HomeMy WebLinkAboutBP6.R019_Har 74 Start of Study1
The North Carolina Department of Transportation is starting the project development,
environmental studies, and engineering studies for the replacement of Bridge No. 420054 in
Harnett County.
The replacement of this Division 6 bridge is currently scheduled for Let in SFY 2026.
We would appreciate any information you might have that would be helpful in evaluating potential
environmental impacts of the project. If applicable, please identify any permits or approvals that may be
required by your agency. Your comments will be used in the preparation of the environmental document.
Further, you are cordially invited to the Virtual Field Scoping Meeting TBD. A calendar invitation with all
virtual connection information will be sent to you as well. We value your opinion as your comments will
enable us to evaluate the impacts of the proposed project and address your concerns. If you
are not able to attend the meeting, please provide written/email comments back to me by May 14th, 2022.
If you have any questions, please do not hesitate to contact me.
Thank you,
Adam
Adam Britt
Division Bridge Program Manager
Highway Division 6
North Carolina Department of Transportation
910 364-0603 office
910 364-0696 direct
910 486 1959 fax
558 Gillespie Street
PO Box 1150
Fayetteville, NC 28301
Dear Agencies,
County WBS No. Structure
No.
Description Location
Harnett BP6.R019 420074 Replace Structure 420074 over lower
Little River on SR 2045 HARNETT 74
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.