HomeMy WebLinkAboutNC0083119_Compliance Evaluation Inspection_20220310ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
S. DANIEL SMITH
Director
Mr. Jeff Corley
Director of Water Resources
Post Office Box 308
Concord, NC 28026-0308
Mr. Corley:
NORTH CAROLINA
Environmental Quality
March 10, 2022
SUBJECT: Compliance Evaluation Inspection
Coddle Creek WTP
NPDES Permit NC0083119
Cabarrus County, NC
On March 8, 2022, Roberto Scheller of this Office conducted a compliance inspection at the
subject facility. This inspection was conducted as a Compliance Evaluation Inspection (CEI) to
ensure compliance with permit requirements and conditions.
We wish to thank the operating staff for assistance regarding this inspection. The enclosed report
should be self-explanatory; however, should you have any questions, please do not hesitate to
contact myself or Roberto Scheller at (704) 235-2204 or roberto.scheller@ncdenr.gov.
Enclosure: CEI Report
Laserfiche
Dap®rUnont of EnNrpN ee IOuant_NORTH CAROLINA
Sincerely,
,—DocuSigned by:
`—A14CC681AF27425...
W. Corey Basinger, Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
North Carolina Department of Environmental Quality 1 Division of Water Resources
Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115
704.663.1699
United States Environmental Protection Agency
EPA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code
1 IN I 2 IL I
21IIIIII
NPDES yr/mo/day Inspection
3 I NC0083119 111 121 22/03/08 117
Type
1810I
IIIIIIIIIII
Inspector Fac Type
19I S I 2011
IIIIIIIIIII IIIIIII I IIIIII
P6
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
671 I 70I3 I 711 1 72 I N I 73I 1 74 71
I I 1
I I I I I I I80
l
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES Dermit Number)
Coddle Creek WTP
6935 NC Hwy 73
Concord NC 28027
Entry Time/Date
10:30AM 22/03/08
Permit Effective Date
19/05/01
Exit Time/Date
11:12AM 22/03/08
Permit Expiration Date
23/11/30
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Jason Lee Sides/ORC/704-920-5163/
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Jeff Corley,PO Box 308 Concord NC 280260308/Director of Water
Resources/704-920-5372/7047950404 No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran Sludge Handling DispoFacility Site Review Compliance Schedules
Effluent/Receiving Wate Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s)
Roberto Scheller
of Inspector(s) Agency/Office/Phone and Fax Numbers
DocuSigned by:
r n 5..� DWR/MRO WQ/707-235-2204/
Date
3/10/2022
"- 91 C2A007838943E...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
W. Corey Basinger DWR/Division of Water Quality/704-235-2194/
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
DocuSigned by:
3/10/2022
"-A14CC681AF27425...
Page# 1
31
NPDES yr/mo/day
NC0083119 111 121 22/03/08
I17
Inspection Type
18 [j
(Cont.)
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Coddle Creek Water Treatment Plant is permit via NPDES Permit (# NC0083119) to discharge 0.922
MGD of treated wastewater into an unnamed tribuatry of Coddle Creek. Coddle Creek is classified as
Class C waters in the Yadkin -Pee Dee River Basin. The current NPDES Permit was issued on May 1,
2019 and expires on November 30, 2023.
Theatment facility consist of:
- 2 Settling lagoons
- Dechlorination with Calcium Thiosulfate
- Flow measurment with 90 degree V-notch weir and ultra sonic measurment device.
Review of 12-month compliance history for calendar year of 2021 found only one violation for
Late/Missing DMR for the month of 6-2021. A Notice of Violition was issued for the Late/Missing DMR
violation Tracking Number NOV-2021-LR-0082.
The subject facility had reported to the Mooresville Regional Office issues with flow meter prior to this
compliance inspection. A new flow meter was installed and calibrated on February 21, 2022. For a
time there was no measurment of flows until the meter was replaced. It is therefore recommended
that a staff gauge be added to V-notch weir so manual readings may be taken in the event of meter
failure and/or as a check against flow meter.
Page# 2
Permit: NC0083119
Inspection Date: 03/08/2022
Owner - Facility: Coddle Creek WTP
Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ ❑
application?
Is the facility as described in the permit? • ❑ ❑ ❑
# Are there any special conditions for the permit? • ❑ ❑ ❑
Is access to the plant site restricted to the general public? • ❑ ❑ ❑
Is the inspector granted access to all areas for inspection? • ❑ ❑ ❑
Comment:
Record Keeping
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain -of -custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Comment:
Lagoons
Type of lagoons?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
•
• ❑ ❑ ❑
• ❑ • ❑
❑ ❑ • ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
El El El El
Yes No NA NE
Page# 3
Permit: NC0083119
Inspection Date: 03/08/2022
Owner - Facility: Coddle Creek WTP
Inspection Type: Compliance Evaluation
Lagoons Yes No NA NE
# Number of lagoons in operation at time of visit? 1
Are lagoons operated in?
# Is a re -circulation line present? ❑ ❑ • ❑
Is lagoon free of excessive floating materials? • ❑ ❑ ❑
# Are baffles between ponds or effluent baffles adjustable? • ❑ ❑ ❑
Are dike slopes clear of woody vegetation? ■ ❑ ❑ ❑
Are weeds controlled around the edge of the lagoon? • ❑ ❑ ❑
Are dikes free of seepage? • ❑ ❑ ❑
Are dikes free of erosion? • ❑ ❑ ❑
Are dikes free of burrowing animals? • ❑ ❑ ❑
# Has the sludge blanket in the lagoon (s) been measured periodically in multiple • ❑ ❑ ❑
locations?
# If excessive algae is present, has barley straw been used to help control the growth? DOME
Is the lagoon surface free of weeds? • El ❑ ❑
Is the lagoon free of short circuiting? • ❑ ❑ ❑
Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? • ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable MI El ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Flow Measurement - Effluent
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Comment: This facility reported issues with flow meter to the Mooresville Regional Office. The
flow meter was replaced with new flow meter. The new flow meter was calibrated on
February 21, 2022. At time of inspection effluent was clear with no visible suspended
solids.
De -chlorination Yes No NA NE
Type of system ? Liquid
Page# 4
Permit: NC0083119
Inspection Date: 03/08/2022
Owner - Facility: Coddle Creek WTP
Inspection Type: Compliance Evaluation
De -chlorination
Is the feed ratio proportional to chlorine amount (1 to 1)?
Is storage appropriate for cylinders?
# Is de -chlorination substance stored away from chlorine containers?
Comment:
Are the tablets the proper size and type?
Are tablet de -chlorinators operational?
Number of tubes in use?
Comment:
Compliance Schedules
Is there a compliance schedule for this facility?
Is the facility compliant with the permit and conditions for the review period?
Comment:
Yes No NA NE
• ❑ ❑ ❑
❑ ❑ • ❑
Yes No NA NE
❑ ❑ • ❑
• ❑ ❑ ❑
Page# 5