Loading...
HomeMy WebLinkAbout640017_Plan of Action_20201223PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 47V - /? Facility Name: County: #'66 r:12 f /its, 7 .7fr 5- Certified Operator Name: Operator # 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): 4,4gaor Spillway (Yes or No): A)V NC Dept of Environmental Quati Level (inches): 2. Check all applicable items 0 SEC 11 2020 Raleigh Regional Office X' Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: /2--/r"A� I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. TS / )( Facility Owner/Manager (print) Facility Owner/Manager (signature) Phone: Date: PoA Cover Page 2/21/00 I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 1A/400,1 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons = 12 ft3 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL Maiblinhvironmental Qualit FIVE (5) DAY DRAW DOWN PERIOD DEC 292020 Raleigh Regional Office 0 inches 12. inches !z 37g166 inches ft2 2,90) 2 6 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design I it° days g. volume of waste produced according to structural design o ft3 h. actual waste produced = current herd # x line g = 0 ft3 certified herd # i. volume of wash water according to structural design O ft3 j. excess rainfall over evaporation according to design 5 wig, `/ ft3 k. (lines h + i + j) x 7.48 x 5 days = 10 8 40, 0 gallons line f 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = ,29 / f 05 6 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY PoA (5 Day) 2/21/00 1 1. structure ID: 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: n. Iines1+2+3+4+5+6 = o. linen = 27,154 line I = z91, o 56 gallons line I = gallons line I = gallons line I = gallons line I = gallons line I = gallons z9 (, o5 6 gallons 10.7 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD12 1 While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan 2 Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste p. tract # q. field # I r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (lb/acre) v. maximum application rate (in/hr) w. maximum application amount (inches) (,O 73I `( l 6corleof ((f__ 5A,,, (( G---%h (. 0 s-0 o,3 731( 2- GGorleu;((c_ Jou& (( Gia;ti 5, v ,SD D,,3 (, D x. total acres available during 5 day draw down (sum of column t) = ,6,-0 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE y. line o = 1. 8- inches per acre to be applied within 5 days line x PoA (5 Day) 2/21100 2 If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new hydraulic load based on new information. Plan to land apply hydraulic load: 1. Describe moisture conditions of fields? (e.g./ Is there water standing in field; does irrigation equipment mar dgwn in field; "trafficability" across soils; will soils absorb application without runoff , etc.) no 2. Date and amount of last rainfall event? i2-5'2 3. Dates of last waste application event per field /2..- I Z 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in line "n" at appropriate seasonal (i.e. winter) application rates within five days? 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposed cha ges`in c tio plin (,L sTd amounts• nd any other information for consideration 01./ ,i, ,0 PoA (5 Day) 2/21/00 3 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 1,A 9 /) 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker a inches b. designed 25 yr./24 hr. storm & structural freeboard ,7g inches c. line b - line a (inches in red zone) _ .28 inches d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons =Z 907 gallons 12 ft' 37, 5i.7 ft2 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 40 days g. volume of waste produced according to structural design D ft3 h. actual waste produced = current herd # x line g = B ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +i) x 7.48 x 30 days = line f 4. Total PAN to be land applied during draw down period / I. current waste analysis dated `.21 7/&9 4 O`' Ib/1000 gal. m. (lines e + k) x line I = ,c:/i ri0 7 74‘741 7— lb PAN 1000 l.e7� (71t, 74 ® ft3 .5?, 42$ ft3 � 76gallons REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2/21 /00 1 1. structure ID: 449v, 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: n. lines 1 +2+3+4+5+6 = line m = ,,� Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN �8 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s U. application window' 73 / / / s...4s..-4:A /.a SO o / ia,o 77_6 2 5,,..-9. / (..iaa n 6 O 50, o 25 0. OC) 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) = 3 Do, o Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = PoA (30 Day) 2/21/00 2 Ib. PAN x. Crop's remaining PAN balance (line v from section III) = 300,9 y. Overall PAN balance (w - x) = z7 1-•a Ib. PAN Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: PoA (30 Day) 2/21l00 3