Loading...
HomeMy WebLinkAboutNCC200139_NOT Signed Certification (2)_20220311North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 County: Duplin Project: Fairfield Inn & Suites Wallace Person financially responsible: Duplin Land Development, Inc. - Terry Tate, Vice Project # President Address: PO Box 1139, Wallace, NC 28466-1139 1. Project Location: River Village Place, Hwy 41, Wallace Pictures: No 2. Weather and soil conditions: 50s cloudy 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: River basin: Cape Fear DUPLI-2020-014 Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No if Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: 10. Comments: File closed. Title: Date given/sent: March O1, 2022 Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. brian.lambe@ncdenr.gov Reported by: Brian Lambe Others present: Date of inspection: March 01, 2022 Time arriving on site: 10:00 AM Time leaving site: 10:20 AM cc: