ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
S. DANIEL SMITH
DirectOr
NORTH CAROLENA
Environmental Qualify
SENT VIA ELECTRONIC MAIL ONLY: NO HARD COPY WILL BE MAILED.
March 14, 2022
Jeffrey Ferguson P.E., Sustainability Manager
Sibelco Schoolhouse Quartz facility
E-mail: Jeff.Ferguson@sibelco.com
SUBJECT: Compliance Inspection Report
Schoolhouse Quartz facility
NPDES WW Permit No. NC0000361
Avery County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Schoolhouse Quartz
facility on 3/04/2022. This inspection was conducted to verify that the facility is operating in compliance
with the conditions and limitations specified in NPDES WW Permit No. NC0000361. The findings and
comments noted during this inspection are provided in the enclosed copy of the inspection report
entitled "Compliance Inspection Report".
Please respond via e-mail to this office within 90 days of your receipt of this letter regarding your plans
to be taken to address the following issue:
• A proposed plan of action for solids removal from the Effluent Lagoon, including schedule milestones and how
permit compliance will be maintained during the activity.
If you should have any questions, please do not hesitate to contact Timothy Heim with the Water
Quality Regional Operations Section in the Asheville Regional Office at 828-296-4500 or via email at
tim.heim@ncdenr.gov.
ATTACHMENTS
Ec: LF, Rick Singleton, Jody McKinney
Sincerely,
�DocuSigned by:
111446 A 1 tk6144
082B1105A3CA418...
Tim Heim, P.E., Environmental Engineer
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
D_EC�
North Carolina Department of Environmental Quelfy I olvtslon of Water Resources
Asheville Regional Office 12090 O.S. Highway 70 I Swannanoa, Noah Carolina 28778
828.296.4500
DocuSign Envelope ID: 2C4B3CEE-D5CC-42C3-A92D-30D99D0E9E7A
United States Environmental Protection Agency
EPA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection
1 IN I 2 IL I 3 I NC0000361 111 121 22/03/04 117
Type
1810I
IIIIIIIIIII
Inspector Fac Type
19I S I 2011
21IIIIII IIIIIIIIIIIIIIIIII I IIIIII
P6
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
671 I 7° I I 711 172 I N I 73I 1 74 71
I I
I I I I I I 180
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Schoolhouse Quartz facility
US Hwy 19-E
Spruce Pine NC 28777
Entry Time/Date
09:30AM 22/03/04
Permit Effective Date
12/06/01
Exit Time/Date
12:30PM 22/03/04
Permit Expiration Date
16/02/29
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Ricky L Singleton/ORC/828-765-4283/
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Jeff Ferguson,136 Crystal Dr Spruce Pine NC 28777/Sustaninablity
Manager/828-765-1114/8287650912 No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Operations & Maintenar Facility Site Review Effluent/Receiving Wate
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Stephanie A Williams 9a,,A—„, x:u:,— DWR/ARO WQ/828-296-4500/ 3/14/2022
Timothy H Heim �po„s;g „,'F8C8JAFcc DWR/ARO WQ/828-296-4665/ 3/14/2022
T woflul him
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
7Lnra7.; 3/14/2022
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
DocuSign Envelope ID: 2C4B3CEE-D5CC-42C3-A92D-30D99D0E9E7A
31
NPDES yr/mo/day
N C0000361 111 121 22/03/04
I17
Inspection Type
18LI
(Cont.)
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Tim Heim and Stephanie Williams of the Asheville Regional Office performed a Compliance Inspection
of the Facility on March 4, 2022. Rick Singleton (Environmental Supervisor/ORC) and Jody McKinney
(Mineral Separation Manager/BORC.) were present and assisted with the inspection.
The following items were noted at the time of the inspection:
Pump (Sump) Station:
The pump station where influent is pumped to the thickeners was undergoing maintenance on one
pump at the time of the inspection. The fluoride and non -fluoride streams were co -mingling and a
small amount of influent was flowing to the Emergency Pond via gravity. Operators stated that the
fluoride and non -fluoride streams are segregated for process optimization only and co -mingling does
not impact compliance.
Thickeners (Primary Clarifiers):
Both clarifiers were completed covered with a scum blanket at the time of the inspection, this is a
normal impact of the treatment process for this type of physical chemical operation and does not
indicate the same concerns it would in a biological treatment facility.
A small volume of influent was splashing over the center well and by-passing optimal hydraulic flow
through the clarifier baffles. Operators state that these units are scheduled to be covered as part of
a planned future project.
Consider adding secondary containment skids under the chemical totes in the chemical storage area
of the thickener building.
Emergency Lagoon:
The emergency pond appears to receive regular flow as part of the treatment operation in order to
divert and/or store flow requiring additional treatment. Consider a project to remove significant solids
from this lagoon to optimize operational capacity.
