Loading...
HomeMy WebLinkAboutWQ0043267_More Information (Received)_20220314VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes No ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Residential Leased ❑ School / preschool / day care ❑ Food and drink facilities ❑ Businesses / offices / factories ❑ Retail (stores, centers, malls) ❑ Retail with food preparation/service ❑ Medical / dental / veterinary facilities ❑ Church El Nursing Home 5. Nature of wastewater : 100 % Domestic/Commercial % Commercial % Industrial (See 15A NCAC 02T .0103(20)) )Is there a Pretreatment Program in effect? 6. Has a flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes > If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: El Car Wash ❑ Hotel and/or Motels El Swimming Pool /Clubhouse El Swimming Pool/Filter Backwash El Other (Explain in Attachment) ❑ Yes El No ® No Establishment Type (see 02T.0114(f)) Daily Design Flow a,b No. of Units Flow 4 - Bedroom lot 480 gal/lot 98 47,040 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 47,040 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i e , minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 47,040 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: El Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line El Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected El Other (Explain): FORM: FTA 04-16 Page 2 of 5