HomeMy WebLinkAbout20210224 Ver 1_Public Notice Comments_20211026 (103)Public Notice Comment Form
ID#*
20210224
Project Name*
Westpoint
First Name
Selena
Version *
1
Number only.
Last Name
Faith
Affiliation (if applicable)
Phone Number
Email *
smf812812@gmail.com
*** The intent for collecting an email address is to allow us send you a receipt for submittal of this comment.
Please pick the response below that represents your stance on the above mentioned project?*
Yes - I agree with the project. No - I do not agree with the project.
Comment
This development will damage the ecosystem of the river beyond what is immediately noticeable. I grew up
going to the Eno Festival, swimming, and hiking around the West Point at the Eno. Black Meadow Ridge should
be conserved, not built on. The size and density of the proposed development will harm the Eno, which has
already been cut down and built around so much. I love the Eno, and I want it to be healthy enough that some
day when I have children I can take them there too.
Upload Supplementary Files
Pdf file type only
Any information (e.g., personal or contact) you provide on this comment form or in an attachment may be publicly
disclosed and searchable on the Internet and will be provided to the Department or Agency issuing the notice.
Submitted on: