HomeMy WebLinkAboutNCC201164_NOT Closeout Documents_20220314Charlolte-Mecklenburg
STORM
WATER
2145 Suttle Avenue
Services
EC Inspection Report C h a r I o t t e, NC 2 8 2 0 8
Project Name: Brighton Park @ Phyllis Lane
Location: Soaring Eagle and Phyllis Lane, Mint Hill, NC - Mint Hill
Owner: Raymond Gottlieb -Mint hill Partners, LLC
EC - Final Inspection #: 66,739 - Date/Time: 3/4/22 12:00 - 3/7/22 13:00 - Inspector: Chanell Hatch
Weather conditions: Sunny
Soil conditions: Workable
Contact made: N/A
Erosion and sediment control measures removed: YES
Site permanently stabilized: YES
BMP's installed per approved plans: YES
Summary: Final inspection for Brighton Park at Phyliss Lane (#401396). All of the erosion control measures have been
removed and the site has been permanently stabilized.
•
Ob
CIIAIUA)TTE.
To report pollution or drainage problems call: 311
http://stormwater.charmeck.org
0
3/7/2022 10:59:41AM Page 1 of 1