HomeMy WebLinkAboutSite inspection 3.14.22 NC 69Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20190210
NCDOT - NC 69 Widening (A-0011C)
Clay
NCDOT - NC 69 Widening (A-0011C)
NC DOT Division 14 - Sylva
3/14/2022
Routine
Site Inspection (DOT)
Version: 2 Status:Issued
Project Type:Road/Highway Widening
Region:Asheville
Longitude:-83° 49' 32''+35° 00'
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on March 14, 2022. Nick Adams
was present during the inspection. The following are items that need attention:
- 186+50 RT L (Site 15) - Extend rip rap to beginning of wing wall per plan.
- 147+00 RT L - Remove sediment from JS. Sediment was from an off site source. This was completed during the site
visit with follow up pictures received on 3.14.22. I have spoken to the landowner and will continue to work to get the site
into compliance.
- 70+00 LT L - Remove sediment from JS. Maintain measures in ditch. Follow up pictures were received on 3.17.22.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20190210
3/14/2022
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Station 186+50 RT L (Site 15). Rip rap should be extended to beginning of wingwall on the left bank
desceding per the plan.
Comment:
page:2