YARD INLET 31.45 LEVEL SPREADER (TYP.) SPILLWAY 0 127.75-..�.,., ., _ ROB✓---...._ GRATE 29,87 - t SEE DETAIL Q� 8.25' .~:.; . ! 1 "r -- INV. 25.88.. "-TC 30.95' ' TYPE 'B' INLET SEE DETAIL ` G 30.a5' GRT 28.00 �4 ��`-���" {TYP.) INV OUT 25.68`,,,/ 30. _ y ( INSTALL 15' ,,,. SPILLWAY 0 31.25' F INSTALL APPROX. 115 L.F. •., 3ps2' ENTRANCE SIGN f i OF 30 HDPE AT 0.25% �.. y '~�-�. (16 SF) I ��,,,,��� INSTALL APPROX. 197 L.F. 2' VALLEY CURB rrrr�� �. ''� _ �.-�.'- OF 36" HDPE AT 0.25% SEE DETAIL � I � (TYP.) 1 I I PROPOSED ELEVATED ` ' �''1 » .,k �```� { CONCRETE SIDEWALK `` ��,,, v� `~�.� HPTC 31.76 C.7s PROPOSED CURB INLET.. '� f G 31.26' : BRIO (5 LF (TYP) GRATE 30.40' � INSTALL APPROX. 63 _`'`- � t { 1 SEE DETAIL „ SCALE. 1 = 50 PROPOSED U • � INV. 25.63 \PROPOSED CURB INLET � �` ..` S'�•..._ 3 15 HDPE DR 3 { 1 SEE DETAIL GRATE 30.70' A PROPOSED YARD � 32.5 0 0.50% 50 0 �� (TYP.) � ' :- ...•.. C.7.11 INV. 25.47 GRATE 29.30 {\` �-.`�`�- �_ �� j� INV. 24.97 SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. D R A I N A G E AREA 1 A PRPOSED INFILTRATION BASiIN In , PROPOSED INFILTRATION M' ^'•' A A PROPOSED INFILTRATION BASIL 1 �-,.# PROPOSED INFILTRATION BASIN.. IT DRAINAGE AREA 1 A-1 DATA TOTAL AREA 0.69 ACRES IMPERVIOUS AREA 0.25 ACRES PERCENT IMPERVIOUS 37% VOLUME 4.5" RAINFALL 4,283 CU.FT. BASIN VOLUME 4,879 CU.FT. DRAINAGE AREA IA-2 DATA TOTAL AREA 0.38 ACRES IMPERVIOUS AREA 0.16 ACRES PERCENT IMPERVIOUS 42% VOLUME 4.5" RAINFALL 2629 CU.FT. BASIN VOLUME 3331 CU.FT. DRAINAGE AREA 1 A-3 DATA TOTAL AREA 016 ACRES IMPERVIOUS AREA 005 ACRES PERCENT IMPERVIOUS 34% VOLUME 4.5" RAINFALL 929 CU.FT. BASIN VOLUME 1,757 CU.FT. DRAINAGE AREA 1 D-1 DATA TOTAL AREA 0.89 ACRES IMPERVIOUS AREA 0.48 ACRES PERCENT IMPERVIOUS 53% VOLUME 4.5" RAINFALL 7739 CU.FT. BASIN VOLUME 7,887 CU.FT. DRAINAGE AREA 1 D--2 DATA TOTAL AREA 2.07 ACRES IMPERVIOUS AREA 0.9.8 ACRES PERCENT IMPERVIOUS 47% VOLUME 4.5" RAINFALL 16,142 CU,FT. BASIN VOLUME 17,335 CU.FT. GENERAL NOTES: (1) TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND ASSOCIATES, P.L.S.# L-2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. (2) ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN FIELD APPROVED BY THE ARMY CORPS OF ENGINEERS ON NOVEMBER 23, 2005 (FINAL APPROVAL PENDING), (3) CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES BEFORE COMMENCING CONSTRUCTION. (4) CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS GENERATED THROUGH DEMOLITION AND GRUBBING ACTIVITIES SHOWN. (5) SEDIMENT FENCING TO BE AT THE LIMIT OF DISTURBANCE FOR THIS CONSTRUCTION SITE, AT LEAST ONE FOOT (10) FROM WETLANDS (6) CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. INTERVALS ALONG SEDIMENT FENCING. (7) ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 CALENDAR DAYS OF GRADING ACTIVITIES. (8) WATER, SEWER, AND STORMWATER PIPES TO BE INSTALLED IN TRENCHES ACCORDING TO STANDARD SPECIFICATIONS AND DETAILS ON SHEETS C.7.1, C.7.6 AND C.7.10. (9) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS SHALL BE LAID AT LEAST TEN (10) FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A TEN (10) FOOT LATERAL SEPARATION -- IN WHICH CASE: (A) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION ON THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER; OR (B) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION OF TIME BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN(18) INCHES ABOVE THE TOP OF SEWER. (10) CROSSING A WATER MAIN OVER A SEWER. WHENEVER NECESSARY FOR A WATER MAIN TO CROSS OVER A SEWER, THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF THE SEWER, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT AN EIGHTEEN (18) INCH SEPARATION -- IN WHICH CASE, BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE CROSSING. (11) CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE POINT(S) OF CROSSING. A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. (12) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" SEPARATION FROM BOTTOM OF STORMWATER PIPE AND TOP OF SEWER PIPE. (13) ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS TO BE DIRECTED TO RIGHT-OF-WAY, OR TO YARD INLET (OR OTHER STORMWATER COLLECTION DEVICES) FOR EVENTUAL DISCHARGE TO INFILTRATION BASIN. (14) FOR MAXIMUM ALLOWABLE BUILT -UPON AREA PER LOT SEE TABLE 5.1 ON SHEET 5.1 AND TABLE 5.5 ON SHEET 5.5. (15) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS DOES NOT INCLUDE ANY RUNOFF FROM IMPERVIOUS SURFACE ASSOCIATED WITH THE FUTURE COMMERCIAL AREA. A PERMIT MODIFICATION WILL BE NECESSARY PRIOR TO CONSTRUCTING ANY ADDITIONAL IMPERVIOUS SURFACE. (16) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SEDIMENT &'' EROSION CONTROL PLAN APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. (17) ACCORDING TO THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973 (NORTH CAROLINA GENERAL STATUTE 113A 51-66) THIS PROJECT IS SUBJECT TO AN APPROVED SEDIMENTATION AND EROSION CONTROL PLAN. THE CONTRACTOR SHALL ADHERE TO ALL OF THE CONDITIONS SET FORTH IN THE APPROVED PLAN, AS PRESCRIBED BY NCDENR. A COPY OF THE APPROVED SEDIMENTATION AND EROSION CONTROLPLAN SHALL BE DISPLAYED AT THE JOB SITE AT ALL TIMES. (18) ALL FITTINGS TO BE MJ DIP WITH THRUST BLOCKING UNLESS OTHERWISE NOTED ON PLANS. (19) EXCELSIOR MATTING AND SEEDING TO BE USED ON SLOPES STEEPER THAN 2:1. SOD SHALL BE USED FOR ALL SLOPES FLATTER THAN 2:1. (20) FINISHED FLOOR ELEVATION (FFE) IDENTIFIED ON THE PLAN IS INDICATIVE OF COMPACTED PAD GRADE TO WHICH 2"-4" OF TOP SOIL WILL BE ADDED. SEE DETAIL 5/C.7.11. (21) CONTRACTOR SHALL IMPLEMENT TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH M.U.T.C.D. CONSTRUCTION SEQUENCE 1. PERFORM CONSTRUCTION STAKE OUT. 2. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE. 3. CLEAR SITE, BUT DO NOT GRUB. 4. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES. 5. GRUB SITE. 6. CONSTRUCT SEDIMENT BASINS. 7. COMMENCE ROUGH GRADING OF THE SITE. 8. INSTALL STORMWATER MANAGEMENT DEVICES. 9. CONSTRUCT SEWER COLLECTION SYSTEM. 10. CONSTRUCT WATER SYSTEM. 11. ROUGH GRADE THE SITE. 12. SHAPE SHOULDERS AND CUT AND FILL SLOPES. 13. SCARIFY, SEED, FERTILIZE AND MULCH ALL DISTURBED AREAS. 14.INSTALL DRY UTILITIES (ELECTRICAL, FIBER-OPTIC, CABLE, PHONE, ETC). 15. RE -SCARIFY, RE -SEED, RE -FERTILIZE AND MULCH ALL DISTURBED AREA. Ld rc V Z r-- u- Q p I- �E o V) to Z LLJ •-J u., Z Z Q-- cr Q W N uj Z w W w w q Ncr_ Q or 0) 1t- =n SHEET NO. C. 5.4 h N w W cr. Q �o Z � V W Z Z 16. CONSTRUCT ROADBED BASE COURSE AND INTERMEDIATE c� •' ASPHALT COURSE. 17. APPLY FINAL ASPHALT COURSE. ©�w 31 18. AFTER DISTURBED AREAS ARE STABILIZED WITH Q w VEGETATION, THE CONTRACTOR SHALL RETURN TO THE Z J z -,��• •4 SITE AND REMOVE ALL TEMPORARY EROSION CONTROL �. � v ., ; MEASURES. o=- �% t-' 0 77 I I II I I RIP RAP W/ LEVEL SPREADER SEE DETAIL 5/C.7.10 BOTTOM EL 30.00 100 YR. STORM EL. 30.17 32`RIP RAP CURB CUT n1 inn nt 1-r SPILLWAY EL. 31.75 3:1 SLOPE MAX. 100 YR STORM EL = 31.27 I — APPROXIMATE SEASONAL HIGH WATER TABLE ELEVATION = 29.00 �— INFIL. BASIN 1 A-1 BOTTOM: 31.00 SECTION A1— Al DETAIL SCALE: NOT TO SCALE /_ - 7-f - )� APPROX. 83' PLAN SPILLWAY EL. 31.25 3:1 SLOPE MAX. EL. 32.25 SCALE: 1" = 30' 3010 30 50' lip SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. { REVISION 3A — REVISED 15' SPILLWAY ELEVA11ON co co a SCALE: 1 " -- 30' 30' 0 30' mm - -=-- i SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. 17 100 YR STORM EL. = 30.17 I- - i — 2'— - APPROXIMATE SEASONAL HIGH WATER TABLE ELEVATION = 28.00 INFIL. BASIN 1A-3 BOTTOM: 30.00 SECTION A3—A3 INFILTRATION BASIN 1 A-3 DETAIL DETAIL � SCALE: NOT TO SCALE kC.7.7i APPROX.., 01 BOTTOM I 100 YR. STORM CURB CUT . _r _ ..... f A 'i SCALE: 1 " = 30' 30 0 30 SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. SPILLWAY El. 31.25 3:1 SCOPE MAX. �Z 100 YR STORM EL. = 30.41 — ....................... 2f— APPROXIMATE SEASONAL HIGH WATER TABLE ELEVATION = 28.00 �— BOTTOM EL. 27.00 100 YR. STORM EL. 27.82 � INFIL. BASIN 1A-2 BOTTOM: 30.00 SECTION A2—A2 INFILTRATION BASIN 1A-2 DETAIL DETAIL r2 SCALE: NOT TO SCALE kC.7.7i APPROX. 161' 3:1 SLOPE MAX. 15' SPILLWAY 0 EL. 30.25 FG: 30.75 �] 100 YR STORM EL. = 27.82 = ........... i i 1 I II I I I I I- - APPROXIMATE SEASONAL HIGH WATER TABLE ELEVATION = 24.00 - QINFIL. BASIN 1D-1 .RIP RAP BOTTOM: 27.00 SEE DETAIL 5/C.7.10 SECTION D1—D1 INFILTRATION BASIN 1D-1 DETAIL DETAIL r4 SCALE: NOT TO SCALE kC.7.71 co 0 co tt1 C c� N N M 0 r A - co 03 r c CL 04 f 1 c c 0 15) as c � o N ._ co El 0) ttL^^ Y/ V 0 0 LL m 4-a _ (f) Z c r • err Q a 0 m 0 0 Q 06 U U) LiJ Q _ W Q V) Ca LL- z co t W o UQD W -� w Q LL N Zz I -J CL Q r— W I =C ar I— r-- � h � U ra Z z SCALE: 1" = 30' �' o 30' 0 30' Ncc `` ~ w � CL cxa SCALE OF MAP MAY VARY . DUE TO METHODS OF REPRODUCTION. N "' 1* to SHEET NO. C.7.7 BOTTOM EL. 21.00 100 YR. STORM EL. 26.05 SCALE: 1 " = 20' 20' o' 20' SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. FROM COLLECTION -------►- SYSTEM BERM EL. 27.50 i . PLAN VIEW 15' SPILLWAY 0 EL. 26.50 — APPROX. 220' N APPROX. 115' 1, BERM EL. 27.50 3:1 SLOPE MAX. sz 100 YR STORM EL. = 26.05 I- - 21 ll APPROXIMATE SEASONAL HIGH WATER TABLE ELEVATION = 19.0 I Ii --iiI... i i—i—ii iii ii—iiiI II III III II I— RIP RAP W/ WFIL. BASIN 16 LEVEL SPREADER BOTTOM: 21.00 INV OUT 42" FLARED SEE DETAIL 5/CJ.10 (BYPASS) END SECTION INV OUT 21.00 SECTION B—B INFILTRATION BASIN- 1 B DETAIL DETAIL roo� SCALE; NOT TO SCALE C,7.8 ABOVE GROUND INFILTRATION BASIN MAINTENANCE AGREEMENT 1. STORMWATER MANAGEMENT FACILITIES SHALL BE REGULARLY MAINTAINED TO ENSURE THEY FUNCTION AT DESIGN CAPACITY AND TO PREVENT HEALTH HAZARDS ASSOCIATED WITH DEBRIS BUILDUP AND STAGNANT WATER. THE PRIVATELY OWNED PORTION OF THE SYSTEM MUST BE PRIVATELY MAINTAINED. 2. RESPONSIBILITY FOR OPERATION AND MAINTENANCE OF STORMWATER FACILITIES, INCLUDING PERIODIC REMOVAL AND DISPOSAL OF ACCUMULATED PARTICULATE MATERIAL AND DEBRIS, BUT NOT LIMITED TO THE FOLLOWING: VISUAL INSPECTION OF ALL SYSTEM COMPONENTS AT LEAST TWICE EACH YEAR; VACUUMING OF ALL STORM SEWER INLETS ONCE EVERY SIX MONTHS (FREQUENCY OF VACUUMING MAY BE ADJUSTED TO ONCE A YEAR IF FIRST YEAR MAINTENANCE RECORDS INDICATE THAT SEDIMENT AND DEBRIS ACCUMULATION IS INSIGNIFICANT); REVERSE FLUSHING AND VACUUMING IF SYSTEM INSPECTIONS INDICATE SIGNIFICANT ACCUMULATION OF SEDIMENT IN THE PIPES; AND PERIODIC REMOVAL AND DISPOSAL OF OTHER MATERIAL AND DEBRIS, SHALL REMAIN WITH THE OWNER OR OWNERS OF THE PROPERTY, WITH PERMANENT ARRANGEMENTS THAT SHALL PASS TO ANY SUCCESSIVE OWNER, UNLESS ASSUMED BY A GOVERNMENTAL AGENCY. 3. IN THE EVENT THAT THE FACILITY BECOMES A DANGER TO PUBLIC SAFETY OR PUBLIC HEALTH, OR IF IT IS IN NEED OF MAINTENANCE, THE OWNER SHALL EFFECT SUCH MAINTENANCE AND REPAIR OF THE FACILITY IN A MANNER THAT IS APPROVED BY THE TOWNSHIP ENGINEER OR HIS DESIGNEE. IF THE OWNER FAILS OR REFUSES TO PERFORM SUCH MAINTENANCE AND REPAIR, THE MUNICIPALITY MAY IMMEDIATELY PROCEED TO DO SO IN ACCORDANCE WITH THE MAINTENANCE BOND. ABOVE GROUND INFILTRATION BASIN. MAINTENANCE AGREEMENT DETAIL r4 SCALE: NOT TO SCALE kC.7.8j BOTTOM EL. 12.00 100 YR. STORM EL. 13.65 15' SPILLWAY 0 EL. 14.75 4 13 apt oN a� SCALE: 1" = 20' 20 0f 20 SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. APPROX. 240' PLAN VIEW L 3:1 SLOPE MAX. APPROX. 74' BERM EL. 15.25 100 YR STORM EL. = 13.65 FROM COLLECTION SYSTEM 121 — APPROXIMATE SEASONAL HIGH WATER TABLE ELEVATION = 10.0 ZI RAP INFIL BASIN 1C INV OUT 30" FLARED SEE DETAIL 5/C.7.10 BOTTOM: 12.00 (BYPASS) END SECTION SECTION C—C INV OUT 12.00 INFILTRATION BASIN 1C DETAIL DETAIL r2 SCALE: NOT TO SCALE kC.7.8j SCALE. 1 = 20' 20' 0' 20' SCALE OF MAC' MAY VARY DUE TO METHODS OF REPRODUCTION. co co A A BOTTOM EL. 25.70 "� 100 YR. STORM EL. 26.47 APPROX. 242' CURB INLETS 0 28.00 PLAN VIEW 3:1 SLOPE MAX. INFIL. BASIN 1D —2 BOTTOM: 25.70 SECTION D2—D2 INFILTRATION BASIN 1D-2 DETAIL DETAIL r74� SCALE: NOT TO SCALE kC.7.81 REVISION 3 3A —INDICATED 15' SPILLWAY ELEVATION 15' SPILLWAY 0 EL. 27.75 #0 N :3 Im A_ N O M O r C2. co N O? i c c rn r$ N CL U -� z 0 0 cts N � m i 66 0 0 U. � o z 0 r •— d 3 a 0 m CD U 0 d od rn al U LL.I � J Q cr Q j I-- W LLp � o �- V) L.v ci C L � m r— Lid 00 C3� rw o W Q � 0 N w 4. Q o w � cc o� SHEET NO. C. 7.8 PROPOSED ROAD SURFACE N*'� x1l 6" OF SELECT FILL ooll EXISTING SUBGRADE GENERAL NOTES: 1.) CONTROL JOINTS SHALL BE PLACED @ 10' INTERVALS UNLESS OTHERWISE SPECIFIED BY ENGINEER, PLANS, OR SPECIFICATIONS. _ 2.) ALL CONTROL JOINTS SHALL BE FILLED WITH JOINT SEALER. 3.) EXPANSION/CONTRACTION JOINTS SHALL BE AT 90 FOOT INTERVALS, AND ADJACENT TO ALL RIGID OBJECTS. 4.) ALL JOINTS SHALL MATCH LOCATIONS WITH JOINT IN ABUTTING SIDEWALK. 5.) CONCRETE SHALL ACHIEVE A MINIMUM 28 DAY YIELD STRENGTH AT 3,000 PSI. VALLEY CURB DETAIL DETAIL n SCALE: NOT TO SCALE C. 7.9 ROW VARIES -•-VARIES 24.00 FT BOS---- r 4 2.00% - ryyp - SLOPE- 2.007o SLOPE .•: ; i.i i•S� PARKING STRIP (FINISH GRADE) SLOPE VARIES 3:1 MAX EXISTING fit -ram ►-� �r-t-- ;•r�- - - i i i i i i i f f i��i%�` ``�� SUBGRADE 5'-0" CONCRETE SIDEWALK 5'-0" CONCRETE SIDEWALK AT 2%, SEE DETAIL 4/C.7.11 AT 27o, SEE DETAIL 4/C.7.11 TYPICAL ROAD SECTION TYPICAL VALLEY CURB SEE DETAIL 3/C.7.9 SEE DETAIL 1 /C.7.9 NOTE: TYPICAL ROADWAY SECTION TO BE APPLIED TO LOGGERHEAD BLVD. BEGINNING AT THE INTERSECTION OF STOCKTON PLACE AND LOGGERHEAD BLVD. MOVING NORTH. N V TES. (1) EOP EDGE' OF PAVEMENT (2) BOC - BACK OF CURB (3) EOS -= EDGE: OF SIDEWALK (4) BOS = BACK OF SIDEWALK TYPICAL ROADWAY SECTION - isj eow = Ricnr of wnv PRIMARY SUBDIVISION ROADS /BOULEVARDS DETAIL n SCALE: NOT i0 SCALE C.].9 ALUMINUM BOTTOMLESS CULVERT W/ WING WALL (WING WALL SHALL BE DESIGNED BY AND BARE THE SEAL OF P.E. LICENSED IN NORTH CAROLINA) SLOPE VARIES 3:1 MAX EXISTING SUBGRADE 5'-0" CONCRETE SIDEWALK AT 27o, SEE DETAIL 4/C.7.11 1.5' MIN. aV 1 i VIVI %Jr GAl%;) 1. STREAM (UNDISTURBED) 'URER JCRETE FOOTING MANUFACTURER'S :CIFICATIONS (MIN. 4,000 PSI CONCRETE) w ow ROW VARIES ROW` VARIES z 22.00 FTr - BOS wil Q SLOPE VARIES 7.00 FT - EOS 17.00 FT -- EOS 3:1 MAX �?� 3.00 FT - BOC 13.00 FT - BOC` i 11.00 FT - EOP 11.00 FT - EOP SLOPE VARIES 3:1 MAX 2.00% SLOPE __-- 2.00% SLOPE -- .� ;� �-5'-0" CONCRETE SIDEWALK AT 27o, SEE DETAIL 4/C.7.11 TYPICAL VALLEY CURB TYPICAL ROAD SECTION SEE DETAIL 1/C.7.9 SEE DETAIL 3/CJ.9 NOTES: (1) EOP =EDGE OF PAVEMENT (2) BOC =BACK OF CURB TYPICAL ROADWAY SECTION - (3) EOS =EDGE OF SIDEWALK SECONDARY SUBDIVISION ROADS (4) BOS =BACK OF SIDEWALK (5) ROW =RIGHT OF WAY DETAIL 5� SCALE: NOT TO SCALE C.7.9 ROW VARIES T_ ROW VARIES ii :• ii :• • - a - • • -14.25 FT • - a a `' ��i iSLOPEi iSLOPE • _ . rw.►w��1 ?w n EXISTING� -•Y,�� .�.y..s,�-��.av�v��y..,,,y„Y..x �.,�.-,c, ., ..,,.,,.,,.,.�,.�i.�iv,, ,...,<.,,Y.,,,. - �_ EXISTING SUBGRADE SUBGRADE 5'-0" CONCRETE SIDEWALK 5'-0" CONCRETE SIDEWALK AT 27o, SEE DETAIL 4/C.7.11 „ TYPICAL ROAD SECTION AT 2%, SEE DETAIL 4/C.7.11 TYPICAL 8 UPRIGHT CURB SEE DETAIL 8/C.7.9 SEE DETAIL 3/C.7.9 NOTES: (1) EOP = EDGE OF PAVEMENT 1) TYPICAL ROADWAY SECTION VARIES WITH CENTER LANDSCAPE ISLAND. SEE PLAN VIEW FOR DIMENSIONS. 2) TYPICAL ROADWAY SECTION TO BE APPLIED TO LOGGERHEAD BLVD. FROM NC 210 ENTRANCE TO INTERSECTION OF STOCKTON PLACE DETAIL r7� SCALE: NOT TO SCALE C.7.9 (2) BOC = BACK OF CURB (3) EOS = EDGE OF SIDEWALK (4) BOS = BACK OF SIDEWALK (5) ROW = RIGHT OF WAY 1" SF 9.5A SURFACE COURSE 2 1/2" 1 19.0 B 6" AGGREGATE BASE COURSE (ABC) COMPACTED SUBGRADE UPPER 8" MINIMUM -III-III-III-III-i I I-III-� I I -III- OF 95% STANDARD PROCTOR =III=III=II I=III=II I=III=III=III-II FILL -MAXIMUM 8" LIFTS AS REQUIRED � \\ \ \ MAXIMUM DRY DENSITY X", �\\\ THIS SECTION REPRESENTS THE MOST RESTRICTIVE PAVEMENT DESIGN SYSTEM. FINAL PAVEMENT DESIGN SYSTEM TO BE DETERMINED IN THE FIELD BASED ON FIELD CONDITIONS. MATERIALS SHALL MEET THE REQUIRED SECTIONS OF THE NCDOT STANDARD SPECIFICATION FOR ROADS AND STRUCTURES. LIGHT -DUTY ASPHALT PAVEMENT DETAIL rT SCALE: NOT TO SCALE �3.9 GL. V V f 1 - 17.00 FT - 1 12.00 FT - BOC 12.00 FT - 10.00 FT - EOP 10.00 FT - I -a � 0 2.00% SLOPE 2.00% SLOPE J0 � rn ca c c� N E9 r cm 0 rn cm co N 1` o r r c v o cz E +r N n .= _ 0 m 0 0 :L 4-0 o Z C ® 0 7 4-0 :3 4Q a. 0 m / c+/06 U a rn U Q00 O J 0 w W U t- U SLOPE VARIES w Q 3:1 MAX 5'-0" CONCRETE SIDEWALK AT 2%, SEE DETAIL 4/C.7.11 REVERSE PAN TYPICAL VALLEY CURB VALLEY CURB TYPICAL ROAD SECTION SEE DETAIL 1/C.7.9 SEE DETAIL 3/C.7.9 NOTES: (1) EOP =EDGE OF PAVEMENT TYPICAL ROADWAY SECTION - (2) BOC = BACK of cuRe (3) EOS =EDGE OF SIDEWALK ONE-WAY TRAFFIC CIRCLES (4) BOS =BACK OF SIDEWALK DETAIL (5) ROW =RIGHT OF WAY 6 SCALE: NOT TO SCALE kC.7.91 R3/4" 2 JOINT RVP SEALER PAVEMENT a• _. SURFACE PROPOSED a \ ' " 2 GRADE / a •• • � ,..3,00o PSI �\ \ CONCRETE41. • \ A 1/2" PREFORMED BITUMINOUS JOINT FILLER NOTES: 1. 1/2" PREFORMED EXPANSION JOINT FILLER, BITUMINOUS TYPE, TO BE INSTALLED BETWEEN THE CURB AND ASPHALT PAVEMENT. DEPTH OF FILLER STRIP EQUALS PAVEMENT THICKNESS LESS 1/2". 2. TRANSVERSE JOINTS 1/2" WIDE SHALL BE INSTALLED IN THE CURB 20 FEET APART AND SHALL BE FILLED WITH PREFORMED BITUMINOUS -IMPREGNATED FIBER JOINT RECESSED 1/4"IN FROM FRONT FACE AND TOP OF CURB. 3. EXPANSION JOINTS THRU AND ADJACENT TO THE CURB SHALL BE INCLUDED IN THE UNIT PRICE BID FOR CURB. MOUNTABLE CURB DETAIL n SCALE: NOT TO SCALE kC.7.91 LLJ LLJ Q) r- L J ( � cj:� _�j LL- Q CLL w �o O � Cn o I--- LLJ oo w Q LL1 a w CL o N N W o Q �= oc w o N o W W EL n� N ►''� o: SHEET NO. moo ,• c.� wo= c3 /� V/ M •� Q W V) Z J Z 'sy C. 7.9 VARIES TO TIE TO 4.00 VARIES TO HE TO FINISH GRADE FINISH GRADE NOTE: (1) USE PENSACOIA BERMUDAGRASS AS VEGETATED COVER (2) USE WOVEN PAPER NET AS CHANNEL LINER VEGETATIVE FILTER DETAIL n SCALE: NOT TO SCALE 2,-of, INVERT < s LIGHT DUTY INLET GRATE INVERT NOTES: (1) ALL CONCRETE TO BE 3,000 P.S.I. (2) ALL CATCH BASINS MORE THAN 3'-6" IN DEPTH SHALL HAVE STEPS 12" ON CENTERS. (3) ALL PIPE IN STORM DRAIN STRUCTURE SHALL BE STRUCK EVEN WITH THE INSIDE WALL, GROUTED, AND BRUSHED SMOOTH. (4) 4'-0" BOX TO USED FOR STORMWATER PIPES 12"-24" AND 5'-0" BOX TO BE USED FOR STORMWATER PIPES GREATER 24" IN DIAMETER. STANDARD STORMWATER YAF DETAIL scnLe: NOT TO SCALE .7.+ HUB END ON C END SEC SPIGOT E INLET END SE( X I STEEL BA AL 3'-0" EXIST. GRADE MIN. 6" LAYERS OF HAND PLACED COMPACTED BACKFILL SEE SPECIFICATIONS PROVIDE UNIFORM AND CONTINUOUS SUPPORT OF PIPE BARREL BETWEEN BELL HOLES FINISHED GRADE AL VARIES rzA, 1/0, A H D P E - NOTES: 1. SOIL FROM TRENCH SHALL BE PLACED TO ENSURE RUNOFF WILL RETURN TO THE TRENCH. 2. GROUND COVER ABOVE TOP OF PROPOSED WATERLINE SHALL BE A MINIMUM OF 3'. BEDDING FOR CLASS "C" HDPE PIPE DETAIL n SCALE: NOT TO SCALE C.7.1 PLAN VARIES NATURAL • ` >t .. ... LAYER OF FILTER FABRIC NOTE: MINIMUM H = 2/3 PIPE SECTION B--B GENERAL NOTES: 1. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER. 2. SIDEWALLS SHALL EXTEND UP AS SHOWN ON THE PLANS BUT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER. 3. THERE SHALL BE NO OVERFALL FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIP RAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. 4. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. 5. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. 6. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED. to RIP RAP APRON REQUIREMENTS OUTLET # CLASS L W THICKNESS D5o/WEIGHT CO--1 1 8' 6' 24" 5-200 LB. CO-2 A 4' 6' 12„ 2"--6" CO-3 B 6' 6' 18" 5"-15" CO-4 A 4' 6' 12" 2"--6" 1 B BASIN 2 10' 10.5' 36" 25-250 LB. 113 BYPASS 1 8' 10.5' 24" 5-200 LB. 1 C (BASIN & BYPASS) B 6' 7.5' 18" 5"-1 5$1 1 C SWALE A 8' 10' 12" 2"-6" 1 D-CC A 4' 6' 12" 2"--6" 1 D-2 A 4$ 4' 12" 2"-6" RIP RAP APRON FOR FLARED END SECTION DETAIL n SCALE: NOT TO SCALE .l.i INFILTRATION P9 A C%l A i BY-PASS LINE FROM DRAINAGE AREA BY-PASS LINE IA![`TA! + SOLID _E COVER MARKED SEWER' NOTES: (1) THICKNESS OF CONCRETE TO BE 6" UNLESS OTHERWISE STATED INSTALL SOLID MANHOLE COVER MARKED 'STORM SEWER' e-.. A A A v►tim: INV. IN: C BYPASS LINE INV. OUT: E INFILTRATION BASIN SUMP: F 12" WASHED A.B.C. BOTTOM: G BASIN INVERT ELEVATIONS A B C D E F G 1 B 28.00 26.50 21.81 23.22 21.81 21.00 19.50 1 C 16.00 14.25 12.11 12.00 12.11 11.00 9.50 STORMWATER BY-PASS BOX DETAIL SCALE: NOT TO SCALE 9& 18" 3"_ OR 2" B.C.B.0 r f7 � GENERAL NOTES: 1. 1 1/2" OF I-2 AND 4" OF A.B.C. TO BE USED IN PARKING AREAS. 2. 1 1/2" OF 1-2 AND 6" OF A.B.C. TO BE USED FOR PRIVATE DRIVES. 3. ALL CONCRETE TO BE 3600 P.S.I. 18" VERTICAL CURB DETAIL SCALE: NOT TO SCALE '' :p, E9N t,\ 0 T c 0 co � Q" U Z O 0 �^' o W N 4-+ .c n � m 0 o u. i z o c oa 0 v) 0 'v a rn v LLJ Lid Or Z C� -,j p cl" (-� --- oz Lois W Q p j � � C� o o OC LLJ Ld o C.)� w � C)W ..� QD F-- co N N © N N W V o: c o_ Cl O N o w w N M ce SHEET NO. C.7.10 o � � ui L 8 N V W W to W V z o Z V) v; Wp � J . Qom_ " :y N • N s QWV) S1. j O of 0 4" CONCRETE SIDEWALK CONCRETE SUPPORT BLOCK AFFIXED TO CONC. CHANNEL WITH TYPE 'S' MORTAR (3N'X6"X5') f., 4" GRAVEL #4 REBAR 0 a 1)" n t, NOTE: ALL CONCRETE SHALL ACHIEVE MINIMUM 28--DAY, YIELD STRENGTH OF 3,000 PSI 2» F PLAN 3.500 PSI CONC. f;" 5' . 12" (TYP.) A: ,A . A 2" MIN. (TYP.) #4 REBAR @ 12" O.C. HORIZ. SECTION---A--A CONCRETE _SIDEWALK BRIDGE DETAIL SCALE: NOT TO SCALE C.7.11 4L MANHOLE F EXPANSION /CONTRACTION JOINT 1200) , f 1" (25) BATTER 0 0 cn PAVEMENT P.C.C. qJRB TYPE 8" UPRIGHT CONCRETE CURB DETAIL � SCALE: NOT TO SCALE C.7.1 I E GENERAL NOTES4. CHAMFER ALL EXPOSED CORNERS 1". USE CLASS "B" CONCRETE THROUGHOUT. OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR _.y #4 0AR DOWELSAT 12t' CENTERS AS DIRECTED SY TIE ENGINEER. co USE FORMS TO CONSTRUCT THE BOTTOM SLAB. PIPE IS SET IN BASE SLAB OF B+OX, IF REINFORCED CONCRETE ADD TO BASE AS SHOWN ON STANDARD NO. 840.00. PROVIDE ALL JUNCTION BOXES OVER 3'-6" IN DEPTH WITH STEPS 12'` ON CENTERS IN ACCORDANCE WITH STD. NO, 840.66. y� tt 3f= 3 4-- ADJUST THE STEEL, CONCRETE AND BRIG MASONRY QUANTITIES TO INCLUDE THE :ADDITION OF THE MANHOLE (I.E. DIAGONAL BARS 40.64 SHORTENED AROUND OPENING IN TOP SLAB, ADDITIONAL VARIABLE FOR MANHOLE COVER & FRAME 144 BARS A" HEIGHT SRIDK MASONRY, 4PENI 0 IN TOO SLAB. ) 6 OPTIONAL SPACED MAX. DEPTH OF THIS STRUCTURE FROM TOP OF BOTTOM SLAB TO TOP C. TO C. ELEVATION IS 12 FEET. BRICK MAY BE USED •-- TO ADJUST FRAME & S'f _ COVER TO SURFACE ELEVATION MAX. 1' za . 14 ft :: ,...-. OUTLET PIPE r r t. T PIPE' SECTION X- „jf SEE NOTE,.-_ F30WEL SECTION Y-Y #4 BAR L�I DOWEL DIMENSIONS AND QUANTITIES FOR CONCRETE JUNCTION BOXES DIMENSIONS OF BOX AND PIPE REINFORCEMENT BARS "A"DIMENSIONS TOP SLAB CUBIC YARDS IN Box TOTAL QUANTITIES BOX AND SLABS DEDUCTIONS FOR ONE PIPE CU.YDS. PIPE SPAN WIDTH HEIGHT D A B H NO. LENGTH E F TRIP SLAB BOTTOM SLAB OLL i FT. OF HT. LBS . REINF CU . YDS. MIN. "H'? R . C 1211 21-Oat 21_Oft '21w3ft 12 2'-9p) S'-O" 3'.of? 0.167 0.167 0.185 22 0.750 0.015 0.024 15ft 21_3tr 2r_3tt 2t_6tt 12 W-01' W-31f 3'-31' 0.196 0.196 0.204 24 0.902 0,023 0.036 18" 2 _ 611 21- 6" 21. 911 14 31 - 311 31- 6 it 3f _ 6 tf 0.227 0.227 0.222 30 1.065 0.033 0.049 2401 3'-fl�'.r 3t_Off 31M3ff 16 3'w8f# ,fit_Ott 41�Oft 0.296 0.296 0.259 40 1.434 0.059 �.08J 3O" 31-6,f 3f_6f1 3f_ ff 18 4t-3tf 4f_6" 41_6ft 0,375► 0.376 0,296 51 1.860 t 0.092 0.127 3611 41- O#r 41 � 0 t1 4?. 3 f' 20 4f „9,1 5t ,, 1 51- Olt 0.463 0.463 0.333 64 2.341 0.132 0.178 42 ft 41,0601 - 611 41 41 * 91t 22 5-3" 5t - 611 51 _ iil; 0.560 0.560 0.370 77 2.878 0.180 0.243 48 It 5 t - 4 f,► t fr 5 _ 4 f fr 5 .3 26 t S . 3f1 t 6 - 4tt 1 � 6 .4 0.743 0.743 0.407 111 3.6.23 0.236 0.317 541' St -loll S'-10" 5f-9't 28 6f-711 6r_1Cft 6f-ioll O.S66 0.866 0.444 126 4.283 0.297 0.401 601, 61. 6 fr 61- 6 t► W - 3 ft 30 7t - 3 ft 7f to 7' - 5" 1 .042 1.042 0.481 145 5.09 D 0.367 0.495 8611 71-.111 71-1" 61-9f' 32 71-101 8'-'�" 8'_1t1 1.210 1.210 O.S18 189 6.917 1 0.444 1 0.589 CONCRETE. JUNC ]ON OX-LB) DETAIL r37� SCALE: NOT TO SCALE C•7•11 SECTION A -A A -*J TOP VIEW ISOMETRIC VIEW r� FRONT VIEW STANDARD CURB CUT DETAIL �1 SCALE: NOT TO SCALE 11,1 VARIES 3i 3 SLOPE 1 /4" PER c; 1 �ppE S FT. FROM R.O.W. 3 MIN. APPROVED COMPACTED 4" SELECT FILL COMPACTED TO 95% OF STANDARD PROCTOR SUBGRADE SECTION 4" AIR ENTRAINED CONC. 3,000 P.S.I. CAD 28 DAYS NOTE: TRANSVERSE EXPANSION JOINTS 1 /2" WIDE SHALL BE PROVIDED AT INTERVALS OF NOT MORE THAN 20 FEET AND FILLED WITH PREFORMED BITUMINOUS CELLULAR TYPE JOINT FILLER. CONTRACTION JOINTS SHALL BE PLACED ON 5 FEET INTERVALS. LONGITUDINAL JOINTS 1 /4» WIDE SHALL BE PROVIDED BETWEEN CURBS ABUTTING SIDEWALKS, AND SHALL BE FILLED WITH PREFORMED BITUMINOUS TYPE JOINT FILLER. THE TOP OF ALL JOINT FILLER SHALL BE 1 /4' BELOW THE TOP OF THE SIDEWALK. SIDEWALK DETAIL DETAIL r4 SCALE: NOT TO SCALE 1C.7.11 RESPREAD 4" TOPSOIL AND STABILIZE FINISHED FLOOR ELEVATION (TYPICAL ALL DISTURBED AREAS) CONCRETE DRIVEWAY 24" CONCRETE VALLEY CURB --1 HOT MIX PAVEMENT FINISHED FLOOR ELEVATION `- COMPACTED PAD GRADE PAD GRADING DETAIL DETAIL r�5 SCALE: NOT TO SCALE C.7.11 NA TYPICAL CONCRETE APRON DETAIL DETAIL s SCALE: NOT TO SCALE CJ.11 COMPACTED PAD GRADE SWALE NOTE: CONTRACTOR TO MAINTAIN POSITIVE DRAINAGE IN DOUSE PAD AREAS AND THROUGHOUT PROJECT AT ALL TIMES. W CL- V a LLij � (J -) LL.1 � p v 0 Q � o W � Q p W �J \ J J a. i-- Q N r N W Vs R- Q. w 13. EO w a a � N M SHEET NO. C. 7. % 1 CONTOUR LINES 7" w 0 6" � VAR. SLOPE NOT w 1 5" V_ TO EXCEED 12:1 tV 4" BACK OF CURB 3" 2" 1" Oto—A N, I, 4'-0" _ (,0 VARIABLE j. 4'--0" _ I FACE OF CURB LAN FOR MIDDLE OF BLOCK 4'-0" ..-..1 FULL CURB B.O.C. ELEV.— — �--- F.O.C. =ELEV. � GUTTER LINE FI FVATION OF CURB DROP HANDICAP RAMP IN SIDEWALK DETAIL __.rl"� SCALE: NOT TO SCALE C.7.1 18" GUTTER i 21*- 1 6" ct'\o I %_ 4" WHITE PAINTED STRIPES Li 9'-0" O.C. 1 .0 9'-0" O.C. 5'-0" O.C. PARKING STRIPING DETAIL SCALE: NOT TO SCALE ON TOP & BOTTOM RAIL USE RAIL COUPLING APPROX. EVERY 20' EXPANSION COUPLING EVERY 100' INTERVALS. BOTTOM AND TOP RAIL KNUCKLED SELVAGE 1-1/4" NORM. PIPE SIZE 10'—O" MAX. (1.380" I.D., 16.60" O.D.) No 2.27 LBS. /FT. END, CORNER & INTERMEDIATE PANEL TIES ® 24" MAX. SPACING TOP & BOTTOM 2" VINYL COATED FABRIC NO. 6 GL WIRE PLACE ON THE OUTSIDE END & CORNER POST, 2-1/2" NORM. PIPE SIZE 300 o (2.469" I.D.o 2.875" O.D.) 579 LBS/FT.CD to w I g 1 /4" x 3/4" FLAT STRETCHER BAf w 1 ar. C- 5-1/4" x Ve BANDS & STRETCHER BAR AT END & CORNER POST ( �j N 31W 0 TRUSS ROD THREADED 1301H ENDS N d- < BAR AT END & CORNER POST 1" TRUSS ROD CONNECTOR .r w 30" 391- 1111 " 2" WASH ' (TYP.) I .r CONCRETE FOOTING TRAFFIC ARROWS g"� >: •1 12"� NOTE; ALL POSTS, RAILS FlrnNGS tD LINE POST SHALL BE RESIN CLAD. DETAIL 2" NORM. PIPE SIZE (2.067" I.D., 2.375" O.D.) SCALE: NOT TO SCALE 3.65 LBS. /FT. 4' & 6' HIGR-NINYL CLAD CHAIN- LINK FENCE DETAIL r4 SCALE: NOT TO SCALE kC. 7.1 EDGE OF EXISTING PAVEMENT 0 O. N NEW ASPHALT PAVEMENT EXISTING ASPHALT PAVEMENT z T 10, ¢ z 3 w BUTT JOINT 0 w 0 � w NOTE: cn z c ALL EXISTING PAVEMENT SHALL BE CUT OFF SQUARE IN w cw� w ORDER TO RECEIVE THE NEW ASPHALT PAVING. THE SQUARE CUT SHALL BE MADE AS FAR BACK FROM THE EXISTING EDGE OF PAVEMENT AS REQUIRED TO FIND A SUITABLE BUTT JOINT EL. 30.46' TO BE MADE. NEW PAVEMENT SHALL BE FEATHERED AND ;jil IEEE, WEDGED TO FORM A SMOOTH TRANSITION AND AS DIRECTED BY THE ENGINEER. INV. 26.05' 1' 1' . NEW PAVEMENT EXISTING PAVEMENT BASE COURSE MgMBASE COURSE JOINT SHALL BE SEALED WITH BITUMINOUS LIQUID TACK COAT, TYPICAL BUTT JOINT DETAIL SCALE: NOT TO SCALE C.7.1 0 tr HWY 210 ROAD SECTION A —A DETAIL SCALE NOT TO SCALE 60' A" x&n wrr- V% A 1►/•f" [1TRIP1r R=3bi W, '-•3" •� -- R=2'--3" PAINT STRIPE ISLAND DETAIL SCALE: NOT TO SCALE 1'-0" 6' 2" SIGN MAY BE ORDERED FROM: C&D SAFETY 4th AVE. N NASHVILLE, TN. PH. 615-255-2717 2"/2"/.188 STL. TUBE ---m EXTENDED INTO CONC. FILLED PIPE 2'-0" PROVIDED WELDED WATERTIGHT CAP. PAINT P.&L. #6118 BLACK COFFEE. PAINT PIPE BASE YELLOW---o- 8" DIA STD PIPE FILLED ---''� W/ CONC. PAVEMENT a #6-14" LONG BARS EA. WAY THRU PIPE 1 -6"CONC. BASE HANDICAP SIGN DETAIL SCALE: NOT TO SCALE VARIES WHITE PAINT STRIPE STOP BAR DETAIL r7 SCALE: NOT TO SCALE •7•1; Q 0 0 ES 1'-6"/1'-0"/.080 STANDARD ALUM. HANDICAPPED PARKING SIGN TO READ: "RESERVED PARKING" WITH IDENTIFICATION SYMBOL. BOLT TO STL. TUBE WITH 3/8 CADMIUM PLATED NUTS, BOLTS, & WASHERS. 12" o. to1 /2" 1 /2" I icy t� 00 w N 2" 2" 2" 1/2 " 1 1 /2" 6" 4" 0 T_ N w = o CL I Z m Z < tL Z CL 0 Q _j C� O u- Q W Q Z w Z w0 3 W z w w 0 w U- 0 © '� w o o 0 a. w t� z CL o- v-i o 0 a of m m xi w I. wfill 0-w F 0 ate. cmn c� INV. = 25.51'� (� mil HWY 210 ROAD SECTION B—B DETAIL i SCALE: NOT TO SCALE EXISTING DITCH 1 /2" 1 /2" ;o 0 0 __T 3" 6" 3" co M NOTE: THE DETAILS SHOWN HERE ARE FOR MINIMUM DESIGN ONLY. COORDINATE W/ STATE & LOCAL CODE, THE STRICTEST SHALL GOVERN 22" CONSTRUCTION. PLANTING STRIP CROSSWALK DETAIL SCALE: NOT TO SCALE TAPER SIDEWALK TO VALLEY CURB e ::•: ; : ; SIDEWALK y. 24" WHITE CROSSWALK LINE 24" GAP _F --►I 10' MIN. WIDTH I-�— 0 U c 0 U tV a. rn 0 N L. r 0 ca N � ca U c o ci Qi � wow N m �J m o o M � Q a O m U 03 U '--- PROPOSED SIDEWALK VALLEY CURB 1.5" S9.5 B (FOR ALL WORK WITHIN NCDOT RIGHT OF WAY) 2" S9.5 B SURFACE COAT 3" 119.0 B INTERMEDIATE COURSE 5" B25.0 B BASE COURSE -��1�III III III 111=�=�T COMPACTED SUBGRADE UPPER 8" 1=1�=III=III-IIHII=III-� COMPACTED OF 98% STANDARD PROCTOR MAXIMUM DRY DENSITY. �ASTM 698) FlLL —MAXIMUM 8" LIFTS AS REQUIRED MATERIALS SHALL MEET THE REQUIRED SECTIONS OF THE N.C.D.O.T. STANDARD SPECIFICATION- FOR ROADS AND STRUCTURES. ASPHALT PAVEMENT IN DOT ROW DETAIL --- ,z SCALE: NOT TO SCALE W .� -_j -- W uz Lljcocit pU Q W Q Q J w z Q. �LJ W W Q z o � � � rr U � w Q„ h i SHEET NO. C. 7.15 h Ntw w CN � d W W zo c OU. CJ DD IVi,J Y V)j Zcr_ �0 i� ©w cn Q w zW �ir LEGEND 4 Tli )[V) EXSTING PROPOSED FUTURE — — -- — ROW LINE/PROPERTY LINE — — SANITARY SEWER —ss —ss —ss '^ SEWER FORCE MAIN _FM —FM —rnf v — "' _ WATER LINE v --- EVTR3— _ CULVERT/ STORM PIPE — — __-- — STREAM/DITCH TOWN OF SURF CITY - SEDIMENT FENCE SF SEWER MANHOLE OO PENDER NTY N UTILITY EASEMENT COU 0RTh C AR LI N _ 0 A PLUG VALVE/GATE VALVE N BLOW —OFF BO OWI.INER � + o FIRE HYDRANT ASSEMBLY DCNC NORTH CAROLINA I, LLC , - OEIP EXISTING IRON PIPE 2528 INDEPENDENCE BLVD., SUITE 104 Q EMN EXISTING MAGNETIC NAIL WILMINGTON, NORTH CAROLINA 28412 �Q EPK EXISTING PARKER—KALON NAIL (910) 790-9880/(910) 790-8759 (fax) .r q* 0 EXISTING PROPERTY CORNER LIMITS OF DISTURBANCE-�-�-�- ENGINEER �uN�T�oN BOX ��8, rr YARD INLET (YI) 0 HF AGES Arr CAVANAUGH ANDASSOCIATES, P.A. BYPASS BOX (BP) BP 130 ,NORTH FRONT STREET, SUITS 202 CATCH BASIN/CURB INSET (CI) �• WILMINGTON, NORTH. CAROLINA 28401 � -. � u - BOX��'�`� (910) 392-4462/(910) 392-4612 (fax) EXISTING MAJOR CONTOURS — EXISTING MINOR CONTOURS ---- --- � ----- ----- PROPOSED MAJOR CONTOURS +o SURVEYOR PROPOSED MINOR CONTOURS - -- RIP RAP CHARLES F. RIGGS & ASSOCIATES, P.A. INFILTRATION BASIN (TREATMENT AREA) 202 WARLICK STREET �77I WETLANDS P.O. BOX 1570 �`—_ VEGETATIVE FILTER JACKSONVILLE, NC 28541-1570 G� �1 BIO—R F NON AREA ED FLOOR ELEVATION NITORING WELL (910)455-0877 ISH � �P�` �SDRAINAGE AREA BOUNDARY --------- FFE v PLANNER HADENSTANZIALE � M SHEET INDEX 3807 WRIGHTSVILLE AVE. OVERALL C.3.1 OVERALL SITE PLAN SUITE 24 SITE C.5.0 PHASE 1 & 2 OVERALL STORM WATER PLAN `'. � f� � C.5.1 PHASE 1 OVERALL STORM WATER PLAN WILMINGTON, NC 28403 Z PHASE 2 ATLO PON C.5.2 PHASE 1 STORMWA-DER PLAN DRAINAGE AREA 1B �� � Roar C.5.3 PHASE 1 STORM WATER PLAN DRAINAGE AREA 1C 910 791-8383 ° � ° �' PHASE„ 1 Z C.5.4 PHASE 1 STORM WATER PLAN DRAINAGE AREAS 1A AND 1D APPROVED TH CAROLINA ENVIRONMENTAL PENDER COUNT' - C.5.5 PHASE 2 OVERALL STORM WATER PLAN ` MANAGEMENT COMMISSION NORTH G'AROLINA NC HIGHWAY 210 � C.7.7 PHASE 1 STORRMWATER INFILTRATION BASINS 1A-1, 1A-21 � DIVISION OFWATER QUALITY 1 Q— j, & 1 D-1C.7.8 INFILTRATION BASINS 113, 1 C, & 1 D-2 DETAILS 10 ZGC7 VICINITY MA P C.7.9 STORM WATER GENERAL DETAILS 1 C.7.10 STORM WATER GENERAL DETAILS 2 PHASE 1 SPECIFICATIONS FINAL DESIGN NOT TO SCALE C.7.11 STORMWATER GENERAL DETAILS 3 BEFORE YOU DIG ! NOT RELEASED FOR CONSTRUCTION CALL 1-800-632-4949 DISTURBANCE ACRE4GE 37 •"'""'""'',ti9 oloo N.C. ONE —CALL CENTER PROPOSED LOT COUNT ,:�oN`�FEs��'��•. A r Au ITS THE LA I� • �I�� SINGLE FAMILY 71 Q SE L 2 FEB 15 2007 - 032 91 Sohiti'ons through integrity and partnership .F' INDWQE �'�.' Sl�BCXoC�UB F'ICICJ ���''%cs. T0�'�.�•`'�,� ROJ # �,,,,,,,,,,,,,,,�� DATE: FEBRUARY 13, 2007 PROJ. NO.: 041.05.043 1� q 9G �yFF k Is, GAFF SAP P°p p\ 9 tiiY qp0 op o z�Fy Go o c o SsQYF� �F�' !O D OgcQ ��4�S �° q �,4 PS F Y �S 6 T2°S!� Fy f'd x ?Q9 o • cos'? A �1 `�Ss; FgT�FTA�I r 0s A�p \ 0 2AF� Q<F °�\ / 9 T T �°S 2O°� TF i`Z O �v • Q- "� 50 ��� � ��a AF�F o�ti• F 9S 0, / N 2 p 306 y NOW OR FO MERLY NOW OR FORMERLY NELLIE AA ORE GLORIA J. DEARMAS & D.B. 456, . 216 NORMAN E. SHEPPARD NOW OR FORMERLY CFR Z° Oy` R!D.B. 997, P. 140 GLORIA J. DEARMAS & NORMAN E. SHEPPARD D.B. 997, P. 140 .6, F,pIY O 20N o �o NOW OR FORMERLY SALLIE BRAGG BATTS !S D.B. 214, P. 96 12 11 t3 1 10 / 2 9 3 8 4 8 T to 1T 18 18 't? 22 PHASE 6 23 xa zs �11 � 28 3 2 28 27, /t 3f 0 �In \ / pFTTi0n' 404 WETLANDS • ,i .Y C (,mil �,_ )� is IVA,® Q f ♦ ® .L -IFM \ � • i1 NOW OR FORMERLY Ftoo� ��NE PRESTON C. KING, III & "•"2+...•,,,,, WIFE JOYCE RENEE KING D.B. 1492, P. 287 U 51 NOW OR FORMERLY EMMETT SNIFF D.B. 810, P. 125 M.B. 4, P. 55 is Q PHASE 2- LOT LEGEND A - DAMD WiLSON JUSTICE, SR. - D.B. 1522, P. 118 M.B. 32, P. 132 8 - STEPHEN ROSS JUSTICE, JR. & WIFE, - D.B. 2347, P. 72 PAULA DENISE JUSTICE M.B. 32, P. 132 C - JOHN MARK SALDRIDGE - 0.6. 2368, P. 145 M.B. 4, P. 55 D - MYRA T. ROCHELLE do HUSBAND, - D.B. 747, P. 166 JAMES L. ROCHELE, JR. M.B. 25, P. 58 E - OSTON G. HARDISON & WIFE, JAQUELINE 0. HARDISON - D.B. 754, P. 755 IF- OSTON G. HARDISON & WIFE„ JAQUELINE 0. HARDISON - O.B. 724, P. 61 G - OSTON G. HARDISON & WIFE, JAQUELINE D. HARDISON - 0.8. 724, P. 61 H - OSTON G. HARDISON & WIFE, JAOUELINE DENISE HARDISON - 0.8. 913, P. 192 1 - GLORIA J. DEARMAS - D.B. 677, P. 48 2 , on Oy �� rn z W o „y G� NOW OR FORMERLY WOODY L. ATKINSON D.B. 661, P. 238 ' NOW OR FORMERLY SHEILA ATKINSON SLATER D.B. 730, P. 31 M.8- 22, P. 35 'Zoo'o 73CP, 1 � B. 22, P, 35- J L18 �v ® o� � t LINE TABLE LINE LENGTH BEARING L1 182.79 N30026'26"E L2 1512.41 S54°56'53"E L3 568.02 S54e56'53"E L4 316.70 N31 °33'02"E L5 92.23 S73°05'55"E L6 85.98 S47°19'06"E L7 153.11 S43e5744"E L8 108.14 S63048'09"E L9 159.23 S26e20'42"E L10 192.24 S18e2829"W L11 126.20 S03e53'36"W L12 177.53 S39e06'38"E L13 339.50 S11 °48'51 "E L14 360.00 S11 °51'53"W L15 337.35 S42026'20"E L16 135.83 N87049'08"E L17 125.75 S07e26'34"W L18 69.34 S57e37'39"W L19 114.82 S06024'26"E L20 81.51 S21 °42'54"W L21 92.63 S03°08'25"E L22 41.10 S64027'58"E L23 52.64 N80°44'44"E L24 31.86 N23°3452"E L25 93.33 N58026'04"E L26 78.04 N89033'12"E L27 60.18 S18e57'07"E L28 53.83 S23e2847"E L29 32.79 S16*10'39"W L30 71.19 S25006'15"W L31 77.81 S09 °46' 45"E L32 32.42 S70e15'23"E L33 114.58 S15039'47"W L34 43.85 S13e30'41"W L35 49.36 S15e40'24"E L36 96.02 S06°1659"W L37 101.37 S69°39'30"W �--- PHASE 1 (43 SINGLE FAMILY LOTS) NOW OR FORMERLY WOODY L. ATKINSON D.B. 661, P. 240 M.B. 22, P. 35 SCALE: 1" = 300' 300' 0 300' SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. LINE TABLE LINE LENGTH BEARING L38 108.06 S64029'14" W L39 51.61 S03004'12"'W L40 98.66 S27°33'21 "'W L41 52.08 S19 048' 36"E L42 76.26 S48021'53"'W L43 25.20 S64e28'34"E L44 69.24 S42015'41 "E L45 44.93 S35°17'54"E L46 39.65 S39e43'45"E L47 132.30 S53°52'24"'W L48 298.01 S88°15'17" W L49 238.87 S85°16'22"'W L50 500.95 N21 °51'21 "W L51 393.64 S68938'59"'W L52 53.03 N23e22'26"'W L53 231.25 S66°37'34"W L54 2886.38 N36e39'27"'W L55 100.57 N 36 °39' 26" W L56 1105.91 N36°38'53" W L57 210.60 N36038'53"W L58 758.66 N34°54'16"E L59 89.55 S61 e27' 26"E L60 192.09 S49055'00"E L61 216.37 S53e52'43"E L62 229.97 S43e49'29"E L63 372.90 N30037'30"E L64 906.62 N49°13'00"W L65 100.00 N49°1 SOO"W L66 100.00 N49016'36"W L67 129.40 N4902554"W L68 200.00 N49009'45"W L69 123.31 N64019'30$1E L70 129.71 N64005'27"E L71 790.52 S49e08'57"E L72 503.60 S49e11'57"E L73 128.14 N 30e37' 30"E NOTE: TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND ASSOCIATES, P.L.S.# L--2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. 0 c z c 0 0 CV v m 1D 0 LL O z O GM n: O Q U L Li III z � { ct:� f cr-cr O Z ( / p L.v o u � w W CL �1 I-- 0 N Z � ct � w 4 , cr- SHEET N0. C.3.1 N o N � � " Q O Lail co P� o co .�� t� cr- .. W 4• Q © U to -� `,,♦ttitttitili/+J+++,,tt', o �` F- e v S. � /Qy {off _ avo � �•= Q in F'- M' - ° N • �.,, W N ... �1 W V)IZ a 13� o • s YC� O IL � 0000 \ 8 1 . e I PHASE 2 SEE SHEET C.5.5 (ALL RUNOFF FROM PHASE 2TOBE DIRECTED TO BASIN B) 3'y ' Yw - 1. r, • • Y r,_ 5' WALKING PATH f ; INFILTRATION f t BASIN 1D-1 a - SEE SHEET C.5.4 4 V 5 t 28 EEYt�AND --- 41 30- 28 z7 PROPOSED 10' 4a � f` EASEMENT "TYP) / f INFILTRATION BASIN 1 C -SEE SHEET C.5.3 11 SANITARY SEWER r. j Cl w. PUMP STATION PROPOSED 20' j EASEMENT TYP T C-3 C� 36 P 5 - t INSTALL CONCRETE -, .. �� �'� DRIVEWAY APRON 404 q , FOR ACCESS TO `� �00 -� �� _� � WETLANDS _ 3 z LODGEHALL RD. { { ` Y, .5 h� o , , i , �.- INFILTRATION : BASIN 1 B SEE SHEET C.5. a t „ r i Zi -30 - lNFILTRAON BASIN 1 A-2 - • F +, SEE SHEET C.5.4 x tiix } PROPOSED 49.5 LF ALUMINUM FUTURE r I f .1 COMMERCIAL AREA BOTTOMLESS CULVERT TO MATCH EXISTING BOTTOM ELEVATIONS.--30 SEE DETAIL ,1 o ^co \ v , C 7 9 jam. fi,t o --ENTRANCE TEMPORARY CONSTRUCTION EXISTING�ORT PATH `, ��(r/o� c� UNNAMED JURISDICTIONAL�' STREAM TO BECKY S CREEK _ 1 _. 'F I 3 INFILTRATION BASIN 1 A-3 F' 1 INFILTRATION BASIN 30 SEE SHEET C.5.4 AREA 1 A-1 ' • ' - 30 SEE SHEET C.5.4 NC HWY 210 \ \ -- � (APPR)X. 60' ROW) PROPOSED PHASE 1 8c 2 S TO R-M WATER PLAN GENERAL NOTES: (1) TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND ASSOCIATES, P.LS.# L-2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. (2) ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN FIELD APPROVED BY THE ARMY CORPS OF ENGINEERS ON NOVEMBER 23, 2005 (FINAL APPROVAL PENDING). (3) CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES BEFORE COMMENCING CONSTRUCTION. (4) CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS GENERATED THROUGH DEMOLITION AND GRUBBING ACTIVITIES SHOWN. (5) SEDIMENT FENCING TO BE AT THE LIMIT OF DISTURBANCE FOR THIS CONSTRUCTION SITE, AT FEAST ONE FOOT (1') FROM WETLANDS (6) CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. INTERVALS ALONG SEDIMENT FENCING. (7) ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 CALENDAR DAYS OF GRADING ACTIVITIES. (8) WATER, SEWER, AND STORMWATER PIPES TO BE INSTALLED IN TRENCHES ACCORDING TO STANDARD SPECIFICATIONS AND DETAILS ON SHEET C.7.10. (9) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS SHALL BE LAID AT LEAST TEN (10) FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A TEN (10) FOOT LATERAL SEPARATION -- IN WHICH CASE: (A) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION ON THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER; OR (B) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN(18) INCHES ABOVE THE TOP OF SEWER. (10) .CROSSING A WATER MAIN OVER A SEWER. WHENEVER THATETHERY FOR BOTiOMAWATER MAIN OF THE WAT'ERTMAINOISSATVER A LEASTSEER, THE EIGHTEEN (18) WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION INCHES ABOVE THE TOP OF THE SEWER, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT AN EIGHTEEN (18) INCH (SEPARATION --- IN WHICH CASE, BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE CROSSING. (11) CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE POINT(S) OF CROSSING. A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. I SCALE: 1" =100' 100' 0 100' SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. (12) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" SEPARATION FROM BOTTOM OF STORMWATER PIPE AND TOP OF SEWER PIPE. (13) ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS TO BE DIRECTED TO RIGHT--OF--WAY, OR TO YARD INLET (OR OTHER STORMWATER COLLECTION DEVICES) FOR EVENTUAL DISCHARGE TO INFILTRATION BASIN. (14) FOR MAXIMUM ALLOWABLE BUILT -UPON AREA PER LOT SEE TABLE 5.1 ON SHEET 5.1. AND TABLE 5.5 ON SHHET 5.5. (15) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS DOES NOT INCLUDE ANY RUNOFF FROM IMPERVIOUS SURFACE ASSOCIATED WITH THE FUTURE COMMERCIAL AREA. A PERMIT MODIFICATION WILL BE NECESSARY PRIOR TO CONSTRUCTING ANY ADDITIONAL IMPERVIOUS SURFACE. (16) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SEDIMENT & EROSION CONTROL PLAN APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. (17) ACCORDING TO THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973 (NORTH CAROLINA GENERAL STATUTE 113A 51-66) THIS PROJECT IS SUBJECT TO AN APPROVED SEDIMENTATION AND EROSION CONTROL PLAN. THE CONTRACTOR SHALL ADHERE TO ALL OF THE CONDITIONS SET FORTH IN THE APPROVED PLAN, AS PRESCRIBED BY NCDENR. A COPY OF THE APPROVED SEDIMENTATION AND EROSION CONTROL PLAN SHALL BE DISPLAYED AT THE JOB SITE AT ALL TIMES. (18) ALL FITTINGS TO BE MJ DIP WITH THRUST BLOCKING UNLESS OTHERWISE NOTED ON PLANS. (19) EXCELSIOR MATTING AND SEEDING TO BE USED ON SLOPES STEEPER THAN 2:1. SOD SHALL BE USED FOR ALL SLOPES FLATTER THAN 2:1. (20) FINISHED FLOOR ELEVATION (FFE) IDENTIFIED ON THE PLAN IS INDICATIVE OF COMPACTED PAD GRADE TO WHICH 2"-4" OF TOP SOIL WILL BE ADDED. SEE DETAIL 5/C.7.11. (21) CONTRACTOR SHALL IMPLEMENT TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH M.U,T.C.D. DRAINAGE AREA AREA (ACRES) AREA 1 A-1 0.69 AREA 1A-2 0.38 AREA 1 A-3 0.16 AREA 113 17.27 AREA 1 C 6.51 AREA 1 D-1 0.88 AREA 1 D-2 1.85 TOTAL PHASE 1 & 2 27.73 DRAINAGE AREA PHASE 1 & 2 DRAINAGE AREAS CONSTRUCTION SEQUENCE 1. PERFORM CONSTRUCTION STAKE OUT. 2. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE. 3. CLEAR SITE, BUT DO NOT GRUB. 4. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES. 5. GRUB SITE. 6. CONSTRUCT SEDIMENT BASINS. 7. COMMENCE ROUGH GRADING OF THE SITE. 8. INSTALL STORMWATER MANAGEMENT DEVICES. 9. CONSTRUCT SEWER COLLECTION SYSTEM. 10.CONSTRUCT WATER SYSTEM. 11. ROUGH GRADE THE SITE. 12.SHAPE SHOULDERS AND CUT AND FILL SLOPES. 13.SCARIFY, SEED, FERTILIZE AND MULCH ALL DISTURBED AREAS. 14.INSTALL DRY UTILITIES (ELECTRICAL, FIBER-OPTIC, CABLE, PHONE, ETC). 15.RE-SCARIFY, RE -SEED, RE -FERTILIZE AND MULCH ALL DISTURBED AREA. 16.CONSTRUCT ROADBED BASE COURSE AND INTERMEDIATE ASPHALT COURSE. 17.APPLY FINAL ASPHALT COURSE. 18. AFTER DISTURBED AREAS ARE STABILIZED WITH VEGETATION, THE CONTRACTOR SHALL RETURN TO THE SITE AND REMOVE ALL TEMPORARY EROSION CONTROL MEASURES. N m tLi U N Cti N rn _o w cm rw.+ cn cm L�1 W^ a r c 0) cz r 0 8 0- -� U Z c c 0 0) L ci c 0 a> CD 0 2 LL z o �' 0 U) U 0 06 C0 C 10 W cr- W Q CL ��-- ec N fP ~ U I `� 1 Q v 1 CL Q � � CL LLJ cs� Q N Z F-- � U J v w V ct Q � liJ w SHEET NO. N C) N Z ors. Ld � O Q p ct•• W 0Lu � W 4 � Q U VUj ♦♦♦♦,,,,����ti►�����tiirr��r�L,,,,'' !h 0 `♦v e6�: ii `J LL- eee P ��e `1 c�w` ev3 � (n� �N wN oH_ W � '� e0 L3_ U 'Irj 00000000.0 IO ♦♦♦ PROPOSED 20' EASEMENT (TYP) INSTALL CONCRETE DRIVEWAY APRON FOR ACCESS TO LODGEHALL RD. PROPOSED 49.5 LF ALUMINUM BOTTOMLESS CULVERT TO MATCH EXISTING BOTTOM ELEVATIONS. SEE DETAIL UNNAMED JURISDICTIONAL STREAM TO BECKY'S CREEK INFILTRATION BASIN AREA 1 A-1 SEE SHEET C.5.4 GENERAL NOTES: (1) TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND ASSOCIATES, P.L.S.# L-2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. (2) ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN FIELD APPROVED BY THE ARMY CORPS OF ENGINEERS ON NOVEMBER 23, 2005 (FINAL APPROVAL PENDING). (3) CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES BEFORE COMMENCING CONSTRUCTION. (4) CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS GENERATED THROUGH DEMOLITION AND GRUBBING ACTIVITIES SHOWN. (5) SEDIMENT FENCING TO BE AT THE LIMIT OF DISTURBANCE FOR THIS CONSTRUCTION SITE, AT LEAST ONE FOOT (1') FROM WETLANDS (6) CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. INTERVALS ALONG SEDIMENT FENCING. (7) ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 CALENDAR DAYS OF GRADING ACTIVITIES. (8) WATER, SEWER, AND STORMWATER PIPES TO BE INSTALLED IN TRENCHES ACCORDING TO STANDARD SPECIFICATIONS AND DETAILS ON SHEET C.7.10. �= `t WETLANDS `L1 ; } I INFILTRATION BASIN 1137 SEE SHEET C.5.2 \` .....INFILTRATION BASIN 1 A-2 SEE SHEET C.5.4 Zo 2s 2O / t f 3o FUTURE \ COMMERCIAL AREA _ TEMPORARY CONSTRUCTION EXISTING DIRT PATH��� -. � \ p� ., ENTRANCE (APPROX. 60' ROW) PROPOSED PHASE 1 STOR PLAN DRAINAGE A DTI PHASE 1 SPECIFICATIONS JUNCTION BOXES (JB) 3 YARD INLETS (YI) 1 CURB INLETS (CI) 25 5' X 7' BYPASS BOX 2 151)HDPE SDR 32.5 1,935 L.F. 18" HDPE SDR 32.5 454 L.F. 24" HDPE SDR 32.5 349 L.F. 30" HDPE SDR 32.5 351 L.F. 36" HDPE SDR 32.5 508 L.F. 42" HDPE SDR 32.5 250 L.F. INFILTRATION BASINS 7 RIP RAP ,P ONS 15 LEVEL. SPREADERS 9 (9) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS SHALL BE LAID AT LEAST TEN (12) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" SEPARATION FROM BOTTOM OF STORMWATER PIPE AND TOP OF (10) FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR (13) SEWER PIPE. ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS TO BE DIRECTED TO RIGHT-OF-WAY, OR TO YARD INLET (OR OTHER STORMWATER BARRIERS PREVENT A TEN (10) FOOT LATERAL SEPARATION -- IN WHICH CASE: COLLECTION DEVICES) FOR EVENTUAL DISCHARGE TO INFILTRATION BASIN. (A) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION ON THE BOTTOM OF (14) FOR MAXIMUM ALLOWABLE BUILT -UPON AREA PER LOT SEE TABLE 5.1 ON SHEET 5.1 AND TABLE 5.5 ON SHEET 5.5.. THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER; OR (15) THE STORMWATER MANAGEMENT PLAN DEPICTED THESE SHEETS DOES NOT INCLUDE ANY RUNOFF FROM IMPERVIOUS SURFACE B THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN () ASSOCIATED WITH THE FUTURE COMMERCIAL AREA, A PERMIT MODIFICATION WILL BE NECESSARY PRIOR TO CONSTRUCTING ANY LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION OF ADDITIONAL IMPERVIOUS SURFACE. THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN(18) INCHES ABOVE THE TOP OF SEWER. (16) THE STORMWATER MANAGEMENT PLAN DEPICTED 0I1 THESE SHEETS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SEDIMENT (10) CROSSING A WATER MAIN OVER A SEWER. WHENEV ER NECESSARY FOR A WATER MAIN TO CROSS &EROSION CONTROL PLAN APPROVED BY THE NTH CAROLING DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. OVER A SEWER, THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF (17) ACCORDING TO THE SEDIMENTATION POLLUTION GO1uTROL ACT OF 973 (NORTH CAROLINA GENERAL STATUTE 113A 51-66) THIS THE WATER MAIN IS AT LEAST EIGHTEEN (18} INCHES ABOVE THE TOP OF THE SEWER, UNLESS PROJECT IS SUBJECT TO AN APPROVED SEDIMENTATION AND EROSION CONTROL PLAN. THE CONTRACTOR SHALL ADHERE TO ALL LOCAL CONDITIONS OR BARRIERS PREVENT AN EIGHTEEN (18} INCH SEPARATION -- IN WHICH OF THE CONDITIONS SET IN THE APPROVED PLAN, AS PRESCRIBED BY NCDENR. A COPY OF THE APPROVED CASE, BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND .FORTH SEDIMENTATION AND EROSION CONTROL PLAN SHALL BE DISPLAYED AT THE JOB SITE AT ALL TIMES. WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) (18) ALL FITTINGS TO BE MJ DIP WITH THRUST BLOCKfIG UNLESS OTHERWISE NOTED ON PLANS. FEET ON EACH SIDE OF THE CROSSING. (1 9) EXCELSIOR MATTING AND SEEDING TO BE USED ON SLOPES STEEPER THAN 2- 1. SOD SHALL BE USED FOR ALL SLOPES FLATTER (11) CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER MAIN TO THAN 2: 1. CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED OF 20 () FINISHED FLOOR ELEVATION (FFE) IDENTIFIED ON THE PLAN IS INDICATIVE OF COMPACTED PAD GRADE TO WHICH 2"-4" OF TOP FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE SOIL WILL BE ADDED. SEE DETAIL 5C.7.11. OF TEN (10) FEET ON EACH SIDE OF THE POINTS) OF CROSSING. A SECTION OF WATER MAIN (21) CONTRACTOR SHALL IMPLEMENT TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH M.U.T.C.D. PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. 3 PHASE 1 DRAINAGE AREAS DRAINAGE AREA AREA 1A-1 AREA 1 A-2 AREA 1 A-3 AREA 1B AREA 1C AREA 1 D--1 AREA 1 D- 2 TOTAL PHASE 1 DRAINAGE AREA AREA ACRES� 0.69 0.38 0.16 8.37 6.51 0.88 1.85 Table 5.1 MAXIMUM IMPERVIOUS SURFACE AREAS FOR PHASE 1 RESIDENTIAL LOTS LOT NUMBER MAXIMUM IMPERVIOUS SURFACE AREA I (SQ. FT.) LOT NUMBER MAXIMUM IMPERVIOUS SURFACE AREA (SQ. FT.) 1 41152 24 4,162 2 41152 25 - - 3 4,152 26 _-- 4 4,152 27 3,681 5 4,300 28 3,672 6 45186 29 35668 7 3,668 30 31664 8 3,608 31 31659 9 3,607 32 3,633 10 3,607 33 3,602 11 3,517 34 3,601 12 4,156 35 3,599 13 31692 36 4,151 14 3, 776 37 41480 15 3,691 38 3,849 16 3,731 39 3,828 17 3,695 40 4,022 18 3,676 41 4,255 19 4,211 42 4,087 20 4,269 43 3,829 21 4,350 44 4,128 22 4,161 45 4,425 23 45165 NOTE 1: AVG SO. FT. PER LOT IS 31923 SQ. FT. (168,669 SO. FT. / 43 LOTS = 3,923 SO. FT.) NOTE 2: TOTAL BUA FOR EACH LOT INCLUDES 55' X 55' BUILDING ENVELOPE, PLUS 18' WIDE DRIVEWAY (VARYING LENGTHS), PLUS SECTION OF DRIVEWAY WITHIN ROW (124 t0 180 SF, DEPENDING ON LOCATION IN PHASE 1), UNLESS OTHERWISE NOTED. SIDEWALKS AND CURB ARE NOT INCLUDED IN BUA. CONSTRUCTION SEQUENCE 1. PERFORM CONSTRUCTION STAKE OUT. 2. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE. 3. CLEAR SITE, BUT DO NOT GRUB. 4. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES. 5. GRUB SITE. 6. CONSTRUCT SEDIMENT BASINS. 7. COMMENCE ROUGH GRADING OF THE SITE. 8. INSTALL STORMWATER MANAGEMENT DEVICES. 9. CONSTRUCT SEWER COLLECTION SYSTEM. 10-CONSTRUCT WATER SYSTEM. 11. ROUGH GRADE THE SITE. 12. SHAPE SHOULDERS AND CUT AND FILL SLOPES. 13. SCARIFY, SEED, FERTILIZE AND MULCH ALL DISTURBED AREAS. 14.INSTALL DRY UTILITIES (ELECTRICAL, FIBER-OPTIC, CABLE, PHONE, ETC). 15. RE -SCARIFY, RE -SEED, RE -FERTILIZE AND MULCH ALL DISTURBED AREA. 16. CONSTRUCT ROADBED BASE COURSE AND INTERMEDIATE ASPHALT COURSE. 17. APPLY FINAL ASPHALT COURSE. 18. AFTER DISTURBED AREAS ARE STABILIZED WITH VEGETATION, THE CONTRACTOR SHALL RETURN TO THE SITE AND REMOVE ALL TEMPORARY EROSION CONTROL MEASURES. 41:0!:3 i L c CTJ Z3 cz `i v CD .c Jc L3 0) Jc w 0 c 0 0 0 L.,1 LLJ � Q CL c c E-- U ct 0 1--- Z j Q_ L>J c v w --� -J L..� 0 Z SHEET NO. C. 5.1 It 0 N z G 0 c\ 0 N N 0) m c 2 LL z V- 0 z 0 co r a: 0 0 O W Q 06 U N z � o o o CL o . w � or_ • : o � ck� m v •• w W lil z a ac w v 00 w -` t= W owetn .Q a V) w ° ° Q W ° w a GENERAL NOTES: (1) TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND ASSOCIATES, P.L.S.# L-2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. (2) ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN FIELD APPROVED BY THE ARMY CORPS OF ENGINEERS ON NOVEMBER 23, 2005 (FINAL APPROVAL PENDING). I _.... (3) CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES BEFORE COMMENCING CONSTRUCTION. (4) CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS GENERATED THROUGH DEMOLITION AND GRUBBING ACTIVITIES SHOWN. +' ': =- (5) SEDIMENT FENCING TO BE AT THE LIMIT OF DISTURBANCE FOR THIS CONSTRUCTION SITE, AT LEAST J ONE FOOT (1') FROM WETLANDS ••_ _, ' ��.,l.l,, (6) CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. INTERVALS ALONG SEDIMENT CI-13 AMENITY + �,. ,, FENCING. ,y-- o GRT 30.00 AREA }(7) ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 CALENDAR DAYS OF INV IN 27.32 INSTALL APPROX. 164 LF 15 _ GRADING ACTIVITIES. `• INV OUT 27.32 HDPE DR 32.5 @ 1.05% � � �-- _ �. O INSTALLED IN TRENCHES ACCORDING TO STANDARD TER, SEWER, AND STORMWATER PIPES TO BE SPECIFICATIONS AND DETAILS ON SHEET C.7.10. W ►� �� ; r �.. (9) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS SHALL BE LAID AT LEAST TEN _ (10) FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR J t z BARRIERS PREVENT A TEN (10) FOOT LATERAL SEPARATION -- IN WHICH CASE: q �,. , „ CI -15 7�� INSTALL APPROX. 56 LF 15 p LANDSCAPED CIRCLE GRT 25.69 (A) THE WATER MAIN !S LAID IN A SEPARATE TRENCH, WITH THE ELEVATION ON THE BOTTOM OF HDPE DR 32.5 Ca? 0.5% -- (RADIUS - 65.00') i =INV IN CI-10 23.03 THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER; OR " = 50' E _ > INSTALL 15' SPILLWAY @ f (B) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN } SCALE. INV IN (CI 11) 23.03 EXISTING POND LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION OF 500 50 t� INV OUT 23 03 EL. 27.75 PROPOSED 5 WALKING PATH THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN(18) INCHES ABOVE THE TOP OF FFE31.50 SEWER. CI-12 / �� v r`s. ~,, 10 CROSSING A WATER MAIN OVER A SEWER. WHENEVER NECESSARY FOR A WATER MAIN TO CROSS V''' CI-14 GRT 27.90 '' /� `` OVER A SEWER, THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF SCALE OF MAP MAY VARY GIRT 30.40 INV IN 25.60 -- " THE WATER MAIN IS AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF THE SEWER, UNLESS DUE TO METHODS OF REPRODUCTION. INV OUT 27.60 -� INV OUT 25.60,LOCAL CONDITIONS OR BARRIERS PREVENT AN EIGHTEEN (18) INCH SEPARATION -- IN WHICH CASE, ASE, BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND �� r � :� , . '. SG ��� INSTALL APPROX. 33 LF 15" �. �- � - ` 20' ONE WAY ---� --- "' HDPE DR 32.5 @ 0.48% ���-�-`?`1---- 8\ �� '`°--J>..- _ �.- WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE CROSSING. TRAFFIC CIRCLE % INSTALL APPROX. 24 LF 15 �%� {11} CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER MAIN TO SEE DETAIL O ' I `/,' P CROSS UNDER A SEWER BOTH THE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED OF s _ ,HDPE DR 32.5 @ 0.25% 22 ASPHALT ROAD (TYP) P FFE = INSTALL APPROX.SEE�DETAIL 5 c FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR DISTANCE 31.50 _gg, M 3a i HDPE DR 32.5 @ 1.05% 1 OF TEN (10) FEET ON EACH SIDE OF THE POINT(S) OF CROSSING. A SECTION OF WATER MAIN _CI-10 FFE - 1 c 7 9 �.,. PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. CI-14 0') / - (12) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" SEPARATION FROM BOTTOM OF 'GRT 25.69 27.00 , STORMWATER PIPE AND TOP OF SEWER PIPE. GRT 30.40 _-....,_.. ( } I -'INV OUT 23.09 13 ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS TO BE DIRECTED TO RIGHT-OF-WAY, OR TO YARD INV OUT 27.60 655 --_� �� FFE = T OR OTHER STORMWATER COLLECTION DEVICES FOR EVENTUAL DISCHARGE TINFILTRATION } ---- ���27 '�" - � I � 26.00 FFE = INLET ( R S ) GE 0 --_ -- - 24.50 ` BASIN. NQ- �_ _ (14) FOR MAXIMUM ALLOWABLE BUILT --UPON AREA PER LOT SEE TABLE 5.1 ON SHEET 5.1 AND TABLE %�\�"��►.,,_- _ -...� IN,q y 5.5 ON SHEET 5.5. FFE ( 15) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS DOES NOT INCLUDE ANY -�, 31.50 RUNOFF FROM IMPERVIOUS SURFACE ASSOCIATED WITH THE FUTURE COMMERCIAL AREA. A PERMIT' MODIFICATION WILL BE NECESSARY PRIOR TO CONSTRUCTING ANY ADDITIONAL IMPERVIOUS SURFACE. INSTALL APPROX. 37 LF 15 CI-11 (16) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS SHALL BE CONSTRUCTED IN y FFE = FFE = GRT 28.06 HDPE DR 32.5 @ 0.49% AN APPROVED BY THE NORTH CAROLIN '• ~ ` �----_._. "; � -`��� � :.:: - � ACCORDANCE WITH THE SEDIMENT & EROSION CONTROL PLAN A 28.50 28.50 INV IN (CI-9) 25.44 �� DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. -�----�-� �, INV IN (CI-12) 25.44 I 3 (17) ACCORDING TO THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973 (NORTH CAROLINA GENERAL 2 VALLEY CURB `'� INV OUT 25.44 �__ INSTALL APPROX. SEE DETAIL (TYP) INSTALL APPROX. 142 LF 15 189 LF 24" STATUTE 113A 51-66) THIS PROJECT IS SUBJECT TO AN APPROVED SEDIMENTATION AND EROSION L 1 HDPE DR 32.5 @ 1.39% HDPE DR 32.5 @ 0.25% z^ CONTROL PLAN. THE CONTRACTOR SHALL ADHERE TO ALL OF THE CONDITIONS SET FORTH IN THE c.7.9 _ FFE - FFE _ / / I \ l '. �' APPROVED PLAN, AS PRESCRIBED BY NCDENR. A COPY OF THE APPROVED SEDIMENTATION AND M Q Q Z ,..:' n Q_ DRAINAGE AREA 1B BOUNDARY PROPOSED RIGHT OF WAY 5' SIDEWALK TYP---,-, SEE DETAIL 4 C.7.11 CI-3 - GRT 30.30 INV OUT 27.00 CI-1 GIRT 30.30 INV OUT 27.00 JB-5 - CENTERED ON EXISTING DRAINAGE DITCH INV. IN = 26.64 INV. OUT = 26.64 INSTALL APPROX. 59 LF - 24" HDPE DR 32.5 @ 0.50% STOCKTON PLACE _WEST FFE = 32.50 - V�r PROPOSED F.E.S. INV. 26.20 INSTALL APPROX. 35 LF 15" HDPE DR 32.5 @ 0.25% r CI-2 I I GRT 30.30 f ; INV IN (C!-1) 26.91 iI INV IN (CI-28) 23.32 INV OUT 23.32 R j INSTALL APPROX. 49 LF 36", HDPE DR 32.5 @ 0.25% ' a INSTALL APPROX. 39 LF 15" HDPE DR 32.5 @ 0.25% f �E 26' ASPHALT ROAD (TYP) LOGGERHEAD BLVD. ONLY SEE DETAIL 4 C.7.9 lI FFE _ ` `�--- / 28.OQ � EROSION CONTROL PLAN SHALL BE DISPLAYED AT THE JOB SITE AT ALL TIMES. 27.00 r . r-- 10 DRAINAGE EASEMENT (TYP.) J ,� 18 ALL FITTINGS TO BE MJ DIP WITH THRUST BLOCKING UNLESS OTHERWISE NOTED ON PLANS. 32.00 { ) -(CENTERED ON PIPE) ( 19) EXCELSIOR MATTING AND SEEDING TO BE USED ON SLOPES STEEPER THAN 2:1. SOD SHALL BE CI-9 �i USED FOR ALL SLOPES FLATTER THAN 2:1. GRT 29.80 r ' INSTALL APPROX. 20 LF 24" `'-- t } FFE _( 27.50 'F (20) FINISHED FLOOR ELEVATION (FFE) IDENTIFIED ON THE PLAN IS INDICATIVE OF COMPACTED PAD INV IN 27.42 HDPE DR 32.5 @ 0.5% ` FFE _ INV OUT 27.42 BFE = 18.50 GRADE TO WHICH 2"-4" OF TOP SOIL WILL BE ADDED. SEE DETAIL 5/C.7.11. YI-1 '-� 26.50 , (21) CONTRACTOR SHALL IMPLEMENT TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH M.U.T.C.D. JB-2 GRT.27.50 INV IN 22.56 RIM 29.00 ` INV OUT 22.56 INV IN 22.51 SEE DETAIL 4 FFE = 28.50 F' FFE _ INV OUT 22.51 ` _ / 33.50 JB-1 C.7.10 BFE 19.50 / I RIM 29.00 INV IN 22.35 INV OUT 22.35 I TA APPFOX. 66 LF ` . : (TYP.) SEE DETAIL 3 DRAINAGE AREA HDPE DR 32.a @ 0.25% "~ 113 BOUNDARY , f f r K FFE _ GRT 28.29.00 70 f _d } FFE = 29.50 °a } 1 INV 26.50 - t� INSTALL APPROX. 74 LF 24 BFE = 20.50 M FFE _ FFE = FFE _ 30.00 HDPE DR 32.5 @ 0.25% ., FFE - 31.00 / s0 32.50 31.50 �� \ - ; GRT 271.67 CI-8 F t' INSTALL APPROX. 25 LF 15 t HDPE DR 32.5 @ 0.25% INV IN 22.17 GRT 27.67 FFE =30.00 :# `} v� '�, .. INV IN CI -a 22.1121.00 o INV OUT 22.17 __ - _ �� ( ) BFE IN fN (CI--7) 22.11 i OUT FF = . 1 INV 2E 1 E 30.00 : t I -BFE = 21.00 r FM 1 t STOCKTON PLACE EAST INSTALL APPROX. �,---,: -?-- F.E. E PROPOSED S D :2 117 42 H --- , I R .5 @ 0.25% INV: 23.00 I INSTALL - - APPROX. 25 - INSTALL APPROX. 289 LF 36" LF 36" HDPE FFE / F HDPE DR 32.5 @ 0.25% 2 8.0 DR 32.5 @ FFE = FFE _ 0.25% - PROPOSED RIP 1" j 32.00 FFE - /-%✓ 18.75 RAP W/ _�-- 00, 1 k 32.50 / FFE _ 29.00 - LEVEL SPREADER. 3 o FFE = 30.50 rn '�' I { SEE DETAIL ` -- ' 3 C _, 31.00 in CI--6 ` 10' DRAINAGE EASEMENT ` �' € Q GRT 28.70 ,� PROPOSED 50' VEGETATED W INV IN (CI-4) 22.48 (CENTERED ON PIPE) _} �. 'FILTER. SEE DETAIL cr {NV IN (CI-5) 26.44 1 `r W INV OUT 22.48 / / 2� f c.7.1a f, 1 �j�' p (TYP.) SEE DETAIL INSTALL APPROX. 145 LF 36" 2 ,� INSTALL APPROX. 64 LF 42" - I �j 2 -' HDPE DR 32 5 Cc 0 25% INSTALL APPROX. ' .�' s.. cis HDPE DR IDZ_ @ 0.25% 3 P HDPE DR 32.5 1 BP-1 RIM:28.QQ CONSTRUCTION SEQUENCE INV. f N : 21.81 _- • �•. / ,,.• , `' �� WEIR EL. 26.50 . PERFORM CONSTRUCTION STAKE OUT. _ �d..-f ,... / INV OUT (BY-PASS): 2 3.2 2 ' _ CI-4 �- �,,/' CONSTRUCTION ENTRANCE ,.._.'�STRU ' 23 �: ��2 INSTALL TEMPORARY GRAVEL CON '� -� / INV OUT (BASIN}: 21.81 • j n... - ..._ram-_.. '---`, GRT 30.30 --�. .�. t � �< . _�._ -- � � 3 AR SITE, BUT DO NOT GRUB -- --�0-`--.. ; SUMP: 21.00 4. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES. INV 1N (CI-3) 26.90 INV IN CI-2) 23.20 - - . SEE DETAIL s � 5 GRUB SITE. 6. CONSTRUCT SEDIMENT BASINS. INV OUT 23.20 '- PROPOSED F.E.S. �,� °`+ � a 7. COMMENCE ROUGH GRADING OF THE SITE. - � w.. ==�_ ..� �....•.-.�--_ - ,` _ INV 21.00 w PROPOSED RIP RAP W/�� •. - DEVICES. - G LEVEL SPREADER / ry �s =. \ ON SYSTEM. - 1 9 CONSTRUCT SEWER COLLECTION BERM 1 4 10 CONSTRUCT WATER SYSTEM . SITE 12. SHAPE SHOULDERS AND CUT AND FILL SLOPES, n , APPROX. LOCATION OF ; r INFILTRATION BASIN 1 B SEED FERTILIZE AND MULCH ALL DISTURBED AREAS. UNNAMED JURISDICTIONAL 'SEE DETAIL - INSTALL 15 SPILLWAY @ 13. SCARIFY, , 36 EXISTING 24" CULVERT r- STREAM TO BECKY'S CREEK 1 EL. 26.75 14. INSTALL DRY UTILITIES (ELECTRICAL, FIBER --OPTIC, CABLE, PHONE, ETC). 15. RE -SCARIFY, RE -SEED, RE -FERTILIZE, AND MULCH ALL DISTURBED AREA. 1-Z X 16. CONSTRUCT ROADBED BASE COURSE AND INTERMEDIATE ASPHALT COURSE. I COTE: INFILTRATION BASIN 113 SIZED TO ACCOMODATE UP TO 17. APPLY FINAL ASPHALT COURSE. DRAINAGE AREA 1 B 38,126 CU. FT. FLOW FROM FUTURE PHASE 2 AREA. 18. AFTER DISTURBED AREAS ARE STABILIZED WITH VEGETATION, THE CONTRACTOR SHALL RETURN TO THE SITE AND REMOVE ALL TEMPORARY EROSION CONTROL MEASURES. 9 SHEET NO. C..5.2 T 0 z c 0 O a a� v c 0 s 0 z 0 co q a 'v 0 06 rn M U J � N Q-) O z w (� ct � Z co LAJ La CJ ,tW f -911, IX z WGJU=�aQ J ��$� it Ll��CO QN ZeQ <t W W :S ev0 op 6: z J z % o G •` 1 1 ■ w• , , 40 T ..- E _ S W D r F. • 3 PROPOSED 5 ' WALKING PATH EXISTING '. .; ---•DRAINAGE AREA Q 1 x �` PON D �;;/ 1 C BOUNDARY - r FFE - N FFE -25.00 `:.. \ }zl 22 50 5' SIDEWALK TYP.) SEE DETAIL 4 a w y y \ n 20 ONE WAY ASPHALT TRAFFIC CIRCLE SEE DETAIL CI - 20 �---, R 6 GRT 18.75 -=2' VALLEY CURB TYP. % ( ) CI-25 c79 . - ..`INV OUT 16 06 , �= SEE DETAIL 1 '"`'`--� j ., INV !N 15.56 FFE C.7.9 ` FFE - INV OUT 15.56 23.00 '� r - N C1-17 z r' if 27.00 FFE - 25 00 GIRT 21.95 INSTALL APPROX. 117 LF 15 BFE = 16.00 • -... FFE _ / f,. INV OUT 19.26 23.50 HDPE DR 32.5 0 0.43% FFE = LANDSCAPED CIRCLE �. 26.00 „ 5.00 FFE _ .INSTALL APPROX. 191 LF 18 (RADIUS - 6 ) INSTALL APPROX. 24.50 HDPE DR 32.5 @ 0.88% INSTALL APPROX. 137 LF 15 33 LF 18" HDPE FFE -25.00 1 HDPE DR 32.5 @ 0.91 - - SEE DETAIL 2 / ��./ . .T c.7.10 DR 32.5 @ 0.24% BFE - 16.00 , INSTALL APPROX. 25 LF 15" -4 HDPE DR 3 2. 5 @ 1.12 % j ',{ } > � :•4 tit -- : GIRT 19.75CI - 9 a INV IN (CI 18)F 17 30 .: °� GIRT 18.50 INV IN (CI-25) 15.48 !NV IN (GI-23) 12.50 FFE - ' --`` INV OUT 12.90 INV OUT 12.50 CI-16 r 27.00 GIRT 23.20 INSTALL APPROX. 111 LF 30» f FFE _ ow- '--- - r INV 20.51 f: r` 2 HDPE DR 32.5 @ 0.36% f .� _` FFE -25.fl0 26.50 - - 10' DRAINAGE AINAGE EASEMENT BFE = 16.00 `? 22' ASPHALT :r FFE =27.50 r:'\�- CEI�fER ED ON PIPE (TYP) , ROAD (TYP.) Y` BFE = 18.50 PROPOSED INFILTRATION BASIN 1 C FFE '�' FFf, - 25.00 SEE DETAI 5 11 SEE DETAIL =25.00 � , c.7.9 FFE = BFE - BFE 16.00 Al �. 22.50 c'7'8 16.40 . �-INSTALL APPROX. 104 LF 30» J , t - . � HDPE 8� DR 325 @ 03 "= .,'PROPOSED RIP RAP W j" LEVEL SPREADER (TYP.) �P FFE - 28.50 f J- ;"�-�i , BFE -- 19.50 / ` - SEE DETAIL a I' w 3 �2--i f 0 _ CI-18 c.7.1 6 ' GIRT 21.95 P 9 ^/ 2 7 r l \O INV IN C! 16 19.26 j i F.E.S. 6 ( ) Y i f 11 �� .., � / - �.- � j: PROPOSED - rL ` � INV IN (CI-17) 18 98 O INV OUT 13.12 r FFE - 29.50 INV OUT 18.98 ESFE = 20.50 / SEE DETAIL (TYP.) 1 - --.- -- , INSTALL APPROX. 112 LF 30 HD P E DR 32.5 ©0.2 5 ; 1 404 WETLANDS / h FFE = 30.- x , / 00 B P 2 _ BFE - 21.00 PUMP STATION DRIVE ` ""`� �\'� PROPOSED RIP RIM: 16.00 GRAVEL ACCESS ROAD A f ^a W� LE - " INV. IN (CI-19): 12.11 RAP LEVEL SPREADER (TYP) WEIR ELEV: 14.25 I INSTALL APPROX. INV. OUT (BY-PASS): 13.40 ,- PROPOSED SANITARY SEWER INSTALL 15' 24 LF 30" HDPE w--' PUMP STATION / INV OUT (BASIN): 1211 SPILLWAY AT DR 32.5 00 6 a FG =16.50 ELEV. 14.75 F SUMP: 11.06 BERM EL. 15.75 / INV OUT 12.00 SEE DETAIL (TYP.) ®g ,F SCALE: 5 50 50 J{yj DRAINAGE AREA 1 C SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. nn n }n} n ter- n roc x DRAINAGE AREA 1 C DATA TOTAL AREA 6.5' ACRES IMPERVIOUS AREA 3.1 F ACRES PERCENT IMPERVIOUS 49% VOLUME 1.5" RAINFALL 17,256 CU.FT. BASIN VOLUME 26,859 CU.FT. PROPOSED INFILTRATION BASIN 1 C GENERAL NOTES: (1) TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND ASSOCIATES, P.L.S.# L-2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. (2) ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN FIELD APPROVED BY THE ARMY CORPS OF ENGINEERS ON NOVEMBER 23, 2005 (FINAL APPROVAL PENDING). (3) CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES BEFORE COMMENCING CONSTRUCTION. (4) CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS GENERATED THROUGH DEMOL11ION AND GRUBBING ACTIVITIES SHOWN. (5) SEDIMENT FENCING TO BE AT THE LIMIT OF DISTURBANCE FOR THIS CONSTRUCTION SITE, AT LEAST ONE FOOT (1') FROM WETLANDS (6) CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. INTERVALS ALONG SEDIMENT FENCING. (7) ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 CALENDAR DAYS OF GRADING ACTIVITIES. (8) WATER, SEWER, AND STORMWATER PIPES TO BE INSTALLED IN TRENCHES ACCORDING TO STANDARD SPECIFICATIONS AND DETAILS ON SHEET C.7.10. (9) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS SHALL BE LAID AT LEAST TEN (10) FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A TEN (10) FOOT LATERAL SEPARATION -- IN WHICH CASE: (A) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION ON THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER; OR (B) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN(18) INCHES ABOVE THE TOP OF SEWER. (10) CROSSING A WATER MAIN OVER A SEWER. WHENEVER NECESSARY FOR A WATER MAIN TO CROSS OVER A SEWER, THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF THE SEWER, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT AN EIGHTEEN (18) INCH SEPARATION -- IN WHICH CASE, BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE CROSSING. (11) CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE POINT(S) OF CROSSING. A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. (12) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" SEPARATION FROM BOTTOM OF STORMWATER PIPE AND TOP OF SEWER PIPE. (13) ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS TO BE DIRECTED TO RIGHT-OF-WAY, OR TO YARD INLET (OR OTHER STORMWATER COLLECTION DEVICES) FOR EVENTUAL DISCHARGE TO INFILTRATION BASIN. (14) FOR MAXIMUM ALLOWABLE BUILT --UPON AREA PER LOT SEE TABLE 5.1 ON SHEET 5.1 AND TABLE 5.5 ON SHEET 5.5. (15) THE STORMWATER MANAGEMENT P1 NN DEPICTED ON THESE SHEETS DOES NOT INCLUDE ANY RUNOFF FROM IMPERVIOUS SURFAC - ASSOCIATED WITH THE FUTURE COMMERCIAL AREA. A PERMIT MODIFICATION WILL BE NEr_ 'S ARY PRIOR TO CONSTRUCTING ANY ADDITIONAL IMPERVIOUS SURFACE. (16) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SEDIMENT & EROSION CONTROL PLAN APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. (17) ACCORDING TO THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973 (NORTH CAROLINA GENERAL STATUTE 113A 51-66) THIS PROJECT IS SUBJECT TO AN APPROVED SEDIMENTATION AND EROSION CONTROL PLAN. THE CONTRACTOR SHALL ADHERE TO ALL OF THE CONDITIONS SET FORTH IN THE APPROVED PLAN, AS PRESCRIBED BY NCDENR. A COPY OF THE APPROVED SEDIMENTATION AND EROSION CONTROL PLAN SHALL BE DISPLAYED AT THE JOB SITE AT ALL TIMES. (18) ALL FITTINGS TO BE MJ DIP WITH THRUST BLOCKING UNLESS OTHERWISE NOTED ON PLANS. (19) EXCELSIOR MATTING AND SEEDING 00 BE USED ON SLOPES STEEPER THAN 2:1. SOD SHALL BE USED FOR ALL SLOPES FLATTER THAN 2:1. (20) FINISHED FLOOR ELEVATION (FFE) IDENTIFIED ON THE PLAN IS INDICATIVE OF COMPACTED PAD GRADE TO WHICH 2"-4" OF TOP SOIL WILL BE ADDED. SEE DETAIL 5/C.7.11. (21) CONTRACTOR SHALL IMPLEMENT TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH M.U.T.C.D. CONSTRUCTION SEQUENCE 1. PERFORM CONSTRUCTION STAKE OUT. 2. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE, 3. CLEAR SITE, BUT DO NOT GRUB. 4. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES. 5. GRUB SITE. 6. CONSTRUCT SEDIMENT BASINS. 7. COMMENCE ROUGH GRADING OF THE SITE. 8. INSTALL STORMWATER MANAGEMENT DEVICES. 9. CONSTRUCT SEWER COLLECTION SYSTEM. 10.CONSTRUCT WATER SYSTEM. 11. ROUGH GRADE THE SITE. 12. SHAPE SHOULDERS AND CUT AND FILL SLOPES. 13. SCARIFY, SEED, FERTILIZE, AND MULCH ALL DISTURBED AREAS. 14.INSTALL DRY UTILITIES (ELECTRICAL, FIBER-OPTIC, CABLE, PHONE, ETC). 15. RE -SCARIFY, RE -SEED, RE -FERTILIZE, AND MULCH ALL DISTURBED AREA. 16. CONSTRUCT ROADBED BASE COURSE AND INTERMEDIATE ASPHALT COURSE. 17. APPLY FINAL ASPHALT COURSE. 18. AFTER DISTURBED AREAS ARE STABILIZED WITH VEGETATION, THE CONTRACTOR SHALL RETURN TO THE SITE AND REMOVE ALL TEMPORARY EROSION CONTROL MEASURES. o N z 0 0 0 N W m 0 U- 0 z 0 a 0 co c cl LLJ __j cl� r... Ll O LLJ O C ci LJ w c __j CL <C CL w Q N w z o � � w 0- V W y\1 l Lu ct SHEET NO. C. 5.3 w , JCC VG I NIL , PROPOSED INFILTRATION BASIN 1D-1 C.7.9 FFE - SEE DETAIL • 32.50 C 7 7 --- v- 01 f 5 CURB CUT @ 30.BERM EL. 30 0 SEE DETAIL 2 CONCRETE Q' CURB AND GUTTER (TYP) s SEE DETAIL C.7.10 / FFE _ 32.50 5' SIDEWALK {TYP.) 027.25 SEE DETAIL .00 + PROPOSED F.E.S. _ INV OUT: 25.70 AMENITY AREA + a; PROPOSED RIP RAP W/ ' LEVEL SPREADER (TYP.) i 7 SEE DETAIL r DRAINAGE AREA } FFE = _.... �_ .... .. 1 D-2 BOUNDARY 32.50 � FFE - LANDSCAPED �.� ..� c.7.10 ,... - 31.75 { ISLAND TOP OF BERM EL @ 28.75' CI-21 'S 5 CURB CUT @ 28.00 GRT 30.75 3 _ ., SEE DETAIL 7 INV OUT 27.00 31.25' s ( c.7.1a �i S t. INSTALL 15' FFE = � Y,, � .• � �l �A .y . . :SPILLWAY @ 27.75' 31.50 5 CURB CUT @ 30.50 INSTALL APPROX. 29 LF 15 SEE DETAIL HDPE DR 32.5 @ 0.88% INSTALL APPROX. 200 0 LF 15 HDPE DR N ..� GIRT 30.75 p / 32.5 0% �a INV OUT 27.00 JB-45 FFE GRT 30.75 3 i INV 31.50 LANDSCAPED CIRCLE I„ IN 26.00 (RADIUS = 65.00') INV OUT 26.00 / / ''�p� 28.5U, t N - ��- PROPOSED INFILTRATIONS INSTALL APPROX. 61 LF 15 28 66S 1 _2 HDPE DR 32.5 @ 0.44� - BASIN D "',_---�, 1 SEE DE-T:AIL _~` -' �.... 9 AND ,t FFE 50 I� 22 ASF- :ALT__ _2' VALLEY CURB TYP. SCALE: 1" = 50' _' ROAD , T (1 ) SEE DETAIL 1 , ' SEE DETA; ` 50 0 50 C.7.9 SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. DRAIN I AGE A R, A,, ID 77 77_77__3�1:5; 2� D. if d 404 WETLANDS _ _w o ry CO :. LLJ PROPOSED 49.5 LF --30-- ALUMINUM BOTTOMLESS CULVERT TO MATCH PROPOSED INFILTRATION z` \ g � EXISTING BOTTOM BASIN 1 A-2 I--,'�, :� ; I1 SEE DETAILr2"��'� \ `° ELEVATIONS. 35 -' FUTURE COMMERCIAL AREA � SEE DETAIL Z fi CO-3 c.7.7 INV 31.50 SEE GENERAL NOTE 13 C.7.9 INSTALL 15 t 3 3 3 \ SPILLWAY @ 31.25' D` LANDSCAPE AREA 1 \ f (10' TYP.) TOP OF BERM PROPOSED ELEVATED W \ CONCRETE SIDEWALK v' C \ \ S Y O j BRIDGE (5 LF) (TYP) ' J ,� � � LP: 3�1:90 I SEE DETA L � � co-1: c.7.11 INV 31.00 - � S� 1 r PROPOSED INFILTRATION PROPOSED INFILTRATION \X, BASIN 1 A-3 BASIN 1A-1 '�.,; ``�� IHP:32.50' SEE DETAIL SEE DETAIL rT,� EXISTING 24" RCP 1 �' C•7.7 CULVERT / C•7.7 \ \ �CO-4 - _ TOP OF BERM -� EL. @ 32.75' INV 30.00 fry f �... � 32 32 \ � INSTALL 15' ' TOP OF BERM .�� 31.75 _ EL @ 32 25' --- SPILLWAY @31.75 ,3�"� 9 31.4.. - =-, ~S ----- --- -- CO-2 \ 31.00 INV\ PROPOSED RIP RAP W/ \ 32 `3r ,� LEVEL SPREADER (TYP.) SEE DETAIL \� PROPOSED ELEVATED INSTALL 15' CONCRETE SIDEWALK - BRIDGE (5 LF) (TYP) _ SPILLWAY @ 31.25' SEE DETAIL 1 •� �\ ` 1 SCALE: 1» = 50a . _ i 50 0 50 SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. n R A I NI A r F- A R E A 1 A GENERAL NOTES: (1) TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND ASSOCIATES, P.L.S.# L--2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. (2) ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN FIELD APPROVED BY THE ARMY CORPS OF ENGINEERS ON NOVEMBER 23, 2005 (FINAL APPROVAL PENDING). (3) CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES BEFORE COMMENCING CONSTRUCTION. (4) CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS GENERATED THROUGH DEMOLITION AND GRUBBING ACTIVITIES SHOWN. (5) SEDIMENT FENCING TO BE AT THE LIMIT OF DISTURBANCE FOR THIS CONSTRUCTION SITE, AT LEAST ONE FOOT (1') FROM WETLANDS (6) CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. INTERVALS ALONG SEDIMENT FENCING. (7) ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 CALENDAR DAYS OF GRADING ACTIVITIES. (8) WATER, SEWER, AND STORMWATER PIPES TO BE INSTALLED IN TRENCHES ACCORDING TO STANDARD SPECIFICATIONS AND DETAILS ON SHEET C.7.10. (9) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS SHALL BE LAID AT LEAST TEN (10) FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A TEN (10) FOOT LATERAL SEPARATION --- IN WHICH CASE: (A) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION ON THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER; OR (B) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN(18) INCHES ABOVE THE TOP OF SEWER. (10) CROSSING A WATER MAIN OVER A SEWER. WHENEVER NECESSARY FOR A WATER MAIN TO CROSS OVER A SEWER, THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF THE SEWER, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT AN EIGHTEEN (18) INCH SEPARATION --- IN WHICH CASE, BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE CROSSING. (11) CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FORA WATER MAIN TO CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE POINT(S) OF CROSSING. A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. (12) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" SEPARATION FROM BOTTOM OF STORMWATER PIPE AND TOP OF SEWER PIPE. (13) ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS TO BE DIRECTED TO RIGHT-OF-WAY, OR TO YARD INLET (OR OTHER STORMWATER COLLECTION DEVICES) FOR EVENTUAL DISCHARGE TO INFILTRATION BASIN. (14) FOR MAXIMUM ALLOWABLE BUILT --UPON AREA PER LOT SEE TABLE 5.1 ON SHEET 5.1 AND TABLE 5.5 ON SHEET 5.5. (15) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS DOES NOT INCLUDE ANY RUNOFF FROM IMPERVIOUS SURFACE ASSOCIATED WITH THE FUTURE COMMERCIAL AREA. A PERMIT MODIFICATION WILL BE NECESSARY PRIOR TO CONSTRUCTING ANY ADDITIONAL IMPERVIOUS SURFACE. (16) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SEDIMENT & EROSION CONTROL PLAN APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. (17) ACCORDING TO THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973 (NORTH CAROLINA GENERAL STATUTE 113A 51-66) THIS PROJECT IS SUBJECT TO AN APPROVED SEDIMENTATION AND EROSION CONTROL PLAN. THE CONTRACTOR SHALL ADHERE TO ALL OF THE CONDITIONS SET FORTH IN THE APPROVED PLAN, AS PRESCRIBED BY NCDENR. A COPY OF THE APPROVED SEDIMENTATION AND EROSION CONTROL PLAN SHALL BE DISPLAYED AT THE JOB SITE AT ALL TIMES. (18) ALL FITTINGS TO BE MJ DIP WITH THRUST BLOCKING UNLESSOTHERWISE NOTED ON PLANS. (19) EXCELSIOR MATTING AND SEEDING TO BE USED ON SLOPES STEEPER THAN 2:1. SOD SHALL BE USED FOR ALL SLOPES FLATTER THAN 2:1. (20) FINISHED FLOOR ELEVATION (FFE) IDENTIFIED ON THE PLAN IS INDICATIVE OF COMPACTED PAD GRADE TO WHICH 2"--4" OF TOP SOIL WILL BE ADDED. SEE DETAIL 5/C.7.11. (21) CONTRACTOR SHALL IMPLEMENT TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH M.U.T.C.D. CONSTRUCTION SEQUENCE 1. PERFORM CONSTRUCTION STAKE OUT. 2. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE. 3. CLEAR SITE, BUT DO NOT GRUB. 4. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES. 5. GRUB SITE, 6. CONSTRUCT SEDIMENT BASINS. 7. COMMENCE ROUGH GRADING OF THE SITE. 8. IN.STALL STORMWATER MANAGEMENT DEVICES. 9. CONSTRUCT SEWER COLLECTION SYSTEM. 1 U. CONSTRUCT WATER SYSTEM. 11. ROUGH GRADE THE SITE. 12. SHAPE SHOULDERS AND CUT AND FILL SLOPES. 13. SCARIFY, SEED, FERTILIZE AND MULCH ALL DISTURBED AREAS. 14.INSTALL DRY UTILITIES (ELECTRICAL, FIBER-OPTIC, CABLE, PHONE, ETC). '5. RE -SCARIFY, RE -SEED, RE --FERTILIZE AND MULCH ALL DISTURBED AREA. I6. CONSTRUCT ROADBED BASE COURSE AND INTERMEDIATE ASPHALT COURSE. 17. APPLY FINAL ASPHALT COURSE. 18. AFTER DISTURBED AREAS ARE STABILIZED WITH VEGETATION, THE CONTRACTOR SHALL RETURN TO THE SITE AND REMOVE ALL TEMPORARY EROSION CONTROL MEASURES. i N z c 0 E 0 N m co m 4) cn 0 U- r v 0 z a d a •U 0 06 m co C C O CL CL- C) SHEET NO. C.5.4 N NLd d" � s © O- Q • : o c Z . co U 4 a W Q cn Z o O ``�P o• eooe sooe000�b �i��r woo '� e C7eJ„A wa fir+•'(!� V o N z: f to V) < U) s .r- P'''�����OOOOOO w O OOOOOOOOOOG'����` PHASE 2 SPECIFICATIONS YARD INLETS (YI) 2 JUNCTION BOXES (JB) 3 CURB INLETS (CI) 15 12" HDPE DR 32.5 50 L.F. 15 HDPE DR 32.5 113 L.F. 18 HDPE DR 32.5 981 L.F. 24" HDPE DR 32.5 59 L.F. 30" HDPE DR 32.5 297 L.F. 36 HDPE DR 32.5 919 L.F. 404 WETLANDS 404 WETLANDS FFE 32.50 32.50 \ 46 JOHN MARK BALDRIDGE DB 2368, Pg. 145 PIN: 4225-79-6001-0000 OFF N/S 210 PL 4/55 J3 10' DRAINAGE EASEMENT (TYP.) (CENTERED ON PIPE) c--LP:30.21 CI-39 BEFORE YOU DIG ! CALL 1-800--632--4949 N.C. ONE -CALL CENTER IT'S THE LAW ! HP: 31.36 STEPHEN ROSS JUSTICE, Jr. DB 2347, Pg. 072 PIN: 4225-78-6767-0000 LOT A - PB 32, Pg. 132 ' INSTALL CURB INLET (TYP.) SEE DETAIL I c.zii INSTALL APPROX. 25 LF 12" CI-35 HDPE DR 32.5 @ 1.0% // ALP: 30.21 / CI '5 ALL APPROX. 136 LF 18" ?PROX. 25 LF 12" -a HDPE DR 32.5 @ 0.25% \ ,3,..,. CI - 38 _�2.5 @ 0.25% 64 62 FFE � 60 68 66 FFE ` ` -, 59 31.50 32.00 FFE \ I 70 FFE FFE 32.00 FFE ' 32.00 31.50 .50 73 FFE 32 FFE 32.00 _ I1 - f INSTALL APPROX. 127 LF 18 32.50 jj `----- INSTALL APPROX. 208 LF 36" INSTALL YARD INLET ,1 HDPE DR 32.5 @ 0.25%- --- --_ HDPE DR 32.5 @ 0.25% 3 YI-3 I CI-40 (TYP.) SEE DETAIL 4 YI-2 I \ CI-31 I r- C•7.10 HP: 32.25 F: - L Ce 4051 INSTALL APPROX. 297 LF 30 X. F 18" R 3 .5 @ 0.25% 11 INSTALL APPROX. 209 L \ HDPE D 2 � 1. HDPE DR 32.5 @ 0.25% 67 " 69 a 63 FFE Q I FF FFE 65 FFE 32.50 E 0 32.00 72 FFE 32.00 32.50 � e , HDPE DR 32.5 @ 0.24% FFE 32.50 {} "ALL APPROX. 114 LF 128" `1 \ 32.50 �I INSTALL APPROX. 115 LF 18 J E DR 32.5 @ 0.25% ---�_ EH ALL READ j INSTALL 18" PRE -CAST F.E.S. (TYP) JB-6 INV = 26.64 CENTERED ON EXISTING JB--5 DRAINAGE DITCH CENTERED ON EXISTING DRAINAGE DITCH INV. IN = 27.34 CONNECT TO CULVERT AS SHOWN INV. OUT = 27.34 INV. IN = 26.64 INV. OUT = 26.64 INSTALL APPROX. 140 _ INSTALL 18" PRE --CAST FES LF 18" HDPE DR 32.5 INV. IN = 27.34 @ 0.50% APPROX. LOCATION EXISTING DRAINAGE DITCH DAVID WILSON JUSTICE, Sr. - DB 1522, Pg. 118 INSTALL APPROX. 140 LF PIN: 4225-78-7489-0000 18" HDPE DR 32.5 @ 0.50% \ LOT B - PB 32, Pg. 132 JB-7 EXISTING DRAINAGE CENTERED ON EXISTING DITCH (TO REMAIN IN PLACE) DRAINAGE DITCH INV. IN = 28.04 INV. OUT = 28.04 i--HP:31.42 18" PRE -CAST F.E.S. (TYP) HP: 31.37 ............... 47 / FFE 32.00 LP:30.20 CI-41 FFE 32.00 i INSTALL APPROX. 25 LF 15" SCALE: 1" = 50' \ 50' 0 50' SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. PHASE 2 DRAINAGE AREA DATA HP: 31.38 Ji" HP: 31. LP: 30.19 -� ,INSTALL � HDPE DR APPROX. 25 LF 32.5 @ 0.88% CI-36 -INSTALL APPROX. 25 LF 15" CI-32 "� t 31 HDPE DR 325 @ 0.24% } 50 54 55 FFE ` Q 51 E Q 5 C3 3) FFE \ ` FFE 32.00 32.50 FFE 32.00 FFE FFE 32.00 32.00 32.00 - \ 32.50FFE c0 0----- _..�_ rf7 _ Yl\ TOTAL DRAINAGE AREA 8.90 ACRES IMPERVIOUS AREA 4.53 ACRES PERCENT IMPERVIOUS 51.0% VOLUME 1.5" RAINFALL 24,615 CU. FT. INFILTRATION BASIN 18 DATA VOLUME PHASE 1 1.5" RAINFALL 18,323 CU. FT. VOLUME PHASE 2 1.5" RAINFALL 24,623 CU. FT. TOTAL VOLUME 1.5" RAINFALL 42,946 CU. FT. (PHASE 1 AND 2) VOLUME INFILTRATION BASIN 1 B 56,449 CU. FT. *NOTE: ALL STORMWATER RUNOFF GENERATED FROM PHASE 2 WILL BE COLLECTED IN THE ABOVE SHOWN STORMWATER COLLECTION SYSTEM AND DIRECTED TO INFILTRATION BASIN 1 B. SEE SHEETS C.5.2 AND C.7.8. INLET DATA (IN FEES INLET RIM INV IN INV OUT CI-27 30.50 24.62 24.62 CI-28 30.50 24.36 24.36 CI-29 30.00 - 26.89 CI-30 30.00 25.29 25.29 CI-31 30.00 25.39 (YI-3) 26.51 (CI-29) 25.39 CI-32 30.00 - 27.31 CI-33 30.00 27.09 27.09 CI-34 30.00 27.08 27.08 CI-35 30.00 - 27.33 CI-36 30.00 - 27.75 CI-37 30.00 27.69 27.69 CI-38 30.00 27.64 27.64 CI-39 30.00 - 27.70 CI-40 30.00 27.17 27.17 CI-41 30.00 - 27.23 YI-3 29.90 26.81 (CI-33) 26.74 (CI-34) 25.91 (YI-2) 25.91 YI-2 29.90 27.40 (CI-37) 27.32 (CI-38) 26.65 (CI-40) 26.65 CI-2 30.30 26.91 (CI-1) 23.32 (CI-28) 23.32 WIN INV = 28.04 1 INSTALL APPROX. 41 LF 36" HDPE DR 32.5 @ 0.24% ---------___ --- -___ CI-30 CI-27 - INSTALL APPROX. 280 LF 36" HDPE DR 32.5 @ 0.24% --- / C I - 2 SEE `SHEET C.5.2 ® N INSTALL APPROX. 