Loading...
HomeMy WebLinkAbout20220378 Ver 1_SW Buffalo and NC42 Letter 10-13-20_20220310 m TM ENGINEERING,INC September 28,2020 Mr. J.Michael Stocks Stocks Engineering,P.A. 801 East Washington Street,P.O. Box 1108 Nashville,NC 27856 Subject: Report of Evaluation&Subsurface Exploration Flowers Plantation Dam—SW Buffalo and NC42 Clayton,NC TME Project No.: #201116E Mr. Stocks: TM Engineering, Inc. (TME) is providing this report to present the results of a subsurface exploration and evaluation on the existing dam located on the above referenced property. SITE OBSERVATIONS The existing dam embankment is approximately 400 feet long. The majority of the crest of the dam is brush and grass with some trees along edge near the water, and is approximately 8 to 12± feet in width and approximately 2± feet in height above the normal pool elevation. The downstream slope varies from 5 to 20± feet in height. The downstream slope is steep (greater than 2H:1 V in most areas based on estimated visual observation) and heavily vegetated with brush and trees. There were no outlets observed, however the dam along the western edge has been washed out and water is flowing out of the pond in the south/southwest direction. See the attached site visit exhibit and soil boring map for reference. SUBSURFACE CONDITIONS Subsurface conditions for the existing dam were evaluated by advancing rotary test borings in four locations along the crest of the dam embankment. Refer to the soil boring location map for approximate boring locations. Hollow-stem augers were advanced to depths of up to 20 feet below existing top of dam grade and representative soil samples were recovered with a standard split-spoon sampler in general accordance with ASTM Standards. The number of blows required to drive the split-spoon sampler three consecutive 6-inch increments is recorded, and the blows of the last two increments are summed to obtain the Standard Penetration Resistance (N-value). The N-value provides a general indication of in-situ soil conditions and has been correlated with certain engineering properties of soils. TM Engineering, Inc. 1103 Hiawatha Court I Cary, NC 27513-4743 I (919) 468-2545 I www.tmengineering.co Flowers Plantation Dam—SW Buffalo and NC42 Page 2 of 5 Representative portions of the split-spoon soil samples obtained during the exploration were evaluated by a member of our professional staff. The soil descriptions and classifications provided in this report and shown on the attached boring logs are based on visual observation and should be considered approximate. Split-spoon soil samples recovered on this project will be stored for a period of sixty days. After sixty days, the samples will be discarded unless prior notification is provided to us. As shown on the attached soil boring logs and subsurface diagram the borings generally encountered very soft to firm sandy clay fill soils with SPT N-values ranging from 2 to 8 blows per foot (bpf) to depths of 8 to 13 feet below existing grade. The fill then transitioned into very soft to firm clay (CL) and/or loose clayey sand (SC) materials with N-values ranging from 2 to 5 blows per foot (bpf). It should be noted that varied subsurface conditions could exist