HomeMy WebLinkAboutNCC200778_Notice of Termination_20220310Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 3/10/2022 1:10:56 PM (NOT Submittal)
Approve by Morman, Alaina 3/15/2022 11:59:29 PM (NOT Request Review - NCC200778)
• The task was assigned to Morman, Alaina. The due date is: March 15, 2022 5:00 PM
3/10/2022 1:10 PM
NORTH CAROLINA
Rrf OmFkm&tral Qualrly
Certificate of NCC200778
Coverage (COC) No.* Enter the Certificate of Coverage Number
2020 Annual Fee Status
2021 Annual Fee Status PAID
May be blank (if not yet billed).
2022 Annual Fee PAID
Status May be blank (if not yet billed).
Information associated with this permit:
Project Name
Erwin -Fayetteville East 230 kV Update Project
Address
Beard Road, Eastover, NC
County
Cumberland
Latitude
35.0000
Longitude
-79.0000
Permittee Listed
Duke Energy Progress
Legally Responsible
Thomas Williams Jr.
Individual
NC Reference No.
NCG01-2020-0778
E&SC Plan ID
CUMBE-2020-125
Original NOI Tracking
22412
No.
Date COC Issued
3/3/2020
Prior Rescission Date
Date populates only if COC was already rescinded at time of submittal.
Reason for Rescission/Termination Request:
Reason for • Project Closed -Out
Termination of Sale (Another Owner/Operator obtained new COC)
Coverage* Mistake or Invalid Coverage
Other
Additional More information about the basis of this request, if needed.
Explanation Please see email from Mike Lawyer (DEQ)
that is attached.
Supporting Upload Supporting Documentation if applicable.
Documentation Must be PDF format
Project Close-out Information:
Final Close-out 2/14/2022
Inspection Approval
Project Close-out Erwin -Fayetteville East 230kV Update
Approval Project_CUMBE-2020-112_2-14-2022.pdf
Documentation
email_NCG01 NOT with incorrect Project ID.pdf
Must be PDF format
North Carolina General Statute 143-215.613 (i) provides that:
37.83KB
670.61 KB
Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document
filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000).
* I, as an authorized representative, hereby request rescission of coverage under the
NPDES Stormwater Permit for the subject facility. I am familiar with the information
contained in this request and to the best of my knowledge and belief such information
is true, complete and accurate.
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item
(6) of that permit.
Signature
>
Type Name* Nuwan Wijesuriya
Title * Sr Transmission Permitting Manager
Organization* Duke Energy Progress
Date * 03/10/2022
Email for nuwan.wijesuriya@duke-energy.com
Confirmation *
Contact Telephone* 9195462090
NOT Certification Notice of Termination.pdf 520.55KB
Form Must be PDF Format
Is this COC Already Ensure this COC has not been rescinded since submittal!
Rescinded?
Additional Email CC'd on Notification Emails
(Optional)
Original Permittee CC'd on Notification Emails
Email Thomas.WilliamsJr@duke-energy.com
Original Site Contact cc'd on Notificaiton Emails
Email Thomas.WilliamsJr@duke-energy.com