Loading...
HomeMy WebLinkAboutNCC200778_Notice of Termination_20220310Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 3/10/2022 1:10:56 PM (NOT Submittal) Approve by Morman, Alaina 3/15/2022 11:59:29 PM (NOT Request Review - NCC200778) • The task was assigned to Morman, Alaina. The due date is: March 15, 2022 5:00 PM 3/10/2022 1:10 PM NORTH CAROLINA Rrf OmFkm&tral Qualrly Certificate of NCC200778 Coverage (COC) No.* Enter the Certificate of Coverage Number 2020 Annual Fee Status 2021 Annual Fee Status PAID May be blank (if not yet billed). 2022 Annual Fee PAID Status May be blank (if not yet billed). Information associated with this permit: Project Name Erwin -Fayetteville East 230 kV Update Project Address Beard Road, Eastover, NC County Cumberland Latitude 35.0000 Longitude -79.0000 Permittee Listed Duke Energy Progress Legally Responsible Thomas Williams Jr. Individual NC Reference No. NCG01-2020-0778 E&SC Plan ID CUMBE-2020-125 Original NOI Tracking 22412 No. Date COC Issued 3/3/2020 Prior Rescission Date Date populates only if COC was already rescinded at time of submittal. Reason for Rescission/Termination Request: Reason for • Project Closed -Out Termination of Sale (Another Owner/Operator obtained new COC) Coverage* Mistake or Invalid Coverage Other Additional More information about the basis of this request, if needed. Explanation Please see email from Mike Lawyer (DEQ) that is attached. Supporting Upload Supporting Documentation if applicable. Documentation Must be PDF format Project Close-out Information: Final Close-out 2/14/2022 Inspection Approval Project Close-out Erwin -Fayetteville East 230kV Update Approval Project_CUMBE-2020-112_2-14-2022.pdf Documentation email_NCG01 NOT with incorrect Project ID.pdf Must be PDF format North Carolina General Statute 143-215.613 (i) provides that: 37.83KB 670.61 KB Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). * I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature > Type Name* Nuwan Wijesuriya Title * Sr Transmission Permitting Manager Organization* Duke Energy Progress Date * 03/10/2022 Email for nuwan.wijesuriya@duke-energy.com Confirmation * Contact Telephone* 9195462090 NOT Certification Notice of Termination.pdf 520.55KB Form Must be PDF Format Is this COC Already Ensure this COC has not been rescinded since submittal! Rescinded? Additional Email CC'd on Notification Emails (Optional) Original Permittee CC'd on Notification Emails Email Thomas.WilliamsJr@duke-energy.com Original Site Contact cc'd on Notificaiton Emails Email Thomas.WilliamsJr@duke-energy.com