Loading...
HomeMy WebLinkAboutWQ0043252_Application (FTSE)_20220214DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 - FAST TRACK SEWER SYSTEM EXTENSION APPLICATION ETA 04-16 & SUPPORTING DOCUMENTATION Application Number. iLiALCOMa,2 j' no be comptaed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: I, Applicant's name: FIB Rd Durham NC. LLC (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑Privately -Owned Public Utility El Federal ❑ State/County ❑ Municipal ❑ Other 3_ Signature authority's name: Paul M. Thrill per 1 ,i1CA U2T ,0106f ht Title: Manager 4. Applicant's mailing address: 901 Wabash Avgnue. Suite 300 City; Tee Haute State: IN Zip: 47807- 5. Applicant's contact information: Phone number: (317) 571-7223 Email Address: bwilliamsa,lhompsonthriil.com I1. PROJECT INFORMATION: 1. Project name: Market Place at Ellis Crossing - Lot 8 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project if a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Durhani 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.9411' Longitude:-78.8555.. 5. Parcel ID (if applicable): 230678 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Gregory Harnish License Number: 032484 Firm: Woo10 rt North Carolina. PLLC Mailing address: 11301 Carmel Commons Blvd. Suite 300 City: Charlotte State: Zip: 28226- Phone number: (20) 525-§284 Email Address: greg.harnishtaiwoolpett,com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: I. Facility Name: Triangle WWTP Permit Number: NC0026051 Owner Name: Durharn County V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): t. Permit Nurnber(s): WQ0040511 Downstream (Receiving) Sewer Size: 8 inch SysiCFn kV]d4_rAillecilon Sysicm P Flint Nt.04criSiflt_ 3ppiiCabLc1: WQCS WQ S00005 Owner Name(s): City of Durham 1...erim a.SrriaLl r (42 0 FORM: FTA 04-16 Pagc 1 of 5 V1. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ON/A 2. If the Applicant is a Developer of lots to be sold, has a f evelopeC's tktcrational Agreement (FORM: IM VI been attached? El Yes ❑No ®N/A 3. If the Applicant is allot no.Vrctt v wftcrs Aucciation, km an Operational AgrcctnciiLlFO : I1OAll been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Residential Leased El School i preschool 1 day care El Food and drink facilities ® Businesses / offices / factories ® Retail (stores, centers, malls) ® Retail with food preparation/service ® Medical 1 dental / veterinary facilities ❑ Church ❑ Nursing Home 5. Nature of wastewater : Q,% Domestic/Commercial I00% Commercial Q % Industrial (Sec f SA NCAC 02T,L})(1 t20i) �Is there a Pretreatment Program in effect? 6. Has a flow reduction been approved under 15A NCAC 023' .01 i 4(f)? ❑ Yes 1f yes, provide a CoDY of flow reduction approval letter 7. Summarize wastewater generated by project: ❑ Car Wash ❑ Hotel and/or Motels ❑ Swimming Pool /Clubhouse ❑ Swimming Pool/Filter Backwash ['Other (Explain in Attachment) ❑ Yes ❑ No ® No Establishment Type (see f2T.011411)) Daily Design Flow ".b No. of Units Flow Grocery - Lot 8 130 gal/day/1000 SF 46,791 SF 6083 GPD Retail - Lot 8 100 gal/day/1000 SF 7,725 SF 773 GPD Restaurant - Lot 8 50 gal/day/100 SF 5,400 SF 2,700 GPD Retail - Lot 5 100 gaUday/1000 SF 8,000 SF 800 GPD Restaurant - Lot 5 50 ga1/100 SF 4,000 SF 2,000 GPD gal/ GPD Total 12,335 GPD a See 15A NCAC 02T ,0114tb1. (d1. tel1fl and P.el(21 for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G ...42A4)• b Per I5A NCAC 02T .0I 14(c), design flow rates for establishments not identified [in table 5 ] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 12,335 GPD (per ) Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-I6 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - O2T .0305 & V1DC {(►cavity Sewers I. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 722 PVC 8 20 DIP D Section II & Ill of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) D Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (if Applicable)--O2T-0305 & MDC' {Pump St:ttlonsiForce Mains): COMPLETE FOR EACII PUMP STATION INCLUDED IN THIS PROJECT I . Pump station number or name: NIA 2. Approximate Coordinates (Decimal Degrees): Latitude: — . Longitude: - 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC Q2,T .030.511tlt 1 is ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B): D Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day D Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T ,0305(h)(1)(C): D It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 TX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1, Does the project comply with all separations found in I5A NC'AC {12T .1}305t ft & (e1 D. 15A NCAC 02T.0305t t) contains minimum searations that shall be arovided for sewer systei Yes ❑ No l Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) I0 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class [I impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement I 0 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet _ Any swimming pools 10 feet Final earth grade (vertical) 36 inches v L5A NrAC 02.1',U305(.0 contains alternatives where separations in t,i2T_03,0Q cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC' Surf-icc Water CIttsttieaLiu ns vicinage ➢ If noncompliance with 0 F.0305[I).r 1g1. see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N. A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 1 SA NC11C 02D .0200? ® Yes ❑ No ❑ N,A ➢ This would include Trout Duffered Streams per I5Atic AC 2D.0202. 4. Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? D Information can be obtained from the 401 & Buffer Permitting Branch ❑ Yes ®No 5. Does project comply with 1A_NCAf. 02 J',,QI05j) (additional permits/certifications)? ® Yes ❑ No Per 15A NC'AC (1 r,0I0jfctf4 directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per I SA NCAC Q2E0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ❑ No ®N/A ➢ if yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: I, Does the submitted system comply with latutc,921. the Minimum Design Cri ri i for the Permitting of Pump Statiuna and Nice Mains llrifest version), and the Gravity Sewer Minimum Design Critcaii►tilt est versiall as applicable? ®Yes No If No, complete and submit the Variance.Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is reauircdprior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification. 1, Gregory Harnish attest that this application for (Professional Engineer's name from Application Item 111.1.) Market Place at Ellis Crossing - Lot 8 gravity sewer extension has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes I43-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 4 won't! t‘t• '�� 3. Applicant's Certification per I5A NCAC 02T .0106(b): r, Paul M. Thrift Manager attest that this application for (Signature Authority's name & title from Application Item 1.3.) Market Place at Ellis Crossing - Lot 8 gravity sewer extension has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documcntation and attachments arc not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143 ..15 6A and 143 215,6B, any person who knowingly makes any false statement, represcntat' , or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to xce $ I0,000 as well as civil penalties up to $25,000 per violation. Signature: I]ate: O FORM: FTA 04-16 Page 5 of 5 Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Ellis Rd Durham NC, LLC Project Name for which flow is being requested: Market Place at Ellis Crossing - Lot 8 More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Triangle Wastewater Treatment Plant b. WWTP Facility Permit #: NC0026051 All flows are in MGD c. WWTP facility's permitted flow 12 d. Estimated obligated flow not yet tributary to the WWTP 2.000 e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 4.227 0.012335 6.239 52.0 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point Pump Station (Name or Number) NIA Pump Station Permit No. Firm Capacity, * MGD (A) Design Average Daily Flow** (Firm / pf), MGD (B) Approx, Current Avg. Daily Flow, MGD and the WWTP: (C) (D)=(B+C) (E)=(A-D) Obligated, Not Yet Total Current Tributary Flow Plus Daily Flow, Obligated Available MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pi) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < O. Downstream Facility Name (Sewer): Durham County Sewer Downstream Permit Number: WQCS00038 Page 1 of 6 FTSE 10-18 1II. Certification Statement: 1 1011iL r$ c i y �.. certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections 1 and 11 plus all attached planning assessment addendums for which 1 am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. )h n I [ 14 jao �a Signing Official Signature Date Title of SIgni Official Page 2 of 6 FTSE 10-18 f)l%iSIoo of 4Vdter Rrsouries State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: City of Durham Project Name for which flow is being requested: Marketplace @ Ellis Crossing More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. [. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit it: c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flaws are in MCD 11. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / pt), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** NO CITY OF DURHAM PUMP STATIONS INVOLVED, EXISTING DOWNSTREAM SEWER MAIN FROM -19OnNT-OF TTR—iI�-To-POTt T-oF-TRi4NSFER--120-DI1itH*M eeuN if-M N- -S- ORAVI £Y - beW-WIl- SUFFICIENT CAPACITY TO SERVE PROPOSED EXTENSION. * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pt) not less titan 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < D. Downstream Facility Name (Sewer): Downstream Permit Number: Page 1 of 6 FTSE 04-16 III. Certification Statement: I Robert N. Joyner, Jr., P.E. certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wa:5tewfl Pr flow. Signing Official2C Date Page 2 of 6 2/2/22 FTSIs 04-16 i PUBLIC WORKS CITY OF DURHAM January 24, 2022 N.C. Department of Environmental Quality Division of Water Resources Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699-1628 Dear Sir/Madam: Subject: Sewer Permit Application - Public & Private MARKETPLACE @ ELLIS CROSSING 0r Please find enclosed the subject application package, which includes the original and one copy of the public and private completed application forms (FTA 04-16) and flow acceptance letters, (form FTSE- 04/18 from the City of Durham and Durham County), the appropriate topographic maps, and the $480.00 fee for each APPLICATION Should you have questions or comments, please do not hesitate to contact me at (919) 560-4326, ext. 30229. Sincerely, Robert N. Joyner, Jr., P.E., Development Review Group Manager City of Durham Dept. of Public Works 101 City Hall Plaza, Third Floor, Durham, NC 27701 919.560.4326 DurhamNC.gov Follow Us @CityofDurhaniNC 00 0 uno3 weyinO 's awe 0-0 0 I 41 ;Bethesda - DEL MAR DR (����{iiR % CARNA71 PIANO DR :f �ci C-., :5'1'.1akL� Crossroads Lake. 3 vo Y� I 44. t. 1 74. NACX - . 1. 1.7 • KINARD . LEESVILLE RD - t , �$ -- - " 4C7 ^ i `' uue:i Spriryr ale Jiscaces-Lali,, \e- ". e GASTON M4NC ROSEDALE CREE CORNERS • y. iS UJ643 M Ellis Rd Avazyme Inc 9 • er co) .45 2 Wrenn Rd 44/len Lake PROJECT LOCATION 1065 YUNUS ROAD Yunus Road * I-, PROJECT LOCATION c 1034 YUNUS ROAD it a WASTEWATER DESIGN CONSIDERATIONS Shops at Ellis Crossing Durham, NC CALCULATE DESIGN FLOWRATE FOR GRAVITY LINE PROPOSED LOADING Avg Daily Peak Daily Units Demand Per Unit Flow Peaking Flow Description (SF) (GPD) (SF) (gpd) Factor" (gpd) New Grocery - Lot (46811 SF) 46791 130 1000 6083 2.50 15,207 Retail Bldg 2 - Lot 8 (13125 SF Total) Retail 7725 100 1000 773 2.50 1,931 Restaurant (specialnkan,out) 5400 50 100 2700 2.50 6,750 Retail Bldg - Lot 5 (12000 SF) Retail 8000 100 1000 800 2.50 2,000 Restaurant tspecialnicanyout) 4000 50 100 2000 2.50 5,000 TOTAL FLOW 12,355 "TOTAL PEAK FLOW 30,888 •Peaking Factor As Determined In Commercial/Retail/Industrial Use UNIT DEMAND FROM NC DEQ Table 15a NCAC 02t.0114 AS FOLLOWS: A. Grocery rate of 130 GPD per 1,000 SF per the DEQ table for retail having food service B. Retail rate of 100 GPD per 1,000 SF per the DEQ table for retail. C. Restaurant rate is 50 GPD per 100 SF per the DEQ table for caterer, carry out restaurant and a specialty food stand. The square footage allocated for restaurant is the maximum allowed for the lots. Actual use may vary depending upon lease agreements. The only known "restaurant use" is a proposed Chipotle at the westerly end of the Lot 5 building. CHECK CAPACITY OF GRAVITY SEWER SYSTEM Qa =(1.491n)xAxRA.67xS^.5 where: Q. = Maximum Flowrate (cfs) n = Mannings Roughness Coefficient A = Cross Sectional Area (sf) R - Hydraulic Radius (It) S - Slope (filft) Calculate Cross Sectional Area of Pipe Dia(in)- 800 Afsf)-PIxd"2r4 A(sf)- 035 Calculate Hydraulic Radius R( ft) - Area 1 Wetted Perimeter R(ft) - (PI x d^2 r 4) , (P1 x el R(ft) - 0 17 Select Variables n - 0.012 PVC S(tl/ft)- 0005 Minimum (cfs) - 0.93 **or** Qw, (gpm) - QI~, �a (gpm)- Therefore. 8 in diameter PVC gravity sewer is 0 K CHECK VELOCITY: V - (krn)(Rim '-S" Vz• P - 2 66 fps 2.00 fps k GE[x•ra,1bw.o•7betc11 .I111Ndum..*sn .buc,gD.L .1 al. .waaalas.. re,. 1,....121. m sa.,,n-s..0 a,n+',..W.a 416 62 21.45