Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GW1-2022-03128_Well Construction - GW1_20220307
WELL CONSTRUCTION RECORD (GW I) For Internal Use Only 1.Well Contractor Information: ,�f15 •14:.DyATER ZONES:'. ''-: :•. _ Well Contractor Name - FROM TO DESCRIPTION Y ft lSr ft- NC Well Contractor Certification Number ft. ft. 15:0Q7ER:QAS1NG,(focmniti4'rasedwelLs)O'Rlm'ESi(ifa'licable' Morgan Well&Pump, Inc. FROM TO' DIAMETER TffiCKNESS MATERIAL Company Name +1 ft L ft 6 1/6/ in• sdi21 pvc ��''l)jjg re�j ][Ct MR CASING OR-TUBING."•eothei'ma1'clo'sbd rod' 2.Well Construction Permit#:iE14 /' C?salf FROM To DIAMETER THICKNESS `..•MATERIAL List all applicable well constructionpermus(i.e.UIC,County,State,variance,etc.)- ft• ft in. 3.Well Use(check well use): ft ft in Water Supply Well: 17,'SCREEN', _ Agricultural Mom TO' : :`- DIAMETER i^SLOT SrZE THICKNESS, "RMATERIAL . 0Municipal/Public ft ft in. Geothermal(Heating/Cooling Supply) mdential Water Supply(Single-) pp y(sin a ft ft in. Industrial/Commercial DResidential Water Supply(shared) .18.GROUT i Init Non-n-Waatee FROM TO MATERIAL EMPLACEMENT METHOD&AMOl7NT r Supply Well: 0 ft 20 ft bentanite poured Monitoring Recovely ft. ft. Injection Well: I Aquifer Recharge. [J Groundwater Remediation ft ft. Aquifer Storage and Recovery :.19S&ND/GRAVEL-PAKa'-liable t Barrier .-.:,'-'-. +:"`:- :: . ..•'; _ FROM TO • I "EMPLACEMENT METHOD •. Aquifer Test DStormwater Drainage ft ft I Experimental TechnologyoJ'Subsidence Control ft ft. i Geothermal(Closed Loop) OTracerDRILLING.L'OG-(,;i 'iE-idditioti'sl s7ieetsafiiCeess_'l".;, `•'.=s Geothermal(Heating/Cooling Retum) Other(explain under#21 Remarks) ft. TO DESCRIPTION(eolo,hardness soiUrock rain size,et ft ft. 4.Date Well(s)Completed: Z-2-1—Z2— Well ID# 't�r. ft ft a Sa.Well Location: ft gS ft. 00 Facility/owner Name �„ i �4Facility ID#(ifapplicab)e) ft ft ft Physical Address,City,and Zip ft ft MAR 0 County Parcel Identification No.(PAN) M• rn r . 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one lat/long is sufficient) 22.C lion: SD N 6.Is(are)the we `Permanent or Oi Temporary Signs. ofCertifi a ntractor Date By signing this form,I hereby certify that the jwell(s)was(were)constructed in accordance 7.Is this a repair to an existing well: .QYes or P< with 15A NCAC 02C.0100 or 15.4 NCAC 02C,0200 Well Construction Standmds and that a Ifthis is a repair,ftll out known well construction biformation and explain the nature ofthe copy ofthii record has beenprovided to the well owner. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER bf wells construction details. You may also attach additional pages if necessary. drilled:_ 1 SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: (D (fL) 24a. For All Wells: Submit this form within 30 dayt of completion of well For multiple wells list all depths ifdifferent(example-3Q200'and 2@100) construction to the following: ' 10.Static water level below top of casing: (ft) Division of Water Resources,Information Processing Unit, Ifwater level is above casino'use"+" e 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 6 (in.) 24b.For Iniection Wells: In addition to sending the form to the address in 24a 12.Well construction method: r 0. Y(�� above, also submit one copy of this form within 30 days of completion of well �(i.e.auger,rotary,cable,da construction to the following: ectpush,etc.) i - FOR WATER SUPPLY WELLS ONLY: Division of Water Resources,Underground Injection Control Program, 1636 Mail Service Center,Raleigh,NC 2 7699-1 63 6 13a.Yield m air pressure (gp ) © Method of test 24c.For Water SunDly&Injection Wells: In addition to sending the form to f�! the address(es) 'above, also submit one copy of this form within 30 days of. 13b.Disinfection type:W 4t Amount. completion of well construction to the county health department of the county where constructed. Form GW-1 North Carolina Department ofEnvironmenml Quality-Division of Water Resources Revised 2-22-2016