intermittently outside of the tested locations. Measurable subsurface water was encountered at the time of drilling in test borings B-01 and B-04 at 12 and 15 feet below existing grade respectively, and in general all of the samples taken during this investigation were characterized as slightly moist to moist. PRELIMINARY RECOMMENDATIONS General The following evaluations and recommendations are based on the information provided, our observations at the site, interpretation of the field data obtained during this exploration, and our experience with similar subsurface conditions. Subsurface conditions in unexplored locations may vary from those encountered. Should subsurface conditions adverse to those indicated in this report be encountered during construction, those differences should be reported to us so that these recommendations may be confirmed, extended, or modified as necessary. The following recommendations are to provide general guidance through the design and construction process. Downstream Slope Observations THE performed a general site reconnaissance of the pond dam embankments. No unstable areas or shallow sloughing was observed on the downstream slope of the pond, however as previously noted it does appear to be 2H:1V or steeper in most locations. Slopes steeper than 2.5H:1V typically have a higher potential for experiencing shallow sloughing, especially during the wetter times of the year. Shallow sloughing does not typically result in immediate safety risk or dam failure, but it does require maintenance and repair to avoid an increase in the advancement of TM Engineering, Inc. 1103 Hiawatha Court I Cary, NC 27513-4743 I (919)468-2545 I www.tmengineering.co Flowers Plantation Dam—SW Buffalo and NC42 Page 3 of 5 distress and damage to the embankment over time. In addition, there are large trees that over time may fall creating voids in the near surface of the slope. Similar to sloughing this is more of a maintenance and repair issue. Slope Stability Evaluation A profile section of the existing dam embankments was created based on a general site reconnaissance and the collected test boring data. In addition to the previously noted geometry, conservative assumptions were made for the pond depth and geometry of the upstream slope as it is under water and unknown at this time. The steady-state downstream and upstream stability of the dam embankment was evaluated (Figures 1&2), as well as the upstream stability of the dam embankment under rapid draw-down conditions (Figure 3). Using a typical phreatic surface assumption, which extends the water line from the approximate existing pond elevation through the embankment section to discharge at the third point above the toe, and using strength parameters for compacted materials based on the test boring data, the downstream steady-state stability factor of safety is approximately 1.1 which does not meet the factor of safety of 1.5 required by Dam Safety for High Hazard dams. The upstream steady-state stability factor of safety is approximately 2.1 which does meet the minimum typical factor of safety of 1.5 required. The factor of safety for the rapid draw-down is approximately 1.18 which does meet the minimum factor of safety of 1.25 