Loading...
HomeMy WebLinkAboutNCG020875_Inspection Report_20170224Compliance Inspection Report Permit: NCG020875 Effective: 12/02/15 Expiration: 09/30/20 Owner : Matthew Sand & Gravel Inc SOC: Effective: Expiration: Facility: Matthews Pit 4 County: Johnston SO009 Devils Racetrack Rd Region: Raleigh Smithfield NC 27577 Contact Person: Shane Eason Title: Phone: 919-934-9941 Directions to Facility: 1-95 south, take exit 90, head south on US701 for +/-2,000', turn left on SR1009 (Devils Racetrack Road), go +/-6.3 miles to the entrance on the left. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/24/2017 Entry Time 10:OOAM Exit Time: 12:OOPM Primary Inspector: Thaddeus W Valentine Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: ❑ Compliant 0 Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG020875 Owner - Facility: Matthew Sand & Gravel Inc Inspection Date: 02/24/2017 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Although a storm water permit was issued on december 12, 2015 none of the permit stipulations have been meet. The owner should contact their environmental consultant or the person that applied for the permit and develope a plan for implement all the permit requirements Page 2 of 3 Permit: NCG020875 Owner - Facility: Matthew Sand & Gravel Inc Inspection Date: 02/24/2017 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ 0 ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: No documentation on site Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑ Comment: No monitoring data on site Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ 0 ❑ ❑ Comment: No samples have been taken Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment: There is no site map with outfalls listed Page 3 of 3