Loading...
HomeMy WebLinkAboutWQ0043267_Application (FTSE)_20220309• � �.0. •• • TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS., TRANSMITTAL TO: NCDEQ DWR-Winston-Salem Regional Office Date:03/07/2022 Water Quality Section 450 W. Hanes Mill Road Winston-Salem, NC 27105 ENCLOSED PLEASE FIND: WE ARE SENDING UNDER SEPARATE COVER: Project: Wexford Reference: Copies Sent To: NC Department of Enviro R ental Quality MAR 0 9 2022 1, Winston-Salem Regional Office Job #:46308 Subdivision PH 1-2 COPIES DATE NUMBER DESCRIPTION 2 1 Fast Track Sewer Application (FTA 04-16) Original & Copy 2 2 FTSE 10-18 (Burlington, Elon, and Gibsonville) Original & Copy 2 2 Cover Letter / Project Narrative 2 3 USGS map 2 4 Vicinity Map 1 5 Check for $480 2 6 Construction Drawings THESE ITEMS ARE TRANSMITTED: If enclosures are not as noted, please notify us at once. COMMENTS: Feel free to contact me with any questions at 919-532-3237 or sondra.lanssen(o�timmons.com. Thank you, Sondra Janssen Project Manager SIGNED: 5410 Trinity Road, Suite 112 I Raleigh, NC 27607 FAX 919.859.5663 TEL 919.866.4951 Site Development I Residential I Infrastructure I Technology timmons.com DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Town of Elon (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County Z Municipal 3. Signature authority's name: Richard Roedner per I5A NCAC 02T .0106(b) Title: Town Manager 4. Applicant's mailing address: 104 S. Williamson Ave City: Elon State: NC Zip: 27244- 5. Applicant's contact information: Phone number: (336) 584-3601 Email Address: rroedner@elon.gov ❑ Other II. PROJECT INFORMATION: 1. Project name: Wexford Subdivision Phases 1 & 2 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: W000 and issued date: If new construction but part of a master plan, provide the existing permit number: W000 3. County where project is located: Alamance 4. Approximate Coordinates (Decimal Degrees): Latitude: 36.122°Longitude: -79.526° 5. Parcel ID (if applicable): 8846-54-6133 / 8846-42-9966 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Mike Zaccardo License Number: 22321 Firm: Timmons Group Mailing address: 5410 Trinity Road Suite 102 City: Raleigh State: NC Zip: 27607- Phone number: (919) 532-3281 Email Address: mike.zaccardo@timmons.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Burlington East Burlington Permit Number: NC0023868 Owner Name: City of Burlington V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ N/A Downstream (Receiving) Sewer Size: 18 inch System Wide Collection System Permit Number(s) (if applicable): WQCS00226 Owner Name(s): Town of Gibsonville FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ZN/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ENo ZN/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes 0No ®N/A 4. Origin of wastewater: (check all that apply): Z Residential Owned 0 Retail (stores, centers, malls) ❑ Residential Leased ❑ Retail with food preparation/service ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Food and drink facilities ❑ Church ❑ Businesses / offices / factories ❑ Nursing Home ❑ Car Wash ❑ Hotel and/or Motels ❑ Swimming Pool /Clubhouse ❑ Swimming Pool/Filter Backwash 0 Other (Explain in Attachment) 5. Nature of wastewater : % Domestic/Commercial % Commercial % Industrial (See 15A NCAC 02T .0103(20)) >Is there a Pretreatment Program in effect? 0 Yes 0 No 6. Has a flow reduction been approved under 15A NCAC 02T .0114(f)? 0 Yes 0 No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow a'b No. of Units Flow 4 - Bedroom lot 480 gal/lot 98 47,040 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 47,040 GPD a See 15A NCAC 02T .0114(b) (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 47 040 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line 0 Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 1,969 DIP 8 3,358 PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: ° Longitude: - . 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B): ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g) > 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: ZYes El No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches > 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(t) cannot be achieved. > **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage > If noncompliance with 02T.0305(f) or (g) see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N/A > See the Division's draft separation requirements for situations where separation cannot be meet > No variance is required if the altemative design criteria specified is utilized in design and construction > As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No ❑ N/A > This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? > Information can be obtained from the 401 & Buffer Permitting Branch ®Yes El No 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6) directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ®No ❑ N/A > If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version) and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: I, Gt t tdlw2 VI• Z&eAM Professional Engineer's name from Application Item III.).) StiOtc ft D•t/ I'144-se5 I ¢ 2.. attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, /Jane J bei3'ler towel moi4 P/, (-An attest that this application for (Signature Authority's name i& title from Applicatioiilltem 1.3.) „ino, O .