HomeMy WebLinkAboutNCC200521_Annual Fee NOD Letter_20220316RCY COOPER
Gownx
ELIZABETH S. BISER
5 , f-Y
BRIAN WRENN
rxrq�-Xr
3/16/2022
SATTERWHITE CONSTUCTION INC
Attn: JESSE SATTERWHITE JR
5933 Farmwell Road
Raleigh, NC 27610-9283
Subject: Notice of Deficiency - Failure to Pay Annual Fee
Invoice No. NCC200521-2022
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater
Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The
annual fee was billed on 2/1/2022 and was due on 3/1/2022. The annual fee applies to the following construction site:
SWEETWATER SUBDIVISON LOT: 20
2129 AUBURN KNIGHTDALE RD, Raleigh, NC
Wake County
Certificate of Coverage No. NCC200521
NC Reference No. NCG01-2020-0521
If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date,
please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Aziza Selkane at aziza.selkane@ncdenr.gov or me at toby.vinson@ncdenr.gov.
Sincerely,
William E. Vinson, Jr.
Chief of Program Operations
Division of Energy, Mineral, and Land Resources
Yu„ NIria Vtpaffmemor @WVMffleMCd1Qohlity I ❑IVISICM^&gWeal BnALand Rteartes11E 512 NanhSalin6ury &rEI1612 AfH5rVioC&mI "Amigh.1orthCErolin92764-1h12 914.707.9200