typically required. Reconstruction Considerations Based on our visual inspection the dam embankment is generally performing suitably at this time, however the results of the subsurface investigation indicate very soft wet materials within the dam embankment which is indicative of conditions that are not suitable for long term stability. As a result, it is our general recommendation that consideration be given to removing and reconstructing the existing dam embankment. It is our understanding that the existing pond likely has excess required storm water capacity. Therefore, as an alternative to complete removal and reconstruction we suggest consideration be given to construction of a new embankment adjacent to the upstream side of the existing dam. As previously noted the existing embankment does not meet the required factor of safety for downstream slope stability, and the downstream slope is steep and heavily overgrown. As such we recommend that the new dam embankment be designed to meet specifications as an TM Engineering, Inc. 1103 Hiawatha Court I Cary, NC 27513-4743 I (919)468-2545 I www.tmengineering.co Flowers Plantation Dam—SW Buffalo and NC42 Page 4 of 5 independent structure. It can then subsequently be connected to the existing embankment and not be negatively affected by any potential future distress in the existing embankment. The existing downstream slope could remain undisturbed since the previously mentioned sloughing and distress related to fallen trees would not negatively affect the proper function of the new embankment. See the attached diagram 4 for general reference for this proposed construction. Design Considerations TME was not provided information to indicate whether this dam falls under review of North Carolina Dam Safety. We recommend that designation be identified. Design and construction requirements typically do not change based on classification, but the timing and complications of plan preparation, submittal, and construction is greatly reduced by not having to go through the full review process. As previously noted the depth of the pond and geometry of the upstream slope is unknown at this time. As a result, preliminary dimensions of the proposed embankment have not been provided as part of this evaluation. TME suggests a survey be performed of the upstream slope. Once the actual geometry is determined a civil engineer can be retained to design the new embankment and determine and design an appropriate new spillway and/or outlet structure if required. Based on visual observation during this evaluation the downstream slope varies from 5 to 20+ feet in height and the test borings encountered fill materials between 8 and 13 feet in depth, so the existing upstream slope likely varies in height along the length of the dam and the new embankment should be able to be designed mimic the existing site conditions. Based on the results of the test borings the residual clay soils immediately below the dam are very soft and we recommend a keyway be incorporated into the design. Construction Considerations Construction of the new embankment will require draining the existing pond or lowering the water level and constructing an upstream coffer dam and pump system to create the required space for construction. Once the area has been dewatered it will have to be excavated down to firm material prior to construction of the new embankment. There will likely be a significant amount of soft material that has been deposited in this area that will be required to be removed. The loose wet material will also need to be removed from the upstream slope. After excavation and prior to placement of the new embankment the area should be carefully evaluated by a geotechnical engineer to verify suitable conditions for construction. Most of the excavated material will likely be wet sedimentation that has been deposited on the pond bottom and will be unsuitable for reuse in construction of the new embankment. Additionally, a keyway may can be TM Engineering, Inc. 1103 Hiawatha Court I Cary, NC 27513-4743 I (919)468-2545 I www.tmengineering.co Flowers Plantation Dam—SW Buffalo and NC42 Page 5 of 5 installed at this stage. Fill materials should be a low permeable material with a classification of ML or CL as defined by the Unified Soil Classification System. Other materials may be suitable for use as controlled structural fill material and should be individually evaluated by the geotechnical engineer. Fill materials should be placed in horizontal lifts with a maximum thickness of eight (8) inches loose measure. New fill should be adequately keyed into stripped and scarified subgrade soils and should be benched into the existing upstream slope. We recommend that structural fill be compacted to at least 95 percent of the Standard Proctor (ASTM Procedure D 698) maximum dry density. We recommend that all compacted fill be placed at moisture contents in the range of -1% to +3% of the materials optimum moisture content as determined from the Standard Proctor density test. Each lift of fill should be tested in order to confirm that the recommended degree of compaction is attained. We recommend that the contractor have equipment on site during earthwork for both drying and wetting of fill soils to meet the above compaction/moisture requirements. Moisture control may be difficult during winter months or extended periods of rain.Attempts to work the soils when wet can be expected to result in deterioration of otherwise suitable soil conditions. Fill slopes should be maintained at no steeper than 2.5H:1 V (Horizontal to Vertical) in order to maintain long term stability of the embankment sections. The compaction of material used for slope construction is critical to the slopes longevity and all slopes should be constructed using approved structural fill. Compaction of a slope face can be difficult, so it is recommended the grading contractor fill past the edge of the slope face during placement and compaction and then cut it back to the design geometry. We appreciate the opportunity to provide you with our services during this phase of the project. Please contact us if you have any questions regarding this letter or if we may be of further assistance. Sincerely, TM Engineering, Inc. (C3201) o:t• 16'•••:Ifs(% -77 :7 SEAL -_ 0264 2 Toby Mallik, P.E. : /O/ft� Bryant Mueller, P.E. NC Registration No. 026472 <•,, GS,K MP,,,,, NC Registration No. 050303 ,,,,,,,,,,,,,� TM Engineering, Inc. 1103 Hiawatha Court I Cary, NC 27513-4743 I (919) 468-2545 I www.tmengineering.co N'' N ,.......