Loading...
HomeMy WebLinkAboutSW3211201_Email_20220316 Farkas, Jim J From:Farkas, Jim J Sent:Wednesday, March 16, 2022 3:35 PM To:Dan Rossi Cc:cbridges@rjoeharris.com; planner@townofweddington.com; Khan, Zahid Subject:RE: SW3211201; Hemby Road Good Afternoon, The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete Stormwater Management Permit Application for the subject project on January 25, 2022. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 - 1062 rules. We are forwarding Permit No. SW3211201, dated March 16, 2022, for the construction, operation and maintenance of the subject project and the stormwater system. This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permits that may be required. The original signed permit package and plans are being mailed to the permittee, Jamie Pou, at the following address (NOTE: An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): Toll Southeast LP Company, Inc. Attn: Jamie Pou, Division President 14529 Grand Palisades Parkway Charlotte, NC 28278 I will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made) after which point, they will be kept on file at the Mooresville Regional Office. If you have any questions, or need additional information concerning this matter, please contact me at jim.farkas@ncdenr.gov. Thank you, Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources – Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim.Farkas@ncdenr.gov 1 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Farkas, Jim J Sent: Wednesday, January 19, 2022 2:34 PM To: Dan Rossi <drossi@tollbrothers.com>; cbridges@rjoeharris.com Cc: Moore, James <james.moore@ncdenr.gov> Subject: RE: SW3211201; Hemby Road Good Afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application th for the subject project on December 6, 2021. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Thank you, Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources – Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim.Farkas@ncdenr.gov 2 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Farkas, Jim J Sent: Monday, December 6, 2021 3:23 PM To: Dan Rossi <drossi@tollbrothers.com>; cbridges@rjoeharris.com Cc: Moore, James <james.moore@ncdenr.gov> Subject: SW3211201; Hemby Road Good Afternoon, We received your applications for the above mentioned projects on 12/6/2021. Reviews under the standard permitting process generally take 30 – 45 calendar days, but can take up to 90 calendar days per statute (our other reviewer, Corey Anen, no longer works for the State, so this review will probably be closer to 45 days than 30). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. Please type in permit #: SW3211201 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. Thank you, Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources – Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 3 Jim.Farkas@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Farkas, Jim J Sent: Monday, November 22, 2021 10:56 AM To: Dan Rossi <drossi@tollbrothers.com>; cbridges@rjoeharris.com Cc: Moore, James <james.moore@ncdenr.gov> Subject: Hemby Road; 13301 Providence Road, Weddington, NC Good Morning, We received your application for a new post-construction stormwater permit on 11/18/2021. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 12/22/2021) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. - 1x original signed (in pen) & sealed hard copy of the Supplement-EZ Form. This item is required per Section V and Section VI, 3 of the Application. The provided hard copy appears to be a photocopy (not an original). - Please provide official documentation showing that Dan Rossi has signatory authority for the Applicant, Toll Southeast LP Company, Inc. This item is required per Section VI, 11 of the Application. The information on the Secretary of State’s website does not list Mr. Rossi’s name. - Please provide a note on the plans indicating the individual that made the on-site wetland determination. This item is required per Section VI, 8m of the Application. It is noted that the on-site wetlands are delineated on the plans, however, the plans must also list the individual that made this determination. NOTE: This is an administrative completeness review, not a detailed engineering review. The following items were noted during this review, but do not need to be addressed for this submission to be administratively complete and accepted for review (but these issues, and possibly others, will probably be brough up during the engineering review): - The city, county and ZIP code of the project are not included in Section I, 2 of the Application - This application is not a modification of an existing permit (Section II, 1a & 1b) since the existing permit has since been rescinded. - Please indicate any additional permits that this project requires, such as an E&SC permit (Section II, 4a & 4b). - Since the Applicant is also the Property Owner, Section III, 2 and Section IX should not be filled out. - Please provide a point of contact for the Town of Weddington (Section III, 4). Once the permit is issued, we will Cc this individual so that they have a copy of the permit (in case they need it before issuing the Certificates of Occupancy). 4 If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process generally take 30 – 45 calendar days, but can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant so this review will probably be closer to 45 days than 30). Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. Thank you, Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources – Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim.Farkas@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. 5