Loading...
HomeMy WebLinkAboutNCC205999_NOT Closeout Documents_20220310Sedimentation/Construction S• . p' • Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Orange Project: Perry Hill Mitigation Site Person financially responsible: Wildlands Engineering, Inc. - John Hutton, Vice President Address: 312 W. Millbrook Road, Suite 225, Raleigh, NC 27609 1. Project Location: Frank Perry Road, Hillsborough Pictures: Yes - Digital 2. Weather and soil conditions: Sunny, Dry and workable River basin: Neuse Project #: ORANG-2021-002 Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Daniel Taylor Title: Inspection report: Sent Report Date given/sent: February 24, 2022 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGO1-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Ivana Barham Others present: Lauren Garcia Date of inspection: February 21, 2022 Time arriving on site: 10:30 AM Time leaving site: 11:00 AM cc: