HomeMy WebLinkAbout640017_Plan of Action_20201223PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 47V - /?
Facility Name:
County: #'66
r:12 f /its, 7 .7fr 5-
Certified Operator Name: Operator #
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID): 4,4gaor
Spillway (Yes or No): A)V NC Dept of Environmental Quati
Level (inches):
2. Check all applicable items
0
SEC 11 2020
Raleigh Regional Office
X' Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: /2--/r"A�
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
TS / )(
Facility Owner/Manager (print)
Facility Owner/Manager (signature)
Phone:
Date:
PoA Cover Page 2/21/00
I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 1A/400,1
2. Current liquid volume in structural freeboard
a. current liquid level according to marker
b. designed structural freeboard zone
(Normally 12 inches or greater)
c. line b - line a (inches within structural freeboard)
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c x line d x 7.48 gallons =
12 ft3
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL Maiblinhvironmental Qualit
FIVE (5) DAY DRAW DOWN PERIOD
DEC 292020
Raleigh Regional Office
0 inches
12. inches
!z
37g166
inches
ft2
2,90) 2 6 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design I it° days
g. volume of waste produced according to structural design o ft3
h. actual waste produced = current herd # x line g = 0 ft3
certified herd #
i. volume of wash water according to structural design O ft3
j. excess rainfall over evaporation according to design 5 wig, `/ ft3
k. (lines h + i + j) x 7.48 x 5 days = 10 8 40, 0 gallons
line f
4. Total volume of waste to be land applied during 5 day draw down
I. total volume to be land applied line e + line k = ,29 / f 05 6 gallons
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN
THE STRUCTURAL FREEBOARD ELEVATIONS
II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS
FOR ALL WASTE STRUCTURES FOR FACILITY
PoA (5 Day) 2/21/00 1
1. structure ID:
2. structure ID:
3. structure ID:
4. structure ID:
5. structure ID:
6. structure ID:
n. Iines1+2+3+4+5+6 =
o. linen =
27,154
line I = z91, o 56 gallons
line I = gallons
line I = gallons
line I = gallons
line I = gallons
line I = gallons
z9 (, o5 6
gallons
10.7 acre -inches
III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD12
1 While this section deals with hydraulic loading capacities, applications cannot exceed
agronomic rate for receiving crop according to its certified waste plan
2 Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are
not considered available to receive waste
p. tract #
q. field #
I r. soil type
s. crop
t. acres
u. remaining
IRR-2 PAN
balance
(lb/acre)
v. maximum
application
rate (in/hr)
w. maximum
application
amount
(inches)
(,O
73I `(
l
6corleof ((f__
5A,,, (( G---%h
(. 0
s-0
o,3
731(
2-
GGorleu;((c_
Jou& (( Gia;ti
5, v
,SD
D,,3
(, D
x. total acres available during 5 day draw down (sum of column t) = ,6,-0 acres
IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE
y. line o = 1. 8- inches per acre to be applied within 5 days
line x
PoA (5 Day) 2/21100
2
If unable to land apply hydraulic load listed in line y, list course of action here including pump
and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options,
recalculate new hydraulic load based on new information.
Plan to land apply hydraulic load:
1. Describe moisture conditions of fields? (e.g./ Is there water standing in field; does irrigation
equipment mar dgwn in field; "trafficability" across soils; will soils absorb application without runoff ,
etc.) no
2. Date and amount of last rainfall event? i2-5'2
3. Dates of last waste application event per field /2..- I Z
4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume
in line "n" at appropriate seasonal (i.e. winter) application rates within five days?
5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and
amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel
speed, etc. to meet proposed cha ges`in c tio plin (,L sTd amounts• nd any other information
for consideration 01./ ,i, ,0
PoA (5 Day) 2/21/00 3
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 1,A 9 /)
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker a inches
b. designed 25 yr./24 hr. storm & structural freeboard ,7g inches
c. line b - line a (inches in red zone) _ .28 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c x line d x 7.48 gallons =Z 907 gallons
12 ft'
37, 5i.7 ft2
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 40 days
g. volume of waste produced according to structural design D ft3
h. actual waste produced = current herd # x line g = B ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +i) x 7.48 x 30 days =
line f
4. Total PAN to be land applied during draw down period /
I. current waste analysis dated `.21 7/&9 4 O`' Ib/1000 gal.
m. (lines e + k) x line I = ,c:/i ri0 7 74‘741 7— lb PAN
1000
l.e7� (71t,
74
® ft3
.5?, 42$ ft3
� 76gallons
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
PoA (30 Day) 2/21 /00
1
1. structure ID: 449v,
2. structure ID:
3. structure ID:
4. structure ID:
5. structure ID:
6. structure ID:
n. lines 1 +2+3+4+5+6 =
line m = ,,� Ib PAN
line m = Ib PAN
line m = Ib PAN
line m = Ib PAN
line m = Ib PAN
line m = Ib PAN
�8 Ib PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining
IRR-2 PAN
balance
(Ib/acre)
t. TOTAL PAN
BALANCE
FOR FIELD
(Ibs.)
column r x s
U.
application
window'
73 / /
/
s...4s..-4:A
/.a
SO o /
ia,o
77_6
2
5,,..-9. / (..iaa n
6 O
50, o
25 0. OC)
'State current crop ending application date or next crop application beginning date for available receiving crops
during 30 day drawn down period
v. Total PAN available for all fields (sum of column t) = 3 Do, o Ib. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) =
PoA (30 Day) 2/21/00 2
Ib. PAN
x. Crop's remaining PAN balance (line v from section III) = 300,9
y. Overall PAN balance (w - x) = z7 1-•a
Ib. PAN
Ib. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on new information. If new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
PoA (30 Day) 2/21l00
3