HomeMy WebLinkAboutHannah Bridge Mitigation Transfer Certificate - DWR - Holly Springs Road Widening - Phase 2fires
Mitigation Credit Transfer Certificate
Prepared by
EBX-NE USE I, LLC
March 10, 2022
Town of Holly Springs
128 South Main Street
Holly Springs, NC 27540
Hannah Bridge Bank Parcel ID: DWR Project # 2017-0537v2
Riparian Buffer Credits Purchased: 18,874.62 (ft)
8 digit-HUC — 03020201
Neuse River Basin
Project Name: Holly Springs Road Widening — Phase 2, DWR Project #20201018
You have elected to fulfill your permitted buffer mitigation requirements for the Holly Springs Road
Widening — Phase 2 project by paying into the RES Neuse Buffer and Nutrient Offset Umbrella
Mitigation Bank (Hannah Bridge Site).
This Bank has received full payment for buffer mitigation for the above referenced project. Riparian
buffer impacts occurred in the Neuse River Basin. The amount of buffer mitigation required is specified
and verified by DWR in project #20201018 and is 93,843.00 ft2. The Stone Creek site is providing
59,563.75 ft2, Stone Creek Buffer Preservation is providing 11,410.96 ft2, the Hannah Bridge site is
providing 17,123.92 ft2, Hannah Bridge Buffer Preservation is providing 1,750.70 ft2, and the Meadow
Spring site is providing 3,993.67 ft2 for a total of 93,843.00 W.
You must also comply with any other state, federal or local government permits, or authorization
associated with this activity including SL 2009-337, An Act to Promote Compensatory Mitigation
Banks. This payment into the Bank is not transferable. If you have any questions or need additional
information, please contact me at 919-209-1055 or astaley@res.us.
Sincerely,
Amy Staley
Credit Sales Manager
Resource Environmental Solutions, LLC
cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator
cc: DWR — Rob Ridings
DWR — Amy Chapman
Kimley-Horn — Emma Radford
Resource Environmental Solutions, LLC . 701 E. Bay Street, Suite 306 . Charleston, SC 29403