HomeMy WebLinkAbout20201509 Ver 1_Email_20220211WETLAND AND SURACE WATER IMPACTS SUMMARY
Site
No.
Station
(Fmm?a)
sail
See /Type
Permanent
Fill In
Weill
(w)
Temp.
Fill In
Wetlands
lad
Exmvalion
in
Wetlands
lac)
Macronaetl
elderg
In Wellands
lad
Hand
opening
In
Wetlands
(ac)
Pemanenl
SW
Implies
(so)
Temp.
SW
dealers
(a)
Existing
channel
Impacts
PelmaneM
Ifl)
Exiling
channel
Imead
Temp.
lfll
Hall
amain
Basin
Os
WA
{-14+89T018+10LT
Ro3tvay embankment
0l
004
WA
-L-14+89 T018+81 LT
Willy Road Embankment
0.13
003
We
1-21+39 T022NB LT
Readway embankment
003
WC
L-14+82 T014+89 RT
Utility Aaess Dnire
001
WD
I 118+01T018+5/LT
I l Relocation
'0.01
SA
-L-19+]4 TO 20+22
Bank slablealion 8 EC
175
124
SA
-L-19g8 T019+93 RT
Tam wwk andam notes
28
SA
1-19+7T020+07LT
Tempworkbndgedmaendea)
35
SB
-L-20,14 TO 22+11
Ral embankment
240
22
TOTALS':
1 071
1
1 '0.01
1 0.07
1
1
1
1 415
1 207
0
'Rounded totals are sum of actual impacts
OOTEs. The temporary walk pad and temporary bridge impacts include the temporary impacts needetl for
bank stabilization and erosion control.