Effluent Lagoon:
The effluent lagoon appears to have reached the upper limits of its solids storage capacity, and a
minimal layer of supernatant was observed above the sludge blanket. Removal of solids and
rehabilitation of the lagoon should be given priority. Failure to adequately manage solids in the
lagoon could result in several detrimental impacts: reduced settling due to increased flow velocity in
the preferential flow path, reduced lagoon volume for solids settling, and significantly increased
potential for detriment to the receiving stream in the event of a breach or other unintended release of
solids.
Respond to the Regional Office with a proposed plan of action including schedule milestones and
how permit compliance will be achieved during solids removal within 90 days or an NOD will be
issued.
Page# 2
DocuSign Envelope ID: 2C4B3CEE-D5CC-42C3-A92D-30D99D0E9E7A
Permit: NC0000361
Inspection Date: 03/04/2022
Owner - Facility: Schoolhouse Quartz facility
Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? • ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable II El El El
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: Process control parameters include pH, TSS, and sludge depth/torque readings in the
clarifiers.
Pump Station - Influent Yes No NA NE
Is the pump wet well free of bypass lines or structures? ■ ❑ ❑ ❑
Is the wet well free of excessive grease? • ❑ El El
Are all pumps present? • El El El
Are all pumps operable? ■ El ❑ ❑
Are float controls operable? • El El El
Is SCADA telemetry available and operational? • El El El
Is audible and visual alarm available and operational? El El • El
Comment: The pump station where influent is pumped to the thickeners was undergoing
maintenance on one pump at the time of the inspection. The fluoride and non -fluoride
streams were co -mingling and a small amount of influent was flowing to the Emergency
Pond via gravity. Operators stated that the fluoride and non -fluoride streams are
segregated for process optimization only and co -mingling does not impact compliance.
Primary Clarifier
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the sludge blanket level acceptable?
Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth)
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ • ❑ ❑
• ❑ ❑ ❑
Page# 3
DocuSign Envelope ID: 2C4B3CEE-D5CC-42C3-A92D-30D99D0E9E7A
Permit: NC0000361
Inspection Date: 03/04/2022
Owner - Facility: Schoolhouse Quartz facility
Inspection Type: Compliance Evaluation
Primary Clarifier Yes No NA NE
Comment: Both clarifiers were completed covered with a scum blanket at the time of the
inspection, this is a normal impact of the treatment process for this type of physical
chemical operation and does not indicate the same concerns it would in a biological
treatment facility.
A small volume of influent was splashing over the center well and by-passing optimal
hydraulic flow through the clarifier baffles. Operators state that these units are
scheduled to be covered as part of a planned future project.
Filtration (High Rate Tertiary) Yes No NA NE
Type of operation: Up flow
Is the filter media present? • ❑ ❑ ❑
Is the filter surface free of clogging? • ❑ ❑ ❑
Is the filter free of growth? • ❑ ❑ ❑
Is the air scour operational? ❑ El • El
Is the scouring acceptable? ❑ ❑ • ❑
Is the clear well free of excessive solids and filter media? • ❑ ❑ ❑
Comment:
Lagoons Yes No NA NE
Type of lagoons? Aerated
# Number of lagoons in operation at time of visit? 2
Are lagoons operated in? Series
# Is a re -circulation line present? • ❑ El El
Is lagoon free of excessive floating materials? • El El El
# Are baffles between ponds or effluent baffles adjustable? ❑ El • ❑
Are dike slopes clear of woody vegetation? ■ El El El
Are weeds controlled around the edge of the lagoon? • El ❑ ❑
Are dikes free of seepage? • El El El
Are dikes free of erosion? • El ❑ ❑
Are dikes free of burrowing animals? • El El El
# Has the sludge blanket in the lagoon (s) been measured periodically in multiple ■ El ❑ ❑
locations?
# If excessive algae is present, has barley straw been used to help control the growth? El El ▪ El
Is the lagoon surface free of weeds? ❑ • ❑ ❑
Is the lagoon free of short circuiting? El • El El
Page# 4
DocuSign Envelope ID: 2C4B3CEE-D5CC-42C3-A92D-30D99D0E9E7A
Permit: NC0000361
Inspection Date: 03/04/2022
Owner - Facility: Schoolhouse Quartz facility
Inspection Type: Compliance Evaluation
Lagoons Yes No NA NE
Comment: Emergency Lagoon:
The emergency pond appears to receive regular flow as part of the treatment
operation in order to divert and/or store flow requiring additional treatment. Consider a
project to remove significant solids from this lagoon to optimize operational capacity.
Effluent Lagoon:
The effluent lagoon appears to have reached the upper limits of its solids storage
capacity, and a minimal layer of supernatant was observed above the sludge blanket.
Removal of solids and rehabilitation of the lagoon should be given priority. Failure to
adequately manage solids in the lagoon could result in several detrimental impacts,
including: reduced settling due to increased flow velocity in the preferential flow path,
reduced lagoon volume for solids settling, and significantly increased potential for
detrimental impacts to the receiving stream in the event of a breach or other
unintended release of solids.
Page# 5