59 LF as 24" HDPE DR 32.5 @ 0.50%_ f INSTALL CONCRETE r DRIVEWAY APRON FOR ACCESS TO a I i LODGEHALL RD. _ �? 0) 22' ASPHALT 5:2., w ROAD (TYP.) Jc N SEE DETAIL s co cb c) J.10 � o Q_ cz N HP: 32.28 z c 5' SIDEWALK (TYP.) cm SEE DETAIL >6 J11 CD o CU cm 2' VALLEY CURB (TYP.) SEE DETAIL c.7.9 0 0 o EXISTING DRAINAGE DITCH (TO BE ABANDONED z AND FILLED) co T- NSTALL APPROX. 364 LF 36" HDPE @ 0.29% 0 a 32 06 CI - 28 CD � L U C I - 2 9 / - { LP: 30.30 57 FFE /�\ 32.00 INSTALL APPROX. 38 LF 15" HnPF nR 32.5 a 1.0% / 404 WETLANDS wmm VIA Table 5.5 MAXIMUM IMPERVIOUS SURFACE AREAS FOR PHASE 2 RESIDENTIAL LOTS MAXIMUM MAXIMUM IMPERVIOUS IMPERVIOUS LOT SURFACE LOT SURFACE AREA NUMBER AREA SO. FT. NUMBER SQ. FT. 46 4,176 60 4,189 47 4,165 614,187 48 4,149 62 41189 ^49 4,226 63 4,187 50 4,145 64 4,195 51 4,152 65 4,187 5c _ 4.151 66 4,187 53 4; # 51 >... 7 4, 187 54 4,151 4, f 87 55 4,147 69 4,183 56 4,166 70 4,186 57 4,165 71 4,186 58 4,213 72 4,232 59 4.253 73 4,289 NOTE 1. AVG SQ. FT. PER LOT IS 4,185 SQ. FT. (117,181 SQ. FT. / 28 LOTS = 4,185 SQ. FT NOTE 2: TOTAL BUA FOR EACH LOT INCLUDES 55' X 55BUILDING ENVELOPE, PLUS 18' WIDE DRIVEWAY (VARYING LENGTHS), PLUS SECTION OF DRIVEWAY WITHIN ROW (126 to 164 SF, DEPENDING ON LOCATION IN PHASE 2), UNLESS OTHERWISE NOTED. SIDEWALKS AND CURB ARE NOT INCLUDED IN BUA Q' W __j p '1. 1 c co v 1 Q O �U LLj O W -.J Q C) Q JLd � Q W cp o N U GENERAL NOTES: 4 � 4 (1) TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS (11) CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS to � AND ASSOCIATES, P.L.S.# L-2981. INFORMATION PROVIDED FOR NECESSARY FOR A WATER MAIN TO CROSS UNDER A SEWER, BOTH g ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION. THE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED OF (2) ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN FIELD FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN cc APPROVED BY THE ARMY CORPS OF ENGINEERS ON NOVEMBER 23, STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF 2005 (FINAL APPROVAL PENDING). THE POINT(S) OF CROSSING. A SECTION OF WATER MAIN PIPE SHALL (3) CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES BEFORE BE CENTERED AT THE POINT OF CROSSING. t- COMMENCING CONSTRUCTION. (12) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" (4) CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE SEPARATION FROM BOTTOM OF STORMWATER PIPE AND TOP OF MATERIALS GENERATED THROUGH DEMOLITION AND GRUBBING SEWER PIPE. SHEET NO. ACTIVITIES SHOWN. (13) ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS TO BE DIRECTED TO (5) SEDIMENT FENCING TO BE AT THE LIMIT OF DISTURBANCE FOR THIS RIGHT-OF-WAY, OR TO YARD INLET (OR OTHER STORMWATER CONSTRUCTION SITE, AT LEAST ONE FOOT (1') FROM WETLANDS COLLECTION DEVICES) FOR EVENTUAL DISCHARGE TO INFILTRATION C. Jam. 5 (6) CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. BASIN, INTERVALS ALONG SEDIMENT FENCING. (14) FOR MAXIMUM ALLOWABLE BUILT -UPON AREA PER LOT SEE TABLE (7) ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHED 5.5 ON SHEET 5.5. N WITHIN 15 CALENDAR DAYS OF GRADING ACTIVITIES. (15) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS p (8) WATER, SEWER, AND STORMWATER PIPES TO BE INSTALLED IN DOES NOT INCLUDE ANY RUNOFF FROM IMPERVIOUS SURFACE NU TRENCHES ACCORDING TO STANDARD SPECIFICATIONS AND DETAILS ASSOCIATED WITH THE FUTURE COMMERCIAL AREA. A PERMICONSTRUCTION SEQUENCE ON SHEETS C.7.1 AND C.7.6. MODIFICATION WILL BE NECESSARY PRIOR TO CONSTRUCTING ANY V_ Q (9) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS ADDITIONAL IMPERVIOUS SURFACE. SHALL BE LAID AT LEAST TEN (10) FEET LATERALLY FROM EXISTING (16) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS 1. PERFORM CONSTRUCTION STAKE OUT. INSTALL Q � OR PROPOSE D SEWERS UNLESS LOCAL CONDITIONS OR BARRIERS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SEDIMENT & 2. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE. Q PREVENT A TEN (10) FOOT LATERAL SEPARATION -- IN WHICH CASE: EROSION CONTROL PLAN APPROVED BY THE NORTH CAROLINA 3. CLEAR SITE, BUT DO NOT GRUB. (A) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. 4. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES. cn w- d W w ELEVATION ON THE BOTTOM OF THE WATER MAIN AT LEAST 17 ( ) ACCORDING TO THE SEDIMENTATION POLLUTION CONTROL ACT OF 5. GRUB SITE. W �� V z EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER; OR 1973 (NORTH CAROLINA GENERAL STATUTE 113A 51-66) THIS 6. CONSTRUCT SEDIMENT BASINS. ti,i ~ ,,,4.l,� ® W (B) THE WATER MAIN f5 LAID IN THE SAME TRENCH AS THE SEWER PROJECT I SUBJECT TO AN APPROVED SEDIMENTATION AND EROSION PLAN. THE CONTRACTOR SHALL ADHERE TO ALL OF THE 7. COMMENCE ROUGH GRADING OF THE SITE. 'Q � CL W � U WITH THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF CONTROL 8. INSTALL STORMWATER MANAGEMENT DEVICES. A U UNDISTURBED EARTH, AND WITH THE ELEVATION OF THE BOTTOM CONDITIONS SET FORTH IN THE APPROVED PLAN, AS PRESCRIBED BY 9. CONSTRUCT SEWER COLLECTION SYSTEM. OF THE WATER MAIN AT LEAST EIGHTEEN(18) INCHES ABOVE THE NCDENR. A COPY OF THE APPROVED SEDIMENTATION AND EROSION CONTROL PLAN SHALL BE DISPLAYED AT THE JOB SITE AT ALL TIMES. 10.CONSTRUCT WATER SYSTEM. TOP OF SEWER, A WHENEVER NECESSARY FOR (18) ALL FITTINGS TO BE MJ DIP WITH THRUST BLOCKING UNLESS 11. ROUGH GRADE THE SITE. 12. SHAPE SHOULDERS AND CUT AND ,,,iilliltttt11/1°j/j1t o (10) CROSSING A WATER MAIN OVER SEWER. OTHERWISE NOTED ON PLANS. FILL SLOPES. 600 ,.-,�P ee e ° A WATER MAIN TO CROSS OVER A SEWER, THE WATER MAIN SHALL BE (19) EXCELSIOR MATTING AND SEEDING TO BE USED ON SLOPES STEEPER 13. SCARIFY, SEED, FERTILIZE AND MULCH ALL DISTURBED AREAS. I1- 1= =� o r� LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN THAN 2: 1. SOD SHALL BE USED FOR ALL SLOPES FLATTER THAN 2: 1. 14. INSTALL DRY UTILITIES (ELECTRICAL, FIBER-OPTIC, CABLE, PHONE, ETC.). U o � �y ti o a Q N o 0 w IS AT LEAST EIGHTEEN 18 INCHES ABOVE THE TOP OF THE SEWER, (20) FINISHED FLOOR ELEVATION (FFE) IDENTIFIED ON THE PLAN IS 15. RE SCARIFY, RE -SEED, RE -FERTILIZE AND MULCH ALL DISTURBED AREA. (7 �r = e w N e UNLESS LOCAL CONDITIONS) OR BARRIERS PREVENT AN EIGHTEEN (18) INDICATIVE OF COMPACTED PAD GRADE TO WHICH 2"-4" OF 16. CONSTRUCT ROADBED BASE COURSE AND INTERMEDIATE ASPHALT COURSE. ¢ W V) a INCH SEPARATION --- IN WHICH CASE, BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH TOP SOIL WILL BE ADDED. SEE DETAIL 5/C.7.11. 17. APPLY FINAL ASPHALT COURSE. z --a z 1'. jjj O 'rr,'••,O�eeO00 1 eV�`*``` JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A (21) CONTRACTOR SHALL IMPLEMENT TRAFFIC CONTROL MEASURES IN 18. AFTER DISTURBED AREAS ARE STABILIZED WITH VEGETATION, THE CONTRACTOR SHALL LL_ p00 V DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE CROSSING. ACCORDANCE WITH M.U.T.C.D. RETURN TO THE SITE AND REMOVE ALL TEMPORARY EROSION CONTROL MEASURES. '°°°•,,,,11„tt„ti 2 RIP RAP W/ LEVEL SPREADER SEE DETAIL 5/C.7.10 SPILLWAY EL. 31.75 3:1 SLOPE MAX. 10,0,,YR STORM EL. = 31.27 7 �) � (`I i i--I { I —I I I —I I I—f I I k I( I — APPROXIMATE SEASONAL HIGH WATER TABLE ELEVATION = 29-00 INFIL. BASIN IA-1 BOTTOM: 31.00 SECTION Al -Al INFILTRATION BASIN 1A-1 DETAIL DETAIL SCALE: NOT TO SCALE eC.7. 7 BOTTOM EL. 30.00 100 YR. STORM EL. 30-17 -------32� ,P RAP CURB CUT III APPROX. 83 A3 15' SPILLWAY EL. 31.25 BERM EL. 32-25 SF 10 WA 111111111"t PLAN SPILLWAY EL. 31.25 Im, co co P4 -5 SCALE.- 1" =30' 30' 0 30' "m _9 SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. REVISION--- 3A - REVISED 15' SPILLWAY ELEVATION SCALE: 1 30' 30 0 30' SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. 3:1 SLOPE MAX. 100 YR STORM EL. = 30.17 . .... ... .. —�� I i f�.-1-7 ............ APPROXIMATE XIMATE SEASONAL HIGH WATER TABLE ELEVATION = 28.00 INFIL. BASIN 1 A-3 BOTTOM: 30-00 SECTION A3-A3 INFILTRATION BASIN 1 A-3 DETAIL DETAIL 3 SCALE: NOT TOSCALE BOTTOM I 100 YR. STORM CURB CUT cl co r SCALE:* 1 30' 30' 0 30' SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. PLAN SPILLWAY EL. 31-25 3:1 SLOPE MAX. 100 YR STORM EL. 30.41 --T-n 2- APPROXIMATE SEASONAL HIGH WATER TABLE ELEVATION = 28.00 INFIL. BASIN 1A-2 BOTTOM: 30.00 SECTION A2-A2 INFILTRATION BASIN 1A-2 DETAIL DETAIL SCALE: NOT TO SCALE C. J7.7 rn f-% rr r-% L I f-1 On-7 n e-, FLAN 3:1 SLOPE MAX. 15' SPILLWAY @ EL. 30.25 100 YR STORM EL. = 27.82 FG: 27.25 APPROXIMATE SEASONAL HIGH WATER TABLE ELEVATION = 24.00 INFIL. BASIN 1D-1 RIP RAP BOTTOM: 27.00 SEE DETAIL 5/C.7.10 SECTION Dl-Dl INFILTRATION BASIN 1D-1 DETAIL DETAIL r4 N*N\ SCALE: NOT TO SCALE C.7.7J 20 cq rn cq ai c: 04 Q. 0 z >1 E 4-a C4 ID .t:t (D 0 2 LL 0 z 0 4-a 0 c/) 0 co rn 4-1 LLJ L,LJ L-Li CE UZ C) LL. �© 0 Lj cr— '<c C (N N z Cl LE: 1 30' 0 30' � lF MAP MAY VARY nnc OFDc*DDnr%i in-nnKl N UVL- IV IVIL111 rv- SHEET NO. C. 7.7 0 Lo Zi L u nh Ch'ff v "I"ED o APR 2 3 2007 0 on UJ F= LLJ (n PROJ 0&c(.oc)L/(/co Ld w cq < uj zv- T- L F — 0 Q ....... 0 z lopilljoilill BOTTOM EL. 21 .00 100 YR. STORM EL. 26.05 1100- 000 SCALE 1 20' 20' 0$ 20$ SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. FROM COLLECTION SYSTEM BERM EL. 27.50 PLAN VIEW 15' SPILLWAY @ EL. 26.50 APPROX. 220' APPROX. 115' BERM EL. 27-50 BP_l 3:1 SLOPE MAX. 100 YR STORM EL. = 26.05 (-- .... .... ... .. --------- - f __ 1ill�w - - . 1 1-1 1 1-1 1 1i -1 1 1l 1 1-1 1 1 2 APPROXIMATE SEASONAL HIGH WATER TABLE ELEVATION 19.0 RIP RAP W/ iNFIL. BASIN 16 LEVEL SPREADER BOTTOM: 21.00 INV OUT 42" FLARED SEE DETAIL 5/C.7.10 (BYPASS) END SECTION INV OUT 21.00 SECTION 8-8 INLFILTRATION BASIN 1B DETAIL DETAIL K7� SCALE: NOT TO SCALE 15' SPILLWAY @ EL. 14.75 SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. BP-22 3:1 SLOPE MAX. BERM EL. 15-25 100 YR STORM EL. = 13.65 FROM COLLECTION ...... SYSTEM __ 2'1 I I I _�_ i7l-8\— APPROXIMATE SEASONAL HIGH WATER TABLE ELEVATION 10.0 RIP RAP INFIL. BASIN 1C INV OUT 30" FLARED SEE DETAIL 5/C.7.10 BOTTOM: 12-00 (BYPASS) END SECTION SECTION C-C INV OUT 12.00 INFILTRATION BASIN 1C DETAIL ABOVE GROUND INFILTRATION BASIN MAINTENANCE AGREEMENT 1. STORMWATER MANAGEMENT FACILITIES SHALL BE REGULARLY MAINTAINED TO ENSURE THEY FUNCTION AT DESIGN CAPACITY AND TO PREVENT HEALTH HAZARDS ASSOCIATED WITH DEBRIS BUILDUP AND STAGNANT WATER. THE PRIVATELY OWNED PORTION OF THE SYSTEM MUST BE PRIVATELY MAINTAINED. 2. RESPONSIBILITY FOR OPERATION AND MAINTENANCE OF STORMWATER FACILITIES, INCLUDING PERIODIC REMOVAL AND DISPOSAL OF ACCUMULATED PARTICULATE MATERIAL AND DEBRIS, BUT NOT LIMITED TO THE FOLLOWING: VISUAL INSPECTION OF ALL SYSTEM COMPONENTS AT LEAST TWICE EACH YEAR; VACUUMING OF ALL STORM SEWER INLETS ONCE EVERY SIX MONTHS (FREQUENCY OF VACUUMING MAY BE ADJUSTED TO ONCE A YEAR IF FIRST YEAR MAINTENANCE RECORDS INDICATE THAT SEDIMENT AND DEBRIS ACCUMULATION IS INSIGNIFICANT); REVERSE FLUSHING AND VACUUMING IF SYSTEM INSPECTIONS INDICATE SIGNIFICANT ACCUMULATION OF SEDIMENT IN THE PIPES; AND PERIODIC REMOVAL AND DISPOSAL OF OTHER MATERIAL AND DEBRIS, SHALL REMAIN WITH THE OWNER OR OWNERS OF THE PROPERTY, WITH PERMANENT ARRANGEMENTS THAT SHALL PASS TO ANY SUCCESSIVE OWNER, UNLESS ASSUMED BY A GOVERNMENTAL AGENCY. 3. IN THE EVENT THAT THE FACILITY BECOMES A DANGER TO PUBLIC SAFETY OR PUBLIC HEALTH, OR IF IT IS IN NEED OF MAINTENANCE, THE OWNER SHALL EFFECT SUCH MAINTENANCE AND REPAIR OF THE FACILITY IN A MANNER THAT IS APPROVED BY THE TOWNSHIP ENGINEER OR HIS DESIGNEE. IF THE OWNER FAILS OR REFUSES TO PERFORM SUCH MAINTENANCE AND REPAIR, THE MUNICIPALITY MAY IMMEDIATELY PROCEED TO DO SO IN ACCORDANCE WITH THE MAINTENANCE BOND. SCALE: 1" = 20' 20 0' 20 ABOVE GROUND INFILTRATION BASIN, MAINTENANCE AGREEMENT SCALE OF MAP MAY VARY DETAIL r4 DUE TO METHODS OF REPRODUC110N. SCALE.- NOT TO SCALE C.7.8j co C) I DETAIL 2 SCALE: NOT TO SCALE k (- 7,R I t5V I I VM LL. Z0. /U 100 YR. STORM EL. 26.47 AppRny 949 PLAN VIEW W REVISION 3 3A =INDICATED 15' SPILLWAY ELEVATION 15' SPILLWAY @ EL. 27.75 2t APPROXIMATE SEASONAL HIGH WATER TABLE ELEVATION = 23.70 Q �.�. �� ..III � ��I=�__-�� ��-- �� �►�� �1I �---� � w � a ., 0 &" �o INFIL.'BASIN 1D -2 � � U BOTTOM: 25.70 SECTION D2—D2 0 %%% t%%j%fl U- z V T000 *moo, z ' INFILTRATION BASIN 1D-2 DETAIL s Q APR 2 3 2007 < V) S DETAIL Z w z ll�. if'o *% 19 SCALE 1­0 SCALE: NOT TO W& 0&0 PROJ # 0 z 4i ICI 0 W rn C44 O cl C%l U) cq c c CL C14 0 z cz c cm >1 E 0) 0 2 LL VJ 0 z 0 co 0 T_ 4-J 0 cl) 0 LLJ Li-i � LLJ (f) Lu C) CN 02 C) 0 C) c� O cl—_ Lli c as U� C) QL 00 won" Lz - lj p C) CL 414) OL Q flu Q N CL Q� SHEET NO. C. 7.8 3:1 SLOPE MAX. 24,E g„ PARKING STRIP (FINISH GRADE) 1" DROP PROPOSED ROAD SURFACE 0 0 7" a � 4" ABC /EXISTING SUBGRADE GENERAL NOTES: 1.) CONTROL JOINTS SHALL BE PLACED @ 10' INTERVALS UNLESS OTHERWISE SPECIFIED BY ENGINEER, PLANS, OR SPECIFICATIONS. 2.) ALL CONTROL JOINTS SHALL BE FILLED WITH JOINT SEALER. 3.) EXPANSION/CONTRACTION JOINTS SHALL BE AT 90 FOOT INTERVALS, AND ADJACENT TO ALL RIGID OBJECTS. 4.) ALL JOINTS SHALL MATCH LOCATIONS WITH JOINT IN ABUTTING SIDEWALK. 5.