HomeMy WebLinkAboutWQ0043206_More Information (Received)_20220309VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑ No ® N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
® Yes ❑ No ❑ N/A
3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement (FORM: HOA) and
supplementary documentation as required by 15A NCAC 02T.0115(c) been attached?
❑ Yes ❑ No ®N/A
4. Origin of wastewater: (check all that apply):
❑ Residential (Individually Owned) ❑ Retail (stores, centers, malls)
❑ Residential (Leased) ❑ Retail with food preparation/service
❑ School / preschool / day care ❑ Medical / dental / veterinary facilities
❑ Food and drink facilities ❑ Church
® Businesses / offices / factories ❑ Nursing Home
❑ Car Wash
❑ Hotel and/or Motels
❑ Swimming Pool/Clubhouse
❑ Swimming Pool/Filter Backwash
❑ Other (Explain in Attachment)
5. Nature of wastewater : 50 % Domestic 50 % Commercial % Industrial (See 15A NCAC 02T .0103(20))
If Industrial, is there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Has a flow reduction been approved under 15A NCAC 02T .0114(fl? ❑ Yes ® No
> If ves. provide a copy of flow reduction approval letter with this application
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0114(f))
Daily Design Flow a,b
No. of Units
Flow
Unknown Use
880 gal/acre
10.542
9,277 GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
gall
GPD
Total
9,277 GPD
a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A-4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 9,277 GPD (per 15A NCAC 02T .0114)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, please indicate why:
❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line.
Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow.
❑ Flow has already been allocated in Permit Number: Issuance Date:
❑ Rehabilitation or replacement of existing sewers with no new flow expected
❑ Other (Explain):
FORM: FTA 06-21
Page 2 of 5
Public Services Department
Derrick Q. Boone
ASSISTANT DIRECTOR
NORTH CAROLINA S INTERNATIONAL CITYTh
March 9, 2022
NCDENR
Winston-Salem Regional Office
450 W. Hanes Mill Rd, Suite 300
Winston-Salem, NC 27105
Project: Airport 1 Business Park
Private Sewer
Applicant: VMI Properties, LLC
Greensboro, NC
Dear Sir or Madam:
This is to acknowledge that the City of High Point will accept for treatment in the Eastside
Wastewater Treatment Plant (Permit #NC0024210), wastewater flow from the above referenced
project in the amount of 9,277 GPD, which will be discharged to facilities operated and
maintained by the City of High Point.
If further information is needed, please let me know.
Very truly yours,
Derrick Q, Boone
Assistant Public Services Director
DQB/tab
City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA
Fax: 336.883.1675 Phone: 336.883.3215 TDD: 336.883.8517
1)ivi=.ion of' Water 1Zot:Ourc ec
Application Number:
Entity Requesting Allocation:
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
2020-175
VMI Properties LLC
Project Name for which flow is being requested:
Airport 1 Business Park
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility name: Eastside WWTP
b. WWTP Facility Permit #: NC-0024210
c. WWTP facility permitted flow:
d. Estimated obligated flow not yet tributary to the WWTP:
e. WWTP facility's actual average flow:
f. Total flow for this specific request:
g. Total actual and obligated flows to the facility:
h. Percent of permitted flow used:
All flows are in MGD
26.0000
3.0905
16.1917
0.0093
19.2914
74.20%
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP.
(A) (B) (C) (D) = (B+C) (E)=(A-D)
Pump Pump Firm Design Approx. Obligated, Total Current Available
Station Station Capacity' Average Current Not Yet Flow Plus Capacity
(Name or Permit Daily Flow' Avg. Daily Tributary Obligated
Number) Number (Firm/pt) Flow, Daily Flow, Flow
MGD MGD MGD MGD MGD MGD
Eastfork W00015751 4.3200 1.7280 0.8611 0.2591 1.1203 0.6077
Riverdale \V00008572 30.0887 11.4842 8.3996 1.7404 10.1400 1.3442
— #N/A #NIA #N/A #N/A #N/A #N/A #N/A
#NIA MIA MIA #N/A #N/A #NIA #N/A #N/A
#NIA #NIA !NIA MI #N/A #N/A #NIA #N/A
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Flow is the firm capacity of the pump station divided by the peaking factor (p1) not
less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planting Assessment Addendum shall be attached for each pump station located between the
project connection point and the WWTP where the Available Capacity is 5 0.
Downstream Facility Name (Sewer):
Downstream Permit Number:
Page 1 of 6 FTSE 10-18
III. Certification Statement
I, Derrick Q. Boone certify to the best of my knowledge that the addition of the volume of
wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater
treatment facility and that the flow from this project is not anticipated to cause any capacity related
sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment
plant under normal circumstances, given the implementation of the planned improvements identified in the
planning assessment where applicable. This analysis has been performed in accordance with local
established policies and procedures using the best available data. This certification applies to those items
listed above in Sections I and II plus all attached planning assessment addendums for which I am the
responsible party. Signature of this form certifies that the receiving collection system or treatment works
has adequate capacity to transport and treat the proposed new wastewater.
3/9/2022
igning Official Signature Date
A SS, 7AM Pvg jc SC-, 'v2Cc'3 j/,E'er 1
Title ofSigning Official
Page 2 of 6
FTSE 10-18