HomeMy WebLinkAboutSW6211203_Supplement-EZ Form_20220310SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name McCain Gas Station 2 Project Area (ac) 5.096 3 Coastal Wetland Area ac 4 Surface Water Area (ac)- 5 1 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 1 Width of vegetated setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMS: 11 1 Infiltration System 1 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 lFilterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title. Carlo Pardo. PE 28 Organization: Bowman North Carolina, Ltd. 29 Street address: 4006 Barrett Drive, Suite 104 30 City, State, Zip: Raleigh, NC 27609 31 Phone numbers : 919-553-6570 32 Email: cpardo@bowman.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. �tAlRD����''f. is s1 14,'� SEAL 051571 FA!1 .�1 �� 6 .t� Signature of Designer 30-6/9-2Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM - Infiltration Basin 5 Total drainage area (sq ft 221969 sf 149468 6 Onsite drainage area (sq ft 134646 7 Offsite drainage area (sq ft 14822 8 Total BUA in project (sq ft 65624 sf 91439 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 10permitting) New BUA not on subdivided lots (subject to s 11 Offsite BUA (sq ft 14822 sf 12 Breakdown of new BUA not on subdivided lots Parkin2 (sq ft 56714 sf 56714 sf Sidewalk (sq ft 1910 sf 1910 sf Roof (sq ft 7000 sf 7000 sf Roadway s ft Future (sq ft) 10993 sf Other, please specify in the comment box below (sq ft 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15[permitting) Existing BUA that will remain (not subject to (sq ft) 13158 sf 16 Existing BUA that is already ermitted sq ft 17 Existing BUA that will be removed (sq ft 2091 sf 2091 sf 18 Percent BUA 29.56% 61.2% 19 Design storm inches 1.0 in 20 Design volume of SCM cu ft 7481 cf 21 Calculation method for design volume Simple Method ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the draina a area(s): Entire Site: Existing 19,988 sf Impervious Area Future: Existing Impervious area that will be future NCDOT roadway INFILTRATION SYSTEM 1 Drainage area number 1 2 1 Minimum required treatment volume (cu ft) 7481 ct 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V or enter "Vertical' for trenches)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10- ear storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC 9 ? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the devicespecific MDC? Yes 17 Was the SCM designed by an NC licensedprofessional? Yes INFILTRATION SYSTFM mne FROM nilu .1nSS 18 Proposed slope of the subgrade surface (%) 0% 19 Are terraces or bafflesprovided? No 20 Type of pretreatment: Forebay I Soils Data 21 Was the soil investigated in the footprint and at the elevation of the infiltrations stem? Yes 22 SHWT elevation fmsl <422.0 23 Depth to SHWT per soils report (in) > 15ft 24 Ground elevation at boring in soils report (fmsl) 437.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? N/A 26 Soil infiltration rate in/hr 9.00 27 Factor of safety (FS) (2 is recommended): 2.00 Elevations 29 Bottom elevation fmsl 436 ft 30 Storage elevation (fmsl) 437.3 ft 31 Bypass elevation (fmsl) 439.4 ft For Basins Only 1 Bottom surface area ftZ 5385 ft I32 33 IStorage elevation surface area (ftz) 6560. ft Fnr Trenches Oniv 34 Length (ft) 35 Width (ft) 36 Perforated pipe diameter, if applicable (inches) 37 Number of laterals 38 Total length of perforated piping 39 Stone type, if aeplicable 40 Stone Porosity(%) 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 Has at least one inspection port been provided? voiumesmrawdown 44 Desi n volume of SCM cu ft) 7481 cf 45 Time to draw down (hours) 3.7 hrs ADDITIONAL INFORMATION 46 Please use this space to provide any additional information about the infiltration system(s): 26-The infiltration rate was intentially lowered to half of the 18 in/hr to account for ling of the soils that will happen over time. Infiltration 1 11:11 AM 3/10/2022