•••'esS, �..Q- :4 has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: 471(4 zz FORM: FTA 04-16 Page 5 of 5 State of North Carolina Department of Environment and Natural Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE 10-18) Enity Requesting Allocation City of Burlington Project Name for which flow is being requested: Wexford Subdivision Phase 1 and 2 More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: East Burlington WWTP b. WWTP Facility Permit #: NC 0023868 All flows are in MGD e. WWTP facility's permitted flow 12.00 d. Estimated obligated flow not yet tributary to the WWTP 1.879718 e. WWTP facility's actual avg. flow 5.0740 f Total flow for this specific request (0.04704) Elon Allocation 0.000000 g. Total actual and obligated flows to the facility 6.953718 h. Percent of permitted flow used 57.9% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP : None (A) (B) (C) (D)=(B+C) (E)=(A-D) Obligated, Total Design Approx. Not Yet Current Flow Firm Average Daily Current Avg. Tributary Plus Pump Station Capacity, * Flow** Daily Flow, Daily Flow, Obligated Available Name GPD (Firm/pf), GPD GPD GPD Flow Capacity*** Dry Creek 4,000,000 1,600,000 497,150 0 497,150 1,102,850 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pumpstation divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity <_ 0. Downstream Facility Name (Sewer) : Downstream Permit Number: Page 1 of 2 FTSE 10-18 Certification Statement: I, W. Todd Lambert, P.E. certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning asssessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature City Engineer Title of Signing Official 2- Date Page 2 of 2 FTSE 10-18 Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Town of Elon Project Name for which flow is being requested: Wexford Subdivision - Phase 1 and 2 More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Town of Elon Collection System b. WWTP Facility Permit #: WQCS00226 All flows are in MGD c. WWTP facility's permitted flow 0.900 Elon East Allocation d. Estimated obligated flow not yet tributary to the WWTP 0.0186 - Elon East e. WWTP facility's actual avg. flow 0.180 - Elon East f. Total flow for this specific request 0.047 - Elon East g. Total actual and obligated flows to the facility 0.246 - Elon East h. Percent of permitted flow used 27.3 - Elon East II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Finn Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Travis Creek Outfall (Gibsonville) Downstream Permit Number: N/A Page 1 of 6 FTSE 10-18 III. Certification Statement: I Richard Roedner certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works h adequate capacity to transport and treat the proposed new wastewater. Signing Offij al Signature Date / ow,q /r>✓uelate Title of Signing Official CI Page 2 of 6 FTSE 10-18 Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Town of Gibsonville Project Name for which flow is being requested: For Elon's Wexford Subdivision Ph 1&2 More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Town of Gibsonville Collection System b. WWTP Facility Permit #: WQCS 00349 All flows are in MGD c. WWTP facility's permitted flow .750 GIB East Allocation d. Estimated obligated flow not yet tributary to the WWTP .040 GIB East Alloc e. WWTP facility's actual avg. flow .313 GIB East Alloc f. Total flow for this,specific request .000 GIB East Alloc g. Total actual and obligated flows to the facility .353 GIB East Alloc h. Percent of permitted flow used 47.1% GIB East Alloc II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** Travis r , 2.0 0.800 .493 .0586 .551 .248 The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < O. Downstream Facility Name (Sewer): Travis Creek Outfall (Gibsonville) Downstream Permit Number: N/A Page 1 of 6 FTSE 10-18 III. Certification Statement: I Ben Baxley certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. 2/IZaZ2 Signing Official Signatu ate %ewn al Mtnqjer Title of Signing Official Page 2 of 6 FTSE 10-18 Peak Capacity of Station - Current Average Daily Flow Capacity- Current Situation I GPD % of Capacity Total Allocation Flows Total Pump Station Flows (Eton & Gib) Project Name Total Allocated - Non Tributary Flows - Elon I 18,600 Proposed Flows Total Allocated - Non Tributary Flows 40,080 Edinborough - Phase 1 and 2 Manning Crossing Phase 5 (partial) Stone Ridge - Preserve (partial) Project Name Joseph's Claim - Phase 2, Section 3 (Parial) Gibsonville Fbw 313,000 WWTP -Allocated Flows - Non -Tributary Station Name Travis Creek Pump Station Total Flow Eton Flow Manning Meter Flow (GIB to Elon) Travis Creek - FY20.21 Flows East Plant Allocation 750,000 I Station Name Gibsonville Flow Town of Gibsonville - East Plant (North) Allocation East Plant - 2021 Flows 1000'009 000'000'8 353,080 551,680 4,800 3,600 GPD 2,400 493,000 493,000 209,000 29,000 GPD 313,000 ,, pea % of Station Capacity 61.6% % of Allocation 41.7% 'Average Daily Flow Capacity -Current Situation Peak Capacity of Station - Current Total Flows to South Plant 432,160 I 54.0% Proposed Flows Project Name GPD Total Allocated - Non Tributary Flows I 1,080 (Savannah Glen Phase 4 - (Partial) HWY 81/70 Water&Sewer Extension Project Name Ashley Woods Phase 3 - (partial) WWTP -Allocated Flows - Non -Tributary LGlbsonville Flaw -Back Creek 355,000 Gibsonville Flow- Westbrook 75,000 Description GPD Total Flow - South 430,000 South Plant - FY 20-21 Flows Gibsonville Flow 430,000 South Plant Allocation 800,000 South Plant - FY 20-21 Flows Station Name GPD Town of Gibsonville - South Plant Allocation z n c n 1,080 GPD a n 2 Elon FTSE Accounting Form - East Plant Calendar Year 2021 Flows Existing Flows 0.180 Total Flow 0.180 Allocated Flows - Non -Tributary Shallowford - Phase 1 and 2 0.0186 Total Allocated - Non Tributary Flows 0.0186 Proposed Flows Wexford - Phase 1 and 2 I 0.04704 Total Flows I 0.246 Permitted Flows I 0.900 Percentage of Permitted Flow 27.3%