Loading...
HomeMy WebLinkAbout20220421 Ver 1_Plan - HEC-RAS (3) Crossing - McCaskill - 2020-10-19_20220315 Existing 319.34 258.27 193.66 113.15 0 McCaskill Existing 319.34 260 258.27 193.66 113.15 0 McCaskill 0 50 100 150 200 250 300 326 327 328 329 330 331 332 Stream Crossing Plan: Plan 06 4/8/2021 Main Channel Distance (ft)Elevation (ft)Legend EG 100 Year Flood WS 100 Year Flood Crit 100 Year Flood Ground McCaskill Existing 0 50 100 150 200 250 300 326 327 328 329 330 331 332 333 Stream Crossing Plan: Plan 07 4/9/2021 Main Channel Distance (ft)Elevation (ft)Legend EG 100 Year Flood WS 100 Year Flood Crit 100 Year Flood Ground McCaskill Existing 319.34 258.27 193.66 113.15 0 Stream Crossing Plan: Plan 06 4/8/2021 Legend WS 100 Year Flood Ground Bank Sta 319.34 258.27 193.66 113.15 0 Stream Crossing Plan: Plan 07 4/9/2021 Legend WS 100 Year Flood Ground Bank Sta