Loading...
HomeMy WebLinkAboutNCC221032_ESC Approval Submitted_20220316ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director Gilbane Building Co. Attention: Al Miller 620 South Tryon Street, Suite 350 Charlotte, North Carolina 28202 c STATtq fNam ,* NORTH CAROLINA Environmental Quality February 24, 2022 LETTER OF APPROVAL RE: Project Name: Project Cardinal Acres Approved: 79.45 Project ID: CABAR-2022-062 County: Cabarrus City: Concord Address: Concord Parkway River Basin: Yadkin Stream Classification: Other Submitted By: Gilbane Building Co Date Received by LQS: February 23, 2022 Plan Type: Revised Dear Mr. Miller: This office has reviewed the subject erosion and sedimentation control plan: We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO 1. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. North Carolina Department of Environmental Quality i Division of Energy, Mineral and Land Resources Mooresville Regional Office 1610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704-663-1699 Letter of Approval Gilbane Building Co. February 24, 2022 Page 2 of 2 Title 15A NCAC 413 .0118(a) and the NCGO I permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO I permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, 69_ t,Z eo mote James Moore Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCGOI Fact Sheet em: inunez@landdesign.com cc:Inspection Department Fact Sheet on the New NCGO1 Permit April • Organizational Updates The new permit: • Repeats state requirements for E&SC Plans and organizes them with federal construction activity requirements; • Is clearly organized by topic; and • Has less text and more tables. Technical Updates The new permit: • Requires that the E&SC Plan meet SWPPP requirements (p. 2); • Provides a list of items that must be included in the SWPPP, such as the construction sequence, plans, calculations, etc. (p. 2-4);' • Has updated language on bypasses and upsets that is tailored to construction activities (p. 10); • Puts all timeframes for inspections, record -keeping and reporting in "calendar days" for clarity and consistency (p. 11-14);2 • Changes the inspection frequency (during business hours) to at least once per 7 calendar days and after every storm > 1.0 inch (previously 0.5 inch);' and • Excludes weekends, state and federal holidays from normal business hours unless construction activities take place (p. 23). 1 This list is based on website guidance by the DEMLR Sediment Program. z The number of calendar days was selected to be as equivalent as possible with the previous permit. ' The intent is to provide predictability to the inspection schedule. Acronyms to Know COC: Certificate of Coverage, proof of coverage under an NCGO1 permit DEMLR: NC Division of Energy, Mineral, and Land Resources E&SC: Erosion & Sedimentation Control e-NOI: Notice of Intent, application form for the NCGO1 permit e-NOT: Notice of Termination, form for closing out the NCGO1 permit SWPPP: Stormwater Pollution Prevention Plan, required by the NCGO1 The NCGO1 Process The new MCG01 applies to permits approved on or after April 1, 2019. Permittees will no longer receive a copy of the NCGO1 permit in the mail with their E&SC Plan approvals and be considered as covered under the permit. Federal rules require that DEMLR receive an NOI on each construction project and issue each construction project its own COC. Under the new NCGO1 process, construction sites will continue to receive approval for E&SC Plans from either DEMLR or the delegated local E&SC program just like before. After receiving E&SC Plan approval, permittees will officially obtain coverage under the NCGO1 by completing an e-NOI (available at deg.nc.gov/NCG01). The e-NOI will only take about 20 minutes to fill out and submit on-line. Initially, there will be no charge associated with applying for an NCGO1 permit but on or around June 1, 2019, DEMLR will begin charging a $100 annual general permit fee as required per §143-215.3D. DEMLR is working on creating a single application form that will allow an applicant to simultaneously apply for an E&SC permit and an NCGO1 COC. That effort is part of a larger Permit Transformation project at DEMLR.