Loading...
HomeMy WebLinkAbout20201509 Ver 1_Email_20220211WETLAND AND SURACE WATER IMPACTS SUMMARY Site No. Station (Fmm?a) sail See /Type Permanent Fill In Weill (w) Temp. Fill In Wetlands lad Exmvalion in Wetlands lac) Macronaetl elderg In Wellands lad Hand opening In Wetlands (ac) Pemanenl SW Implies (so) Temp. SW dealers (a) Existing channel Impacts PelmaneM Ifl) Exiling channel Imead Temp. lfll Hall amain Basin Os WA {-14+89T018+10LT Ro3tvay embankment 0l 004 WA -L-14+89 T018+81 LT Willy Road Embankment 0.13 003 We 1-21+39 T022NB LT Readway embankment 003 WC L-14+82 T014+89 RT Utility Aaess Dnire 001 WD I 118+01T018+5/LT I l Relocation '0.01 SA -L-19+]4 TO 20+22 Bank slablealion 8 EC 175 124 SA -L-19g8 T019+93 RT Tam wwk andam notes 28 SA 1-19+7T020+07LT Tempworkbndgedmaendea) 35 SB -L-20,14 TO 22+11 Ral embankment 240 22 TOTALS': 1 071 1 1 '0.01 1 0.07 1 1 1 1 415 1 207 0 'Rounded totals are sum of actual impacts OOTEs. The temporary walk pad and temporary bridge impacts include the temporary impacts needetl for bank stabilization and erosion control.