Loading...
HomeMy WebLinkAbout20220436 Ver 1_SAW-2021-01521 Executed PCN Albemarle Road Project_20220316 Nationwide Permit 14, 58 Verification Request Pre-Construction Notification Albemarle Road Project Forestar Group, Inc. Town of Midland, Cabarrus County, NC Section 3. Owner Information - Supplement PIN: 55242891230000 3a. Name on Recorded Deed PIONEER MILL ROAD LLC A NC LLC INGLEFIELD ENTERPRISES LTD Mailing Address: C/O SSP SE LAND MANAGEMENT CHARLOTTE 2820 Selwyn Ave., Ste. 500 Charlotte, NC 28209 3b. Deed Book/Page No. 3519-0282 3c. Responsible Party (for LLC if applicable) C/O SSP SE LAND MANAGEMENT CHARLOTTE 3d. Street Address 2820 Selwyn Ave., Ste. 500 3e. City, State, Zip Charlotte, NC 28209 3f. Telephone No. (843) 768-3472 3g. Fax No. N/A 3h. Email Address N/A PIN: 55241713420000 3a. Name on Recorded Deed ALBEMARLE ROAD-HOWELL ROAD LLC 3b. Deed Book/Page No. 6113-0113 3c. Responsible Party (for LLC if applicable) C/O SSP SE LAND MANAGEMENT CHARLOTTE 3d. Street Address 2820 Selwyn Ave., Ste. 500 3e. City, State, Zip Charlotte, NC 28209 3f. Telephone No. (843) 768-3472 3g. Fax No. N/A 3h. Email Address N/A PIN: 55147962500000; 55158170600000 3a. Name on Recorded Deed LOWER ROCKY RIVER-MORRISON RD LLC 3b. Deed Book/Page No. 13268-0018 3c. Responsible Party (for LLC if applicable) C/O SSP SE LAND MANAGEMENT CHARLOTTE 3d. Street Address 2820 Selwyn Ave., Ste. 500 3e. City, State, Zip Charlotte, NC 28209 3f. Telephone No. (843) 768-3472 3g. Fax No. N/A 3h. Email Address N/A PIN: 55241598530000 3a. Name on Recorded Deed Mrs. Jessie G. Baker 3b. Deed Book/Page No. 297-130 3c. Responsible Party (for LLC if applicable) N/A 3d. Street Address 1077 Wadesboro Road 3e. City, State, Zip Tallahassee, FL 32317 3f. Telephone No. 850-445-4092 or 850-212-3297 3g. Fax No. N/A 3h. Email Address N/A C. Proposed Impacts Inventory 1.1.Impacts SummaryImpacts Summary 1a.1a.Which sections were completed below for your project (check all that apply): Which sections were completed below for your project (check all that apply): Wetlands Wetlands Streams Streams --tributariestributariesBuffBuffers ers Open Waters Open Waters Pond Construction Pond Construction 2.2.Wetland ImpactsWetland Impacts If there are wIf there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.etland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2a. 2b. 2b. 2c. 2c. 2d. 2d. 2e. 2e. 2f. 2f. Wetland impact Wetland impact Type of Type of jurisdictionjurisdiction number number Type of impactType of impactType of wetlandType of wetlandForestedForested(Corps (Corps --404, 10404, 10Area of impact Area of impact Permanent (P) or Permanent (P) or (if known)(if known)DWQ DWQ nonnon--404, other)404, other)(acres)(acres) Temporary (T)Temporary (T) Yes Yes Corps Corps W1 W1 P P TT NoNoDWQDWQ Yes Yes Corps Corps W2 W2 P P TT NoNoDWQDWQ Yes Yes Corps Corps W3 W3 P P TT NoNoDWQDWQ Yes Yes Corps Corps W4 W4 P P TT NoNoDWQDWQ Yes Yes Corps Corps W5 W5 P P T T NoNoDWQDWQ Yes Yes Corps Corps W6 W6 P P TT NoNoDWQDWQ See Following Supplemental Information 2g2g. Total wetland impacts. Total wetland impacts 2h. Comments: 2h. Comments: 3.3.Stream ImpactsStream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted.question for all stream sites impacted. 3g.3g. 3a.3a.3b.3b.3c.3c.3d.3d.3e.3e.3f.3f. Impact Impact Stream impact Stream impact Type of impactType of impactStream nameStream namePerennial Perennial Type of jurisdictionType of jurisdictionAverage Average length length number number --(PER) or (PER) or stream stream (Corps (Corps --404, 10404, 10 (linear (linear Permanent (P) or Permanent (P) or intermittent intermittent width width DWQ DWQ nonnon--404, 404, feet)feet) Temporary (T)Temporary (T)(INT)?(INT)? (feet)(feet) other)other) PER PER Corps Corps S1 S1 P P TT INTINTDWQDWQ PER PER Corps Corps S2 S2 P P TT INTINTDWQDWQ PER PER Corps Corps S3 S3 P P TT INTINTDWQDWQ PER PER Corps Corps S4 S4 P P TT INTINTDWQDWQ PER PER Corps Corps S5 S5 P P TT INTINTDWQDWQ PER PER Corps Corps S6 S6 P P TT INTINTDWQDWQ 3h.3h.Total stream and tributary impactsTotal stream and tributary impacts 3i. Comments: 3i. Comments: Page 5 of 11 PCN Form Version 1.3 December 10, 2008 Version Pre-Construction Notification Supplemental Information SAW-2021-01521 Albemarle Road Project C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which Sections were completed below for your project (check all that apply): X Wetlands X Streams - Tributaries ___Open Waters ___Pond Construction ___Buffers 1. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland Impact 2b. Type of 2c. Type of 2d. 2e. Type of 2f. Area Number Impact Wetland (if Forested? Jurisdiction (Corps of Impact Permanent (P) or known) 404, 10; DWR (Acres) Temporary (T) Non-404, other) W1 (P) Culvert Headwater Yes 404 0.03 W2 (P) Culvert Freshwater Yes 404 0.04 Forested W3 (P) Grading Basin Yes Non-404 0.31 W4 (P) Grading Basin Yes Non-404 0.16 W5 (T) Utility Freshwater Yes 404 0.12 Easement Forested (Sanitary Sewer) W6 (T) Utility Freshwater Yes 404 0.16 Easement Forested (Sanitary Sewer) 2g. Total Wetland Impacts 0.82 acre 2h. Comments: Nationwide Permit 14 Impacts Proposed permanent impacts W1 and W2 are necessary to construct road access to high ground and to provide adequate emergency vehicle access to the project area. Proposed permanent impacts W3 and W4 are necessary to grade (balance) the area to construct road access to high ground and to provide adequate emergency vehicle access to the project area. Total proposed NWP 14 permanent wetland impacts (404 jurisdiction): 0.07 acre Total proposed NWP 14 temporary wetland impacts (404 jurisdiction): N/A Total proposed non-404 permanent wetland impacts (NC Isolated Wetland): 0.47 acre Nationwide Permit 58 Impacts Proposed Temporary impacts W5 and W6 are necessary to construct sanitary sewer infrastructure. Total proposed NWP 58 permanent wetland impacts (404 jurisdiction): N/A Total proposed NWP 58 temporary wetland impacts (404 jurisdiction): 0.28 acre Pre-Construction Notification Supplemental Information SAW-2021-01521 Albemarle Road Project 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream 3b. Type of 3c. 3d. 3e. Type of 3f. 3g. (ACRES Impact Impact Stream Perennial Jurisdiction Average Impact OF Number name (PER) or (Corps Stream Length IMPACT) Permanent Intermittent 404,10 Width (Linear (P) or (INT) DWR (Feet) Feet) Temporary Non-404, (T) other) S1 (P) Culvert Tributary INT 404 2.5 86 0.005 11 S2 (P) Culvert Tributary INT 404 2.5 97 0.006 10 S3 (P) Culvert Tributary INT 404 4 142 0.013 9 S4 (P) Culvert Tributary PER 404 4 110 0.01 13 S5 (P) Culvert Tributary INT 404 2 111 0.005 14 S6 (P) Energy Tributary INT 404 2.5 39 0.002 Dissipator 11 (Riprap) S7 (P) Energy Tributary INT 404 2.5 33 0.002 Dissipator 10 (Riprap) S8 (P) Energy Tributary INT 404 4 33 0.003 Dissipator 9 (Riprap) S9 (P) Energy Tributary PER 404 4 39 0.004 Dissipator 13 (Riprap) S10 (P) Energy Tributary INT 404 2 39 0.002 Dissipator 14 (Riprap) S11 (T) Utility Tributary PER 404 8.5 30 0.006 Easement 1 (Sanitary Sewer) S12 (T) Utility Tributary PER 404 8.5 30 0.006 Easement 1 (Sanitary Sewer) S13 (T) Dewatering Tributary INT 404 2.5 40 0.002 11 S14 (T) Dewatering Tributary INT 404 2.5 40 0.002 10 S15 (T) Dewatering Tributary INT 404 4 40 0.004 9 Pre-Construction Notification Supplemental Information SAW-2021-01521 Albemarle Road Project S16 (T) Dewatering Tributary PER 404 4 40 0.004 13 S17 (T) Dewatering Tributary INT 404 2 40 0.002 14 3h. Total Stream and Tributary Impacts 989 0.078 Linear Acres Feet 3i. Comments: Nationwide Permit 14 Impacts Proposed permanent impacts S1-S5 are necessary to construct road access to high ground and to provide required emergency vehicle access to the project area. Culvert details at each crossing are as follows: S1 72 RCP, 102.56 LF @ 1.02% S2 72 RCP, 96.93 LF @ 3.05% S3 60 RCP, 111.02 LF @ 2.43% S4 60 RCP, 86.03 LF @ 4.78% S5 72 RCP, 84.85 LF @ 3.12% Proposed permanent impacts S6-S10 are necessary to provide energy dissipation at culvert outlets. Riprap will be keyed into the channel bed to facilitate continued aquatic life passage. Proposed temporary impacts S13-S17 request up to 40 linear feet of temporary impacts for dewatering to establish work-in-the-dry conditions, and will utilize coffer dam and pump-around (or similar) methods to dewater. Total proposed NWP 14 permanent stream impacts (404 jurisdiction): 729 linear feet, 0.052 acre Total proposed NWP 14 permanent loss of stream bed (404 jurisdiction): 546 linear feet, 0.039 acre Total proposed NWP 14 temporary stream impacts (404 jurisdiction): 200 linear feet, 0.014 acre Nationwide Permit 58 Impacts Proposed temporary impacts S11-S12 are necessary to construct sanitary sewer infrastructure. Total proposed NWP 58 permanent stream impacts (404 jurisdiction): N/A Total proposed NWP 58 temporary stream impacts (404 jurisdiction): 60 Linear Feet, 0.012 acre Water & Land Solutions, Upper Rocky River Umbrella Mitigation Bank; NC DMS if no private available The applicant proposes a 2:1 mitigation ratio to offset unavoidable impacts to aquatic resources. An SOA has been requested from both NCDMS and Water & Land Solutions in the event private bank credits are unavailable should a permit verification be issued.