Loading...
HomeMy WebLinkAbout20050666 Ver 1_Report_20051018DRAFT -- Post-Interbasin Transfer Development in the Goose Creek Watershed as of 22 September 2005 Development Phase Location "Lots/ Developer Most Recent Water Sewer Water Quality/ Notes *Dens. Approval Quantity BMPs Bridges at Mint Approved Lawyers/I-485 1.3M sq ft Childers Cline ~ CMUD (Bain Sch. CMUD (pump over Hill (mall) retail Rd) to McAlpine line) Meadows at Mint Hill Final plats Bain School Road 64/ James Mauney 5/16/2005 CMUD (Bain Sch. Septic approved *30K Rd) Subdivision 7th Day Adventist Rezoned I-485 E of proposed ? ? ? ? ? Church mall Gerrard Tire 1/ James Gerrard CMUD (line CMUD (line Service Station Approved off 218 near 51 *N/A (own.), Jim Rodgers ~ location?) location?) (engineer) Final plats add to Ashe Pleasant Valley rev. to raise Silver Maple Lane *30/ Ed Shirley, Carrolton g/15/2005 community well Plantation WWTP Subdivision density, 30K Burton (engineer) (Heater Util.) approved Bains Farm 98/ CMUD (tie in to Equestrian Preliminary Thompson Road *1-6 Keith Paris 5/16/2005 Fairington Oaks Septic Center / ac. Line) Subdivision Off Bains School 21 Isaac Group, Brent ~ CMUD (line CMUD(line Town Homes Approved Rd, near 218 Units Cowan (engineer) location?) location?) Plantation Falls Preliminary Fairview Road 65/ Ed Phelps, after 4/18/05 CMUD (line Septic Subdivision Phase I *30K+ Cornerstone location?) Southampton Subdivision Preliminary Thompson/Lawyers *54/ 30K Fred Gore (owner) 6/20/2005 CMUD (tie in to Bains Farm) Septic DevonHurst bdi i i S Preliminary Idlewild near 51 13 Fred Gore 5/16/2005 CMUD (line location? ) Septic v on u s McEwin Green Proposed Lawyers/51 ? Dell Nelson, DR Horton N/A ? ? LID waiting on env'tl permits, road issues, spans Goose Creek curb-gutter under contruction 9/05, Goose Creek along back rezoned institutional, proposed ? church and school, nothing submitted at present curb-gutter waiting county review (7/11), sidewalk out front, site graded 2 houses built 9/05, added 3 curb-gutter lots due to WWTP connection, adjacent to Duck Cr or trib, sidewalk waiting on final plans, includes equestrian center (31 ac. ), agreed to 70' conservation grassed swells easement, perennial trib to Steven Creek thru property, wetland, Goose Creek one lot away new developer, dropped by underground old, not cleared, wants to drain detention stormwater into adjacent wetland,headwaters to Goose Creek previously called Cornerstone, curb-gutter should be grading 9/05, Duck Creek at back of lots grassed swales waiting on plat approval, has Goose Creek crossing curb-gutter waiting on revisions, Stevens Creek on back of property High density commercial and ~ residential; nothing formally submitted, only conceptual plan under contruction 9/05, Fairington CMUD (off multiple houses iconstructed, Oaks Final Thompson Road 28 Fairington Oaks, LLC 3/21/2005 Mintwood Dr) Septic curb-gutter sidewalk 1 side, Phase II west Subdivision of creek, proposing to bridge creek Davis Run CMUD (line Final plat submitted not yet Subdivision Preliminary Fox Hollow Road 15 Russell J. Davis 4/18/2005 location?) septic curb-gutter approved, under const. 1 house built 9/05, sidewalk Olde S camore pre m nary p ans approve y Golf Course Olde Sycamore CMUD (line prior to 2001. Some phases Subdivision / Final Plat Drive ? Olde Sycamore LLC 2004 location?) WWTP curb-gutter and clubhouse have final plans Clubhouse approved post-2001, some 1 sided sidewalks Heathfield Final Plat Heath Glen Drive 70? RP Providence LLC 2004 well septic curb-gutter Subdivision built-out 9/05, Subdivision Revision sidewalk 1 side Beckingham Final Plat Thompson Rd/ 12 Hobart Smith Const./ 2004 CMUD (line septic curb-gutter formerly Thompson Place, Subdivision Beckingham Drive Eagle Engineering location?) under const 9/05, sidewalk Idlewild Ridge Sketch Idlewild Road 34 Danny Hilton, Glen 6/3/2002 NOT BUILT never went further Subdivision Edwards Davis Trace Final Idlewild Road/ 22 Brooks Davis 6/17/2002 CMUD (line CMUD (line curb-gutter aka Villas of Brooks Knoll, Subdivision Davis Trace location?) location?) many built 9/05, sidewalk Shannamara Final Ph II Shannamarra Drive ? Union Development 6/25/2001 CMUD (line ? curb-gutter under construction Subdivision Group location?) Mayhew Country Final Mayhew Country ~ Ken Jezek and LP 4/10/2002 well septic curb-gutter many completed 9105, Estates Drive Mayhew sidewalk 1 side Subdivision Mint Hill Hwy 218 near Hwy Sonshine Proposed, sign posted, Professional ? 51 1 Construction ? ? ? ? supposedly a 16,000 sf Center professional center The Sunshine curb-gutter, Under construction, near House Day Approved Hwy 51 1 ? ? ~ ~ current sediment headwaters of perennial trib to Care ~ pond w/concrete Stevens Creek riser Matthews E side of Hwy 485 Matthews Baptist Nothing submitted, proposed Baptist Church Proposed N of 7th Day 1? Church ? ? ? ? athletic fields and church Adventist Property Queen's Grant curb-gutter, grass Completed, near headwaters Community Completed Hwy 51 1 ? ? ~ ~ swales on E side of perennial trib to Stevens School of drive and Creek parking lot All li i l d All information is to the best of our knowledge.