Loading...
HomeMy WebLinkAboutNC0083119_Compliance Evaluation Inspection_20220310ROY COOPER Governor ELIZABETH S. BISER Secretary S. DANIEL SMITH Director Mr. Jeff Corley Director of Water Resources Post Office Box 308 Concord, NC 28026-0308 Mr. Corley: NORTH CAROLINA Environmental Quality March 10, 2022 SUBJECT: Compliance Evaluation Inspection Coddle Creek WTP NPDES Permit NC0083119 Cabarrus County, NC On March 8, 2022, Roberto Scheller of this Office conducted a compliance inspection at the subject facility. This inspection was conducted as a Compliance Evaluation Inspection (CEI) to ensure compliance with permit requirements and conditions. We wish to thank the operating staff for assistance regarding this inspection. The enclosed report should be self-explanatory; however, should you have any questions, please do not hesitate to contact myself or Roberto Scheller at (704) 235-2204 or roberto.scheller@ncdenr.gov. Enclosure: CEI Report Laserfiche Dap®rUnont of EnNrpN ee IOuant_NORTH CAROLINA Sincerely, ,—DocuSigned by: `—A14CC681AF27425... W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ North Carolina Department of Environmental Quality 1 Division of Water Resources Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 704.663.1699 United States Environmental Protection Agency EPA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code 1 IN I 2 IL I 21IIIIII NPDES yr/mo/day Inspection 3 I NC0083119 111 121 22/03/08 117 Type 1810I IIIIIIIIIII Inspector Fac Type 19I S I 2011 IIIIIIIIIII IIIIIII I IIIIII P6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 671 I 70I3 I 711 1 72 I N I 73I 1 74 71 I I 1 I I I I I I I80 l Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES Dermit Number) Coddle Creek WTP 6935 NC Hwy 73 Concord NC 28027 Entry Time/Date 10:30AM 22/03/08 Permit Effective Date 19/05/01 Exit Time/Date 11:12AM 22/03/08 Permit Expiration Date 23/11/30 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Jason Lee Sides/ORC/704-920-5163/ Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Jeff Corley,PO Box 308 Concord NC 280260308/Director of Water Resources/704-920-5372/7047950404 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenar Records/Reports Self -Monitoring Progran Sludge Handling DispoFacility Site Review Compliance Schedules Effluent/Receiving Wate Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) Roberto Scheller of Inspector(s) Agency/Office/Phone and Fax Numbers DocuSigned by: r n 5..� DWR/MRO WQ/707-235-2204/ Date 3/10/2022 "- 91 C2A007838943E... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date W. Corey Basinger DWR/Division of Water Quality/704-235-2194/ EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. DocuSigned by: 3/10/2022 "-A14CC681AF27425... Page# 1 31 NPDES yr/mo/day NC0083119 111 121 22/03/08 I17 Inspection Type 18 [j (Cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Coddle Creek Water Treatment Plant is permit via NPDES Permit (# NC0083119) to discharge 0.922 MGD of treated wastewater into an unnamed tribuatry of Coddle Creek. Coddle Creek is classified as Class C waters in the Yadkin -Pee Dee River Basin. The current NPDES Permit was issued on May 1, 2019 and expires on November 30, 2023. Theatment facility consist of: - 2 Settling lagoons - Dechlorination with Calcium Thiosulfate - Flow measurment with 90 degree V-notch weir and ultra sonic measurment device. Review of 12-month compliance history for calendar year of 2021 found only one violation for Late/Missing DMR for the month of 6-2021. A Notice of Violition was issued for the Late/Missing DMR violation Tracking Number NOV-2021-LR-0082. The subject facility had reported to the Mooresville Regional Office issues with flow meter prior to this compliance inspection. A new flow meter was installed and calibrated on February 21, 2022. For a time there was no measurment of flows until the meter was replaced. It is therefore recommended that a staff gauge be added to V-notch weir so manual readings may be taken in the event of meter failure and/or as a check against flow meter. Page# 2 Permit: NC0083119 Inspection Date: 03/08/2022 Owner - Facility: Coddle Creek WTP Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ ❑ application? Is the facility as described in the permit? • ❑ ❑ ❑ # Are there any special conditions for the permit? • ❑ ❑ ❑ Is access to the plant site restricted to the general public? • ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? • ❑ ❑ ❑ Comment: Record Keeping Are records kept and maintained as required by the permit? Is all required information readily available, complete and current? Are all records maintained for 3 years (lab. reg. required 5 years)? Are analytical results consistent with data reported on DMRs? Is the chain -of -custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? Has the facility submitted its annual compliance report to users and DWQ? (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? Is the ORC visitation log available and current? Is the ORC certified at grade equal to or higher than the facility classification? Is the backup operator certified at one grade less or greater than the facility classification? Is a copy of the current NPDES permit available on site? Facility has copy of previous year's Annual Report on file for review? Comment: Lagoons Type of lagoons? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • • ❑ ❑ ❑ • ❑ • ❑ ❑ ❑ • ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ El El El El Yes No NA NE Page# 3 Permit: NC0083119 Inspection Date: 03/08/2022 Owner - Facility: Coddle Creek WTP Inspection Type: Compliance Evaluation Lagoons Yes No NA NE # Number of lagoons in operation at time of visit? 1 Are lagoons operated in? # Is a re -circulation line present? ❑ ❑ • ❑ Is lagoon free of excessive floating materials? • ❑ ❑ ❑ # Are baffles between ponds or effluent baffles adjustable? • ❑ ❑ ❑ Are dike slopes clear of woody vegetation? ■ ❑ ❑ ❑ Are weeds controlled around the edge of the lagoon? • ❑ ❑ ❑ Are dikes free of seepage? • ❑ ❑ ❑ Are dikes free of erosion? • ❑ ❑ ❑ Are dikes free of burrowing animals? • ❑ ❑ ❑ # Has the sludge blanket in the lagoon (s) been measured periodically in multiple • ❑ ❑ ❑ locations? # If excessive algae is present, has barley straw been used to help control the growth? DOME Is the lagoon surface free of weeds? • El ❑ ❑ Is the lagoon free of short circuiting? • ❑ ❑ ❑ Comment: Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? • ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable MI El ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Flow Measurement - Effluent # Is flow meter used for reporting? Is flow meter calibrated annually? Is the flow meter operational? (If units are separated) Does the chart recorder match the flow meter? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Comment: This facility reported issues with flow meter to the Mooresville Regional Office. The flow meter was replaced with new flow meter. The new flow meter was calibrated on February 21, 2022. At time of inspection effluent was clear with no visible suspended solids. De -chlorination Yes No NA NE Type of system ? Liquid Page# 4 Permit: NC0083119 Inspection Date: 03/08/2022 Owner - Facility: Coddle Creek WTP Inspection Type: Compliance Evaluation De -chlorination Is the feed ratio proportional to chlorine amount (1 to 1)? Is storage appropriate for cylinders? # Is de -chlorination substance stored away from chlorine containers? Comment: Are the tablets the proper size and type? Are tablet de -chlorinators operational? Number of tubes in use? Comment: Compliance Schedules Is there a compliance schedule for this facility? Is the facility compliant with the permit and conditions for the review period? Comment: Yes No NA NE • ❑ ❑ ❑ ❑ ❑ • ❑ Yes No NA NE ❑ ❑ • ❑ • ❑ ❑ ❑ Page# 5