Loading...
HomeMy WebLinkAboutGW1-2022-03148_Well Construction - GW1_20220216 WELL CONSTRUCTION RECORD(GW-1] For lntemal Use Only: 1.Well Contractor Information: Alfred Kiesling Sr r 14::13"X•t 'RZO.�#`S ;-. . gFR'01�1TO DESCRIPTIONNell Contractor Name `- 0 ft.2670-A f=tB 1 6 7ozz ft.NC Well Contractor Certification Number •�. ,..,- ^;.^- i '+ U FASiKQ ioraatrt caseilivel>s Ej�x'• TO DLLWETER THICKNESS MATERIAL B & K Well Drilling Inc•' D%NNQ� oft. ft- g 1/4 i SDR-21 PVC Company Name 2.Well Construction Permit#: 4 t /' Q '7- FROM to DIAMETER THICKNESS MATERIAL % ! t%ariauCa'.e7c'. ft• ft. in. List all applicable well coiarruction permits.t.c'.C!C'.Cotam.State. ) ft. ft. /n. 3.Well Use(check well use): Water Supply Well: FROM TO DIAMETER I CLOT SIZE THI(KNESS MATERIAL ❑A&icultural ❑MunicipaL'Public ft. ft. EIGcothermal(HeatinJCooling Supply) OReside itial Water Supply(single) R. ft. ❑Industrial/Commercial ❑Residential Water Supply(Shared) Y8ilafttml ?' ❑irrigation ❑wells> 100,000GPD FROM TO I MATERIAL E.At.PLACEMMEKTMrM0D&/rMOUNT Nun-WaterSupply-Well: 0 ft. 20 fL Bentonite Pour ❑monitoring ❑Recovery Injection V4e1L ft. ft. ❑Aquifer Recharge ❑<irouudwaterRemediation ;p9&AN9Gi1� EYFd ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM To MATERIAL. EMPLACEMF7Yf METHOD ❑Aquifer Test ❑Stormy ater Drainage R. ft. ❑Experimental Technology ❑Subsidence Control ft. ft. ❑Geothermal(Closed Loop) ❑Tracer :1)RLEL33YG.L4G sttscha4di4tiazl°L�teab'#.e,xcssalx. FROM TO DES IPTION lor.hardness.soil/rwk .gram ma Fret ❑Geothermal(HeatinJCooling Return) /'❑2Other(explain under#21 Remark) ft. 4.Date Well(s)Completed:'-� ` Well ID# ft. Sa.Well Location: ft. t. �2 t 0 _...L Ae ern is _ ft. ft. Facility/Osv7+or Name , /I Facilittym (ifapprlicable) L e� l�o Sn•s riT�t la—� 7 ft. ft. Physical Address.City.and Zip q SS 2i:RE1SaaR S. County ?arcel Identification No.(P1N) 5b.Latitude and longitude in degrees/minates/seconds or decimal degrees: (if well ticld,one latilong is%utiicicnQ 22.C c •on �• N W Signat ofC tided eItContractor Date 6-is(are)the well(s): OPermanent or ❑Temporary - Br Vining this jonn.I herehr cenift rhor the+:vlllsl+vas(were)ronsrruered in a<rordan<a,rirh 7.is this a repair to an existing well: ❑Yes or PJNo l9.4:vCAC 02C.Olnn o>lS.d A'CaC 02C.0200 Iteell CatLtrruCriali Standards and that a cqm: of this record has been provided m the o.oll owner. lJ this is a repair.fill outknosrt well<»nstnrclimt irsfonnarimt and explain the nature afrhr , repair rarder#27 remu:ks section or on the back of this form. 23-Site diagram or additional Nvell details: You may use the back of this page to provide additional well construction info 9.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same (add,See a.er'in Remarks Box):You may also attach additional pages if necessary. construction.only i GW-1 is needed. indicate TOTAL NUMBER of wclls drilled: 24.SUBMITTAL INSTRUCTIONS 9,Total well depth below land surface: O049tr (ti') Submit this GW-1 within 30 days of well completion per the following: Far multiple n,ells lisl a0 depths if different(Trample-3(ar_00 and 2@10(f) 24a. For All Wells: Original'form to Division of Water Resources (DIA'R), 10.Static water level below top of using:40 (ft-) Information Processing Unit,1617 MSC.Raleigh.NC 27699-1617 if nvrer level is abot a casing.use 6 1/8 24b.For Injection Wells:Copy to DWR,Underground Injection Control(IUC) 11-Borehole diameter: (in-) Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method•Ai r Rotary 2-4c.For Water Supply and Open Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary.cable.direct push,etc.) county enNzronmental health department of the county where m.-taijed to DVt'R,L'CPCUA FOR WATER SUPPLY WELLS ONLY: 21d.For Water Weds producing Deer 100.000 GPD:Copy- Air Lift Ptm rrtProgam.1611 M SC,Ralelgh.iNC 27699-1611 13a.Yield(gpm) Method of test:13b.Disinfection type: ChlOr, Tabs Amount: 1 1/2 Lb s 1 , Form GW-1 North Carolina Dcpanmcnt of Ern ironmental Quality-Division of Water Resources Revised 6-6-1019