HomeMy WebLinkAboutNCC210543_NOT Closeout Documents_20220308North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200
County: Wake Project: Northwoods Elementary Modular Unit River basin: Neuse
Person financially responsible: Wake Co. Public School System - Clint Council Project #: WAKE-2020-040
Address: 5625 Dillard Drive Crossroads Bldg #1, Cary, NC
1. Project Location: Chapel Hill Road, Cary
Pictures: No
2. Weather and soil conditions: sunny, dry, workable
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
Initial inspection: No
If no, check violations below:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): no one
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: February 23, 2022
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Kimberly Summers Others present: Lauren Garcia
Date of inspection: February 09, 2022 Time arriving on site: 1:00 PM Time leaving site: 1:10 PM
cc:
Yes