Loading...
HomeMy WebLinkAboutNCC201164_NOT Closeout Documents_20220314Charlolte-Mecklenburg STORM WATER 2145 Suttle Avenue Services EC Inspection Report C h a r I o t t e, NC 2 8 2 0 8 Project Name: Brighton Park @ Phyllis Lane Location: Soaring Eagle and Phyllis Lane, Mint Hill, NC - Mint Hill Owner: Raymond Gottlieb -Mint hill Partners, LLC EC - Final Inspection #: 66,739 - Date/Time: 3/4/22 12:00 - 3/7/22 13:00 - Inspector: Chanell Hatch Weather conditions: Sunny Soil conditions: Workable Contact made: N/A Erosion and sediment control measures removed: YES Site permanently stabilized: YES BMP's installed per approved plans: YES Summary: Final inspection for Brighton Park at Phyliss Lane (#401396). All of the erosion control measures have been removed and the site has been permanently stabilized. • Ob CIIAIUA)TTE. To report pollution or drainage problems call: 311 http://stormwater.charmeck.org 0 3/7/2022 10:59:41AM Page 1 of 1