} CONCRETE SHALL ACHIEVE A MINIMUM 28 DAY YIELD STRENGTH AT 3,500 PSI. VALLEY CURB DETAIL DETAIL SCALE: NOT TO SCALE ��-9 SLOPE VARIES 3:1 MAX EXISTING SUBGRADE ROW VARIES �_ ROW VARIES 24.00 FT - BOS 19.00 FT - EOS 19.00 FT - EOS 15.00 FT - BOC 15.00 FT - BOC 1 -� nn FT - FnP 1:� nn FT - FnR i i'. SLOPE 2.00% SLOPE ::i•:ii � is x - xt t �z::�ii: :� a �:::iz: •::aii:�:zsi. ..�;�r:�ss��.: vv-sw:r�� •r .ti�.`r I � 1 f �y1:�1:1:1:1:1:1... • •.�.r ..r 1 1•I_•'i�"��..,�_v__t...1�1 ♦ r � `•__....__�_v._ �Y...1_ . 11!.t SLOPE VARIES 3:1 MAX _ `- 5-0" CONCRETE SIDEWALK 5-0" CONCRETE SIDEWALK AT 2%, SEE DETAIL 4/C.7.11 AT 2%, SEE DETAIL 4/C.7.11 TYPICAL ROAD SECTION TYPICAL VALLEY CURB SEE DETAIL 3/C.7.9SEE DETAIL 1 /CJ.9 NOTES: (t) EOP =EDGE OF PAVEMENT NOTE: TYPICAL ROADWAY SECTION VARIES WITH CENTER LANDSCAPE ISLAND. (2) BOC =BACK OF CURB SEE PLAN VIEW FOR DIMENSIONS. (3) EOS =EDGE OF SIDEWALK (4) BOS =BACK OF SIDEWALK TYPICAL ROADWAY SECTION — t5> ROW = RIGHT OF WAY PRIMARY SUBDIVISION ROADS/BOULEVARDS DETAIL n SCALE: NOT TO SCALE V. APPROXIMATE PVC WATERLINE AND FORCEMAIN ELEVATION ELEV. 38.00 �- _I 3' MIN. r-- 12" MIN. ALUMINUM BOTTOMLESS CULVERT W/ WING WALL (WING WALL SHALL BE DESIGNED BY AND BARE THE SEAL OF P.E. LICENSED IN NORTH CAROLINA) SLOPE VARIES 3:1 MAX EXISTING SUBGRADE 5-0" CONCRETE SIDEWALK AT 2%, SEE DETAIL 4/C.7.11 PER MANUFACTURER INNER RADIUS PER MANUFACTURER APPROX. 24' INV 27.00 BOTTOM OF EXIST. STREAM (UNDISTURBED) APPROXIMATE DIP WATERLINE AND FORCEMAIN ELEVATION FINISHED GRADE 17 m tIF—IFi'--1i� I1III��IIIIIIII(I----)II—^— PER MANUFACTURER ALUMINUM BOTTOMLESS CULVERT DETAIL � SCALE: NOT TO SCALE C•7.9 ROW VARIES 17.00 FT — EOS 13.00 FT - BOC 11.00 FT - EOP 2.00% SLOPE ROW VARIES 22.00 FT - BOS 17.00 FT - EOS 13.00 FT - BOC 11.00 FT — EOP 2.00% SLOPE CONCRETE FOOTING PER MANUFACTURER'S SPECIFICATIONS (MIN. 4,000 PSI CONCRETE) w J ory cl�v W U w� SLOPE VARIES SLOPE VARIES 3:1 MAX J3:1 MAX 5-0" CONCRETE SIDEWALK AT 2%, SEE DETAIL 4/C.7.11 TYPICAL VALLEY CURB TYPICAL ROAD SECTION SEE DETAIL 1 f C.7.9 SEE DETAIL 3/C.7.9 NOTES: (1) EOP = EDGE OF PAVEMENT (2) BOC = BACK OF CURB (3) EOS = EDGE OF SIDEWALK (4) BOS = BACK OF SIDEWALK 5 ROW - RIGHT OF WAY 1" cP a r, A ca I FACE COURSE B BASE COURSE (ABC) COMPACTED SUBGRADE UPPER 8" MINIMUM OLL95 M8" %MAXIMDRPLIOTS AS REQUIRED � \ \ X \ \ \MAXIMUM DRY DENSITY THIS SECTION REPRESENTS THE MOST RESTRICTIVE PAVEMENT DESIGN SYSTEM. FINAL PAVEMENT DESIGN SYSTEM TO BE DETERMINED IN THE FIELD BASED ON FIELD CONDITIONS. MATERIALS SHALL MEET THE REQUIRED SECTIONS OF THE NCDOT STANDARD SPECIFICATION FOR ROADS AND STRUCTURES. LIGHT —DUTY ASPHALT PAVEMENT DETAIL 3 SCALE: NOT TO SCALE C. W VARI 19 nn FT - Rnr, ROW VARIES 22.00 FT - BOS 17.00 FT - EOS 1,) nn FT — Rnr 10.00 FT — EOP 10.00 FT — EOP 2.00% SLOPE 2.00% SLOPE REVERSE PAN VALLEY CURB TYPICAL ROAD SECTION SEE DETAIL 3/C.7.9 TYPICAL ROADWAY SECTION — kJ, "v'� - "�V��� yr ���� TYPICAL ROADWAY SECTION — SECONDARY SUBDIVISION ROADS ONE—WAY TRAFFIC CIRCLES DETAIL 5 DETAIL r6 SCALE: NOT TO SCALE CJ.9 SCALE: NOT TO SCALE CJ.9 I t.- oLli I o ry W U h- U SLOPE VARIES W d 3:1 MAX < . ,� ,.\ 1— c� 5-0" CONCRETE SIDEWALK AT 2%, SEE DETAIL 4/C.7.11 -TYPICAL VALLEY CURB SEE DETAIL 1 /C.7.9 NOTES: (1) EOP = EDGE OF PAVEMENT (2) BOC = BACK OF CURB LLJ w u LLJ -J o I--- ar n-- v c:7) o �- V) fl� Ld o zz� W Z ._._I w -- CL W co Q N ti LZ_U � U o_ w v °- Q p v l ct W ct SHEET NO. C. 7.9 Itt co N Z r_ 0 s 0 N a� - CIO 0 u. s 0 0 Q a 6 �U 0 to 06 c co U (3) EOS = EDGE OF SIDEWALK o (4) BOS = BACK OF SIDEWALK (5) ROW = RIGHT OF WAY rn Ca o o z i� lr_ pq • ° w •. w L Q Q 4�. w V tQj Q En z w z Lli 0W� o w ��� QLLiQ� mo Z_jZ°� W 0 '��Oa ° �U SLOPe VARIES TO TIE TO 4. LK-P.SLOPE_ 40 VARIES TO TIE TO FINISH GRADE NOTE: (1) USE PENSACOIA BERMUDAGRASS AS VEGETATED COVER (2) USE WOVEN PAPER NET AS CHANNEL LINER VEGETATIVE FILTER DETAIL 0 SCALE: NOT TO SCALE C.7.10 5,-0„ INVERT OUT LIGHT DUTY INLET GRATE NOTES: (1) ALL CONCRETE TO BE 3,600 P.S.I. (2) ALL CATCH BASINS MORE THAN S-6" IN DEPTH SHALL HAVE STEPS 12" ON CENTERS. (3) ALL PIPE IN STORM DRAIN STRUCTURE SHALL BE STRUCK EVEN WITH THE INSIDE WALL, GROUTED, AND BRUSHED SMOOTH. (4) 4'-0" BOX TO USED FOR STORMWATER PIPES 12"-24" AND 5'-0" BOX TO BE USED FOR STORMWATER PIPES GREATER 24" IN DIAMETER. STANDARD STORMWATER YARD INLET (YO DETAIL SCALE: NOT TO SCALE FINISH GRADE 21 3'-0" EXIST. GRADE MIN. 6" LAYERS OF HAND PLACED COMPACTED BACKFILL SEE SPECIFICATIONS PROVIDE UNIFORM AND CONTINUOUS SUPPORT OF PIPE BARREL BETWEEN BELL HOLES 2'-0" MIN. FINISHED GRADE X \ /- E 0 VARIES KIIIA � __ H D P E 3,- O„ NO - MIN. EXIST. GRADE A\ TRENCH WALLS MAY BE SLOPED \�- CONDUCTIVE TRACER TAPE /< #57 WASHED STONE TO 1 /6TH A DIAMETER OF PIPE O.D. _-------MINIMUM OF 4" OF NO. 57 WASHED STONE TO BRING TO GRADE NOTES: 1. SOIL FROM TRENCH SHALL BE PLACED TO ENSURE RUNOFF WILL RETURN TO THE TRENCH. 2. GROUND COVER ABOVE TOP OF PROPOSED WATERLINE SHALL BE A MINIMUM OF 3'. BEDDING FOR CLASS "C" HDPE PIPE DETAIL � SCALE: NOT TO SCALE &7•7 f HUB END ON C END SEC SPIGOT E INLET END SE( =Tjr , `!11 X L_ STEEL BA PLAN VARIES NATURAL GRADE =- RIP RAP =z 2 2 '-- �II- ca o .- . ..................... ........ I i 1 i LAYER OF FILTER FABRIC NOTE: MINIMUM H = 2/3 PIPE SECTION B-B GENERAL NOTES: 1. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER. 2. SIDEWALLS SHALL EXTEND UP AS SHOWN ON THE PLANS BUT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER. 3. THERE SHALL BE NO OVERFALL FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIP RAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. 4. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. 5. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. 6. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED. LEVEL SPREADER RIP RAP APRON REQUIREMENTS OUTLET # CLASS L w THICKNESS D50/WEIGHT CO-1 1 8' 6' 24" 5-200 LB. CO-2 A 4' 6 12" 2"-6" CO-3 B 6' 6, 18" 5"-15„ CO-4 A 4' 6' 12" 2"-6" 1B BASIN 2 10' 10.5' 36" 25-250 LB. 1 B BYPASS 1 8' 10.5' 24" 5-200 LB. 1 C (BASIN & BYPASS) B 6' 7. 5' 18" 5" -15" 1 C SWALE A 8' 16 12 2"-6" 1 D-CC SEE DETAIL 7/C.7.10 FOR PIP RAP SPECIFICATIONS 1 D-2 A 4' 4' 12„ 2"-6„ RIP RAP APRON FOR FLARED END SECTION DETAIL � SCALE: NOT TO SCALE C7.10) INFILTRATION Cl A C' 1 A 1 BY-PASS LINE FROM DRAINAGE AREA BY-PASS LINE " "' ISOLID _E COVER MARKED SEWER' NOTES: (1) THICKNESS OF CONCRETE TO BE 6" UNLESS OTHERWISE STATED INSTALL SOLID MANHOLE COVER MARKED 'STORM SEWER' BYPASS WEIR: B INV. IN: C INV. OUT: D BYPASS LINE INV. OUT: E SUMP: F BOTTOM: G BASIN INVERT ELEVATIONS A B C D E F G 1 B 28.00 26.50 21.81 23.22 21.81 21.00 19.50 1C 16.00 14.25 12.11 13.40 12.11 11.11 9.61 STORMWATER BY-PASS BOX DETAIL I f/ SCALE: NOT TO SCALE M a ?� N rn i a \ c 0 co N z c o C E •z, L.. � o •!-j c N N r Ll c cn c� 0 i o .c v z M 0 r .ram � a 0 a)t��/ LJ �U 0 a co r- 0) co as JOINT SEALER NOTE: CONCRETE SPILLWAYS 'SHALL 1 /8"R. SURFACE OF BE CONSTRUCTED WITH A 4-INCH GUTTER DROP OR AT THE SLOPE OF ADJACENT GROUND, WHICHEVER IS aGREATER. CONCRETE SPILLWAY ( 1 /2„ JOINT FILLER APPROX. 60" X 24") a. a TRANSVERSE EXPANSION JOINT eGUTTEX ° A O a 4IN CURB AND GUTTERC4 CC CURB: n CURB 4a ° ao 4 o .. 12" #4 REBAR a d a< o 1 -6"* 6 (EMBEDED 6") 4 N 1 " 12" 1 /4" 1 "R CURB CUT Q RIP RAP .APRON SUFACE oa e a Q 4 12„ L10' , BASE TREATMENTAND 7„ a n1 �4„ a a W = 6.5 4 D50 = 2-6' $ ° ° a - COURSE � ° o °a THICKNESS '- 12" ROLLED CURB OR STANDARD PLAN VIEW 2'-p"* CURB AND GUTTER 12" 12" _=-- 60" -..�-- GENERAL NOTES: 1. CONTRACTION JOINTS SHALL BE SPACED AT 10 FOOT INTERVALS, NO LIP EXCEPT THAT A 15 FOOT SPACING MAY BE USED WHEN A MACHINE GUTTER 14� IS USED OR WHEN SATISFACTORY SUPPORT FOR THE FACE FORMCAN BE OBTAINED WITHOUT THE USE OF TEMPLATES AT 10 FOOT °> INTERVALS. JOINT SPACING MAY BE ALTERED BY THE ENGINEER TO PREVENT UNCONTROLLED CRACKING. 2. CONTRACTION JOINTS MAY BE INSTALLED BY THE USE OF TEMPLATES OR FOR BY OTHER APPROVED METHODS. WHERE SUCH JOINTS ARE NOT FORMED BY TEMPLATES, A MINIMUM DEPTH OF ; 1 1 /2" SHALL BE OBTAINED. 3. ALL CONTRACTION JOINTS SHALL BE FILLED WITH JOINT SEALER. 3" R. (TYP) 4. EXPANSION JOINTS SHALL BE AT 90 FOOT INTERVALS, AND SECTION CC -CC ADJACENT TO ALL RIGID OBJECTS. 5. JOINTS SHALL MATCH LOCATIONS WITH JOINT IN ABUTTING SIDEWALK. 6. CONCRETE SHALL BE 4,000 PSI. CONCRETE CURB &GUTTER DETAIL SCALE: NOT TO SCALE U W C� � � � �o on- Q W � C) w W � � C) w L.. d � 4.. W UJ Q \ N � W O � -_' U Q. U w 4' W 0 z 0 te. SHEET NO. C. 7. 10 N o N � �. Q o a o cr_ U W W STANDARD CURES CUT U tJ Q. Gl V to DETAIL r7 SCALE: NOT TO SCALE C.7.10 ►,������,��u,,,�l�.,,, r"� z w z 4• e .. fib•,, e w n :�ocn N J z U- #4 REBAR @ 3, 500 PSI CON C. " 4" CONCRETE SIDEWALK 12" O.C. 6 EXPANSION/CONTRACTION HORIZ. A JOINT :d v d..° �• d v a d..°• .4,' ° 4 A va. d °.a a : 2 MIN. CLEARANCE a f CONCRETE SUPPORT BLOCK AFFIXED TO CONC, a �� . CONCRETE CHANNEL °d CHANNEL WITH TYPE S MORTAR (3 Yz„ X 611 X 51 ) 4" GRAVEL 5' 12" (TYP.) NOTE: ALL CONCRETE SHALL 2„ Q• a xi o ACHIEVE MINIMUM 28-DAY, YIELD STRENGTH OF 3,500 PSI T 2" MIN. (TYP.) #4 REBAR @ 12" O.C. HORIZ SECTION A -A y CONCRETE SIDEWALK BRIDGE DETAIL 1 SCALE: NOT TO SCALE Kz".11/ PRECAST LID MARKED "STORM SEWER" FINAL GRADE ..�.— 12 (TYP.) a�a , 48" MIN. .4 . VARIES A • a a' D FLOW CHANNEL 6" MIN. a `s PRE -CAST GRADE RINGS (3 MAX.) E.P.D.M. SLEEVE CAST IN CONCRETE - PRE -CAST ECCENTRIC CONE SECTION (FOR MANHOLES OVER 6' DEEP) ELASTOMERIC RUBBER BOOT WITH STAINLESS STEEL CLAMP INTEGRALLY CAST INTO MANHOLE FOR 8" 0 THRU 24110 PIPES (TYP.) 6" „A" - PRE -CAST RISER SECTIONS (AS REQUIRED) RUBBER GASKET AND CEMENT GROUT AT EACH JOINT IN CONFORMANCE WITH ASTM C-443 2" MIN. 2" MIN. ----- 4" MIN. `— UNDISTURBED SOIL JUNCTION BOX (JB) DETAIL 3 SCALE: NOT TO SCALE �_7.1 THE STRUCTURE SHALL BE PLACED ON A MINIMUM OF 6" OF 3/4" WASHED STONE, SUBJECT TO REVIEW! OF SOIL CONDITIONS BY A GEOTECHNICAL ENGINEER. INSTALL SOLID MANHOLE COVER MARKED 'STORM SEWER' m R = 24" MIN. PIPE IN AND OUT OF MANHOLE TO BE CRADLED IN 3,500 LB. CONC. OR BEDDED IN STONE AS ORDERED SECTIONAL PLAN BY ENGINEER NOTES: 1. THE STORM MANHOLE CONCRETE STRUCTURE SHALL BE PRECAST CONCRETE TO MEET A MINIMUM OF H-20 LOADING. ALL UNITS SHALL BE CONSTRUCTED AND REINFORCEDIN ACCORDANCE WITH THE APPROPRIATE ASTM, ACI, AND AASATO STANDARDS. ALL PRECAST SECTIONS SHALL BE JOINED USING A GASKET AND CEMENT GROUT TO PRODUCE A LEAK -PROOF JOINT. 2. ALL PIPES ENTERING OR LEAVING THE STRUCTURE SHALL BE INSTALLED WITH AN ELASTOMERIC RUBBER BOOT AND S.S. CLAMP. 8" FOR BRICK, 6" FOR CLASS "B" CONCRETE OR CONC. BLOCK A L No 5-0" FINISHED GRADE TO BE FLUSH *".�'? u WALKWAY VARIES SLOPE 1 /4" PER FT. FROM R.O.W. APPROVED COMPACTED SUBGRADE SECTION 3'-6" A 114L1- I 1 \JVIIut'1 IIVIV TO BE EXTENDED 6" WHERE DEPTH EXCEEDS 8' NOTE: 1. ALL INLETS SHALL BE PRECAST, REINFORCED CONCRETE WITH A MINIMUM 28-DAY YIELD STRENGTH OF 3,500 PSI. ALL INLETS SHALL MEET A MINIMUM OF H-20 LOADING. 2. CONTRACTOR SHALL BE REQUIRED TO INSTALL 20 LINEAR FEET OF LONGITUDINAL UNDERDRAIN ON EACH SIDE OF ALL CATCH BASINS LOCATED IN ROADWAY UNDER VERTICAL CURVES OR ROADWAY SUMP AREAS. THE UNDER DRAINS SHALL BE INSTALLED IN ACCORDANCE W/ NCDOT STANDARDS AND PLACED ON BOTH SIDES OF THE ROAD IN LOW AREAS. CURB INLET (Cl) DETAIL r7 SCALE: NOT TO SCALE �.7.11 NV_ iy co" 1 3 MIN. 4" SELECT FILL COMPACTED TO 95% OF STANDARD PROCTOR 4" AIR ENTRAINED CONC. 4,000 P.S.I. @ 28 DAYS NOTE A: TRANSVERSE EXPANSION JOINTS 1 /2" WIDE SHALL BE PROVIDED AT INTERVALS OF NOT MORE THAN 20 FEET AND FILLED WITH PREFORMED BITUMINOUS CELLULAR TYPE JOINT FILLER. CONTRACTION JOINTS SHALL BE PLACED ON 5 FEET INTERVALS. LONGITUDINAL JOINTS 1 /4" WIDE SHALL BE PROVIDED BETWEEN CURBS ABUTTING SIDEWALKS, AND SHALL BE FILLED WITH PREFORMED BITUMINOUS TYPE JOINT FILLER. THE TOP OF ALL JOINT FILLER SHALL BE 1 /4" BELOW THE TOP OF THE SIDEWALK. SIDEWALK DETAIL DETAIL KO'4 SOLE: NOT TO SCALE C.7.11 3. THE INLET FRAME AND GRATE/COVER SHALL BE FABRICATED TO MEET A MINIMUM OF H-20 LOADING, UNLESS PRE -APPROVED IN WRITING BY THE ENGINEER, OR UNLESS NOTED ON THE INDIVIDUAL STRUCTURE NOTES. 4. ALL PIPES SHALL EXTEND NO MORE THAN 1 INCH INTO THE STRUCTURE. 5. A 3,500 PSI MIN. CONCRETE PIPE FLOW CHANNEL SHALL BE INSTALLED IN THE STRUCTURE BOTTOM, AFTER ALL THE PIPES ARE INSTALLED, OR THE FLOW CHANNELS CAN BE PRECAST WITH THE BASE. RE`.PREAD 4" TOPSOIL AND STABILIZE (TYPICAL ALL DISTURBED AREAS) FINISHED FLOOR ELEVATION DR BRICK, DR CLASS "B" ',RETE ;ONC. BLOCK, 'RECAST „D„ TE CONCRETE DRIVEWAY v J -0 17' MIN. zzQ 6" THICK CONCRETE � zJ � Caw - o APRON WITH FIBER + w 0 Ln MESH ON 6" ABC Ln Co- o =-- -i 20' MIN. 24" CONCRETE VALLEY CURB FINISHED FLOOR ELEVATION COMPACTED PAD GRADE PAD GRADING DETAIL DETAIL SCALE: NOT TO SCALE HOT MIX PAVEMENT TYPICAL CONCRETE APRON DETAIL DETAIL 6 SCALE: NOT TO SCALE C.7.11 6" (+/- 1 /2") COMPACTED PAD GRADE SWALE NOTE: CONTRACTOR TO MAINTAIN POSITIVE DRAINAGE IN HOUSE PAD AREAS AND THROUGHOUT PROJECT AT ALL TIMES. L9 :3 �2. r. n�1 W c S2. _c: Rf Jc EJ L_ Jc to .0 0 W W w z o C�3 UZ i -�- c �O �O \�J Lu W 2. Ld � N w 2 � a w U Q` U) V) S: 0 0 or G1i cr. SHEET NO. C. 7. 1 1 0 �r OD N z c 0 E N n a� cn c 0 U- r 0 z 0 _M Q 4 0 a co U 0, c � Q flcr W U� Z W N Nam.. � o cic w a •- Q z - w z � ,� eeee aaaaao. -1' 5•,,, \0 e r„ © Ld � LL. 'w A O in 1. `v a {�► w < 1— • O Q �j r ` zLli 0 �Yd Of