„))/ Flowers SW Buffalo and NC-42 Boring Locations • W471?hgo, j... I •..., r 6 ... ;dr_ ill. '"•••if• 1.. - 'IL ;,_,J 1.1...• \ A •-&-+.,„ --‘,.. ----------------_---- ,5,...... 10 . •-• . 1 ! --r....\''------ ---- -- 1 .. ____...........e 4. 00•1 . 41. ,,,. All& 11 -isl , 1* 4%,• - - . 4 -_ \ 4i. . .• 10140131 '134 1111111. . , 1111111111111- G (i • _ -,i I -,. ___. • - . o 2020 Goog, . ! . )- " ...:i : ...) 12-,4 ft •• . a 1Y43 Imagery Date:2/4/2019 3599'09.92"N 78'20'46.77"W elev 27'5,fe eye alt 5907 ft 0 TM Engineering, Inc. 103 Hiawatha Court Cary,North Carolina Telephone: (919)468-2545 CLIENT Stocks Engineering,P.A. SUBSURFACE DIAGRAM PROJECT NAME Flowers Plantation Dam-SW Buffalo and NC42 PROJECT NUMBER 201116E PROJECT LOCATION Clayton,North Carolina kit Fill(made ground) V7?A USCS Clayey Sand r//%USCS Low Plasticity Clay U Z ° Z � B-01 B-02 B-03 B-04 O m ♦i♦i ♦• ♦i♦i ♦• i♦i N i♦i♦ i♦i ♦♦�♦ 1-3-5 ♦.♦. 1-1-4 ♦♦ 1-1-3 ♦♦ 1-1-3 ♦��� (A) ♦O• (4) -2 ♦♦ V. ♦♦ V. ° ii♦ i♦i♦ • ,, i♦i♦ o le.)♦i ♦i♦i ♦• i♦i ♦i♦i ♦. ♦♦�♦• ....... ♦i. ♦i♦i ♦♦ 2Z3 • ♦♦♦♦ 2-2-3 V. 2=T3 -4 5 00• 6)s ♦ • ♦ ♦ ♦♦♦ ♦♦♦ el OO 5) ♦♦♦ (5) a ♦♦♦♦ ♦♦ ♦♦♦♦ ♦ o ♦♦♦♦ ♦♦ ♦♦♦♦ ♦♦♦♦ • • ♦♦ ♦♦ 1-2-3 ♦♦ 1-2-2 ♦♦ 1-1-1 ♦•♦♦ 1-4-3 ti ♦�♦ (5) • ♦♦ (4) ♦�♦ (2) •• (7) ♦ • z C ♦�♦� •1-1-3 ♦••♦� 1-2-2 1-2-3 1-3-4 K .2 ♦♦♦♦ (4) ♦♦♦♦ (4) / (5) (7) o8. -12-*ii47 i♦i % % -12 o 1=2=3 T=T=1 1=7=3 0-1-1 -14 F -16 ?,� 0 % -16 ?ro 0-1-1 0-1-1 1-1-1. () 20 % (2) % (2) % (2) -20ac � Flowers SW Buffalo and G42 Topography Map — — �' r 'mil ,,Q ' .0 t 6. Flowers SW Buffalo and NC-42 Dam Photos t q: of a. { !'� yn l +, i� I Y r[A:: .� - r 4 '-.1. .:4:, ''-' :: ' ' ' '' : : -..-L.' { , �: 3 i f e i r tiC 7 l .x� , .4 — nth• . �: - �' - ram, ! [ $ ' F e ,r r L. I r- i 'i `3' F 1'1 r F 1 - "t°3 yye,t e 'u !i3�t/ Yse .Z> '"�'�:-.¢ & � `7'1' '" c-tom 5L r •a i 'F� .c . � , 7 i4 pK'c,:-- n 4 ! StigL Y a , 1 '_-4 x k ‘ '► • °_.l"*n.$x` mS 44 :;_ +e ��"' °''' Minimal vegetated cres Wooded portion of cres • , , ' ltr,frk-1, yr _L�.r N _ ..:� e t . • 1 P 4 `, �aT '"S -.--,4 -, '' a •:_ ••4 , h� f • a Y-. ;,�''. l_4 -' e iik Water dischar in alon west ed e of dam,' Sli htl vegetated upstream slope g g g ., g Y g p p .% .� , gyp:. - - / Y i�; / zkc�, ll r y1 } l ,, P.11r `y: ,, - 1 .,E •'�1 yl .. -I it[ A ,.,.i _�.�.'� 4?� _"r PVVt {�-`r'.3� .fir 3 d h - ,.. f, . , . .. _.„ ,„,, .e. .4,iiii..,*..,„.,1 1 .: iL -_ r � S jt i$� � •��? w r<.•� >c . �� ' Y i! r 1 - a lb _- 1 ,. :.g, • t . ' i l� .� }• � • 1 3. ' [rt -¢4 #,.; ��'. �,;. 1J,ac:�- is • [ 1 !V1 ,L. jar.,. 4.. ♦ 0 tl `/ ) `' Heavil wooded downstream slope ,p . $ Safety Factor - immmmm 0.000 0.375 1.162 FIGURE 1 O 0.750 F 1.125 1.500 1.875 2.250 2.625 _ 3.000+ 0 N— (h _ Material Name Color Cohesion Phi (psf) (deg) Fill 250 0 O CL 200 0 O— c� CL-2 ■ 300 27 0 - coo— uor , V ,,,i,Illll'I 0000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000 .00000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000 NVONSMONNOWWWWWWWWWWSMMMXXXXXXXXXXXXXXXXXXZ W N . 0 V N 0 20 40 60 80 100 120 140 160 180 Project Flowers Dam - Downstream Slope Stability • Analysis Description @ Test Boring B-02 '�! enceDiratewnBY THE Scale1:250 CompanyTM Engineering, Inc File Name SLIDEINTERPRET 6.039 Carolina springs pond DSS.slim o Safety Factor 0.000 0.375 FIGURE 2 0.750 F 1.125 1.500 1.875 2.250 2.625 _ 3.000+ 0 o— 2.101 Material Name Color Unit Weight Cohesion Phi (lbs/ft3) (psf) (deg) Fill 120 250 0 0 coN CL 120 200 0 W CL-2 . 120 300 27 ,,�,��wxxiiiii.... ♦ .,..144 0,w,.....c 0,c,,,...,,,-4,1:4,s•:::::::scicic 0 m 0 \� / N W \\ j/ice 0 N 20 40 60 80 100 120 140 160 Project Flowers Dam - Upstream Slope Stability .I 6-_,_ Analysis Description @ Test Boring B-02 'sill! n Drawn 8y THE Scale 1:175 Company TM Engineering, Inc Date File Name flowers pond USS.slim SLIDEINTERPRET 6.039 — Safety Factor immmmm 0.000 0.375 FIGURE 3 0.750 oN F 1.125 1.500 1.875 2.250 _ 2.625 _ 3.000+ O O Material Name Color Unit Weight Cohesion Phi (lbs/ft3) (psf) (deg) 1.180 Fill 120 250 0 CL ■ 120 200 0 ao N CL-2 ■ 120 300 27 W----------- �inal) o W(Initial) O N N 20 40 60 80 100 120 140 160 Project Flowers Dam - Rapid Draw Down • Analysis Description @ Test Boring B-02 ! #9fCeDrawnBy THE Scale 1:200 Company TM Engineering, Inc Date File Name SLIDEINTERPRET 6.039 flowers pond RDD.slim 0 N— CO FIGURE 4 0 0— Material Name Color Ex.Dam Residual CL NEW DAM o co— New Dam N W Residual CL-2 ■ AllIiiiiiikk.- lillif!!!!!!!!!!. EX TIN DAMMOO w IH . _it N 0 N N 0 N N 20 40 60 80 100 120 140 160 Project Flowers Dam - Upstream Addition til.>- Analysis Description @ Test Boring B-02 -1:14.'-gmenCe Drawn 8y THE Scale 1:200 Company TM Engineering, Inc Date File Name SLIDE 6.039 flowers pond new.slim Safety Factor 0.000 0.625 F.S.= 1.55 1.250 = 1.875 o 2.500 m � 3.125 mmmmm 3.750 4.375 5.000+ 0 o— co Cohesion Phi Material Name Color (psf) (deg) Ex.Dam il 250 0 Residual CL . 200 0 FILL AREA BETWEEN New Dam 500 0 EMBANKMENTS 0 co N Residual CL-2 ■ 300 27 w V --7 r-ANNNONSMONSMOMM o N W �j j /j��/� 0 N N 20 40 60 80 100 120 140 160 Project Flowers Dam - Upstream Addition .I 6-,0._ • Analysis Description @ Test Boring B-02 '�! # n r Drawn By THE Scale 1:200 Company TM Engineering, Inc Date File Name SLIDEINTERPRET 6.039 flowers pond new.slim 103 Hiawatha Court BORING NUMBER B-01 Cary,North Carolina TM Engineering, Inc. PAGE 1 OF 1 Telephone: (919)468-2545 CLIENT Stocks Engineering,P.A. PROJECT NAME Flowers Plantation Dam-SW Buffalo and NC42 PROJECT NUMBER 201116E _ _ PROJECT LOCATION _Clayton,North Carolina DATE STARTED 9/24/20 COMPLETED 9124/20 GROUND ELEVATION 0 ft HOLE SIZE 4 DRILLING CONTRACTOR Carolina Drilling GROUND WATER LEVELS: DRILLING METHOD SS 7 AT TIME OF DRILLING 12.00 ft I Elev-12.D0 ft LOGGED BY Radford CHECKED BY TME AT END OF DRILLING - NOTES AFTER DRILLING --- u1 Z ■ SPT N VALUE ■ a cn w 20 40 60 80 z = Hw �^ a r - ci-= 0-J MATERIAL DESCRIPTION 2 >Ca O,¢ ly z K ❑ 0_❑ Om cps x-- ,.. 0 2z 0 Uz UD >- cc < it a ❑ 0 ♦•♦•♦• (CL)Soft to Firm Tan/Brown Fine Sandy Clay FILL 44+ ♦♦4♦i♦ +•:•• SPT 1-3-5 ••ee.� 1 (8) A ♦♦♦ v x *.♦:♦ SPT 1-3-3 A �4', 2 (6) I• 5 i♦i. s m .X♦♦♦♦♦ .:. ♦:i♦ice �+: SPT 1-2-3 A a_ It 3 (5)o cc- 1%ii SPT 1-1-3 3 ♦�♦4.•• 4 (4) ■ 0 m- ♦,a♦- ♦♦♦ 77 N (SC)Very Loose Gray/Black Clayey Fine SAND F."- $PT 1-2-3� A N 5 (5) • 15 0 Cv g F ,J• S- YYY / (CO Very Soft Gray/Tan/Brown CLAY co a- �'/ SPT 0-1-1 • m 6 (2) 20 A Bottom of borehole at 20.0 feet. 0 w c BORING NUMBER B-02 103 Hiawatha Court Cary,North Carolina TM Engineering, Inc. PAGE 1 OF 1 Telephone: (919)468-2545 CLIENT Stocks Engineering,P.A. PROJECT NAME Flowers Plantation Dam-SW Buffalo and NC42 PROJECT NUMBER 201116E PROJECT LOCATION Clayton,North Carolina DATE STARTED 9/24/20 COMPLETED 9?24120 GROUND ELEVATION Oft HOLE SIZE 4 DRILLING CONTRACTOR Carolina Drilling GROUND WATER LEVELS: DRILLING METHOD SS AT TIME OF DRILLING --- LOGGED BY Radford CHECKED BY THE AT END OF DRILLING --- NOTES AFTER DRILLING --- A SPT N VALUE A _ L.) o- m w w i- 20 40 80 80 d _0 II p MATERIAL DESCRIPTION LA j 8 2 ¢ 1;:3 z��' LO J o-0 Oct m0> Y D— C7 <2 w UZ UO ce N r: a ❑ 0 ♦+: (CO Soft to Firm Tan/Brown Fine Sandy Clay FILL ♦ FT 114 - • %� (5) N ♦•♦•• z- ♦ SPT 2-2-4 o •♦•� 2 (5) J w ♦♦♦ • 0♦ FT 1-2-2 o- � (4)♦ z a ♦•� ♦•♦•• ♦ SPT 1-2-2 4 (4) � 10 33:.: IT z w ♦ F ♦ cc ♦ 2- 4.4®� . N (CL)Very Soft Tan/3rown CLAY 6 - / FT 1-1-1 u, (2) a15 r a r r 1 0 F ui 2- EL FT 0-1-1 m x 20A (2) w Bottom of borehole at 20.0 feet. 0 w 0 BORING NUMBER B-03 103 Hiawatha Court Cary,North Carolina TM Engineering, Inc. PAGE 1 OF 1 Telephone: (919)468-2545 CLIENT Stocks Engineering,P.A. PROJECT NAME Flowers Plantation Dam-SW Buffalo and NC42 PROJECT NUMBER 201116E PROJECT LOCATION Clayton,North Carolina DATE STARTED 9/24/20 COMPLETED 9?24120 GROUND ELEVATION Oft HOLE SIZE 4 DRILLING CONTRACTOR Carolina Drilling GROUND WATER LEVELS: DRILLING METHOD SS AT TIME OF DRILLING --- LOGGED BY Radford CHECKED BY THE AT END OF DRILLING --- NOTES AFTER DRILLING --- A SPT N VALUE ■ _ c] o 11)31.71 w w 20 40 60 80 I— _[7 p MATERIAL DESCRIPTION g j ct 0 o¢ w�3 Z pv J o O� m0› Y 0 M Z w U Z 0 )- N a ❑ 0 +:.: (CL)Very Soft to Firm Tan/Brown Fine Sandy Clay FILL 46.4604, ♦: • • FT 1-1-3 A - •• � (4) o zo- • • SPT 2-2-3 o %v. 2 (5) i J ♦♦" SPT 1-1-1 z a 3 / (CL)Soft to Firm Tan/Brown/Gray Fine Sandy CLAY j S4 T 1(5}3 z o o a_ m w- SPT 1-1-3 5 {4} 15 g _c,;.rz zi (SC)Loose Tan/Gray Clayey Fine SAND g 1— r • ijiiI 0, _ IST 1-2-3 A x 20 {5} o w Bottom of borehole at 20.0 feet. 0 w 0 BORING NUMBER B-04 103 Hiawatha Court Cary,North Carolina TM Engineering, Inc. PAGE 1 OF 1 Telephone: (919)468-2545 CLIENT Stocks Engineering,P.A. PROJECT NAME Flowers Plantation Dam-SW Buffalo and NC42 PROJECT NUMBER 201116E PROJECT LOCATION Clayton,North Carolina DATE STARTED 9/24/20 COMPLETED 9?24120 GROUND ELEVATION 0 ft HOLE SIZE 4 DRILLING CONTRACTOR Carolina Drilling GROUND WATER LEVELS: DRILLING METHOD SS \' AT TIME OF DRILLING 15.00 ft t Elev-15.00 ft LOGGED BY Radford CHECKED BY THE AT END OF DRILLING --- NOTES AFTER DRILLING --- w e A SPT N VALUE A _ L.) o m w 20 40 60 80 a_ _[7 II p MATERIAL DESCRIPTION _1 g j a 0 D¢ w 4 z a wp`- J o-0 Oct m0› Y`-' D- 0 M Z w U Z 0 )- N a ❑ 0 ♦..... (CO Soft to Firm Tan/Brown Fine Sandy Clay FILL ♦A ♦ FT 1-1-3 - ♦•� (4) N s . o"♦ • o- ♦ SPT 2-2-3 o i♦•� 2 (5) J m ♦♦♦ (SC)Loose Gray/Black Clayey Fine Sand FILL w/wood and rock a ♦♦•� fragments SPT 1-4-3 o_ ♦ 3 (7) A • z a a / (CL)Firm Tan/Brown Fine Sandy CLAY Ij- S4 1-3-4 ,3 1 0 z o o a_ m �_ . w (CL)Very Loose Tan/Brown/Gray CLAY ju, SPT 0-1-1 a i15 _, 0 N ❑ EL- FT 1-1-1 m • (2} x 20 j o w Bottom of borehole at 20.0 feet. o 0